This document is a Statement of Work (SOW) for the construction of a new Emergency Department at the Stratton VA Medical Center in Albany, NY. The solicitation number is 36C24224R0071.
The key details are:
- The contractor shall demolish existing structures, perform site work, and construct a new Emergency Department with connecting corridors to the main hospital. The work includes general construction, mechanical, electrical, plumbing, fire protection, and other related tasks.
- The period of performance is 550 calendar days after the notice to proceed.
- The contractor must provide a full-time, OSHA-certified superintendent dedicated to this project.
- The contractor must utilize the Autodesk Build construction management platform for project collaboration, communication, and submissions at no cost. Training and access to the platform must be completed within 12-14 days of contract award.
- The contractor must complete all punch list items within the 550-day period of performance.
- The contracting agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC SIGNATURE BLOCK
DIRECTOR OF MEDICAL CENTER - SIGNATURE BLOCK
BUILDING 1
HYMAN
HAYES
ASSOCIATES
800 TROY-SCHENECTADY
ROAD, STE 103
LATHAM, NY 12110
(518) 452-3470 www.hymanhayes.com
ENGINEERING LLP
FE PROJECT NO: 19-181
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
528-809
Project Director
DECEMBER 16, 2022 JDFRevisions: Date:
STRATTON VA MEDICAL CENTER
NEW EMERGENCY DEPARTMENT100% FOR BID
SRB
AREA OF WORK
SITE LOCATION
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text
MYRTLE AVE
AutoCAD SHX Text
O2 HOOKUP PAD
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text
BIG BROTHER IS WATCHING
AutoCAD SHX Text
BIG BROTHER IS WATCHING
AutoCAD SHX Text V
AutoCAD SHX Text
BIG BROTHER IS WATCHING
AutoCAD SHX Text
BIG BROTHER IS WATCHING
AutoCAD SHX Text
BIG BROTHER IS WATCHING
AutoCAD SHX Text
ROAD GLIDE PARKING ONLY
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text S38°52'50"W 888.30'
AutoCAD SHX Text
10" VTP
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
EL:199.92
AutoCAD SHX Text
COM
AutoCAD SHX Text
COM
AutoCAD SHX Text
COM
AutoCAD SHX Text
EL:198.96
AutoCAD SHX Text SAN MH 8 RIM EL: 188.80 INV.(A):182.23 INV.(B):183.49 INV.(C):182.14 INV.(D):183.49
AutoCAD SHX Text V
AutoCAD SHX Text
WHITE STRIPING IDENTIFYING TUNNEL ACCESS
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
%%UMEDICAL CENTER
AutoCAD SHX Text
ALBANY, N.Y. 12208
AutoCAD SHX Text
DRAWING LIST
AutoCAD SHX Text
%%UDEPARTMENT OF VETERANS AFFAIRS
AutoCAD SHX Text
PROJECT NO. 528-809
AutoCAD SHX Text
%%USAMUEL S. STRATTON
AutoCAD SHX Text
GI-001
AutoCAD SHX Text
TITLE SHEET WITH INDEX TO DRAWINGS
AutoCAD SHX Text
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
NEW EMERGENCY DEPARTMENT
AutoCAD SHX Text PROPERTY OF THE UNITED STATES GOVERNMENT. COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED.
AutoCAD SHX Text
1-GS-000
AutoCAD SHX Text
DWG. TITLE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
DWG. #
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-GS-001
AutoCAD SHX Text
SITE PLAN: EXISTING CONDITIONS
AutoCAD SHX Text
INFECTION CONTROL NURSE
AutoCAD SHX Text
FACILITY SERVICES MANAGER
AutoCAD SHX Text
FIRE & SAFETY MANAGER
AutoCAD SHX Text
GEMS COORDINATOR
AutoCAD SHX Text
CHIEF OF POLICE
AutoCAD SHX Text
OPERATIONS MANAGER
AutoCAD SHX Text
ENVIRONMENTAL SERVICES MANAGER
AutoCAD SHX Text
REVIEWED BY
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DIRECTOR OF MEDICAL CENTER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
TITLE SHEET WITH INDEX TO DRAWINGS
AutoCAD SHX Text
GI-001
AutoCAD SHX Text
SCALE: 1"=100'
AutoCAD SHX Text
1-GS-101
AutoCAD SHX Text
SITE PLAN: GRADING PLAN
AutoCAD SHX Text
1-GS-100
AutoCAD SHX Text
SITE PLAN: DEMOLITION PLAN
AutoCAD SHX Text
JOHN D. FELLENZER, P.E.
AutoCAD SHX Text
ALBANY, NY
AutoCAD SHX Text
NY PROFESSIONAL ENGINEER NO. 069373-1 ISSUED 1992; EXP. 9/25
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text
GENERAL INFORMATION
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text
GI-002
AutoCAD SHX Text
ICRA, PROJECT SCHEDULE & GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-GS-301
AutoCAD SHX Text
SITE PLAN: CONSTRUCTION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
1-GS-901
AutoCAD SHX Text
SITE PLAN: DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
1-GS-902
AutoCAD SHX Text
SITE PLAN: DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
SITE PLAN: NOTES & LEGEND
AutoCAD SHX Text
ASBESTOS ABATEMENT
AutoCAD SHX Text
AutoCAD SHX Text
1-HA-100
AutoCAD SHX Text
BASEMENT ASBESTOS ABATEMENT PLAN
AutoCAD SHX Text
1-GS-002
AutoCAD SHX Text
SITE PLAN: LANDSCAPING PLAN
AutoCAD SHX Text
1-GS-601
AutoCAD SHX Text
SITE PLAN: EROSION AND SEDIMENT CONTROL PLAN
AutoCAD SHX Text
SITE PLAN: LIGHTING PLAN
AutoCAD SHX Text
1-GS-701
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DWG. TITLE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
DWG. #
AutoCAD SHX Text
1-SS-002
AutoCAD SHX Text
SCHEDULE OF SPECIAL INSPECTIONS
AutoCAD SHX Text
1-SS-100
AutoCAD SHX Text
BASEMENT FOUNDATION PLAN
AutoCAD SHX Text
1-SS-102
AutoCAD SHX Text
FIRST FLOOR FRAMING PLAN (FULL BASEMENT OR CRAWL SPACE)
AutoCAD SHX Text
1-SS-101A
AutoCAD SHX Text
STRUCTURAL
AutoCAD SHX Text
1-SS-001
AutoCAD SHX Text
GENERAL NOTES AND DESIGN DATA INFORMATION
AutoCAD SHX Text
1-SS-204
AutoCAD SHX Text
1-SS-300
AutoCAD SHX Text
SLAB ON DECK FRAMING DETAILS
AutoCAD SHX Text
1-MD-100
AutoCAD SHX Text
BASEMENT LEVEL DEMOLITION PLAN
AutoCAD SHX Text
1-MD-101
AutoCAD SHX Text
FIRST FLOOR DEMOLITION PLAN
AutoCAD SHX Text
