Z1DA--MINOR-CONST 528-809 NEW EMERGENCY DEPARTMENT ALBANY VAMC
Solicitation number
36C24224R0071
Issued by

About this file

This document is a table of contents for the specifications of a project to design a new emergency department at the Samuel S. Stratton VA Medical Center in Albany, NY (VA Project No. 528-809).

The key details include:

  • The project involves demolition, asbestos abatement, excavation, site work, exterior improvements, general construction, alterations, and work on the structural, mechanical, plumbing, electrical, fire alarm, sprinkler, and medical gas systems.
  • The contractor must utilize the VISN 2 Autodesk Build Construction management platform for all project-related communications and collaboration at no cost.
  • The period of performance is 550 calendar days from the notice to proceed.
  • The contractor must provide a competent 30-hour OSHA certified superintendent dedicated solely to this project.
  • Commissioning of all required items must be completed prior to training government staff and the final inspection/punch list.

View the file

Other files

File Type Posted
36C24224R0071 0008.docx DOCX document
36C24224R0071 0007.docx DOCX document
1-SE-701.pdf PDF
36C24224R0071 0006.docx DOCX document
SK-ES-802.1.pdf PDF
36C24224R0071 0005.docx DOCX document
Albany VA ED Walk Through Sign in List.pdf PDF
Albany VAMC Geotech Report for New ED.pdf PDF
087100 Door hardware SET 14.pdf PDF
071352 Modified Bituminous Sheet Waterproofing.pdf PDF
Stratton ED_103177_SET.pdf PDF
Q40 - 1-HA-100.pdf PDF
36C24224R0071 0004.docx DOCX document
055000 Metal Fabrications.pdf PDF
Subbasement Structural Originals.pdf PDF
084113 Aluminum Framed Entrances and Storefront8-18-22.pdf PDF
088000 Glazing-8-18-22.pdf PDF
36C24224R0071 0003.docx DOCX document
36C24224R0071 0002.docx DOCX document
19-181 100 Specs VA 528-809 Volume I.pdf PDF
19-181 100 Specs VA 528-809 Volume II.pdf PDF
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
36C24224R0071 0001.docx DOCX document
072400 EIFS.pdf PDF
EXHIBIT C - Past Performance Questionnaire.docx DOCX document
divisions 27-28 Specs.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part1.pdf PDF
2022-02-22 VA 528-809 Submittal Register-Divisions 01 - 34 FE.xlsx XLSX spreadsheet
Division 3 specs - concrete.pdf PDF
000115 List of Drawing Sheets.pdf PDF
Division 26 Specs - electrical.pdf PDF
Division 23 Specs - HVAC.pdf PDF
Division 7 Specs - Thermal and Moisture Protection.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part7.pdf PDF
Division 5 specs - Metals.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part8.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part10.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part2.pdf PDF
Division 9 specs - Finishes.pdf PDF
WD Albany NY20240002 07-12-2024.docx DOCX document
Division 6 Specs - wood and plastics.pdf PDF
Division 4 Specs - Masonry.pdf PDF
Division 2 specs - existing conditions.pdf PDF
Division 21-22 Specs.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part4.pdf PDF
Divisions 31-34 Specs.pdf PDF
Division 8 Spec - Doors and windows.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part5.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part11.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part9.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMUEL S. STRATTON VA MEDICAL CENTER

DESIGN NEW EMERGENCY DEPARTMENT

VA PROJECT NO. 528-809

01-01-21

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS – March 18, 2022

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01-21

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 03-19

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 01-21

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 01-21

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

03 30 20 Concrete Slab on Grade 01-21

03 20 25 Concrete Slab on Metal Deck 01-25

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 01-21

04 20 00 Unit Masonry 08-17

04 72 00 Cast Stone Masonry 01-21

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 31 00 Steel Decking 01-21

05 36 00 Composite Metal Decking 01-21

VA PROJECT NO. 528-809

01-01-21

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

05 40 00 Cold-Formed Metal Framing 01-21

05 50 00 Metal Fabrications 08-18

05 51 00 Metal Stairs 01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 16 63 Cementitious Sheathing 01-21

06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 01-21

07 22 00 Roof and Deck Insulation 01-21

07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21

07 40 00 Roofing and Siding Panels 01-21

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21

07 60 00 Flashing and Sheet Metal 01-21

07 71 00 Roof Specialties 01-21

07 72 00 Roof Accessories 01-21

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 31 13 Access Doors and Frames 01-21

