This document is a solicitation (Solicitation Number: 36C24224R0071) for the construction of a new Emergency Department at the Stratton VA Medical Center in Albany, NY (VA Project No. 528-809). The key details are:
The contractor shall prepare the site, including demolition and removal of existing structures, excavation, and site work, and perform all construction work for the new Emergency Department addition. This includes general construction, alterations, structural, mechanical, plumbing, electrical, fire alarm, sprinkler, medical gas, low-voltage communications, and other work as specified. The period of performance is 550 calendar days. The contractor must provide a dedicated, OSHA-certified superintendent to supervise the project full-time. Commissioning and punch list completion are required prior to project closeout. The contractor must utilize the Autodesk Build construction management platform for all project correspondence and collaboration. The contracting agency is the Department of Veterans Affairs Veterans Integrated Service Network 2.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMUEL S. STRATTON VA MEDICAL CENTER
DESIGN NEW EMERGENCY DEPARTMENT
VA PROJECT NO. 528-809
01-01-21
07 24 00 - 1
SECTION 07 24 00
EXTERIOR INSULATION AND FINISH SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Direct exterior finish systems (DEFS).
2. Exterior insulation and finish systems (EIFS).
3. Unit finishes as accent trim within DEFS.
1.2 RELATED WORK
A. Section 09 29 00, GYPSUM SHEATHING: Gypsum Board Sheathing.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American National Standards Institute (ANSI):
A108/A118/A136-19.......Installation of Ceramic Tile.
A137.1-19...............Ceramic Tile - Version 1.
C. ASTM International (ASTM):
B117-19.................Operating Salt Spray (Fog) Apparatus.
C67/C67M-20.............Sampling and Testing Brick and Structural Clay
Tile.
C177-19.................Steady-State Heat Flux Measurements and Thermal
Transmission Properties by Means of the
Guarded-Hot-Plate Apparatus.
C297/C297M-16...........Flatwise Tensile Strength of Sandwich
Constructions.
C578-19.................Rigid, Cellular Polystyrene Thermal Insulation.
C666/C666M-15...........Resistance of Concrete to Rapid Freezing and
Thawing.
C920-18.................Elastomeric Joint Sealants.
D968-17.................Abrasion Resistance of Organic Coatings by
Falling Abrasive.
D2794-93(2019)..........Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact).
E84-20..................Surface Burning Characteristics of Building
Materials.
E96/E96M-16.............Water Vapor Transmission of Materials.
07 24 00 - 2
E119-20.................Fire Tests of Building Construction and
Materials.
E330/E330M-14...........Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform
Static Air Pressure Difference.
E331-00(2016)...........Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Wall by Uniform
Static Air Pressure Differences.
E2486/E2486M-13(2018)...Impact Resistance of Class PB and PI Exterior
Insulation and Finish Systems (EIFS).
G90-17..................Performing Accelerated Outdoor Weathering of
Nonmetallic Materials Using Concentrated
Natural Sunlight.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
2. Show details for corner treatment, sills, soffits, dentils, quoins, lintels, openings, penetrations, flashing, and other special applications.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
3. Warranty.
D. Samples: Two 300 mm (1 foot) square samples of EIFS over cement board identical to proposed installation in thickness, color, texture insulation and workmanship.
E. Test reports: Certify each product and complete system complies with specifications.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Installer with project experience list .
1.5 QUALITY ASSURANCE
A. Installer Qualifications:
1. Regularly installs specified products.
2. Installed specified products with satisfactory service on five similar installations for minimum five years.
07 24 00 - 3
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight // conditioned // facility.
B. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS
A. Environment: Unless greater temperature is required by system manufacturer, install products only when ambient air temperature is minimum 7 degrees C (45 degrees F) and rising and predicted to persist for 24 hours after installation.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant EIFS system materials against material and manufacturing defects.
1. Warranty Period: 10 years.
PART 2 - PRODUCTS
2.1 PRODUCTS - GENERAL
A. Basis of Design: STO THERM CI GPS (2” thickness): comply with
ASTM C1397, ASTM E2511, and EIFS manufacturer's written instructions for installation of EIFS as applicable to each type of substrate indicated.