1-MH-101
AutoCAD SHX Text
FIRST FLOOR HYDRONIC PIPING PLAN
AutoCAD SHX Text
1-MH-100
AutoCAD SHX Text
BASEMENT LEVEL HYDRONIC PIPING PLAN
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
1-MH-001
AutoCAD SHX Text
SYMBOLS, ABBREVIATIONS & NOTES
AutoCAD SHX Text
1-MH-702
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
1-MH-701
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
1-MH-201
AutoCAD SHX Text
FIRST FLOOR HVAC PLAN & DEDUCT. ALT. (SLAB ON GRADE) FIRST FLOOR HVAC PLAN
AutoCAD SHX Text
1-MH-200
AutoCAD SHX Text
BASEMENT LEVEL HVAC PLAN
AutoCAD SHX Text
1-MH-202
AutoCAD SHX Text
ROOF HVAC PLAN
AutoCAD SHX Text
1-MH-703
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
1-PD-100
AutoCAD SHX Text
BASEMENT LEVEL SANITARY & STORM PIPING DEMOLITION PLAN
AutoCAD SHX Text
1-PL-101
AutoCAD SHX Text
FIRST FLOOR SANITARY & STORM PIPING PLAN
AutoCAD SHX Text
1-PL-100
AutoCAD SHX Text
BASEMENT LEVEL SANITARY & STORM PIPING PLAN
AutoCAD SHX Text
PLUMBING
AutoCAD SHX Text
1-PL-001
AutoCAD SHX Text
SYMBOLS, ABBREVIATIONS & NOTES
AutoCAD SHX Text
1-PL-702
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
1-PL-701
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
1-PL-201
AutoCAD SHX Text
FIRST FLOOR DOMESTIC WATER & GAS PIPING PLAN
AutoCAD SHX Text
1-PL-200
AutoCAD SHX Text
BASEMENT LEVEL DOMESTIC WATER & GAS PIPING PLAN
AutoCAD SHX Text
1-FX-101
AutoCAD SHX Text
FIRST FLOOR SPRINKLER PLAN
AutoCAD SHX Text
1-FX-100
AutoCAD SHX Text
BASEMENT LEVEL SPRINKLER PLAN
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
1-FX-001
AutoCAD SHX Text
SYMBOLS, ABBREVIATIONS, NOTES & DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
DRAWING LIST CONTINUED
AutoCAD SHX Text
DWG. TITLE
AutoCAD SHX Text
PAGE
AutoCAD SHX Text
DWG. #
AutoCAD SHX Text
1-ES-100-SB
AutoCAD SHX Text
SUB-BASEMENT LEVEL DEMOLITION & NEW POWER PLANS
AutoCAD SHX Text
1-ED-101
AutoCAD SHX Text
FIRST FLOOR DEMOLITION PLAN
AutoCAD SHX Text
1-ES-101
AutoCAD SHX Text
FIRST FLOOR POWER PLAN
AutoCAD SHX Text
1-ES-100
AutoCAD SHX Text
BASEMENT LEVEL POWER PLAN
AutoCAD SHX Text
AutoCAD SHX Text
1-ES-001
AutoCAD SHX Text
SYMBOLS, ABBREVIATIONS & NOTES
AutoCAD SHX Text
1-ES-702
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
1-ES-701
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
1-ES-201
AutoCAD SHX Text
FIRST FLOOR LIGHTING PLAN
AutoCAD SHX Text
1-ES-200
AutoCAD SHX Text
BASEMENT LEVEL LIGHTING PLAN
AutoCAD SHX Text
1-ES-801
AutoCAD SHX Text
SCHEDULES
AutoCAD SHX Text
1-ES-301
AutoCAD SHX Text
FIRST FLOOR FIRE ALARM PLAN
AutoCAD SHX Text
1-ES-300
AutoCAD SHX Text
BASEMENT LEVEL FIRE ALARM PLAN
AutoCAD SHX Text
1-ES-102
AutoCAD SHX Text
ROOF POWER PLAN
AutoCAD SHX Text
1-ES-401
AutoCAD SHX Text
FIRST FLOOR ENLARGED POWER AND COMMUNICATIONS PLANS
AutoCAD SHX Text
1-PL-102
AutoCAD SHX Text
ROOF STORM PIPING PLAN
AutoCAD SHX Text
1-ED-100
AutoCAD SHX Text
BASEMENT LEVEL DEMOLITION PLAN
AutoCAD SHX Text
1-PL-200-SB
AutoCAD SHX Text
SUB-BASEMENT LEVEL DOMESTIC WATER & GAS PIPING PLAN
AutoCAD SHX Text
1-MH-401
AutoCAD SHX Text
CONTROLS DIAGRAMS
AutoCAD SHX Text
AutoCAD SHX Text
1-MH-801
AutoCAD SHX Text
SCHEDULES
AutoCAD SHX Text
1-MH-802
AutoCAD SHX Text
SCHEDULES
AutoCAD SHX Text
1-FXD-101
AutoCAD SHX Text
FIRST FLOOR SPRINKLER DEMOLITION PLAN
AutoCAD SHX Text
1-GS-903
AutoCAD SHX Text
SITE PLAN: DETAILS
AutoCAD SHX Text
1-PL-601
AutoCAD SHX Text
RISER DIAGRAMS
AutoCAD SHX Text
AutoCAD SHX Text
1-AS-002
AutoCAD SHX Text
PARTITION TYPES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-LS-100
AutoCAD SHX Text
BASEMENT LIFE SAFETY PLAN AND SCHEDULE
AutoCAD SHX Text
1-AS-100
AutoCAD SHX Text
1-LS-101
AutoCAD SHX Text
FIRST FLOOR LIFE SAFETY PLAN AND SCHEDULE
AutoCAD SHX Text
1-AS-001
AutoCAD SHX Text
GENERAL NOTES, TYPICAL ELEVATIONS
AutoCAD SHX Text
1-AS-102
AutoCAD SHX Text
FIRST FLOOR DIMENSION PLAN
AutoCAD SHX Text
1-AS-202
AutoCAD SHX Text
ENLARGED REFLECTED CEILING PLAN
AutoCAD SHX Text
1-AS-301
AutoCAD SHX Text
FIRST FLOOR FURNITURE & EQUIPMENT PLAN
AutoCAD SHX Text
1-AS-201
AutoCAD SHX Text
BASEMENT AND FIRST FLOOR REFLECTED CEILING PLANS
AutoCAD SHX Text
1-AS-400
AutoCAD SHX Text
BUILDING SECTIONS
AutoCAD SHX Text
1-AS-100A
AutoCAD SHX Text
BASEMENT FLOOR PLAN - DEDUCT ALTERNATE 1 (CRAWL SPACE)
AutoCAD SHX Text
1-AS-101
AutoCAD SHX Text
FIRST FLOOR PLAN
AutoCAD SHX Text
1-AS-404
AutoCAD SHX Text
WALL SECTIONS
AutoCAD SHX Text
1-AS-405
AutoCAD SHX Text
EXTERIOR ELEVATION - NORTH AND EAST
AutoCAD SHX Text
1-AS-406
AutoCAD SHX Text
EXTERIOR ELEVATION - WEST
AutoCAD SHX Text
1-AS-401
AutoCAD SHX Text
WALL SECTIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-AS-103
AutoCAD SHX Text
ROOF PLAN
AutoCAD SHX Text
AutoCAD SHX Text
1-AD-101
AutoCAD SHX Text
FIRST FLOOR DEMOLITION PLAN
AutoCAD SHX Text
BASEMENT FLOOR PLAN
AutoCAD SHX Text
1-AD-100
AutoCAD SHX Text
BASEMENT LEVEL DEMOLITION PLAN
AutoCAD SHX Text
1-AS-407
AutoCAD SHX Text
EXTERIOR ELEVATION - SOUTH
AutoCAD SHX Text
1-AS-408
AutoCAD SHX Text
EXTERIOR ELEVATIONS - ENLARGED
AutoCAD SHX Text
1-AS-501
AutoCAD SHX Text
ENLARGED FLOOR PLANS
AutoCAD SHX Text
1-AS-502
AutoCAD SHX Text
ENLARGED FLOOR PLANS
AutoCAD SHX Text
1-AS-503
AutoCAD SHX Text
ENLARGED FLOOR PLANS
AutoCAD SHX Text
1-AS-504
AutoCAD SHX Text
ENLARGED FLOOR PLANS
AutoCAD SHX Text
1-AS-601
AutoCAD SHX Text
INTERIOR ELEVATIONS
AutoCAD SHX Text
1-AS-602
AutoCAD SHX Text
INTERIOR ELEVATIONS
AutoCAD SHX Text
1-AS-603
AutoCAD SHX Text
INTERIOR ELEVATIONS
AutoCAD SHX Text
1-AS-604
AutoCAD SHX Text
INTERIOR ELEVATIONS
AutoCAD SHX Text
1-AS-605
AutoCAD SHX Text
INTERIOR ELEVATIONS
AutoCAD SHX Text
