36C24224R0071 0003.docx

DOCX document 96 KB Posted

Attached to
Z1DA--MINOR-CONST 528-809 NEW EMERGENCY DEPARTMENT ALBANY VAMC
Solicitation number
36C24224R0071
Issued by

About this file

This document appears to be an amendment to Solicitation Number 36C24224R0071 for the construction of a New Emergency Department at the Stratton VA Medical Center in Albany, NY. The key details are:

The solicitation is for the construction of a new Emergency Department addition to the main hospital, including demolition, site work, general construction, and various trades work. The period of performance is 550 calendar days. The contractor must provide a full-time, OSHA-certified superintendent dedicated solely to this project. Commissioning and completion of the punch list items must be done during the established performance period. The contractor is required to use the Autodesk Build construction management platform provided by the agency at no cost. Specific responses are provided to vendor questions regarding the lighting and lightning protection system designs.

View the file

Other files

File Type Posted
36C24224R0071 0008.docx DOCX document
36C24224R0071 0007.docx DOCX document
1-SE-701.pdf PDF
36C24224R0071 0006.docx DOCX document
SK-ES-802.1.pdf PDF
36C24224R0071 0005.docx DOCX document
Albany VA ED Walk Through Sign in List.pdf PDF
Albany VAMC Geotech Report for New ED.pdf PDF
087100 Door hardware SET 14.pdf PDF
071352 Modified Bituminous Sheet Waterproofing.pdf PDF
Stratton ED_103177_SET.pdf PDF
Q40 - 1-HA-100.pdf PDF
36C24224R0071 0004.docx DOCX document
055000 Metal Fabrications.pdf PDF
Subbasement Structural Originals.pdf PDF
084113 Aluminum Framed Entrances and Storefront8-18-22.pdf PDF
088000 Glazing-8-18-22.pdf PDF
36C24224R0071 0002.docx DOCX document
19-181 100 Specs VA 528-809 Volume I.pdf PDF
19-181 100 Specs VA 528-809 Volume II.pdf PDF
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
36C24224R0071 0001.docx DOCX document
072400 EIFS.pdf PDF
EXHIBIT C - Past Performance Questionnaire.docx DOCX document
divisions 27-28 Specs.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part1.pdf PDF
2022-02-22 VA 528-809 Submittal Register-Divisions 01 - 34 FE.xlsx XLSX spreadsheet
Division 3 specs - concrete.pdf PDF
000115 List of Drawing Sheets.pdf PDF
Division 26 Specs - electrical.pdf PDF
Division 23 Specs - HVAC.pdf PDF
Division 7 Specs - Thermal and Moisture Protection.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part7.pdf PDF
Division 5 specs - Metals.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part8.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part10.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part2.pdf PDF
000110 TOC.pdf PDF
Division 9 specs - Finishes.pdf PDF
WD Albany NY20240002 07-12-2024.docx DOCX document
Division 6 Specs - wood and plastics.pdf PDF
Division 4 Specs - Masonry.pdf PDF
Division 2 specs - existing conditions.pdf PDF
Division 21-22 Specs.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part4.pdf PDF
Divisions 31-34 Specs.pdf PDF
Division 8 Spec - Doors and windows.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part5.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part11.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part9.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

08/13/2024

528A8-809

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders

36C24224R0071 08-12-2024

X

X

X 08/26/2024 at 12:00 EST

See Attached

Michael Spivack

This amendment answers the following vendor questions:

1) Drawing 1‐ES‐201 in room E102 shows two clusters of type Q light fixtures with only 3 actual fixtures shown in each cluster but 4 leer Q’s in each area. Is this intended to be 2 clusters of 3 fixtures or 2 clusters of 4 fixtures?

A. Three (3) Q light fixtures should be included in each cluster

2) Drawing 1-ES-102 depicts the lightning protection system for the new addition. Is this supposed to tie into an existing system or is this a stand alone new system? If tie-in to existing, can the name of the original installer be provided so the UL Label can be maintained without having to recertify the whole system. As per the details on 1-ES-702 the manufacturer was listed as Harger but that is not the installer.

A. Response: On 1-ES-102, add the following notes 4,5,6 under “LIGHTNING PROTECTION GENERAL NOTES”

1. At each ground rod location, provide a dedicated lightning protection down conductor concealed within the building exterior metal sheath. Down conductor shall be bonded to ground rod on the bottom, and perimeter conductor on the top.

1. At each ground rod location, provide a No. 6 AWG bare copper conductor, brazed to the building exterior metal sheath, and bonded to the ground rod

1. Entire lightning protection system shall comply with NFPA 780 and NFPA 70.

(Note: This revision does not remove the instructions in notes 1&2, which require that air terminals and ground rods be connected to the building’s steel frame.)

All other terms and conditions remain the same.

File details come from the government source that posted it. Updated .