Section L - Exhibit 2.1.7 Response to Questions Baghdad - Amend 006 - 06.25.20.xlsx
XLSX spreadsheet 51 KB Posted
- Attached to
- Worldwide Protective Services III (WPS III)
- Solicitation number
- 19AQMM20R0013
About this file
This federal synopsis announces multiple award indefinite delivery, indefinite quantity contracts for worldwide protective services. Key details include:
-
The Department of State seeks to award several IDIQ contracts for armed personal protective, static guard, and team-based emergency response security services globally, with a focus on high-threat overseas locations. The maximum contract value is $15 billion over a ten-year period including options.
-
Offerors must demonstrate experience within the last five years providing armed personal protective, armed guard, and team-based emergency response security services in high-risk, high-threat environments outside the U.S. with at least one contract valued over $10 million annually in multiple locations employing 75 personnel.
-
Offerors must be U.S. companies without foreign ownership, control or influence or have approved mitigation. Selected contractors must obtain International Code of Conduct Association membership within 60 days of award.
-
A thirty-day proposal period begins after solicitation posting. A mandatory virtual pre-proposal conference will be held approximately two weeks after posting. Questions may be asked for five days following.
-
Attachments containing restricted information will be provided to approved offerors via CD. Offerors must submit registration by the specified date to access these documents.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation #: | 19AQMM20R0013 | ||
| Task Order Number: | 20XX-00xx | ||
| Task Order Title: | Worldwide Protective Services (WPS) III, Sample Task Order - Baghdad Security | ||
| Task Order Name: | Sample Task Order - Baghdad | ||
| Date: | Amendment 006 | ||
| Item | Document Reference (PWS, Attachments, Solicitation) | Questions/Issues | AQM/Program Office Corrective Action/Response |
| 001 | Attachment 6 – Standard Equipment- 2.1.1-Personal Protective Equipment | No manufacturer model number was provided for the Low-Profile Armor Kit. Please provide a model number for this equipment that the government deems acceptible? | Please see IDIQ Attachment 6, 1.D and updated 2.1.1. |
| 002 | Attachment 6 – Standard Equipment- 2.1.2 Body Gear | No manufacturer model number was provided for Tactical Gloves, Low-Profile Belt – Black Leather, Ballistic Sunglasses, Interchangeable Lens. Please provide a model number for this equipment that the government deems acceptible? | Attachment 6, 1.D states, D. Brand names/model numbers are provided as reference only; equipment may be equivalent to or higher quality than the brand names/model numbers specified. |
| 003 | Attachment 6 – Standard Equipment- 2.1.3 Personal Medical Kit | Can the Government confirm the Tactical Medical Tourniquet SOFTT-W is the GEN 4 model? | See Item 2. |
| 004 | Attachment 6 – Standard Equipment- 2.1.3 Personal Medical Kit Pouch/Carrie | No manufacturer model number was identified for the Medical Kit Pouch/Carrier. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 005 | Attachment 6 – Standard Equipment- 2.1.3 Personal Medical Kit | No manufacturer model number was identified for the Trauma Shears. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 006 | Attachment 6 – Standard Equipment- 2.1.4 Low-Profile Holster System | No manufacturer model number was provided for Low-Profile Holster System-Raven Concealment Systems. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 007 | Attachment 6 – Standard Equipment- 2.2 Basic Issue Items for Specialized Security Support Services (S) Personnel, 2.2.3 DS Belt Kit, Black | No manufacturer model number was provided for DS Belt Kit, Black-Raven Concealment Systems. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 008 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.3 Clothing (All Weather) | No manufacturer model number was provided for Vertx -Battle Dress Uniform (BDU) Blouse/Jacket. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 009 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.3 Clothing (All Weather) | No manufacturer model was provided for Vertx -Cargo or BDU Pants. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 010 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.3 Clothing (All Weather) | No manufacturer model numbers were provided for Rain Gear – Raincoat, Pants and Boots. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 011 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.3 Clothing (All Weather) | No manufacturer model numbers were provided for Summer and Winter socks. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 012 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.3 Clothing (All Weather) | No manufacturer model number was provided for Long Underwear, Top and Bottom- Propper. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 013 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.3 Clothing (All Weather) | No manufacturer model number was provided for Jacket, Cold Weather 3-in-1- 5.11. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 014 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.3 Clothing (All Weather) | No manufacturer model number was provided for Running Shoes. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 015 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.3 Clothing (All Weather) | No manufacturer model number was provided for Gym Socks. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 016 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.5 Belt Gear | No manufacturer model number was provided for Low-Profile Holster System, Raven Concealment. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 017 | Attachment 6 – Standard Equipment- 2.3 Basic Issue Items for Guard (G) Personnel, 2.3.5 Belt Gear | No manufacturer model number was provided for Drop Holster for Glock-19- Safariland. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 018 | Attachment 6 – Section 3 SPECIAL PROTECTIVE EQUIPMENT- 3.1 Firearms | Will the Government be providing all Weapons as GFE? | For use at the Task Order place of performance, yes. |
| 019 | Attachment 6 – Section 3- 3.1 Firearms | They are two models SR-25 CC M-LOK and SR-25 PC M-LOK. Which is the correct model? | See Item 2. |
| 020 | Attachment 6 – Section 3- 3.3 Optics | No manufacturer model numbers were provided for the optics equipment. Please provide a model number for this equipment that the government deems acceptible? | Please see Attachment 6, 3.3 for item description. |
| 022 | Attachment 6 – Section 6 ARMORY TOOLS, EQUIPMENT, AND PARTS-6.1 Armory Tool List | No manufacturer or model numbers were provided for the Voltage Regulator. Please provide a model number for this equipment that the government deems acceptible? | See Item 2. |
| 023 | Attachment 6 – Section 6 ARMORY TOOLS, EQUIPMENT, AND PARTS- 6.4-6.6 | No manufacture model numbers were provided for the M240, M203, and M249 Tool Lists. Please provide a model number for this equipment that the government deems acceptible? | The specific tools/gauges under these categories will be provided by DEAV as GFE. |