08 32 13 ICU Sliding Glass Doors 01-21

08 34 53 Security Doors and Frames 01-21

08 41 13 Aluminum-Framed Entrances and Storefronts 01-21

08 44 13 Glazed Aluminum Curtain Walls 04-20

08 51 13 Aluminum Windows 01-21

08 56 53 Blast Resistant Windows 01-21

08 56 59 Service and Teller Window Units 01-21

08 71 00 Door Hardware 01-21

08 71 13 Automatic Door Operators 01-21

08 80 00 Glazing 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 01-21

09 51 00 Acoustical Ceilings 12-18

09 54 23 Linear Metal Ceilings 01-21

VA PROJECT NO. 528-809

01-01-21

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

09 65 13 Resilient Base and Accessories 01-21

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A and

RES 6B)

01-21

09 68 00 Walk-Off Mat Carpet 01-21

09 91 00 Painting 01-21

09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2)

01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 21 23 Cubicle Curtain Tracks 01-21

10 26 00 Wall and Door Protection 01-21

10 28 00 Toilet, Bath, and Laundry Accessories 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

10 51 13 Lockers 06-14

DIVISION 11 – EQUIPMENT

11 12 00 Parking Control Equipment 01-21

11 73 00 Ceiling Mounted Patient Lift System 08-20

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17

12 32 00 Manufactured Wood Casework 09-15

12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

13 49 00 Radiation Protection 02-16

DIVISION 14– CONVEYING EQUIPEMENT

14 92 00 Pneumatic Tube System

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

22 05 19 Meters and Gages for Plumbing Piping 09-20

22 05 23 General-Duty Valves for Plumbing Piping 09-20

VA PROJECT NO. 528-809

01-01-21

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

22 05 33 Heat Tracing for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 11-19

22 13 00 Facility Sanitary and Vent Piping 09-20

22 14 00 Facility Storm Drainage 09-15

22 40 00 Plumbing Fixtures 09-15

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15

22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 02-20

23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20

23 23 00 Refrigerant Piping 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 36 00 Air Terminal Units 02-20

23 37 00 Air Outlets and Inlets 02-20

23 40 00 HVAC Air Cleaning Devices 03-20

23 73 00 Indoor Central-Station Air-Handling Units 03-20

23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-20

23 81 23 Computer-Room Air-Conditioners 03-20

23 82 00 Convection Heating and Cooling Units 03-20

23 82 16 Air Coils 03-20

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 13 Medium-Voltage Cables 01-17

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 36.26 Wireways for Radiology Equipment 01-18

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 01-18

VA PROJECT NO. 528-809

01-01-21

00 01 10-5

SECTION NO. DIVISION AND SECTION TITLES DATE

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18

26 24 13 Distribution Switchboards 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 29 11 Motor Controllers 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 36 23 Automatic Transfer Switches 01-17

26 41 00 Facility Lightning Protection 01-17

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

26 55 71 Medical and Surgical Lighting Fixtures 01-18

26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 15 00 Communications Structured Cabling 01-16

27 31 31 Voice Communications Switching and Routing Equipment -

Extension

06-15

27 51 23 Intercommunications and Program Systems 06-15

27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 13 53 Security Access Detection 09-11

28 16 00 Intrusion Detection System 10-11

28 23 00 Video Surveillance 09-11

28 26 00 Electronic Personal Protection System 09-11

28 31 00 Fire Detection and Alarm 10-11

28 52 31 Emergency Call System 06-15

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

31 23 19 Dewatering 10-12

VA PROJECT NO. 528-809

01-01-21

00 01 10-6

SECTION NO. DIVISION AND SECTION TITLES DATE

31 63 29 Drilled Concrete Piers 01-21

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

32 31 13 Chain Link Fences and Gates 06-18

32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 11-16

33 10 00 Water Utilities 03-17

33 30 00 Sanitary Sewer Utilities 06-13

33 40 00 Storm Sewer Utilities 12-17

33 46 13 Foundation Drainage 10-11

DIVISION 34 – TRANSPORTATION

34 71 13 Passive Vehicle Barriers 04-18

DIVISION 48 – Electrical Power Generation – NOT USED