250063_ATT 4_ODS.pdf

PDF 157 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a memorandum from the Department of the Air Force, Headquarters 72 Air Base Wing (AFMC) at Tinker Air Force Base, Oklahoma, dated 14 October 2025. The memorandum addresses requirement WWYK250063 for installing a REACT VII facility in building B9001, Post V19. The document is directed to AFSC/PZIOC from 72 ABW/CEED and signed by Cole Hixon, Project Manager at Tepa Companies.

The primary purpose of this memorandum is to certify that the requirement has been reviewed by appropriate technical personnel and does not require the contractor to use or deliver Class 1 Ozone Depleting Substances (ODS) as identified in Air Force Policy during contract performance or as part of any delivered items or services. The memorandum was digitally signed on 14 October 2025 at 09:40:17 and copies were distributed to the project folder.

View the file

Other files

File Type Posted
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
2_-_HE05-JINV-S11EE---GNT---L_001.pdf PDF
ERV Schedule_TAFB B9001_O-212477.xlsx XLSX spreadsheet
4500-CIVIL.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 72 AIR BASE WING (AFMC)

TINKER AIR FORCE BASE OKLAHOMA

14 OCT 25

MEMORANDUM FOR AFSC/PZIOC

FROM: 72 ABW/CEED

SUBJECT: WWYK250063 INSTALL REACT VII FACILITY, B9001, POST V19

This requirement has been reviewed by appropriate technical personnel and to the best of my knowledge and belief, it does not require the contractor to use Class 1 Ozone Depleting Substances (ODS) identified in Air Force Policy in the performance of the contract, nor does it require the delivery of these Class 1 ODS in any item or as part of any service.

COLE HIXON

Project Manager Tepa Companies cc:

Project Folder

2025-10-14T09:40:17-0500
HIXON.WILLIAM.COLE.1609684727

File details come from the government source that posted it. Updated .