| 024 | Attachment 6 – Section 6 ARMORY TOOLS, EQUIPMENT, AND PARTS-6.7.1 SR-25 | Folding Front Sight Assembly Mk11 Mod0 is Discontinued with no replacement. Can the Government provide an alternative part number? | Please see IDIQ Attachment 6, 1.D, and updated 6.7.1 |
| 025 | Attachment 6 – Section 6 ARMORY TOOLS, EQUIPMENT, AND PARTS-6.7.1 SR-25 | They are two models SR-25 CC M-LOK and SR-25 PC M-LOK. Which is the correct model? | Attachment 6, 1.D states, D. Brand names/model numbers are provided as reference only; equipment may be equivalent to or higher quality than the brand names/model numbers specified. |
| 026 | Section L, Exh 2.1.0, 4.4.2 | The PWS for the sample task order states that the Contractor shall support the government provided H&MCS under this TO in accordance with the requirements specified the IDIQ contract. Can the government please clarify what specifically is meant by support to this government provided function? | The Contractor is required to provide the emergency medical personnel, as specified in the sample task order Staffing Table as well as all equipment, supplies, and medications that would be identified in the contractor provided medical protocols. |
| 027 | Section L, Exh 2.1.0, 4.4.3 | Can the government confirm that all gym equipment and associated maintenance (to include janitorial) will also be government provided? | All gym equipment and associated maintenance (to include janitorial) will also be government provided. |
| 028 | Section L, Exh 2.1.0, 4.4.4 | The contractor will be responsible for providing transportation services to and from the task order location and the airport. Will the personnel providing this service be direct billable labor positions that are included in the task order staffing requirements? Where are contractors to price this labor, e.g. in the FFUP labor CLINs or the FFP Transportation CLIN? | CFE vehicles must be used for airport transportation. This is deemed administrative. No direct billable task order personnel may conduct airport runs. |
| 029 | Section L, Exh 2.1.0, 4.4.4 | Will the government provide armored vehicles for use in providing transportation to/from the airport, e.g. is that service considered operational or administrative? | See Item 28 above. |
| 030 | Section L, Exh 2.1.0, 4.4.4 | Will the government provide the weapons and ammunition required for transportation services at the task order location? | The Government will not provide weapons/ammunition for the transportation service identified in Section 4.4.4.. |
| 031 | Section L, Exh 2.1.0, 4.4.6 | The PWS states that the contractor is prohibited from using off compound housing or office space to provide direct support under this contract. Please confirm that the transportation services identified in section 4.4.4 will be billable contract positions and will be provided housing and life support. | See Item 28 above. |
| 032 | Section L, Exh 2.1.0, 4.4.9 | There is no "Logistics Management Services" section included in Section C of the IDIQ. Is this PWS section in reference to Section C.8.4.2.4 and C.8.4.2.5? | The Logistics section titles have been updated to be consistent with Section B.15 and C.8.4.2.6 of the IDIQ. See updated Exhibit 2.1.0, Section 4.4.9, Attachment 9 Section 7, Exhibit 2.1.6, Section L.6.2.3 and Section M.3.2.3. |
| 033 | Section L, Exh 2.1.0, 4.4.12 | The PWS states that the government will provide ammunition at the task order place of performance. Does this include ammunition required for all weapons qualification training and testing performed at the TO Location? | See Exhibit 2.1.0, Section 4.4.11. All ammunition at the TO location will be provided by the Government with the exception of weapons/ammunition for the transportation service identified in Exhibit 2.1.0, Section 4.4.4. |
| 034 | Section L, Exh 2.1.0, 5.0 | The PWS states that "Personnel filling LPMO positions must have security clearances/public trust determinations as established in Attachment A, Figure 2." The IDIQ allows for the contractor to identify other labor categories as needed, e.g. a finance manager, HR specialist, etc. Will these additional LPMO support positions that are not identified in Attachment A require a clearance or public trust determination? | Generically no, unless the personnel requires OpenNet access. This will be evaulated on a case-by-case basis. |
| 035 | Section L, Exh 2.1.0, 5.0 | If the answer to the above question is yes, for the purposes of calculating transition costs, what is the Government's timeline for awarding the final clearance? | Not applicable. |
| 036 | Section L, Exh 2.1.0, 4.4.4 & 7.0 | Can the government clarify what vehicles will be provided by the government and which are to be provided by the Contractor? The SOW states that if additional vehicles are required for administrative purposes, they will be contractor provided. Please define administrative purposes, e.g. does this include transportation of guards to the posts? | Vehicles for operational use on and off-compound are provided by the Government. Vehicles for administrative use on-compound are provided by the Government. Any other vehicles are the responsibility of the Contractor. |
| 037 | Section L, Exh 2.1.0, 4.4.4 & 7.0 | If the Contractor is providing administrative vehicles, what is the government's criteria to determine which vehicles should be armored? | All vehicles used off-compound must be armored. |
| 038 | Section L, Exh 2.1.0, 4.4.4 & 7.0 | Section 7 identifies a total of 130 vehicles - are these the vehicles to be provided by the government? If so, please provide a current inventory. | The 130 vehicles are Government provided. Vehicle details would be provided upon TO award. |
| 039 | Section L, Exh 2.1.0, 7.0 | The only variation to the IDIQ standard equipment is identification of the required medical equipment. Can the government please confirm that contractors will be required to supply all items in Sections 3-6 of Attachment 6 of the IDIQ, to include weapons, radios, camera systems and all armory equipment? | Please reference Exhibit 2.1.6, L.7 for pricing instructions. Weapons, radios, camera systems, and all other armory equipment are Government provided. |
| 040 | Section L, Exh 2.1.0, 8.1 | Will the government provide kennels at the task order place of performance? If so, will the contractor be responsible for janitorial services and other kennel supplies? | For the purpose of the sample task order, kennels will Government provided. The Government will provide janitorial services. |
| 041 | Section L, Exh 2.1.0, 8.1 | Will the contractor be responsible for laundry services? Will washers/dryers at the task order location be provided by the government? | For the purpose of the sample task order, laundry services will be provided by the Government. |
| 042 | Section L, Exh 2.1.0, 8.1 | Will the government provide maintenance and janitorial services for the government- provided housing? | For the purpose of the sample task order, janitorial services will be Government provided. |