1-AS-701
AutoCAD SHX Text
VERTICAL CIRCULATION PLANS & SECTIONS
AutoCAD SHX Text
1-AS-702
AutoCAD SHX Text
VERTICAL CIRCULATION
AutoCAD SHX Text
1-AS-801
AutoCAD SHX Text
ROOF DETAILS
AutoCAD SHX Text
1-AS-802
AutoCAD SHX Text
EXTERIOR PLAN DETAILS
AutoCAD SHX Text
1-AS-803
AutoCAD SHX Text
EXTERIOR PLAN DETAILS
AutoCAD SHX Text
1-AS-804
AutoCAD SHX Text
EXTERIOR SECTION DETAILS
AutoCAD SHX Text
1-AS-805
AutoCAD SHX Text
EXTERIOR SECTION DETAILS
AutoCAD SHX Text
1-AS-806
AutoCAD SHX Text
INTERIOR DETAILS
AutoCAD SHX Text
1-AS-901
AutoCAD SHX Text
DOOR SCHEDULE AND DETAILS
AutoCAD SHX Text
1-AS-902
AutoCAD SHX Text
WINDOW SCHEDULES AND DETAILS
AutoCAD SHX Text
1-AS-903
AutoCAD SHX Text
ROOM FINISH SCHEDULE
AutoCAD SHX Text
1-AS-904
AutoCAD SHX Text
FIRST FLOOR WALL PROTECTION PLAN
AutoCAD SHX Text
1-AS-905
AutoCAD SHX Text
FIRST FLOOR FINISH PLAN
AutoCAD SHX Text
1-AS-906
AutoCAD SHX Text
FIRST FLOOR SIGNAGE PLAN
AutoCAD SHX Text
1-AS-910
AutoCAD SHX Text
MILLWORK SECTIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-SS-301
AutoCAD SHX Text
TYPICAL/MISC. FRAMING SECTIONS AND DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
1-SS-302
AutoCAD SHX Text
ROOF FRAMING DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
1-SS-303
AutoCAD SHX Text
MAIN ENTRANCE CANOPY AND LOBBY HIGH ROOF DETAILS
AutoCAD SHX Text
1-SS-304
AutoCAD SHX Text
BRACE FRAME ELEVATIONS
AutoCAD SHX Text
1-SS-400
AutoCAD SHX Text
WALL FRAMING ELEVATIONS AND DETAILS, BLAST FRAME ELEVATIONS
AutoCAD SHX Text
AutoCAD SHX Text
1-SS-500
AutoCAD SHX Text
COLUMN SCHEDULE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-SS-200
AutoCAD SHX Text
FOUNDATION DETAILS
AutoCAD SHX Text
1-SS-202
AutoCAD SHX Text
FIRST FLOOR SLAB DETAILS AT EXISTING & MASONRY DETAILS
AutoCAD SHX Text
1-SS-203
AutoCAD SHX Text
PIER DETAILS
AutoCAD SHX Text
1-MH-100-SB
AutoCAD SHX Text
SUB-BASEMENT LEVEL STEAM PIPING PLAN
AutoCAD SHX Text
1-PL-602
AutoCAD SHX Text
RISER DIAGRAMS
AutoCAD SHX Text
1-GS-904
AutoCAD SHX Text
SITE PLAN: DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-MH-705
AutoCAD SHX Text
AIR INTAKE PROTECTION DETAILS
AutoCAD SHX Text
1-MH-402
AutoCAD SHX Text
CONTROLS POINTS LIST
AutoCAD SHX Text
1-ES-303
AutoCAD SHX Text
FIRST FLOOR COMMUNICATION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
1-MH-403
AutoCAD SHX Text
CONTROLS DIAGRAMS & SEQUENCE OF OPERATIONS
AutoCAD SHX Text
AutoCAD SHX Text
1-AS-703
AutoCAD SHX Text
VERTICAL CIRCULATION-EXTERIOR STAIRS
AutoCAD SHX Text
1-SS-201
AutoCAD SHX Text
FOUNDATION DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-GS-905
AutoCAD SHX Text
SITE PLAN: DETAILS
AutoCAD SHX Text
1-GS-906
AutoCAD SHX Text
SITE PLAN: DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-GS-201
AutoCAD SHX Text
SITE PLAN: UTILITIES PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-ES-601
AutoCAD SHX Text
ONE-LINE DIAGRAMS
AutoCAD SHX Text
AutoCAD SHX Text
1-ES-802
AutoCAD SHX Text
SCHEDULES
AutoCAD SHX Text
AutoCAD SHX Text
1-MH-601
AutoCAD SHX Text
AHU VESTIBULE PIPING PLANS
AutoCAD SHX Text
1-MH-602
AutoCAD SHX Text
AHU-ED-1 VESTIBULE PIPING SECTIONS & ELEVATIONS
AutoCAD SHX Text
1-MH-603
AutoCAD SHX Text
AHU-ED-2 VESTIBULE PIPING SECTIONS & ELEVATIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-LS-100A
AutoCAD SHX Text
1-AS-402
AutoCAD SHX Text
WALL SECTIONS
AutoCAD SHX Text
1-AS-403
AutoCAD SHX Text
WALL SECTIONS
AutoCAD SHX Text
AutoCAD SHX Text
WALL FINISH PLAN
AutoCAD SHX Text
BASEMENT SIGNAGE PLAN
AutoCAD SHX Text
1-AS-907
AutoCAD SHX Text
1-AS-908
AutoCAD SHX Text
1-SS-103
AutoCAD SHX Text
ROOF FRAMING PLAN
AutoCAD SHX Text
1-SS-104
AutoCAD SHX Text
AMBULANCE CANOPY & WALK-IN LOBBY ROOF FRAMING PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-SS-305
AutoCAD SHX Text
BRACE FRAME CONNECTION DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1-ES-302
AutoCAD SHX Text
BASEMENT COMMUNICATION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
1-MH-704
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
1-SS-205
AutoCAD SHX Text
PLATE SCHEDULES AND DETAILS AND ANCHOR ROD INFO
AutoCAD SHX Text
PIER DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
1-PL-201B
AutoCAD SHX Text FIRST FLOOR DOMESTIC WATER & GAS PIPING PLAN - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
1-PL-200B
AutoCAD SHX Text BASEMENT LEVEL DOMESTIC WATER & GAS PIPING PLAN - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
1-PL-602B
AutoCAD SHX Text
RISER DIAGRAMS - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
1-SS-201B
AutoCAD SHX Text
FOUNDATION DETAILS - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
1-SS-102B
AutoCAD SHX Text
FIRST FLOOR FRAMING PLAN - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
1-MH-101B
AutoCAD SHX Text
FIRST FLOOR HYDRONIC PIPING PLAN - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
1-MH-100B
AutoCAD SHX Text
BASEMENT LEVEL HYDRONIC PIPING PLAN - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
1-AS-100B
AutoCAD SHX Text
AutoCAD SHX Text
BASEMENT LIFE SAFETY PLAN AND SCHEDULE - DEDUCT ALTERNATE 1&5
AutoCAD SHX Text
BASEMENT FLOOR PLAN - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
BASEMENT FOUNDATION PLAN - DEDUCT ALTERNATE 1 (CRAWL SPACE)
AutoCAD SHX Text
1-SS-101B
AutoCAD SHX Text
BASEMENT FOUNDATION PLAN - DEDUCT ALTERNATE 5 (SLAB ON GRADE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
UP
SMOKING
SHELTER
VESTIBULE
UP
UP
EXISTING
MORGUE
EXISTING
AREAWAY
EX
IS
TI
N
G
AR
EA
W
AY
EXISTING
WAREHOUSE
B40-8
MORGUE
B43-2
ELEVATOR
RM
B41
B42
B36-1
B36-2
B39
PUBLICATIONS
B39B40-1B40-2 B40-3
MORGUE
B40-6
B40-7
B40-7
OFFICE
B43-3
ELEV.
