21 - DID_Request_for_Variance.pdf

PDF 131 KB Posted

Attached to
Amendment- 08 B-1 Nose Radome Repair and New Buy - Final RFP ( Updated)
Solicitation number
FA811923R0004-01
Issued by

About this file

This is a Data Item Description (DID) document that establishes the format and content requirements for a Request for Variance (RFV), a federal contracting form used to document proposed departures from approved product definition information or products found to be nonconforming after production.

The RFV (DI-SESS-80640E, approved February 11, 2020) describes a proposed departure from approved product specifications for a limited time period or specified effectivity, or identifies a product that does not conform to product definition information after production. Pre-production variances and post-production nonconformances must result in a reduction in cost, indicated by enclosing the value in parentheses, except when the nonconformance is induced or caused by the Acquirer. The RFV shall be submitted using one of three formats: DD Form 1694 (Request for Variance), the Acquirer's Integrated Digital Environment (IDE) schema, or the Supplier's preferred format. All submissions must contain the complete information required by DD Form 1694 and comply with EIA-649-1 and EIA-649 standards. An electronic version of DD Form 1694 is available at https://www.esd.whs.mil/dd/. This DID supersedes the previous version DI-SESS-80640D.

View the file

Other files

File Type Posted
Exhibit A - CDRLs.pdf PDF
2 - AFMC_158_Packaging_Requirements.pdf PDF
7 - DID_Certificate_of_Compliance.pdf PDF
22 - DID_Status_Report.pdf PDF
28 - Item_Description_Antenna.pdf PDF
FA8119-23-R-0011 P00008.pdf PDF
6 - DID_CAV_Reporting.pdf PDF
11 - DID_Conference_Minutes.pdf PDF
14 - DID_Counterfeit_Prevention_Plan.pdf PDF
15 - DID_Engineering_Change_Proposal.pdf PDF
17 - DID_Presentation_Material.pdf PDF
18 - DID_Product_Engineering_Design_Data_and_Associated_Lists.pdf PDF
19 - DID_Production_Surge_Plan.pdf PDF
20 - DID_Report_of_Shipping_Item_and_Packaging_Discrepancy.pdf PDF
23 - DID_Test_Inspection_Report.pdf PDF
24 - GFP.pdf PDF
26_PWS_Updated_20_March_23.pdf PDF
27 - Item_Description_Radome.pdf PDF
30 - Justification_for_Qualification_Requirements.pdf PDF
33 - Salient_Characteristics_Radome.pdf PDF
3 - DD_Form_1653_Transportation_Data_for_Solicitations.pdf PDF
4 - DD_Form_2169_Special_Packaging_Instructions.pdf PDF
5 - DID_Calibration_Certification_Report.pdf PDF
12 - DID_Contract_Depot_Maintenance_Production_Report.pdf PDF
13 - DID_Contractors_Corrective_Action_Plan.pdf PDF
25 - IUID_Checklist.pdf PDF
26 - PWS_Updated_26_Jan_23.pdf PDF
29 - DD254_Security_Classification.pdf PDF
32 - Pricing_Matrix.xlsx XLSX spreadsheet
1 - AFMC_260_First_Article_Requirements.pdf PDF
8 - DID_Certification_Data_for_Non_Nuclear_Level_I.pdf PDF
9 - DID_Computer_Software_Product_End_Items.pdf PDF
10 - DID_Conference_Agenda.pdf PDF
16 - DID_Government_Property_Inventory_Report.pdf PDF
31 - Personnel_and_Skill_Requirement.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: REQUEST FOR VARIANCE (RFV)

Number: DI-SESS-80640E Approval Date: 20200211

AMSC Number: N10141 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: NM Project Number: SESS-2020-004

Applicable Forms: DD Form 1694, Request for Variance (RFV)

Use/relationship: A Request for Variance (RFV) describes a proposed departure from (a nonconformance with) approved product definition information for a limited amount of time/specified effectivity or a product found to be nonconforming with product definition information after the product has been produced by the production process.

When the RFV describes a proposed departure from approved product definition information

(i.e., pre-production), the variance shall result in a reduction in cost; indicated by enclosing the value in parentheses.

When the RFV describes a product found to be nonconforming after the product has been produced (i.e., post-production), the variance shall result in a reduction in cost; indicated by enclosing the value in parentheses.

When the nonconformance is induced or caused by the Acquirer, a reduction in cost is not required when submitting the RFV.

a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in EIA-649-1 and the principles of EIA-649 (Copies of these standards are available online at www.sae.org or from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 [inside USA and Canada] or 724-776-4970 [outside

USA]).

b. This DID supersedes DI-SESS-80640D.

c. An electronic version of DD Form 1694, Request for Variance (RFV), is available online at https://www.esd.whs.mil/dd/.

Requirements:

1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The RFV shall be in one of the following formats:

a. DD Form 1694, Request for Variance (RFV),

b. The schema required by the Acquirer’s Integrated Digital Environment (IDE), or

DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.

http://www.sae.org/ http://www.esd.whs.mil/dd/

DI-SESS-80640E

c. The Supplier’s preferred format.

3. Content. The RFV shall contain all the information required by DD Form 1694.

End of DI-SESS-80640E

File details come from the government source that posted it. Updated .