| 043 | Section L, Exh 2.1.0, 8.1 | Are cell phones or smart phones required for any of the staff identified in Attachment A? Will those be government provided or is the contractor required to provide these and the associated service? | For the purpose of the sample task order, the Government is not specifying cell phones are a requirement and the offeror is not required to price for this item. For the sample task order, consider cell phones as Government provided. |
| 044 | Section L, Exh 2.1.5 | The labor quantity identified in the base period (312 days) reflects performance of the entire period and does not account for the transition period that may be up to 120 days. Assuming that labor invoicing will begin after transition on FOC, should the contractor reduce the quantity in the base period consistent with the proposed transition period? | Any reduction in the number of direct billable days will be adjusted post-award based on the proposed IOC date. For the sake of the this sample task, the 312 days should be left as stated. |
| 045 | Section L, Exh 2.1.5 | SubClins X303 (GP clothing), X304 (special protective equipment), X305 (communications equipment) , X306 (vehicle equipment) and X307 (armory equipment) were not removed as a requirement from the base IDIQ. These SubCLINs were not identified in the pricing template. Are contractors to price these subCLINs? | Offerors are not required to price for these items. For the purposes of the STO, the listed items are Government provided. |
| 046 | Section L, Exh 2.1.0, 4.3.5 | IDIQ Attachment 10 states that required profiency and obedience training at the task order location will either be provided by the government or by the contractor. For this sample task order, will the contractor be responsible for proficiency training at the task order location? | The Contractor will be responsible for profiency obedience training in coordination with the post established SOPs and Government Technical Monitor. |
| 047 | Section L, Exh 2.1.0, 4.3.5 | Will the government provide the necessary supplies for the government provided canines? This would include vari kennels, leashes, collars, rewards, etc. | The Government will provide the necessary supplies for the Government provided canines |
| 048 | Section L, Exhibit 2.1.1 | For the certification required for the FI/SOT, will the government please identify the firearms simulation training system that will be used for the task order? | Exhibit 2.1.2 GFE Inventory, is updated to reflect the Meggitt FATS. |
| 049 | Section L, Exhibit 2.1.0, 4.7 | Per the Sample Task Order PWS, the contractor is to provide a GEMS system. Can the government please provide additional details necessary for contractors to accurately price this requirement, e.g. number of activation points, the number of handheld devices required and the number of required media tags? | Exhibit 2.1.0 Baghdad Security - Performance Work Statement, is updated to reflect activation points and GEMS information. |
| 050 | Section L, Exhibit 2.1.1 | Under this sample task order, training will be provided by the contractor. Given the volume of annual training that would be expected on a task order of this size and that either a Director of Training or Training Coordinator be in attendence for all contractor provided training, will the government please add Training Coordinators to the staffing required for this sample task order? | For the purpose of the sample task order, any additional personnel will not be direct-billable. |
| 051 | Section_L_-_Exhibit_2.1.2_Attachment_B_Baghdad_Security_-_GFE_Inventory_-_04.10.2020(1) | Can the Government confirm radios will be GFP? |
| If they are contractor provided, can the Government provide the specifications, required ancillaries, and numbers of radios required for P personnel, G personnel, S personnel, vehicles and base stations? | Radios are Government provided. | ||
| 052 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.3 | Can the Government confirm if the contractor has to provide televisions and cable service for the force? |
| If so, can the Government detail the facilities where the contractor could place TV's (for example in personal rooms, common areas, etc.)? | The Contractor is required to provide televions and cable service, per Section C. of the IDIQ. For the purpose of the sample task order, TVs shall be placed in personal rooms. | |||
| 053 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.3 | Can the Government confirm if mail service is provided by the Government? | Per Section C.8.4.1.4 (D) of the IDIQ, the Contractor is required to provide mail services. | |
| 054 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.12.1 | Can the Government confirm the number of lanes in the indoor firing range and frequency of use? | For the purpose of the sample task order, the indoor range has eight (8) lanes. The indoor range it open to WPS use four (4) days a week. | |
| 055 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.12.1 | Can the Government explain why firing range O&M is not performed under the existing PAE O&M contract? | For the purpose of this sample task order, this task order does not represent any current WPS operation. | |
| 056 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.12.1 | Can the Government provide the make, model, age, condition, and expected life cycle, of all range equipment? | All available Government Furnished Equipment has been provided in Exhibit 2.1.2 GFE Inventory. | |
| 057 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.12.1 | Will all parts, equipment, materials, and supplies required to conduct maintenance and repairs on the indoor range be cost reimbursable? | CLIN X700 – Indoor Range Operations and Maintenance has been added to the Exhibit 2.1.5 Baghdad Security – Pricing Table under General Requirements (FFP) CLIN. | |
| 058 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.4. | Are any vehicles provided as GFE? |
| If so, can the Government update the provided GFE list? | All vehicles on this sample task order are GFE. Vehicle numbers are provided in the PWS. Specifics on the vehicles are not relevant to the purposes of proposal. | ||
| 059 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.4. | Can the Government confirm if CFE or GFE vehicles are to be used for transportation to and from airport? |
| Are TO personnel authorized to conduct airport runs? | See Item 28 above. | |||
| 060 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 4.4.4. | Can the Government confirm if CFE vehicles are currently used by the Guard Force (G) personnel for on site administrative purposes (meal delivery, moving personnel from one post another etc.)? | All on-compound vehicles are GFE. | |
| 061 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 8.2 | Can the Government confirm if Automatic External Defibrillators (AED) are GFP? | For the purpose of this sample task order, AEDs are GFE. | |
| 062 | Section L.2.3.1 Logistics and Property Management/Accountability, Items B, G | The Offeror shall address the following components in its logistics and property management and accountability plan. |
G. Maintenance, repair, and lifecycle replacement plan and schedule for all Contractor-Acquired Property (CAP), Contractor-Furnished Equipment (CFE), and GFE.