VEST
B37-1
B37-2
B37
EMPLOYEE
GYM
C51-1 C51-2
ELEV
SW6
STAIR
SW4
STAIR
HYMAN
HAYES
ASSOCIATES
800 TROY-SCHENECTADY
ROAD, STE 103
LATHAM, NY 12110
(518) 452-3470 www.hymanhayes.com
ENGINEERING LLP
FE PROJECT NO: 19-181
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
528-809
Project Director
DECEMBER 16, 2022 JDFRevisions: Date:
STRATTON VA MEDICAL CENTER
NEW EMERGENCY DEPARTMENT100% FOR BID
SRB
Description of Required Infection Control Precautions by Class During Construction Project Upon Completion of
1. Execute work by methods to minimize raising duct rrom construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.C la ss
I
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area.
6. Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.C la ss
II
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transportation in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
C la ss
IV
C la ss
II
I
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
NOTES:
PATIENT RISK GROUP FOR "TYPE D" CONSTRUCTION
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP Class IV
Class III / IV
Class IV Class IV
FIRST FLOOR ICRA PLAN2BASEMENT FLOOR ICRA PLAN1
LOW RISK
B-WING
HIGH RISK
B-WING
AutoCAD SHX Text
ICRA, PROJECT SCHEDULE & GENERAL NOTES
AutoCAD SHX Text
GI-002
AutoCAD SHX Text
JOHN D. FELLENZER, P.E.
AutoCAD SHX Text
ALBANY, NY
AutoCAD SHX Text
NY PROFESSIONAL ENGINEER NO. 069373-1 ISSUED 1992; EXP. 9/25
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text
1. CONTRACTOR SHALL PROVIDE REQUIRED INFECTION CONTRACTOR SHALL PROVIDE REQUIRED INFECTION CONTROL PRECAUTIONS AS SHOWN IN CHART FOR ALL WORK TO BE DONE UNDER THIS PROJECT. 2. IF AREA OF WORK IS IN QUESTION, COORDINATE WITH IF AREA OF WORK IS IN QUESTION, COORDINATE WITH VA REPRESENTATIVE FOR CLASSIFICATION OF AREA. 3. INSPECTION OF AREA REQUIRED BY VA INSPECTION OF AREA REQUIRED BY VA COR/SAFETY/INFECTION PREVENTION PRIOR TO REMOVING BARRIERS.
AutoCAD SHX Text MAJOR DEMOLITION AND CONSTRUCTION PROJECTS ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM NEW CONSTRUCTION
AutoCAD SHX Text N.T.S.
N.T.S.
PAVEMENT DEMOLITION NOTES:
GENERAL NOTES: EROSION & SEDIMENT CONTROL NOTES:
VEHICLE ACCESS NOTES:
TEMPORARY SAFETY BARRIER NOTES:
HYMAN
HAYES
ASSOCIATES
800 TROY-SCHENECTADY
ROAD, STE 103
LATHAM, NY 12110
(518) 452-3470 www.hymanhayes.com
ENGINEERING LLP
FE PROJECT NO: 19-181
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
528-809
Project Director
DECEMBER 16, 2022 JDFRevisions: Date:
STRATTON VA MEDICAL CENTER
NEW EMERGENCY DEPARTMENT100% FOR BID
SRB
EXISTING WAREHOUSE ROOF STRUCTURE -LIMITED ACCESS-
REQUIREMENTS:
ABBREVIATIONS
PHASING PLAN - CONCEPT
PHASE 1: GENERAL START PHASE (6 WEEKS)
PHASE 2: CONTRACTOR MOBILIZATION (3 WEEKS)
PHASE 4: CONSTRUCTION FOR NEW ADDITION (40 WEEKS)
PHASE 3: SITE DEMOLITION (20 WEEKS)
PHASE 5: CONTRACTOR DEMOBILIZATION AND CLOSEOUT (4 WEEKS)
AutoCAD SHX Text
HYD
AutoCAD SHX Text
SITE - SYMBOLS
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text
KEYNOTE INDICATOR
AutoCAD SHX Text
DEMOLITION LINE
AutoCAD SHX Text
REVISION INDICATOR (SHOWN WITH CLOUD)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONCRETE SIDEWALK AND PAVEMENT
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
EXISTING LANDSCAPING
AutoCAD SHX Text
HYDRANT, FIRE
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
STORM LINE
AutoCAD SHX Text
EX. ST
AutoCAD SHX Text
SITE - EXISTING
AutoCAD SHX Text
STORM MANHOLE
AutoCAD SHX Text D
AutoCAD SHX Text
UTILITY, ELECTRICAL MANHOLE
AutoCAD SHX Text E
AutoCAD SHX Text
SITE - NEW
AutoCAD SHX Text
CONSTRUCTION FENCE
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
CONCRETE FILLED BOLLARD
AutoCAD SHX Text
STREET SIGN
AutoCAD SHX Text
V.A. PANEL SIGN WITH POSTS
AutoCAD SHX Text
CONCRETE CURB
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
STORM LINE
AutoCAD SHX Text
ST
AutoCAD SHX Text 100.00
AutoCAD SHX Text
SPOT ELEVATION
AutoCAD SHX Text
CONTOUR
AutoCAD SHX Text
AutoCAD SHX Text
CONTOUR
AutoCAD SHX Text
AutoCAD SHX Text
1. PARKING LINES SHALL BE REMOVED BY ABRASIVE METHODS OR BY COATING PARKING LINES SHALL BE REMOVED BY ABRASIVE METHODS OR BY COATING ENTIRE AREA WITH A NEW COAT OF ASPHALTIC SEALER. PAINTING OVER OF THE EXISTING PARKING LINES/STRIPES ALONE IS NOT PERMITTED. 2. IN AREAS WHERE PAVEMENT BEING REMOVED WHICH IS ADJACENT TO PAVEMENT IN AREAS WHERE PAVEMENT BEING REMOVED WHICH IS ADJACENT TO PAVEMENT TO REMAIN, CONTRACTOR SHALL NEATLY SAW-CUT PAVEMENT USING WET METHODS THROUGH ASPHALTIC LAYERS PRIOR TO REMOVAL AS NOTED IN "PAVEMENT RESTORATION DETAIL" LOCATED ELSEWHERE WITHIN THIS PLAN SET. 3. AREAS OF REMOVED PAVEMENT WHICH WILL BE RESTORED TO GRASS, LAWN OR AREAS OF REMOVED PAVEMENT WHICH WILL BE RESTORED TO GRASS, LAWN OR PLANTED AREAS SHALL HAVE THE EXISTING SUBBASE MATERIAL REMOVED DOWN TO VIRGIN SOIL. 4. EXISTING PAVEMENT THAT IS SAW-CUT USING WET METHODS SHALL BE COATED EXISTING PAVEMENT THAT IS SAW-CUT USING WET METHODS SHALL BE COATED AND SEALED ALONG ALL CUTS PRIOR TO INSTALLATION OF MATERIALS NEXT TO THE PAVEMENT REMAINING. 5. AREAS THAT ARE EXCAVATED TO EXPOSED SOILS AND HAVING NEW PAVEMENT AREAS THAT ARE EXCAVATED TO EXPOSED SOILS AND HAVING NEW PAVEMENT INSTALLED SHALL BE EXCAVATED TO THE DEPTH OF THE REQUIRED SUBBASE & COVERED WITH SUBBASE MATERIAL AS SOON AS IS PRACTICAL SO AS TO STABILIZE THE AREA AND DETER EROSION.