B. Provide system components from one manufacturer and from one production run.
2.2 EXTERIOR INSULATION AND FINISH SYSTEM (EIFS)
07 24 00 - 4
A. Description: Polymer-Based (PB) system consists of Type I molded rigid polystyrene insulation adhered to sheathing and finished with glass-fiber-mesh reinforced based-coat and textured finish coat.
B. Performance Requirements:
1. Surface Burning Characteristics: When tested according to ASTM E84.
a. Flame Spread Rating: 25 maximum.
b. Smoke Developed Rating: 450 maximum.
2. Full Scale Wall Fire Test: No significant surface flaming or propagation of vertical or lateral flames when tested according to
ASTM E119.
3. Impact Resistance (Sample to be cured. Finish, base coat and fabric over 25 mm (2 inch) insulation typical of project application), ASTM E2486/E2486M:
a. Medium Impact Resistance - 5.65 to 10.1 J (50-89 inch-pounds).
4. Structural Performance: (Test panels 1200 mm x 1200 mm (4 feet by
4 feet) typical of project application): ASTM E330/E330M, no permanent deformation, delamination or deterioration for positive and negative pressures as required.
a. Wind Loads: Uniform pressure as indicated on Drawings.
5. Water Penetration: ASTM E331, no water penetration minimum 720Pa (15 psf) for windows and 300 Pa (6.24 psf) for curtain wall assembly.
6. Abrasion Resistance: ASTM D968, 500 liters of sand with slight smoothing and no loss of film integrity.
7. Accelerated Weathering: ASTM G90; 2000 hours with no deterioration.
8. Salt Spray Resistance: ASTM B117; Withstand 300 hours with no deleterious effects.
9. Water Vapor: ASTM E96/E96M; Maximum 12 grains/hour/square meter (18 grains/hour/square foot.).
10. Absorption-Freeze-Thaw (Pre-weighed 100 mm x 200 mm (4 inch by
8 inch) specimens; 25 mm (1 inch) insulation, faced with finish coat cured and stored in air; tested with edges and back open), ASTM C67.
a. 50 Cycles: 20 hours at 9 degrees C (4 degrees F); 4-hour thaw in water.
b. After 50 cycles; total weight gain of maximum 6.2 grams. No checking splitting, or cracking.
C. Adhesive: Manufacturers standard product including primer compatible with sheathing.
07 24 00 - 5
D. Insulation:
1. Thermal Resistance: Thermal resistance (R-value), as indicated, measured by ASTM C177.
2. Insulating Material: ASTM C578, as recommended by EIFS manufacturer and treated to be compatible with EIFS components. Age insulation minimum of 6 weeks before installation.
3. Provide Type I Molded Expanded Polystyrene (MEPS) insulation board for Type PB systems, in sizes as required except maximum 600 mm X
1200 mm (24 X 48 inches) boards, and maximum 100 mm (4 inches) thick.
E. Mechanical Anchors: As recommended by EIFS manufacturer.
F. Accessories:
1. Trim, control joints, weep screed, edging, anchors, expansion joints, and other items required for proper installation as recommended by EIFS manufacturer.
2. Metal Items and Fasteners: Corrosion resistant.
G. Reinforcing Fabric: Balanced, open weave, glass fiber fabric made from twisted multi-end strands specifically treated for compatibility with the other materials of system.
1. Minimum weight 100 grams/square meter (4.3 ounces/square yard).
H. Base Coat: Manufacturer's standard.
I. Finish Coat: Manufacturer's standard. Minimum thickness 1.5 mm
(1/16 inch), complying with performance requirements.
J. Sealant: ASTM C920; Class 50 with 100 percent recovery. Type, grade and use as recommended by sealant manufacturer.
1. When required, provide non-staining primer, bond breaker, and backer rods as recommended by sealant manufacturer.
2. Do not use absorptive materials as backer rods.
2.3 UNIT FINISH
A. Joint Reinforcement:
1. Reinforcing tape: Minimum 100 mm (4 inches) wide, polymer coated, open mesh glass fiber tape.
2. Tape Embedding Material: ANSI A118.4; ready-to-mix Portland cement latex fortified mortar containing dry latex polymers.