"The Offeror shall address the following components in its logistics and property management and accountability plan.
B. Quantitative analysis of maintenance and lifecycle replacement requirements for all logistics assets required to support the TO, to include:
1. Status description of each item; Item B of the Logistics and Property Management/Accountability requirement requests that Offers shall address the following:
Quantitative analysis of maintenance and lifecycle replacement requirements for all logistics assets required to support the TO, to include:
1. Status description of each item;
2. Person (or position) responsible for the operational condition of the item;
3. Description of required maintenance;
4. Frequency of maintenance
5. Identification and acquisition of applicable maintenance manuals;
6. Area of responsibility for each maintenance facility;
7. Test equipment
8. Spare parts (on-hand) and replacement parts requirements
9. Reorder thresholds, to include forecasting of expiration dates."
However, Item B of the requirement also requests the following:
"G. Maintenance, repair, and lifecycle replacement plan and schedule for all Contractor-Acquired Property (CAP), Contractor-Furnished Equipment (CFE), and GFE."
Several of these items requested in Item B are redundant and duplicated in what is being asked in Item G. Because of the page limitations in the Sample TO, can the Government consolidate the requirements or remove one of the requirements?
2. Person (or position) responsible for the operational condition of the item;
3. Description of required maintenance;
4. Frequency of maintenance
5. Identification and acquisition of applicable maintenance manuals;
6. Area of responsibility for each main enhance facility;
7. Test equipment
8. Spare parts (on-hand) and replacement parts requirements
| 9. Reorder thresholds, to include forecasting of expiration dates. | The page limit for the sample task order technical responses has been increased from 50 pages to 75 pages. The Government will not consolidate requirements. | |
| 063 | L.6.2.3.1 Logistics and Property Management/Accountability, Item L |
Sample TO PWS 4.3.5, Item B Section L.6.2.3.1, Item L states, "Plan for acquiring and managing all required canines, to include purchase, training, transportation, in-country management, and retirement."
| Since EDCs under this TO will be Government provided, can the Government confirm Section L.6.2.3.1(B) does not apply and remove this requirement from the Sample TO Instructions? | See change to Exhibit 2.1.6 Section L.6.2.3.1 (L) under Amendment 04. | ||
| 064 | Section L Exhibit 2.1.0 Baghdad Security SOW. Section 8.2 and Exhibit 2.1.2 GFE | Section L Exhibit 2.1.2 GFE inventory does not contain a full list of weapons, radios, vehicles, ancillary equipment, MWR items, etc. that the contractor would expect to be issued; and enable the offeror to build pricing. |
| Can the Government confirm that Section L, Exhibit 2.1.2 GFE inventory contains all the GFE that will be issued to the contractor? If not, can the Government provide an update GFE list (Exhibit 2.1.2, Attachment B)? | See Item 57. | ||
| 065 | Section L Exhibit 2.1.5 Baghdad Security Pricing table, Sub CLIN X500 | As the contractor transition team will be in place from award, through mobilization and FOC. Can the Government confirm CLIN X01 captures mobilization costs from award through IOC, ending at FOC? |
| Can the Government clarify when the awardee can invoice for this CLIN? | The mobilization phase is from the beginning of the period of performance specified at the task order award to IOC. For clarification, see change in invoicing instruction to Exhibit 2.1.6 Section L.7.1.E.1.c under Amendment 04. | ||||
| 066 | Section L, Exhibit 2.1.1 Attachment A, Staffing table | Can the Government specify which S positions are armed? | Offerors should review Attachment 1 of the IDIQ - Personnel Qualifications. | ||
| 067 | Section L.2.3.1 Logistics and Property Management/Accountability, Item K | Due to the current situation with obtaining an import license for controlled medications from the appropriate Iraq authority, will DOS assist in the controlled medication transport for the Sample TO? | In accorance with Section H.7 of the IDIQ, all requests for assistance must be submitted to the Contracting Officer for consideration. | ||
| 68 | Sample TO PWS Exhibit 2.1.6 Proposal Instructions, L.6.1.2 Quality Control and Risk Management Plan, L.6.2.2.6 Staffing Quality Assurance Plan, 6.2.2.7 Training Quality Assurance Plan, 6.2.3.2 Logistics and Property Management Quality Assurance Plan, IDIQ Attachment 9 -TOMP | The subject Exhibit instructions call for four (4 ) Quality Assurance Plans (QAPs). The TOMP, Section 1.B calls for separate Appendices for: 1) a detailed and comprehensive Quality Control Plan; and 2) a detailed and comprehensive QAP. While quality management is critical need, this requirement, notably for the page limited body of the proposal is unusually large. 1) Will the Government eliminate the requirements for the Staffing, Training and Logistics and Property Management QAPs? and/or 2) May offerors present Tables of Contents for the required plans, displaying their responses to the requirements? | Offerors are to provide the requirements for the sample task order as outlined in Exhibit 2.1.6 Baghdad Section L - Instructions to Offerors. | ||
| 069 | WPS III Sample TO PWS Exhibit 2.1.1 Attachment A Staffing Table: Clearance Requirements | This offeror experienced an average DOS/DS security clearance adjudication time of 114 days in 2019, which would leave no room for delay against the WPS III Baghdad mobilization and transition period maximum of 120 days, notwithstanding the potential additional constraints imposed by the COVID-19 pandemic. Please advise whether the Government will make allowance for this by extending the mobilization and transition period. | For the purpose of this sample task order, assume you may obtain at least an interim clearance or vetting within a reasonable amount of time in the mobilization period. The Government recognizes the COVID-19 pandemic and current environment, but the sample task order proposal makes the assumption that there is not any delays due to a Pandemic. | ||