AutoCAD SHX Text
1. CONTRACTOR, AT THEIR OWN EXPENSE, SHALL ABIDE BY THE LATEST EDITIONS OF CONTRACTOR, AT THEIR OWN EXPENSE, SHALL ABIDE BY THE LATEST EDITIONS OF ALL OSHA REGULATIONS AND REQUIREMENTS. 2. THERE SHALL BE NO CLAIMS AGAINST THE V.A. FOR WORK STOPPAGES DUE TO THERE SHALL BE NO CLAIMS AGAINST THE V.A. FOR WORK STOPPAGES DUE TO ACTS OF GOD, WEATHER CONDITIONS, STOP WORK ORDERS (VERBAL AND/OR WRITTEN), UNDERESTIMATION OF WORK, ESTIMATED QUANTITIES, MATERIALS, SUPPLIES, TOOLS, CORRECTION OF SAFETY PROBLEMS, OR ANY OTHER REASON. 3. ALL QUANTITIES SHOWN ON THE DRAWING ARE ESTIMATED QUANTITIES ONLY. IT ALL QUANTITIES SHOWN ON THE DRAWING ARE ESTIMATED QUANTITIES ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY AND ASCERTAIN ALL EXISTING CONDITIONS, DIMENSIONS AND QUANTITIES. 4. ALL WORK SHALL BE PERFORMED BY THOSE WHO ARE SKILLED IN THEIR TRADE, ALL WORK SHALL BE PERFORMED BY THOSE WHO ARE SKILLED IN THEIR TRADE, JOURNEYMEN MECHANICS, TO PRODUCE A FIRST CLASS JOB. THE CONTRACTOR IS ADVISED THAT WORK DEEMED UNSUITABLE, UNACCEPTABLE, SECOND CLASS IN NATURE BY THE VA SHALL BE DEEMED NON-ACCEPTABLE AND THE CONTRACTOR SHALL REMOVE, REPLACE, RE-DO, TO THE SATISFACTION OF THE V.A., THE UNACCEPTABLE WORK AT NO ADDITIONAL COST TO THE OWNER. THERE SHALL BE NO ADDITIONAL CLAIMS AGAINST THE V.A. FOR THE ABOVE. 5. ROAD WAYS, BUILDING EMERGENCY ACCESS AREAS, AND BUILDING ENTRY AND ROAD WAYS, BUILDING EMERGENCY ACCESS AREAS, AND BUILDING ENTRY AND EXITS AREAS ARE TO BE KEPT CLEAR AT ALL TIMES. 6. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN IN THE FIELD, CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN IN THE FIELD, ALL EXISTING UTILITIES, EXISTING CONDITIONS, FIELD MEASUREMENTS, DIMENSIONS, AND QUANTITIES RELATED TO THE PROJECT. 7. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN THE THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN THE LOCATION, DEPTH, DIRECTION, AND SIZE OF ANY AND ALL UTILITIES EXISTING IN THE GENERAL VICINITY OF THE WORK AREA. 8. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR ANY UTILITY IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR ANY UTILITY DISRUPTED, BROKEN OR OTHERWISE RENDERED NON-FUNCTIONAL DUE TO THE WORK PERFORMED AT NO ADDITIONAL COST TO THE V.A. DURING THIS COURSE OF WORK. 9. THE CONTRACTOR SHALL IDENTIFY ANY NON-FUNCTIONING UTILITY/SYSTEM, PRIOR THE CONTRACTOR SHALL IDENTIFY ANY NON-FUNCTIONING UTILITY/SYSTEM, PRIOR TO THE START OF WORK TO THE VA. IDENTIFICATION OF SUCH AFTER THE START OF WORK SHALL BE DEEMED AS DISTURBED/DAMAGED BY THE CONTRACTOR AND SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 10. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROPERLY SUPPORT ANY IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROPERLY SUPPORT ANY UTILITY ENCOUNTERED IN THE COURSE OF THIS WORK. 11. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE CAUSED BY THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE CAUSED BY CONSTRUCTION OF THIS PROJECT AT THE CONTRACTOR'S EXPENSE. 12. THE CONTRACTOR SHALL SECURE ALL EXTERIOR WORK AND STAGING AREAS WITH THE CONTRACTOR SHALL SECURE ALL EXTERIOR WORK AND STAGING AREAS WITH ACCEPTABLE FENCING. 13. THE CONTRACTOR SHALL NOT LEAVE THE WORK AREA UNATTENDED FOR ANY THE CONTRACTOR SHALL NOT LEAVE THE WORK AREA UNATTENDED FOR ANY REASON, UNLESS SAFETY PARTITIONS, SAFETY FENCING AND COVERING FOR ALL OPEN TRENCHES ARE INSTALLED AND SECURED. 14. THE CONTRACTOR SHALL LEAVE THE WORK SITE CLEAN AND SECURED AT THE THE CONTRACTOR SHALL LEAVE THE WORK SITE CLEAN AND SECURED AT THE END OF EACH WORKING DAY. THE WORK SITE SHALL NOT BE LEFT UNATTENDED AT ANY TIME BY THE CONTRACTOR UNLESS THE WORK AREA IS PROPERLY SECURED BY THE CONTRACTOR. 15. THE CONTRACTOR IS ADVISED THAT THEY ARE SOLELY RESPONSIBLE FOR THE THE CONTRACTOR IS ADVISED THAT THEY ARE SOLELY RESPONSIBLE FOR THE SAFETY OF THE WORK SITE AND SHALL TAKE ALL ACTIONS TO ELIMINATE ANY SAFETY HAZARDS THAT SHALL EXIST AND POSE A THREAT OF HARM TO STUDENTS, EMPLOYEES OF THE VA, EMPLOYEES OF THE CONTRACTOR OR OTHER(S). IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO TAKE IMMEDIATE ACTION TO ALLEVIATE ANY SAFETY HAZARD THAT MAY EXIST WITHOUT DIRECTION FROM THE VA. 16. CONTRACTOR SHALL WET SAW CUT WITH PROPER BLADE ANY ROADS, CURBS AND CONTRACTOR SHALL WET SAW CUT WITH PROPER BLADE ANY ROADS, CURBS AND SIDEWALKS ENCOUNTERED IN THE COURSE OF THIS WORK. 17. ALL HOLES SHALL BE CORE-DRILLED WITH DIAMOND CORE BITS. ALL HOLES SHALL BE CORE-DRILLED WITH DIAMOND CORE BITS. 18. CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ANY AND ALL DEBRIS FROM THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ANY AND ALL DEBRIS FROM THE SITE DAILY AND DISPOSE OF SAME OFF SITE IN ACCORDANCE WITH ALL LOCAL AND STATE REGULATIONS. 19. THE CONTRACTOR SHALL MAINTAIN THE WORK SITE IN A NEAT AND CLEAN THE CONTRACTOR SHALL MAINTAIN THE WORK SITE IN A NEAT AND CLEAN CONDITION. THE WORK SITE SHALL BE CLEANED DAILY OF CONSTRUCTION DEBRIS 20. GRADE AND RE-SEED AREAS DAMAGED BY TRENCHING AND CONSTRUCTION GRADE AND RE-SEED AREAS DAMAGED BY TRENCHING AND CONSTRUCTION VEHICLES 21. GRADING AND RE-SEEDING TO INCLUDE; TOP SOIL, FERTILIZER, SEEDS AND GRADING AND RE-SEEDING TO INCLUDE; TOP SOIL, FERTILIZER, SEEDS AND PROTECTIVE BEDDING. 22. SUB-GRADE FILL TO BE COMPACTED TO 95% STANDARD PROCTOR RELATIVE SUB-GRADE FILL TO BE COMPACTED TO 95% STANDARD PROCTOR RELATIVE DENSITY AND PAVEMENT AREAS SHALL HAVE SUB-GRADE COMPACTED TO 95% MODIFIED RELATIVE DENSITY PER AASHTO REQUIREMENTS. 23. PROVIDE PROTECTIVE MEASURES FOR ALL TREES, BUSHES AND DECORATIVE PROVIDE PROTECTIVE MEASURES FOR ALL TREES, BUSHES AND DECORATIVE SHRUBBERY. CONTRACTOR TO REPLACE ALL VEGETATION DAMAGED DURING CONSTRUCTION AT NO COST TO THE VA. 24. ALL ESTABLISHED EGRESS ROUTES SHALL REMAIN CLEAR AT ALL TIMES. ALL ESTABLISHED EGRESS ROUTES SHALL REMAIN CLEAR AT ALL TIMES. 25. ALL WORK SHALL BE CONDUCTED WITHIN THE APPROVED FENCING PLAN AREA. ALL WORK SHALL BE CONDUCTED WITHIN THE APPROVED FENCING PLAN AREA. 26. ALL CONSTRUCTION VEHICLES WILL HAVE A FUNCTIONING BACKUP ALARM. ALL CONSTRUCTION VEHICLES WILL HAVE A FUNCTIONING BACKUP ALARM. 27. TEMPORARY WALKWAYS SHALL BE KEPT CLEAR OF SNOW AND/OR DEBRIS AT ALL TEMPORARY WALKWAYS SHALL BE KEPT CLEAR OF SNOW AND/OR DEBRIS AT ALL TIMES BY THE CONTRACTOR. 28. TEMPORARY WALKWAYS SHALL BE ADA COMPLIANT. TEMPORARY WALKWAYS SHALL BE ADA COMPLIANT. 29. SPECIFIC MANUFACTURERS AND/OR PRODUCTS ON THE DRAWINGS SHALL BE SPECIFIC MANUFACTURERS AND/OR PRODUCTS ON THE DRAWINGS SHALL BE CONSIDERED BASIS-OF-DESIGN AND SUBJECT TO SUBSTITUTION WITH VA APPROVAL UNLESS OTHERWISE NOTED
