18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-9.pdf

PDF 10 MB Posted

Attached to
36C25023B0049 - Y1NB--Construct Chiller Plant - Columbus, OH Chalmers P. Wylie VAACC SDVOSB Set-Aside - Solicitation
Solicitation number
36C25023B0049
Issued by

About this file

This document outlines a federal contract opportunity to construct a chiller plant for the Columbus VA Medical Center in Ohio. The solicitation number is 36C25023B0049 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. It is a set-aside for Service-Disabled Veteran-Owned Small Businesses. Responses are due on the date specified in the solicitation to provide construction services for a new chiller plant at the Columbus VAACC in Columbus, Ohio. The contract will be awarded based on the criteria established in the solicitation to the responsible offeror whose offer conforms to the solicitation and is most advantageous to the Government, considering only price and past performance. The period of performance and pricing terms are as specified in the solicitation documentation.

View the file

Other files

File Type Posted
36C25024C0013 SAM Award Notice 1.0.pdf PDF
36C25023B0049 - Amendment 3.docx DOCX document
36C25023B0049 - Amendment 2.pdf PDF
36C25023B0049 - Amendment 1.docx DOCX document
Single Source Justification MPT to SAT - Wattstopper - Pricing Removed - Signed.pdf PDF
VHA Directive 1192.01, Seasonal Influenza Prevention Program for VHA Health Care Personnel.pdf PDF
18912 Columbus VAMC Chiller BC Sole Source Redacted.pdf PDF
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-8.pdf PDF
VAAR 852.219-75 - To Be Submitted With Bid.pdf PDF
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-5.pdf PDF
VAACC Health Requirements - Bid Ready 2023.pdf PDF
36C25023B0049 - Ready.docx DOCX document
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-4.pdf PDF
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-1.pdf PDF
Single Source Justification MPT to SAT - Simplex - 2.0 Price Removed - Signed.pdf PDF
18912 Columbus VA Chiller Plant Revision Final B_C Re-Revised - PM Vol 1 of 2.pdf PDF
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-2.pdf PDF
Franklin DB - Current as of 07.13.2023.pdf PDF
Single Source Justification MPT to SAT - Software House - Pricing Removed - Signed.pdf PDF
Single Source Justification MPT to SAT - Russ Electric Price Removed - Signed.pdf PDF
18912 Columbus DVAMC Chiller FB_C PM Volume 2 of 2.pdf PDF
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-6.pdf PDF
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-7.pdf PDF
Hca Signed NCO 10 Caterpillar - Sole Source - Pricing Removed.pdf PDF
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-10.pdf PDF
18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-3.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Interior

Engineering

LM

9.2

CE CFCC CDCA CB AA AB AC AD AEXC XD

FM

XR-SCHWP-1

XR-CH-1

XR-CH-2

XR-ET-3

XR-AS-3

XR-CHWP-1

XR-CHWP-2

XR-SCHWP-2

XR-CWP-1

XR-CWP-2

XR-VFD

X-UH

XR-VFD

XR-FM

X-DOMESTIC

WATER METER

X-BACKFLOW

PREVENTER

X-DOMESTIC

WATER PUMP

X-EF

X-DWH X-DWH

X-CP

C1DEA

X

PRIMARY

SWITCH

SUB

SS4

XFMR.

MAIN

BREAKER

FEEDER

BREAKERS

PRIMARY

SWITCH

SUB

SS2

XFMR.

MAIN

BREAKER

FEEDER

BREAKERS

FEEDER

BREAKERS

FEEDER

BREAKERS

FEEDER

BREAKERS

FEEDER

BREAKERS

FIRE PUMP TAP

EOMPARTMENT

FEEDER

BREAKERS

FEEDER

BREAKERS

FEEDER

BREAKERS

MAIN

BREAKER

MAIN

BREAKER

SUB

SS3

XFMR.

PRIMARY

SWITCH

PRIMARY

SWITCH

SUB

SS1

XFMR.