| 70 | WPS III Sample TO PWS 4.4.12 Training Services, IDIQ Attachment 2 - Training; IDIQ Attachment 3 - Firearms | Neither of the cited documents refers to WPS 2 to WPS III Transition Training. May offerors assume that incumbents performing in Baghdad on the WPS II Task Orders meet all WPS III Training requirements? | Attachment 2 of the IDIQ specifies qualification timelines for personnel that have worked on WPS II and have previous training under WPS II. There is no transition training. | ||
| 071 | WPS III Sample TO PWS 4.4.12 Training Services, IDIQ Attachment 2.3.1 NPSS Training- recertification and refresher training | Recertification is not listed in the subject Attachment. Please clarify the requirement | NPSS training is valid for five (5) years. If Attachment 2 of the IDIQ does not specify refresher training as part of a labor category, it is not a requirement. See 3.10.1.F in IDIQ Attachment 2. | ||
| 72 | IDIQ Attachment 2 LN training | The subject Attachment does not mention LN training requirements. Please clarify. | Local Nationals (LN) contractors must be trained per the labor category standards in IDIQ Attachment 2. The training can be conducted at the TO place of performance for LN labor categories. | ||
| 073 | WPS III Amendment 04, Questions and Answers | Q&A 36 States that the LPMO DPM has been removed from the TO Staffing Table, however Q&A 56 says the PLMO DPM is not Key Personnel – implying the position is still required. Please clarify | The LPMO DPM position is no longer a required position for the sample task order. | ||
| 74 | ATT 2 3.1 | Support personnel (hereinafter referred to as NPSS) training, to include recertification, and refresher training. See details in this attachment for NPSS training requirements | |||
| However the course is not listed in WPS III Attachment 2. Please clarify. | NPSS is valid for five (5) years from the certification date. If the NPSS is annotated as a supervisor, there are annual refresher requirements for the position. If there is no refresher training specified, then it is not a requirement. | ||||
| 075 | ATT 2 3.1 | Guard Services, to include recertification, and refresher training. See details in this attachment for NPSS training requirements | |||
| However the course is not listed in WPS III Attachment 2. Please clarify. | Guard training certification periods are specified in the course descriptions contained in Attachment 2 of the IDIQ. There are annual refresher guard requirements specified in Attachment 2 to occur at the TO place of performance. | ||||
| 76 | PWS Staffing Table | In the PWS Staffing attachment, some of these CLINS are labeled S and for the others the CLIN is not designated (e.g., DDMFI – 2, FI – 13, FI/SOT – 14). Please advise. | Exhibit 2.1.1 - Staffing Table has been updated with the labor category designator. | ||
| 077 | Amendment 4, Exhibit 2.1.6 | Two different versions of Exhibit 2.1.6 were provided. Which is correct? | At the time of solicitation release, two Exhibit 2.1.6 were released in error. One was dated 04/21/20, and the other was dated 04/30/20. The one dated 04/30/20 was the correct version. | ||
| 78 | WPS III Sample Task Order – Baghdad Security, Exhibit 2.1.1: Attachment A “Staffing Tables,” “Baghdad Embassy Compound, Explosive Detection Canin Support” | In the WPS STO, Exhibit 2.1.1: Attachment A Staffing Tables, The Kennel Master, and the Canine Trainer are not assigned a Firearms Training Category. However, in the Baghdad Diplomatic Support Center Staffing Table of the same document, both the KM and CT are assigned a Firearms Training Category of (S). | |||
| Please verify that the BEC Kennel Master and Canine Trainer should be assigned a Firearms Training (S) Category, the same as the BDSC Kennel Master and Canine Trainer. | Exhibit 2.1.1 - Staffing table has been updated to reflect relevant labor categories to reflect P, S, or G. Firearms qualification requirements for S labor category positions are annotated in IDIQ Attachment 1. | ||||
| 079 | WPS III Sample Task Order – Baghdad Security, Exhibit 2.1.1: Attachment A “Staffing Tables,” “Baghdad Embassy Compound, Explosive Detection Canin Support” | The STO Attachment A, Staffing Table shows that the BDSC Kennel Master, Canine Handlers, and Canine Trainer are “(OCONUS)” but it does not list the BEC Kennel Master, Canine Handlers, and Canine Trainers as “(OCONUS).” Please clarify that this omission was an oversight and does not have any significance. | For clarification of Exhibit 2.1.1 - Staffing Table, all positions other than those annotated in the LPMO, are OCONUS staffing positions. Exhibit 2.1.1 has been updated to reflect this clarification. | ||
| 80 | Exhibit 2.1.6, Section L.7.1.E (2)(a) | Exhibit 2.1.6, Section L.7.1.E (2)(a) instructs Offerors that the labor portion of the FFUP for the sample task order shall not exceed the Offeror’s current not-to-exceed (NTE) fully burdened IDIQ labor rate per labor category. The FFUP shall also include all costs associated with providing the positions, including but not limited to direct labor, uplifts/bonuses, training, travel, taxes, insurance (including DBA), other direct costs, indirect costs and profit. Section L - L.13.1.3.a(9) specifically prevents Offerors from including DBA in their not-to-exceed (NTE) fully burdened IDIQ labor rate. Additionally, Section L L.13.1.3.B4(4) prevents offerors from including "any other costs, including other compensation costs like post hardship differential pay and danger pay" in their not-to-exceed (NTE) fully burdened IDIQ labor rate. Please confirm that the FFUP for the sample task order is the sum of the fully burdened costs associated with providing the position and the associated NTE fully burdened IDIQ labor rate minus any discounts. In other words, the FFUP includes the IDIQ NTE labor rate, plus DBA, plus uplifts and all other costs associated with providing the position. | The FFUP for the sample task order is the sum of the associated NTE fully burdened IDIQ labor rate minus any discounts, plus fully burdened costs associated with providing the position as described in Exhibit 2.1.6 Section L.7.1.E(2). | ||