AutoCAD SHX Text
1. THE CONTRACTOR SHALL ASSURE THAT AN EROSION AND SEDIMENT (E&S) THE CONTRACTOR SHALL ASSURE THAT AN EROSION AND SEDIMENT (E&S) CONTROL PLAN HAS BEEN PREPARED, APPROVED BY THE VETERANS ADMINISTRATION, AND IS BEING IMPLEMENTED AND MAINTAINED FOR ALL SOIL AND/OR ROCK SPOIL AND BORROW AREAS, REGARDLESS OF THEIR LOCATIONS. 2. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MUST BE A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. 3. THE E&S CONTROL PLAN MAPPING MUST DISPLAY A NY ONE CALL SYSTEM THE E&S CONTROL PLAN MAPPING MUST DISPLAY A NY ONE CALL SYSTEM INCORPORATED SYMBOL INCLUDING THE SITE IDENTIFICATION NUMBER. (THIS IS A NUMBERED SYMBOL NOT A NOTE.) 4. THE CONTRACTOR SHALL ASSURE THAT THE APPROVED EROSION AND THE CONTRACTOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED. 5. EROSION AND SEDIMENT BMPS (BEST MANAGEMENT PRACTICES) MUST BE EROSION AND SEDIMENT BMPS (BEST MANAGEMENT PRACTICES) MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMPS. 6. UNTIL THE SITE ACHIEVES FINAL STABILIZATION, THE CONTRACTOR SHALL UNTIL THE SITE ACHIEVES FINAL STABILIZATION, THE CONTRACTOR SHALL ASSURE THAT THE BEST MANAGEMENT PRACTICES ARE IMPLEMENTED, OPERATED, AND MAINTAINED PROPERLY AND COMPLETELY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL BEST MANAGEMENT PRACTICE FACILITIES. THE OPERATOR WILL MAINTAIN AND MAKE AVAILABLE TO ALL AGENCIES AND MUNICIPALITIES HAVING JURISDICTION, COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE INSPECTIONS. ALL MAINTENANCE WORK, INCLUDING CLEANING, REPAIR, REPLACEMENT, RE-GRADING, AND RE-STABILIZATION SHALL BE PERFORMED IMMEDIATELY. 7. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE CONTRACTOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION. 8. THE EROSION AND SEDIMENT CONTROLS SELECTED AND MAINTAINED BY THE THE EROSION AND SEDIMENT CONTROLS SELECTED AND MAINTAINED BY THE CONTRACTOR SHALL BE SUCH THAT WATER QUALITY STANDARDS ARE NOT VIOLATED AS A RESULT OF THE CONTRACTOR'S ACTIVITIES. CONSTRUCT OR INSTALL ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENTATION CONTROL FEATURES SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN. MAINTAIN TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SUCH AS SILT FENCING, GRASSING, AND DEWATERING, UNTIL PERMANENT DRAINAGE AND EROSION CONTROL FACILITIES ARE COMPLETED AND OPERATIVE. 9. BEFORE INITIATING ANY REVISIONS TO THE APPROVED EROSION AND SEDIMENT BEFORE INITIATING ANY REVISIONS TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN OR REVISIONS TO OTHER PLANS THAT MAY AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN, THE CONTRACTOR MUST RECEIVE WRITTEN APPROVAL OF THE REVISIONS FROM THE VA CONTRACTING OFFICERS REPRESENTATIVE. 10. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING, MUST BE PERFORMED IMMEDIATELY BY THE CONTRACTOR. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS EXPECTED, THE CONTRACTING OFFICER'S REPRESENTATIVE MUST BE INFORMED. REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED TO BE INSTALLED, OPERATED, AND MAINTAINED BY THE CONTRACTOR. 11. WITH THE WRITTEN PERMISSION OF THE CONTRACTING OFFICERS WITH THE WRITTEN PERMISSION OF THE CONTRACTING OFFICERS REPRESENTATIVE SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, PLACED IN TOPSOIL STOCKPILES, OR REMOVED FROM THE SITE AT NO COST TO THE GOVERNMENT 12. THE CONTRACTOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF THE CONTRACTOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES. THE CONTRACTOR SHALL NOT BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THE SITE. 13. CONSTRUCTION VEHICLES AND EQUIPMENT ENTERING AND EXITING THE SITE CONSTRUCTION VEHICLES AND EQUIPMENT ENTERING AND EXITING THE SITE MUST USE THE STABILIZED CONSTRUCTION ENTRANCE LOCATION(S) ONLY. MEASURES MUST BE TAKEN TO PREVENT SOIL AND SEDIMENT FROM A VEHICLE'S TIRES FROM BEING DEPOSITED ONTO THE PUBLIC ROADS. ROADWAY SHALL BE CLEANED DAILY, OR MORE OFTEN TO INSURE SAFE ROADING. BMPS - AFTER DISTURBANCE 1. WHEN FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION WHEN FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMPS MUST BE STABILIZED IMMEDIATELY. 2. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER MOVEMENTS.
AutoCAD SHX Text
1. ALL TRAFFIC ROUTING MUST BE ABLE TO ACCOMODATE ALL EMERGENCY VEHICLES UP ALL TRAFFIC ROUTING MUST BE ABLE TO ACCOMODATE ALL EMERGENCY VEHICLES UP TO AND INCLUDING A LADDER TRUCK USED BY THE ABLANY FIRE DEPT. 2. TWO WAY TRAFFIC ALONG VETERANS WAY SHALL BE MAINTAINED AT ALL TIMES TWO WAY TRAFFIC ALONG VETERANS WAY SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION, UNLESS PRIOR WRITTEN PERMISSION IS OBTAINED FROM THE VA FOR TEMPORARY CLOSURE OF ONE LANE. 3. CONTRACTOR SHALL PROVIDE A MINIMUM OF 2 RADIO EQUIPPED PERSONNEL TO CONTRACTOR SHALL PROVIDE A MINIMUM OF 2 RADIO EQUIPPED PERSONNEL TO PROVIDE ALTERNATE TRAFFIC FLOW AROUND THE LANE CLOSURE FOR THE FULL DURATION OF THE CLOSURE. 4. PRIOR TO THE END OF THE WORK DAY CONTRACTOR SHALL RESTORE 2-WAY PRIOR TO THE END OF THE WORK DAY CONTRACTOR SHALL RESTORE 2-WAY TRAFFIC ALONG THE ENTIRE LENGTH OF VETERANS WAY. 5. OVERNIGHT LANE CLOSURES SHALL NOT BE PERMITTED. OVERNIGHT LANE CLOSURES SHALL NOT BE PERMITTED. 6. A MINIMUM OF ONE LANE OF TRAFFIC SHALL BE MAINTAINED AT ALL TIMES A MINIMUM OF ONE LANE OF TRAFFIC SHALL BE MAINTAINED AT ALL TIMES ALONG VETERANS WAY TO PROVIDE SAFE TRAVEL OF ALL EMERGENCY VEHICLES.
