This document appears to be an amendment to Solicitation Number 36C24224R0071 for the construction of a New Emergency Department at the Stratton VA Medical Center in Albany, NY. The key details are:
The solicitation is for the construction of a new Emergency Department addition to the main hospital, including demolition, site work, general construction, and various trades work. The period of performance is 550 calendar days. The contractor must provide a full-time, OSHA-certified superintendent dedicated solely to this project. Commissioning and completion of the punch list items must be done during the established performance period. The contractor is required to use the Autodesk Build construction management platform provided by the agency at no cost. Specific responses are provided to vendor questions regarding the lighting and lightning protection system designs.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
08/13/2024
528A8-809
Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227
Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders
36C24224R0071 08-12-2024
X
X
X 08/26/2024 at 12:00 EST
See Attached
Michael Spivack
This amendment answers the following vendor questions:
1) Drawing 1‐ES‐201 in room E102 shows two clusters of type Q light fixtures with only 3 actual fixtures shown in each cluster but 4 leer Q’s in each area. Is this intended to be 2 clusters of 3 fixtures or 2 clusters of 4 fixtures?
A. Three (3) Q light fixtures should be included in each cluster
2) Drawing 1-ES-102 depicts the lightning protection system for the new addition. Is this supposed to tie into an existing system or is this a stand alone new system? If tie-in to existing, can the name of the original installer be provided so the UL Label can be maintained without having to recertify the whole system. As per the details on 1-ES-702 the manufacturer was listed as Harger but that is not the installer.
A. Response: On 1-ES-102, add the following notes 4,5,6 under “LIGHTNING PROTECTION GENERAL NOTES”
1. At each ground rod location, provide a dedicated lightning protection down conductor concealed within the building exterior metal sheath. Down conductor shall be bonded to ground rod on the bottom, and perimeter conductor on the top.
1. At each ground rod location, provide a No. 6 AWG bare copper conductor, brazed to the building exterior metal sheath, and bonded to the ground rod
1. Entire lightning protection system shall comply with NFPA 780 and NFPA 70.
(Note: This revision does not remove the instructions in notes 1&2, which require that air terminals and ground rods be connected to the building’s steel frame.)
All other terms and conditions remain the same.