| 081 | Exhibit 2.1.6, Section L.7.1.E (2)(a) | Exhibit 2.1.6, Section L.7.1.E (2)(a) instructs Offerors that the labor portion of the FFUP shall not exceed the Offeror’s current not-to-exceed (NTE) fully burdened IDIQ labor rate per labor category. The FFUP shall also include all costs associated with providing the positions, including but not limited to direct labor, uplifts/bonuses, training, travel, taxes, insurance (including DBA), other direct costs, indirect costs and profit. Please confirm that the total FFUP for a labor category, that includes the NTE IDIQ labor rate and all cost associated with providing the positions, can exceed the the Offeror’s current not-to-exceed (NTE) fully burdened IDIQ labor rate for the associated labor category. | See Item 80 above. | ||
| 82 | Exhibit 2.1.6, Section L.7.1.E (2)(a) and Exhibit 2.1.7 Response to Questions Baghdad Security Amend 04 - Item 31 | Exhibit 2.1.6, Section L.7.1.E (2)(a) requires offerors to include training in the the FFUP. The requirements also states that the labor portion of the FFUP shall not exceed the Offeror’s current not-to-exceed (NTE) fully burdened IDIQ labor rate per labor category. Please confirm that training is not priced as part of the NTE IDIQ fully burdened labor rate. Rather it is an additional costs included in the FFUP that is applied to the NTE IDIQ labor rate at the task order level. | See Item 80 above. | ||
| 083 | Exhibit 2.1.6, Section L.7.1.E (2)(a) | Exhibit 2.1.6, Section L.7.1.E (2)(a) requires offerors to include travel in the the FFUP. Please confirm that travel is not priced as part of the NTE IDIQ fully burdened labor rate. Rather it is an additional costs included in the FFUP that is applied to the NTE IDIQ labor rate at the task order level. | See Item 80 above. | ||
| 84 | Exhibit 2.1.6, Section L.7.1.E (2)(a) | Exhibit 2.1.6, Section L.7.1.E (2)(a) requires offerors to include taxes in the the FFUP. Please confirm that taxes are not priced as part of the NTE IDIQ fully burdened labor rate. Rather they are an additional cost included in the FFUP that is applied to the NTE IDIQ labor rate at the task order level. | See Item 80 above. | ||
| 085 | Exhibit 2.1.6, Section L.7.1.E (2)(a) | Exhibit 2.1.6, Section L.7.1.E (2)(a) requires offerors to include taxes in the labor portion of the FFUP. This will require offerors to develop a blended cost for taxes per NTE labor category over the period of performance. This requirement is extremely challenging since taxes are country specific and legal requirements are constantly changing in WPS III performance locations. Offerors will be required to accept significant costs risks that will ultimately be passed onto the Government. We respectively request that the Government include taxes as a separate CLIN, preferably a cost reimbursable CLIN, negotiated at the task order level to decrease the operational and cost risks to both the offeror and the Government. | See Item 80 above. | ||
| 86 | Exhibit 2.1.7 Response to Questions Baghdad Security Amend 04 - Items 1 and Item 37 | The Government response to Exhibit 2.1.7 Iteam 1 - Life support and housing will not be Government provided for the transition team of the Sample TO. This response seems to contrict the Government response to Item 37 - Updated the STO PWS under section 8.1 to clarify that housing, transportation, and life support services will be government provided for the mobilization team. Please confirm that housing, transportation, and life support services will be government provided for the mobilization team in the sample task order. | Clarification: Life support and housing will be Government provided for the moblization/transition team of the Sample TO for the duration of the transition. A typo was made in Item 1 of Amendment 04 Response to Questions. | ||
| 087 | Exhibit 2.1.7 Response to Questions Baghdad Security Amend 04 - Item33 | The Government response to Iteam Exhibit 2.1.7 Item 33 indicates that SubCLIN X600 has been removed. However, the Sample Task Order Pricing Table included with Amendment 4 includes SubCLIN X600. Please confirm that the Government is not removing SubCLIN X600. If the Government is removing the CLIN please confirm in which CLIN Local Program Management costs should be priced. | CLIN X04 Is Local Program Management Office. Sub-CLIN X600 is where pricing is to be proposed. | ||
| 88 | Exhibit 2.1.7 Response to Questions Baghdad Security Amend 04 - Items 1 and Item 37 | The Government response to Exhibit 2.1.7 Item 1 - Life support and housing will not be Government provided for the transition team of the Sample TO. This response seems to contradict the Government response to Item 37 - Updated the STO PWS under section 8.1 to clarify that housing, transportation, and life support services will be government provided for the mobilization team. Please confirm that housing, transportation, and life support services will be government provided for the mobilization team in the sample task order. | See Item 86 above. | ||
| 089 | Exhibit 2.1.7 Response to Questions Baghdad Security Amend 04 - Item33 | The Government response to Iteam Exhibit 2.1.7 Item 33 indicates that SubCLIN X600 has been removed. However, the Sample Task Order Pricing Table included with Amendment 4 includes SubCLIN X600. Please confirm that the Government is not removing SubCLIN X600. If the Government is removing the CLIN please confirm in which CLIN Local Program Management costs should be priced. | See Item 87 above. | ||