B. Accessories: Trim, control joints and corner beads as recommended by exterior finish system manufacturer.
07 24 00 - 6
C. Sealant: ASTM C920; Class 50 with 100 percent recovery. Type, grade and use recommended by sealant manufacturer.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Notify Contracting Officer's Representative in writing of conditions detrimental to proper completion of work.
D. Do not proceed with work until unsatisfactory conditions are corrected.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
3.3 CONTROL JOINT INSTALLATION
A. Install surface control joints as follows:
1. Direct Exterior Finish: Install at 6 meters (20 feet) maximum on center, both directions, erecting continuous vertical joints first at building expansion joints, intersection of dissimilar substrates or finishing materials where concentrated stresses or movement is anticipated. Leave 13 mm (1/2inch) minimum continuous gap between board panels to receive control joint.
2. Unit Finish: Install at 5 meters (16 feet) maximum on center, both directions, or at lesser spacing as recommended by manufacturer, erecting continuous vertical joints first. Leave 13 mm (1/2 inch) minimum, continuous gap between board panels to receive control joint or sealant backer and sealant.
3. Exterior Insulation and Finish System. Install at 15 meters
(50 feet) maximum in both directions and at building expansion joints, floor lines and where EIFS intersects other materials per manufacturer's recommendations.
3.4 SEALANT INSTALLATION
A. Direct Exterior Finish System: Apply sealant at intersections of gypsum board with windows, doors, control joints, other openings and locations as shown on drawings.
07 24 00 - 7
B. Exterior Insulation and Finish System: Apply sealant according to EIFS manufacturer's recommendation.
C. Do not apply sealant in locations intended for water drainage.
UNIT FINISH INSTALLATION
D. Joint Reinforcement: Pre-fill gypsum board joints and trim with latex fortified mortar mixed according to manufacturer's instructions.
1. Immediately embed reinforcing tape into wet mortar and tightly trowel to board surface to avoid crowning joints.
2. Cure for four hours minimum before applying skim coat.
E. Skim Coat: Uniformly apply skim coat of latex fortified mortar a minimum of 3 mm (1/8 inch) thick, smooth and flat over entire surface.
1. Dampen board surface as necessary under rapid drying conditions.
3.5 EXTERIOR INSULATION AND FINISH SYSTEM INSTALLATION
A. Insulation Board Layout: Place horizontally from level base line.
Stagger vertical joints and interlock at corners. Butt joints tightly.
Provide flush surfaces at joints. Offset insulation board joints from joints in sheathing minimum 200 mm (8 inches). Do not align joints with corners of doors, windows and other openings. Do not leave insulation board exposed longer than recommended by insulation manufacturer.
B. Adhesive: Apply directly to entire back surface of the insulation board as recommended by the system manufacturer and immediately apply to gypsum board substrate. Apply firm pressure over entire board to ensure uniform contact and level surface. Allow adhesive to cure for 24 hours minimum before sanding.
C. Create means of drainage between insulation board and gypsum board sheathing.
D. Flash penetrations and terminations to discharge water to exterior.
E. Mechanical Fasteners: Fasten with manufacturer's standard anchors, spaced as recommended by manufacturer, maximum 600 mm (24 inches) on center horizontally and vertically.
F. Sanding: Sand entire surface of insulation before applying base coat, level high joints and remove dirt and weathering damage. Do not pre-fill low areas with basecoat.
G. Base Coat: Trowel apply uniform thickness of base coat to insulation with minimum thickness of 1-1/2 times reinforcing fabric thickness and minimum 2.4 mm (3/32 inches) wet thickness.
07 24 00 - 8
H. Install reinforcing fabric embedded in base coat. Provide diagonal reinforcement at opening corners, back wrapping, and other reinforcement recommended by EIFS manufacturer. Ensure fabric pattern is not visible beneath the surface of the basecoat after installation.
Cure basecoat 24 hours minimum before applying finish coat.
I. Finish Coat:
1. Inspect basecoat for damage or defects and repair before applying finish coat.
2. Trowel apply finish coat minimum 1.6 mm (1/16 inch) thick.
3. Texture finish Traditional Finish “Fine”.
4. Surface Tolerance: Maximum 1/500 (1/4 inch in 10 feet) deviation from plumb and plane.
- - E N D - -