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
1. AT A MINIMUM, ALL WORK AREAS SHALL BE ENCLOSED BY GATED TEMPORARY AT A MINIMUM, ALL WORK AREAS SHALL BE ENCLOSED BY GATED TEMPORARY CONSTRUCTION FENCING AS INDICATED ON PLANS. 2. ALL WORK AREA BOUNDARIES THAT ARE ADJACENT TO AREAS OF VEHICULAR TRAFFIC ALL WORK AREA BOUNDARIES THAT ARE ADJACENT TO AREAS OF VEHICULAR TRAFFIC SHALL HAVE TEMPORARY BARRIERS ALONG SUCH BOUNDARIES, AS INDICATED ON PLANS.
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
EX. UGE
AutoCAD SHX Text
UNDERGROUND ELECTRIC LINE
AutoCAD SHX Text
JOHN D. FELLENZER, P.E.
AutoCAD SHX Text
ALBANY, NY
AutoCAD SHX Text
NY PROFESSIONAL ENGINEER NO. 069373-1 ISSUED 1992; EXP. 9/25
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text W
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
EX. W
AutoCAD SHX Text
UGE
AutoCAD SHX Text
COMBINED SEWER MANHOLE
AutoCAD SHX Text S
AutoCAD SHX Text
DEMO PAVEMENT HATCH
AutoCAD SHX Text
COMBINED SEWER LINE
AutoCAD SHX Text
EX-CS
AutoCAD SHX Text
CANOPY
AutoCAD SHX Text
SANITARY LINE
AutoCAD SHX Text
PROPOSED PAVEMENT
AutoCAD SHX Text
PROPOSED BUILDING
AutoCAD SHX Text
COMBINED SEWER LINE
AutoCAD SHX Text
SAN
AutoCAD SHX Text
CS
AutoCAD SHX Text
DISCONNECTION SYMBOL
AutoCAD SHX Text
CONNECTION SYMBOL
AutoCAD SHX Text THE WAREHOUSE ROOF STRUCTURE IS LOCATED ADJACENT TO THE PROPOSED CONSTRUCTION SITE. THE ROOF HAS RESTRICTED ACCESS AND LIMITED STRUCTURAL LOADING. IF ACCESS IS REQUIRED, THE CONTRACTOR IF ACCESS IS REQUIRED, THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN THE STRUCTURAL CAPACITY AND LIMITATIONS OF THE EXISTING WAREHOUSE ROOF STRUCTURE FOR ANY PROPOSED LOADS PRIOR TO ACCESS ON AND ADJACENT TO THE PAVED ROOF AREA. NO STORAGE OF EQUIPMENT OR MATERIALS IS ALLOWED. CONTRACTOR SHALL PROVIDE TO THE VA A PROPOSED LOADING PLAN TO BE CERTIFIED, SIGNED, AND SEALED BY AN INDEPENDENT STRUCTURAL ENGINEER LICENSED IN THE STATE OF NEW YORK THAT IS BASED ON AND INDICATES THE FOLLOWING CRITERIA WHICH INCLUDES, BUT IS NOT LIMITED TO: A. IDENTIFICATION OF ALL PROPOSED CONSTRUCTION EQUIPMENT AND MATERIALS AND HOW SAID IDENTIFICATION OF ALL PROPOSED CONSTRUCTION EQUIPMENT AND MATERIALS AND HOW SAID EQUIPMENT AND MATERIALS SHALL BE USED B. WEIGHTS AND LOADS FOR ANY PROPOSED CONSTRUCTION EQUIPMENT WEIGHTS AND LOADS FOR ANY PROPOSED CONSTRUCTION EQUIPMENT C. WEIGHTS AND LOADS FOR ANY PROPOSED CONSTRUCTION MATERIALS WEIGHTS AND LOADS FOR ANY PROPOSED CONSTRUCTION MATERIALS D. LOCATION PLAN FOR PROPOSED CONSTRUCTION EQUIPMENT AND MATERIALS LOCATION PLAN FOR PROPOSED CONSTRUCTION EQUIPMENT AND MATERIALS E. ANTICIPATED DURATION OF PROPOSED CONSTRUCTION EQUIPMENT AND MATERIALS ON OR NEAR ANTICIPATED DURATION OF PROPOSED CONSTRUCTION EQUIPMENT AND MATERIALS ON OR NEAR THE WAREHOUSE ROOF F. PROCEDURES NECESSARY FOR THE SAFE OPERATION AND USE OF EACH PIECE OF PROCEDURES NECESSARY FOR THE SAFE OPERATION AND USE OF EACH PIECE OF CONSTRUCTION EQUIPMENT AND MOVEMENT OF MATERIALS G. PROCEDURES NECESSARY FOR THE STRUCTURAL REINFORCEMENT AND SUPPORT OF THE PROCEDURES NECESSARY FOR THE STRUCTURAL REINFORCEMENT AND SUPPORT OF THE WAREHOUSE ROOF STRUCTURE AND COMPONENTS
AutoCAD SHX Text
LANDSCAPING PROTECTIVE FENCE
AutoCAD SHX Text
IMPACT RATED BOLLARD
AutoCAD SHX Text
REMOVABLE IMPACT RATED BOLLARD
AutoCAD SHX Text
CONCRETE DROP CURB
AutoCAD SHX Text S
AutoCAD SHX Text
WATER SPIGOT
AutoCAD SHX Text
HYDRANT SIAMESE CONNECTION
AutoCAD SHX Text
1-GS-000
AutoCAD SHX Text
BEST MANAGEMENT PRACTICES
AutoCAD SHX Text
BMPS
AutoCAD SHX Text
NEW YORK STATE DEPARTMENT OF TRANSPORTATION
AutoCAD SHX Text
NYSDOT
AutoCAD SHX Text
POLYVINYL CHLORIDE
AutoCAD SHX Text
PVC
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DRAINAGE MANHOLE
AutoCAD SHX Text
SITE PLAN: NOTES AND LEGEND
AutoCAD SHX Text
COMBINED SEWER MANHOLE
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
SEWER MANHOLE
AutoCAD SHX Text
SMH
AutoCAD SHX Text
CONTRACTING OFFICERS REPRESENTATIVE
AutoCAD SHX Text
COR
AutoCAD SHX Text
VETERAN AFFAIRS
AutoCAD SHX Text V.A.