| 90 | Exhibit 2.1.6 Section L.6; IDIQ Section L.13.1.4; Attachment 9 TOMP | Exhibit 2.1.6 Section L.6-Management/Technical Response provides instructions describing the minimum information to be provided in the narrative response to the Baghdad Security Sample Task Order, specifies the sections and topics by which the response shall be organized, and refers the offeror to Section L of the IDIQ solicitation for additional instructions. IDIQ Section L.13.1.4 states the Offeror shall provide a technical response to the Baghdad Security Sample Task Order in the form of a Task Order Management Plan (TOMP). IDIQ Attachment 9 - Task Order Management Plan Requirements state at Section 1, Paragraph A “Regardless of what components of the TOMP are requested as part of the TO RFP, the Contractor shall submit all applicable TOMP sections as a deliverable...” While there are similarities between the content requirements of Exhibit 2.1.6 Section L.6 and the Attachment 9 TOMP Requirements, there are multiple instances where the Attachment 9 TOMP states requirements that are not included in the Exhibit 2.1.6 Section L.6 sample task order instructions. For the purposes of the sample task order response, please provide guidance as to how the Government wishes Offerors to respond (or not) to Attachment 9 TOMP requirements that are not otherwise specified in the Exhibit 2.1.6 Section L.6 instructions. | Offerors are to response to requirements as outlined in Exhibit 2.1.6. | ||
| 091 | Exhibit 2.1.6 Section L.6.2.3.3; Attachment 9 TOMP | Amendment 4 deleted the instruction “(see Section 3, Quality Control Plan)” from Exhibit 2.1.6 Section L.6.2.3.3.E-Housing and Office Quality Assurance Plan. However, it was not deleted from the same paragraph in Attachment 9 TOMP 8.3-Housing, Office, and Temporary Labor Camp Assurance Plan. Does the Government wish Offerors to respond to the Exhibit 2.1.6 instructions or the Attachment 9 TOMP? | Outdated references to the section for quality control plans were removed from the IDIQ Attachment 9. | ||
| 92 | Solicitation - C.7.1.E and C.7.8.C | Since contractors are required to adhere to local regulations in accordance to their licensing, has the USG obtained an exemption to the Article 15 section 5 of the PSC law (no 52) of 2017 regarding the appointment of 25% of their workforce as local nationals? | For the purpose of this sample task order assume the Government has obtained an exception for the 25% workforce provision of PSC law. | ||
| 093 | General; Section L -Exhibit 3.0-Response to IDIQ Questions-Amend 005-06.12.20; Amendment 4 Section L-Exhibit 2.1.6 Baghdad Section L-Proposal Instructions-06.10.20 | Given the changes in Ammendments 4 and 5, especially the clarification response Item 53 in the Amendment 005 Response to Questions and its effect on pricing complexity, we respectfully respect the Government extend the submission date by at least 14 days. | Proposal due date will be as stated on the SF-30 of the soliciation. | ||
| 94 | Quality Assurance Plan: Exhibit 2.1.6 Baghdfad Proposal Instructions; IDIQ Section L Instructions to Bidders; IDIQ Attachment 9, TOMP | Each of these reference documents is silent on whether the (detailed) Quality Assurance Plan (QAP), an appendix to the TOMP, is included or excluded from the sample task order page count. As this is a lengthy document, we respectfully request the Government allow the QAP to be excluded from the 75 page Technical Response page limit. | See Item 68 above. | ||
| 095 | Amendment 04 Response to Questions | The Government's response in Item 1 states "Life support and housing will not be Government provided for the transition team of the Sample TO" while its response in Item 37 states "Updated the STO PWS under Section 8.1 to clarify that housing, transportation, and life support services will be government provided for the mobilization team. " These appear to conflict. Could the government please clarify which is correct? Or, if both statements are correct, can the Government outline the difference is between the transition and mobilization teams, if any? | See Item 86 above. | ||
| 96 | Exhibit 2.1.6 Proposal Instructions | To align with the format of other volumes of the response, should the Technical Response and Pricing Approach in Volume 3 be labeled as Part 01 and Part 02, respectively? | The technical response includes the pricing. Offerors are invited to divide the technical narrative from the pricing portion as deemed reasonable. | ||
| 097 | Exhibit 2.1.3 | Exhibit 2.1.3/Attachment C states that the Personnel and Canine Daily Accountability Report is to be provided "Daily, by close of business" while SOW Section C.8.4.2.1.B.1 states, "Daily, each morning, the Contractor shall submit a complete and accurate accountability of all personnel and canines." Could the government clarify which of these is correct? | Section C.8.4.2.1.B.1 of the IDIQ has been updated to reflect by close of business | ||
| 98 | Exhibit 2.1.4 | Exhibit 2.1.3/Attachment C states that the Personnel Report/Muster Sheet is to be provided "Within 7 calendar days of the end of every billing period." while SOW Section C.8.4.2.1.B.2 states, "At the end of each billing period, within the first forty-eight (48) hours, submit the muster " Could the government clarify which of these is correct? | Section C.8.4.2.1.B.2 of the IDIQ has been updated to reflect within 7 calendar days. | ||
| 099 | Amendment 004 Task Order Q&A | ||||
| Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 2.0 B&C requires mobilization and transition. Section C.10.7.B of the IDIQ requires a mobilization team to handle all aspects of mobilization and transition. Amend 004 Q&A Question 37, the government states life and housing will be provided to the mobilization team. In Question 1 the government states that life and housing will not be provided to the transition team. The mobilization team will be dedicated to handle both the transition and mobilization. Can the government confirm the mobilization team will be provided housing and life while they handle mobilization and transition activities? | See Item 86 above. | |||