C1DNA

X

X X

X

X

X

C1SBEMA

ATS

ATS ATS

X

ATS-EQ

X

ATS-CR

ATS-LS

X

C1DSA

X

C1DCA

X

C1SBEA

X

1 2

1 2

X

X

X

X X

X X

X

TCP

X

TCP

X

X C1E2

VFD

XR

VFD

XR

XR-VFDXR-VFD

VFD

XR

VFD

XR

FUTURE

SUBSTATION

SS5

X-DAMPER

TYP

TYP

TYP

TYP

TYP

TYP

M-151AM-151B

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:4

P M

ED-102

PARTIAL MAIN BUILDING FIRST FLOOR

ELECTRICAL DEMOLITION PLAN - AREA A

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 1

CODED NOTES:

1 PROVIDE DIGITAL METER ON WATER COOLED CHILLER AT THE START OF THE PROJECT. METER SHALL HAVE DIGITAL DISPLAY AND CONNECT TO VA BMS COMPLETE. REMOVE COMPLETE WHEN THE CHILLERS

ARE DISCONNECTED. METER SHALL PROVIDE AT MINIMUM THE FOLLOWING POINTS: VOLTAGE,

INSTANEOUS POWER PER PHASE (KW, KVAR, AND KVA), INSTANTANEOUS AMPERAGE PER PHASE, AND PEAK DEMAND POWER PER PHASE (KW, KVAR, AND KVA). ASSUME (5) ADDITIONAL MONITORING POINTS TO

BE DETERMINED BY THE VA ENERGY ENGINEER. COORDINATE WITH VA COR.

REMOVE ALL EQUIPMENT UNLESS OTHERWISE NOTED. DISCONNECT EQUIPMENT AND REMOVE ALL

ASSOCIATED ELECTRICAL STARTERS, DISCONNECT SWITCHES, VFDs, CONDUIT, SUPPORTS, WIRING, ETC.

COMPLETE BACK TO THE SOURCE. LABEL EXISTING CIRCUIT BREAKERS AS SPARES.

DEMOLITION PHASING SEQUENCE

REFER TO MECHANICAL DRAWINGS FOR DEMOLITION PHASING SEQUENCE OF ITEMS IN EXISTING MECHANICAL

ROOMS.

ELECTRICAL DEMOLITION NOTES

D1 ALL EXISTING LIGHTING FIXTURES, RECEPTACLES, SPECIAL SYSTEMS OUTLETS, CONDUIT, WIRING ETC. THAT

WILL NOT BE REUSED IN THE REMODELED INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE NOTED. THIS DEMOLITION SHALL INCLUDE ALL ELECTRICAL ITEMS SHOWN ON THIS PLAN THAT ARE DESIGNATED BY "XR" OR "XB" AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT MUST BE REMOVED IN ORDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING ELECTRICAL INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING REUSED ELECTRICAL SYSTEMS COMPONENTS - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE THE SAME. THE CONTRACTOR SHALL FIELD VERIFY THE NATURE AND EXTENT

OF ALL DEMOLITION WORK AND SHALL INCLUDE COST FOR THE SAME IN THE BID SUBMITTAL.

D2 ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT RETAINED BY THE OWNER

SHALL BE DISPOSED OF BY THE ELECTRICAL CONTRACTOR.

D3 DASHED WALLS ON PLAN INDICATE EXISTING CONSTRUCTION TO BE REMOVED.

D4 REFER TO ELECTRICAL LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION TO SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED XB, XRR OR XN, AND REMOVE/BLANK OFF, RELOCATE OR REPLACE

THESE COMPONENTS AS REQUIRED.

D5 MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS IN AREAS NOT BEING REMODELED UNLESS OTHERWISE NOTED. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO

ACHIEVE SAME.

D6 THE ELECTRICAL CONTRACTOR SHALL CLOSELY COORDINATE ALL ELECTRICAL DEMOLITION WORK WITH THE GENERAL AND MECHANICAL CONTRACTORS, AND SHALL DISCONNECT ALL REQUIRED CIRCUITS IN A TIMELY

MANNER.

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL MAIN BUILDING FIRST FLOOR

ELECTRICAL DEMOLITION PLAN - AREA A 1N

NOT TO SCALE

ACC 1ST FLOOR KEY PLAN

AREA A

AREA B

Revisions: Date:

FINAL BID & CONSTRUCTION 11/24/2021

FINAL BID & CONSTRUCTION (REVISED) 05/06/2022

Automated Line

E2E2 X

A

ELEC.

CLOSET

2BEC

STORAGE

2B261

POINT OF CARE

TRAINING

2B261

CORRIDOR

2B260

OFFICE

2B257

OFFICE

2B255

CORRIDOR

2B250

MEN'S LOCKER

2B256 MEN'S TOILET

2B256T

WOMEN'S LOCKER

2B258

WOMEN'S TOILET

2B258T

EXG TOILET

2B262

CORRIDOR

2A020

OFFICE

2B253

CORRIDOR

2B254

MECH

2B259

CONDUITS

CONTINUED

XRX X

A

W

W

V

V

X-CU

X-CU

X-RTU-14

XR-ACC

X-EF

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:5

P M

ED-103

PARTIAL MAIN BUILDING SECOND FLOOR

DEMOLITION PLAN

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 1

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL MAIN BUILDING SECOND FLOOR

ELECTRICAL DEMOLITION PLAN 2

NOT TO SCALE

ACC 2ND FLOOR KEY PLAN

N

CODED NOTES

DEMOLITION PHASING SEQUENCE

REFER TO MECHANICAL DRAWINGS FOR DEMOLITION PHASING SEQUENCE OF ITEMS IN AREA.

