14 - DID_Counterfeit_Prevention_Plan.pdf

PDF 33 KB Posted

Attached to
Amendment- 08 B-1 Nose Radome Repair and New Buy - Final RFP ( Updated)
Solicitation number
FA811923R0004-01
Issued by

About this file

This is a Data Item Description (DID) for a Counterfeit Prevention Plan document (DI-MISC-81832), approved January 21, 2011, with primary responsibility assigned to the National Reconnaissance Office (NRO). The document serves as a template and evaluation tool for contractors to develop and implement comprehensive counterfeit protection strategies. The Counterfeit Prevention Plan will be used by procurement activities to assess the effectiveness of the contractor's counterfeit protection measures and determine award fee eligibility.

The plan must include minimum requirements covering: procurement practices that prioritize Original Equipment Manufacturer (OEM) or OEM-authorized distributors; procedures for exceptions when items are unavailable, including non-OEM parts qualification processes; monitoring procedures with random sampling and supply chain surveillance that do not assume any source is inherently safe; training and certification programs for receiving inspectors; processes to verify counterfeit items; identification, storage, and reporting procedures for counterfeit parts; and self-audits of internal processes. Contractors must ensure all subcontracts contain equivalent requirements tailored to specific subcontractors and monitor subcontractor compliance through on-site audits. A six-step notification procedure is mandatory: quarantine suspect products and document the justification for suspicion; immediately notify the next customer in the chain, with the prime contractor notifying the Contracting Officer and Technical Representative; secure original documentation including part information, procurement traceability, manufacturer documentation, testing results, and affected products; determine whether parts are counterfeit through root cause analysis; isolate confirmed counterfeit parts pending law enforcement direction; and provide additional information to the government's investigation team. The plan must be updated as counterfeiting methods and prevention processes evolve.

View the file

Other files

File Type Posted
Exhibit A - CDRLs.pdf PDF
2 - AFMC_158_Packaging_Requirements.pdf PDF
7 - DID_Certificate_of_Compliance.pdf PDF
22 - DID_Status_Report.pdf PDF
28 - Item_Description_Antenna.pdf PDF
1 - AFMC_260_First_Article_Requirements.pdf PDF
8 - DID_Certification_Data_for_Non_Nuclear_Level_I.pdf PDF
9 - DID_Computer_Software_Product_End_Items.pdf PDF
10 - DID_Conference_Agenda.pdf PDF
16 - DID_Government_Property_Inventory_Report.pdf PDF
21 - DID_Request_for_Variance.pdf PDF
31 - Personnel_and_Skill_Requirement.pdf PDF
3 - DD_Form_1653_Transportation_Data_for_Solicitations.pdf PDF
4 - DD_Form_2169_Special_Packaging_Instructions.pdf PDF
5 - DID_Calibration_Certification_Report.pdf PDF
12 - DID_Contract_Depot_Maintenance_Production_Report.pdf PDF
13 - DID_Contractors_Corrective_Action_Plan.pdf PDF
25 - IUID_Checklist.pdf PDF
26 - PWS_Updated_26_Jan_23.pdf PDF
29 - DD254_Security_Classification.pdf PDF
32 - Pricing_Matrix.xlsx XLSX spreadsheet
FA8119-23-R-0011 P00008.pdf PDF
6 - DID_CAV_Reporting.pdf PDF
11 - DID_Conference_Minutes.pdf PDF
15 - DID_Engineering_Change_Proposal.pdf PDF
17 - DID_Presentation_Material.pdf PDF
18 - DID_Product_Engineering_Design_Data_and_Associated_Lists.pdf PDF
19 - DID_Production_Surge_Plan.pdf PDF
20 - DID_Report_of_Shipping_Item_and_Packaging_Discrepancy.pdf PDF
23 - DID_Test_Inspection_Report.pdf PDF
24 - GFP.pdf PDF
26_PWS_Updated_20_March_23.pdf PDF
27 - Item_Description_Radome.pdf PDF
30 - Justification_for_Qualification_Requirements.pdf PDF
33 - Salient_Characteristics_Radome.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

TITLE: COUNTERFEIT PREVENTION PLAN

Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:

DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A

Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.

a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.

b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).

c. This DID is related to “As Designed” and “As Built” Parts List.

d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).

Requirements:

1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:

a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.

b. Procurement practices and internal processes used for exceptions to buying from

OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.

c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.

d. Training/certification program for receiving inspectors.

e. Process to verify counterfeit.

DI-MISC-81832

- 2 -

f. Processes to identify, store, and report counterfeit parts.

g. Process to ensure subcontracts contain the following requirements (As a minimum):

(1) Requirements to procure only from Original Equipment Manufacturer

(OEM) or OEM franchised distributors

(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained

(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain

(4) Training/certification program for receiving inspectors

(5) Process to verify counterfeit

(6) Processes to identify, store, and report counterfeit parts.

(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)

h. Self-audit of internal processes.

i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.

j. Notification Procedure:

(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.

(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.

Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.

DI-MISC-81832

- 3 -

(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:

a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information

b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence

c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)

d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests

e. List of company products affected

(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)

(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.

(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team

END OF DI-MISC-81832

File details come from the government source that posted it. Updated .