| 100 | Exhibit 2.1.5 | ||||
| Exhibit 2.1.0 Baghdad PWS (06.10.20) | Licenses and Permits are reserved under Section 3 of PWS. In Exhibit 2.1.5, CLIN X509, the government is requesting a firm fixed price for Licenses, Permits, and Registration Fees. Does the government require a firm fix priced for CLIN X509? If yes, can the government provide clarification in Section 3 of the PWS? Section B.14 of IDIQ states that licenses will be negotiated at the TO. | CLIN X509 has been removed. Revised Exhibit 2.1.5 Pricing table has been provided. | |||
| 101 | Attachment A | ||||
| Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 4.1.1.G requires Protective Services (PRS) Positions assigned to the Quick Response Force (QRF) must attend and successfully complete QRF training prior to providing QRF services. Is the government requesting 8 Shift Leader (SL) (OCONUS) (P) of which 4 will be part of the QRF? Or is the government requesting 12 Shift Leader (SL) (OCONUS) (P), 8 for PRS and 4 for QRF? | The staffing table is organized where the part of the table that outlines quantities of ERT or QRF are separate from other quantities outlined in the staffing table. For example, if SLs are identified in one area as a quantity of 8, and there are 4 SLs identified in QRF, then it would be a count of 12 SLs. | |||
| 102 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 4.1.1.G requires PRS positions to complete QRF training. In Attachment A, the government lists PRS positions and QRF positions which are the same positions/categories. Can the government confirm that only QRF positions receive QRF training? | Only those personnel identified in the staffing table under QRF, require PSS and QRF training. | ||
| 103 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 4.1.1.G requires PRS positions to complete QRF training. In Attachment A, the government lists PRS positions and QRF positions with are the same positions. Can the government confirm PRS positions are split into two groups, group 1 PRS and group 2 QRF? | PRS and QRF are separate sections and quantities of personnel. | ||
| 104 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 4.3, are specialized security services requires to receive Attachment 3 weapons training? For example TOC services are requested and are unarmed. | Firearms requirements are outlined in Attachment 1 of the IDIQ under each position description. | ||
| 105 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 4.4.1 requires Facilities and Support Services with the exception of items in Section 8, one of them being housing and office space. The government request the contractor provides supplies and equipment for the office. For who will the government provide office space? Can the government provide the supplies and equipment the contractor needs to provide (for example, desk, chairs, computers, etc.)? For how many personnel should the contractor provide the supplies and equipment? | Exhibit 2.1.0 Performance Work Statement, Section 8 has been updated to reflect all aspects of office space is Government provided,. | ||
| 106 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 4.4.1 requires Facilities and Support Services with the exception of items in Section 8, Life support, to include food, drink, electricity, running water, and fuel. Does this include waste management per Attachment 7 Section 5.3? Does this include climate control per Attachment 7 Section 5.4? | For the purpose of the sample task order, the government will provide waste management and climate control. | ||
| 107 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 4.4.1 requires Facilities and Support Services with the exception of items in Section 8, Life support, to include food, drink, electricity, running water, and fuel. Section 10 requires the Contractor shall provide detergent, bleach, and fabric softener if such products are unavailable for individual purchase by personnel at the task order place of performance. Are detergent, bleach, and fabric softener available for individual purchase at the task order location? | For the purpose of the sample task order, laundry services will be provided by the Government to include detergent, bleach, and fabric softener. | ||
| 108 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | Section 4.4.1 requires Facilities and Support Services with the exception of items in Section 8, Life support, to include food, drink, electricity, running water, and fuel. Are facilities (whether government or contractor provided) required for LNs? | For the purpose of the sample task order, facilities for LNs are government provided. No contractor provided facilities are required. | ||
| 109 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | ||||
| Section C SOW (06.05.20) | Section 4.4.1 requires Facilities and Support Services with the exception of items in Section 8, Housing and Life Support. Section C.8.4.1.1 requires the contractor provide living, dining, laundry, health, exercise, medical, and other facilities and services. When the government states it will provide housing and life support does it include living, dining, and laundry? | The government will provide housing and life support which includes living, dining, and laundry. | |||
| 110 | Exhibit 2.1.0 Baghdad PWS (06.10.20) | ||||
| Section C SOW (06.05.20) | Section 4.4.1 requires Facilities and Support Services with the exception of items in Section 8, Housing and Life Support. Section C.8.4.1.1 requires the contractor provide living, dining, laundry, health, exercise, medical, and other facilities and services. When the government states it will provide housing does it include Attachment 7 Section 7 Hygiene and Sanitary Facilities? | Attachment 7 of the IDIQ are requirements for temporary labor camps. The facilities in this sample task order are government provided. | |||