AutoCAD SHX Text CONTRACTOR SHALL PROVIDE A DETAILED PHASING AND COORDINATION PLAN AND SCHEDULE AS PART OF THE INITIAL SUBMISSION. REFER TO SPEC SECTION 01 32 16.15. 1. SUBMIT ALL REQUIRED DOCUMENTATION AND PROPOSED SCHEDULE. COORDINATE SCHEDULE SUBMIT ALL REQUIRED DOCUMENTATION AND PROPOSED SCHEDULE. COORDINATE SCHEDULE WITH VA OPERATIONS FOR CONSTRUCTION HOURS OF OPERATION AND MITIGATION OF NOISE, VIBRATION, ODOR, ETC. IMPACTS TO SENSITIVE HOSPITAL AREAS. SCHEDULE SHALL INCLUDE ANTICIPATED UTILITY OUTAGES FOR COORDINATION WITH VA AND PROVIDING TEMPORARY FACILITIES: A. PRIMARY ELECTRIC PRIMARY ELECTRIC B. SITE LIGHTING SITE LIGHTING C. HVAC HVAC D. PLUMBING PLUMBING E. FIRE PROTECTION FIRE PROTECTION F. COMMUNICATIONS COMMUNICATIONS 2. SUBMIT ALL CRITICAL PATH SUBMITTALS SUBMIT ALL CRITICAL PATH SUBMITTALS 3. SUBMIT ALL NON-CRITICAL PATH SUBMITTALS SUBMIT ALL NON-CRITICAL PATH SUBMITTALS 4. LOCATE, VERIFY, AND DOCUMENT ALL EXISTING CONDITIONS AND UTILITIES PRIOR TO THE LOCATE, VERIFY, AND DOCUMENT ALL EXISTING CONDITIONS AND UTILITIES PRIOR TO THE START OF ANY WORK
AutoCAD SHX Text
1. PROVIDE CONSTRUCTION TRAILER, TEMPORARY DUMPSTERS, TEMPORARY CONSTRUCTION PROVIDE CONSTRUCTION TRAILER, TEMPORARY DUMPSTERS, TEMPORARY CONSTRUCTION FENCING, SITE PROTECTIONS, SAFETY BARRIERS, EROSION AND SEDIMENT CONTROL MEASURES, AND TEMPORARY SIGNAGE (INTERNAL AND EXTERNAL). MAINTAIN EGRESS OUT OF EXISTING HOSPITAL EXITS AND FULL ACCESS OF VETERAN'S WAY FOR EMERGENCY VEHICLES 2. PROVIDE DUST CONTROL AND TEMPORARY PROTECTION FOR ADJACENT AIR INTAKES INTO PROVIDE DUST CONTROL AND TEMPORARY PROTECTION FOR ADJACENT AIR INTAKES INTO HOSPITAL 3. PROVIDE TEMPORARY PROTECTION FOR EXISTING WAREHOUSE AND ROOF, SITE FEATURES, AND PROVIDE TEMPORARY PROTECTION FOR EXISTING WAREHOUSE AND ROOF, SITE FEATURES, AND UTILITIES TO REMAIN 4. RELOCATE C-100 CHILLER UNIT ADJACENT TO SMOKING SHELTER RELOCATE C-100 CHILLER UNIT ADJACENT TO SMOKING SHELTER 5. COORDINATE WITH THE VA TO SECURE AREAS OF WORK WITHIN EXISTING HOSPITAL COORDINATE WITH THE VA TO SECURE AREAS OF WORK WITHIN EXISTING HOSPITAL A. MORGUE MORGUE B. CANTEEN CANTEEN C. WAREHOUSE WAREHOUSE D. PHARMACY (INCLUDES WAREHOUSE CACHE AND ELEVATOR TO REMAIN) PHARMACY (INCLUDES WAREHOUSE CACHE AND ELEVATOR TO REMAIN)
AutoCAD SHX Text
1. COORDINATE WITH PHASE 3 DEMOLITION FOR INSTALLATION OF NEW SANITARY, STORM, AND COORDINATE WITH PHASE 3 DEMOLITION FOR INSTALLATION OF NEW SANITARY, STORM, AND ELECTRIC UTILITIES REQUIRED TO BE IN PLACE PRIOR TO COMPLETE DEMOLITION OF EXISTING UTILITIES AND REQUIRED FOR CUT-OVER TO NEW. COORDINATE WITH VA FOR SCHEDULING OF CUT-OVER 2. FORM, INSTALL REINFORCEMENT, AND POUR CONCRETE FOR FOUNDATION FOR NEW ADDITION FORM, INSTALL REINFORCEMENT, AND POUR CONCRETE FOR FOUNDATION FOR NEW ADDITION 3. INSTALL SANITARY AND STORM SEWER UTILITY CONNECTIONS TO BUILDING INSTALL SANITARY AND STORM SEWER UTILITY CONNECTIONS TO BUILDING 4. BACKFILL AND COMPLETE FINISH GRADING BACKFILL AND COMPLETE FINISH GRADING 5. TEMPORARILY STABILIZE EXPOSED SOIL TEMPORARILY STABILIZE EXPOSED SOIL 6. INSTALL STRUCTURAL STEEL, WALLS, AND ROOFING INSTALL STRUCTURAL STEEL, WALLS, AND ROOFING 7. COMPLETE INTERIOR BUILDING ARCHITECTURAL, PLUMBING, HVAC, FIRE PROTECTION, AND COMPLETE INTERIOR BUILDING ARCHITECTURAL, PLUMBING, HVAC, FIRE PROTECTION, AND ELECTRICAL WORK 8. INSTALL ALL PEDESTRIAN AND VEHICULAR IMPROVEMENTS, INCLUDING SIDEWALKS, SIGNAGE, INSTALL ALL PEDESTRIAN AND VEHICULAR IMPROVEMENTS, INCLUDING SIDEWALKS, SIGNAGE, STRIPING, PAVEMENTS, BOLLARDS, SITE LIGHTING AND PARKING GATES. PROVIDE TEMPORARY EXTERIOR LIGHTING FOR CONSTRUCTION AREA AND AROUND HOSPITAL TO MAINTAIN EXISTING LIGHT LEVELS DURING INSTALLATION OF PROPOSED SITE LIGHTING 9. INSTALL LANDSCAPING AND SITE DECORATIONS INSTALL LANDSCAPING AND SITE DECORATIONS 10. CONTRACTOR PUNCH LIST CONTRACTOR PUNCH LIST 11. PROVIDE ALL CLOSE OUT DOCUMENTATION AND AS-BUILTS, UNDERTAKE ALL FINAL PROVIDE ALL CLOSE OUT DOCUMENTATION AND AS-BUILTS, UNDERTAKE ALL FINAL COMMISSIONING WORK AND OWNER TRAINING AS REQUIRED BY THE CONTRACT DOCUMENTS AND THE CONTRACT
AutoCAD SHX Text
1. COORDINATE WITH PHASE 4 CONSTRUCTION FOR INSTALLATION OF NEW ELECTRIC UTILITIES COORDINATE WITH PHASE 4 CONSTRUCTION FOR INSTALLATION OF NEW ELECTRIC UTILITIES REQUIRED TO BE IN PLACE PRIOR TO COMPLETE DEMOLITION OF EXISTING AND REQUIRED FOR CUT-OVER TO NEW. COORDINATE WITH VA FOR SCHEDULING CUT-OVER OF NEW TRANSFORMERS, UNDERGROUND PRIMARY ELECTRIC, AND CONNECTION TO EXISTING ELECTRICAL MANHOLE #13 2. STRIP AND STORE EXISTING TOPSOIL AS REQUIRED FOR ADDITION AND STAGING AREAS STRIP AND STORE EXISTING TOPSOIL AS REQUIRED FOR ADDITION AND STAGING AREAS 3. REMOVE NECESSARY EXISTING SIDEWALKS, PAVEMENTS, UTILITIES, SIGNAGE, LANDSCAPING AND REMOVE NECESSARY EXISTING SIDEWALKS, PAVEMENTS, UTILITIES, SIGNAGE, LANDSCAPING AND OTHER SITE IMPROVEMENTS LOCATED AT GRADE REQUIRED FOR ADDITION 4. INSTALL DEWATERING EQUIPMENT ON SITE IN PREPARATION OF FOUNDATION EXCAVATION INSTALL DEWATERING EQUIPMENT ON SITE IN PREPARATION OF FOUNDATION EXCAVATION 5. EXCAVATE FOR NEW ADDITION FOUNDATION AND STOCKPILE SOIL. REMOVE/ABANDON EXISTING EXCAVATE FOR NEW ADDITION FOUNDATION AND STOCKPILE SOIL. REMOVE/ABANDON EXISTING UNDERGROUND UTILITIES AND STRUCTURES WITHIN AND ADJACENT TO BUILDING FOOTPRINT. PROTECT EXISTING UNDERGROUND UTILITY TUNNEL AND WAREHOUSE 6. GRADE SITE TO REQUIRED ELEVATIONS GRADE SITE TO REQUIRED ELEVATIONS 7. COORDINATE WITH PHASE 4 CONSTRUCTION FOR INSTALLATION OF NEW UNDERGROUND COORDINATE WITH PHASE 4 CONSTRUCTION FOR INSTALLATION OF NEW UNDERGROUND UTILITIES REQUIRED TO BE IN PLACE PRIOR TO COMPLETE DEMOLITION OF EXISTING UTILITIES AND REQUIRED FOR CUT-OVER TO NEW. COORDINATE WITH VA FOR SCHEDULING OF CUT-OVER: A. NEW COMBINED STORM/SEWER PIPING AND MANHOLES NEW COMBINED STORM/SEWER PIPING AND MANHOLES B. SITE LIGHTINGSITE LIGHTING
1. REMOVE CONSTRUCTION TRAILER, TEMPORARY DUMPSTERS, CONSTRUCTION FENCING, BARRIERS, REMOVE CONSTRUCTION TRAILER, TEMPORARY DUMPSTERS, CONSTRUCTION FENCING, BARRIERS, AND…