ELECTRICAL DEMOLITION NOTES

D1 ALL EXISTING LIGHTING FIXTURES, RECEPTACLES, SPECIAL SYSTEMS OUTLETS, CONDUIT, WIRING ETC. THAT

WILL NOT BE REUSED IN THE REMODELED INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE NOTED. THIS DEMOLITION SHALL INCLUDE ALL ELECTRICAL ITEMS SHOWN ON THIS PLAN THAT ARE DESIGNATED BY "XR" OR "XB" AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT MUST BE REMOVED IN ORDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING ELECTRICAL INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING REUSED ELECTRICAL SYSTEMS COMPONENTS - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE THE SAME. THE CONTRACTOR SHALL FIELD VERIFY THE NATURE AND EXTENT

OF ALL DEMOLITION WORK AND SHALL INCLUDE COST FOR THE SAME IN THE BID SUBMITTAL.

D2 ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT RETAINED BY THE OWNER

SHALL BE DISPOSED OF BY THE ELECTRICAL CONTRACTOR.

D3 DASHED WALLS ON PLAN INDICATE EXISTING CONSTRUCTION TO BE REMOVED.

D4 REFER TO ELECTRICAL LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION TO SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED XB, XRR OR XN, AND REMOVE/BLANK OFF, RELOCATE OR REPLACE

THESE COMPONENTS AS REQUIRED.

D5 MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS IN AREAS NOT BEING REMODELED UNLESS OTHERWISE NOTED. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO

ACHIEVE SAME.

D6 THE ELECTRICAL CONTRACTOR SHALL CLOSELY COORDINATE ALL ELECTRICAL DEMOLITION WORK WITH THE GENERAL AND MECHANICAL CONTRACTORS, AND SHALL DISCONNECT ALL REQUIRED CIRCUITS IN A TIMELY

MANNER.

SPLICE AND EXTEND EXISTING CIRCUITS IN POINT OF CARE TRAINING ROOM 2B263 FROM PANEL 'E2E2' FOR CONNECTION OF NEW MECHANICAL CHILLED WATER PIPING. PROVIDE 32" x 4" x 2-1/8" PULLBOX WITH DIVIDERS INSIDE PULLBOX EVERY 4". EACH SECTION SHALL HAVE NO MORE THAN 8 CURRENT CARRYING WIRES WITH NO MORE THAN (2) CONDUITS PER SECTION. CONDUITS SHALL BE SPLICED AND EXTENDED TO ALLOW NEW MECHANICAL PIPING CONNECTION. PROVIDE CONDUIT AND WIRING EXTENSIONS. COORDINATE SINGLE, OFF- HOURS SHUTDOWN FOR ALL WORK IN THIS AREA. REFER TO MECHANICAL PLANS FOR ADDITIONAL

INFORMATION.

A

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL MAIN BUILDING

SURGERY ADDITION ROOF DEMOLITION PLAN 1N

CODED NOTES

REMOVE EXISTING AIR COOLED CHILLER AND ALL ASSOCIATED CONDUIT, WIRING, CONTROLS, CURBS, ETC.

COMPLETE TO THE SOURCE.

DELETE SCOPE OF WORK ON THIS SHEET.

BID ALTERNATE #4:

Revisions: Date:

5 5

A

AB

B

C

CD

D

E

E

F

F

G

G

H

H

J

J

K

K

3.8

0.2

0.5 0.5

0.8 0.8

A.2

A.2

A.1

A.1

A.8

A.8

0.7

B.4 B.4

X -R

T U

-1

X-ACH-1

X-ACH-2

X -R

T U

-1

X -R

T U

-7

X-RTU-9

X -R

T U

-6

X-RTU-8

X-RTU-15

X-RTU-12

X-GEF-5

X-TEF-7

X-TEF-5

X-GEF-6

X-TEF-6

XR-CU-15

X-CU-2X-CU-3

X -R

T U

-1

X-EF-7

X-EF-6

X-EF-2

X-EF-3

X-GEF-4 X-TEF-4

X-CU

ROOF

ROOF

CC-1

PENTHOUSE

X X X

X X

D3DEA

D3DEA

X X X X

X

XX

X

X

D D

N A

D D

E B

D C

A

D E

D

C

2 A3

A3

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:0

P M

ED-104

PARTIAL MAIN BUILDING THIRD FLOOR ROOF

ELECTRICAL DEMOLITION PLAN

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 1

CODED NOTES:

1 REMOVE ALL LIGHTING FIXTURES, RECEPTACLES, CONDUITS, ETC. THAT ARE MOUNTED TO EXISTING PARTITION WALL. REMOVE ALL ASSOCIATED CONDUITS, CONTROLS, WIRING, SUPPORTS, ETC. COMPLETE BACK TO THE SOURCE. MAINTAIN CONTINUITY TO CIRCUITS OUTSIDE OF THE PROJECT SCOPE AREA.

UPON INSTALLATION AND ACTIVATION OF NEW CHILLED WATER COIL IN EXISTING RTU-15, CONTRACTOR SHALL REMOVE EXISTING CONDENSING UNIT AND ALL ASSOCIATED CONDUITS, CONTROLS, WIRING, SUPPORTS, ETC. COMPLETE BACK TO THE SOURCE.

DEMOLITION PHASING SEQUENCE

REFER TO MECHANICAL DRAWINGS FOR DEMOLITION PHASING SEQUENCE OF ITEMS IN AREA.

ELECTRICAL DEMOLITION NOTES

D1 ALL EXISTING LIGHTING FIXTURES, RECEPTACLES, SPECIAL SYSTEMS OUTLETS, CONDUIT, WIRING ETC. THAT

WILL NOT BE REUSED IN THE REMODELED INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE NOTED. THIS DEMOLITION SHALL INCLUDE ALL ELECTRICAL ITEMS SHOWN ON THIS PLAN THAT ARE DESIGNATED BY "XR" OR "XB" AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT MUST BE REMOVED IN ORDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING ELECTRICAL INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING REUSED ELECTRICAL SYSTEMS COMPONENTS - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE THE SAME. THE CONTRACTOR SHALL FIELD VERIFY THE NATURE AND EXTENT

OF ALL DEMOLITION WORK AND SHALL INCLUDE COST FOR THE SAME IN THE BID SUBMITTAL.

D2 ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT RETAINED BY THE OWNER

SHALL BE DISPOSED OF BY THE ELECTRICAL CONTRACTOR.

D3 DASHED WALLS ON PLAN INDICATE EXISTING CONSTRUCTION TO BE REMOVED.

D4 REFER TO ELECTRICAL LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION TO SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED XB, XRR OR XN, AND REMOVE/BLANK OFF, RELOCATE OR REPLACE

THESE COMPONENTS AS REQUIRED.

D5 MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS IN AREAS NOT BEING REMODELED UNLESS OTHERWISE NOTED. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO

ACHIEVE SAME.

D6 THE ELECTRICAL CONTRACTOR SHALL CLOSELY COORDINATE ALL ELECTRICAL DEMOLITION WORK WITH THE GENERAL AND MECHANICAL CONTRACTORS, AND SHALL DISCONNECT ALL REQUIRED CIRCUITS IN A TIMELY

MANNER.

NOT TO SCALE

ACC 3RD FLOOR/ROOF KEY PLAN

N

0' 8' 16' 32' 64'0' 8' 16' 32' 64'0' 8' 16' 32' 64'0' 8' 16' 32' 64'0' 8' 16' 32' 64'

1/16" = 1'-0"

PARTIAL MAIN BUILDING THIRD FLOOR

ELECTRICAL DEMOLITION PLAN 1

BID ALTERNATE #3:

A3 DELETE SCOPE OF WORK ASSOCIATED WITH RTU-15

Revisions: Date:

DN

UP

K

K

L

L

M

M

N

N

7.37.3

XA

XA

XC

XC XD

XR-CT-1 1 XR-CT-2 1

ELECT. RM

SY

STAIR NO. 2

4S002

MECHANICAL ROOM

4A011

CORRIDOR

4A009

ELEVATOR

MACHINE ROOM

4A010

UPS

4A008

BIOMED

4A013

STAIR NO. 6

4S006

CORRIDOR

4A007

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:1

P M

ED-105

PARTIAL MAIN BUILDING FOURTH FLOOR

ROOF ELECTRICAL DEMOLITION PLAN

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 1

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

PARTIAL MAIN BUILDING FOURTH FLOOR

ROOF ELECTRICAL DEMOLITION PLAN 1

N

ELECTRICAL DEMOLITION NOTES

D1 ALL EXISTING LIGHTING FIXTURES, RECEPTACLES, SPECIAL SYSTEMS OUTLETS, CONDUIT, WIRING ETC. THAT

WILL NOT BE REUSED IN THE REMODELED INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE NOTED. THIS DEMOLITION SHALL INCLUDE ALL ELECTRICAL ITEMS SHOWN ON THIS PLAN THAT ARE DESIGNATED BY "XR" OR "XB" AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT MUST BE REMOVED IN ORDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING ELECTRICAL INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING REUSED ELECTRICAL SYSTEMS COMPONENTS - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE THE SAME. THE CONTRACTOR SHALL FIELD VERIFY THE NATURE AND EXTENT

OF ALL DEMOLITION WORK AND SHALL INCLUDE COST FOR THE SAME IN THE BID SUBMITTAL.

D2 ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT RETAINED BY THE OWNER

SHALL BE DISPOSED OF BY THE ELECTRICAL CONTRACTOR.

D3 DASHED WALLS ON PLAN INDICATE EXISTING CONSTRUCTION TO BE REMOVED.

D4 REFER TO ELECTRICAL LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION TO SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED XB, XRR OR XN, AND REMOVE/BLANK OFF, RELOCATE OR REPLACE

THESE COMPONENTS AS REQUIRED.

D5 MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS IN AREAS NOT BEING REMODELED UNLESS OTHERWISE NOTED. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO

ACHIEVE SAME.

D6 THE ELECTRICAL CONTRACTOR SHALL CLOSELY COORDINATE ALL ELECTRICAL DEMOLITION WORK WITH THE GENERAL AND MECHANICAL CONTRACTORS, AND SHALL DISCONNECT ALL REQUIRED CIRCUITS IN A TIMELY

MANNER.

CODED NOTES

1 EXISTING COOLING TOWER TO BE REMOVED. REMOVE ALL ASSOCIATED DISCONNECT, CONDUITS, WIRING, SUPPORTS, ETC COMPLETE BACK TO SOURCE. COORDINATE WORK ABOVE 3RD FLOOR CEILING WITH VA COR.

REMOVE ALL ASSOCIATED CONTROLS, HEAT TRACE, ETC. COMPLETELY.

DEMOLITION PHASING SEQUENCE

REFER TO MECHANICAL DRAWINGS FOR DEMOLITION PHASING SEQUENCE OF ITEMS IN AREA.

NOT TO SCALE

ACC 4TH FLOOR KEY PLAN

Revisions: Date:

J

J

X

X

X

X

X

X

X

X

X X

X

X

XR

X

XR

XR

XR

XR

XR

1 TYP

TYP

TYP

B.2 B.2

B.5 B.5

B.8 B.8

C.3 C.3

D.4 D.4

E.3 E.3

BOILER ROOM

CONTROL ROOM

STORAGE

21 3 4

0.2 0.2

0.5 0.5

0.8 0.8

IN-GRADE

ELECTRICAL BOX

X

PULLBOX

DC PANELBOARD

BATTERY RACK

PULLBOX

X

X

X

X

PSG - NORMAL

X

XR X

X

H1T1 P

S G

E

M E

R G

E N

C Y

P S

G C

O N

T R

O L S

X XX

X

X X

X

X X

X X

X

X X

X X

X

X

X

NGR

GENERATOR #2

EXISTING UNDER

PROJECT NUMBER:

757-20-205

X

2.7

B.4 B.4

5 A5

ALL DEVICES IN THE BOILER

PLANT ARE EXISTING TO

REMAIN, UNLESS OTHERWISE

NOTED.

E-103

H1E1-24

H1EA-2A - 1,3,5

A5

XRR

AIR COMPRESSOR

XX X X X

X

X

X

XXX

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:2

P M

ED-106

BOILER PLANT / CHILLER PLANT ELECTRICAL

DEMOLITION PLAN

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 3

CODED NOTES:

1 GROUND ROD - REFER TO DETAILS ON SUBSEQUENT SHEETS FOR ADDITIONAL INFORMATION.

GROUND CABLE FROM STRUCTURAL STEEL AND REBAR: 1#4/0 BARE COPPER. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. REFER TO TYPICAL STRUCTURAL STEEL GROUND DETAIL ON SUBSEQUENT SHEET

FOR ADDITIONAL INFORMATION.

COUNTERPOISE GROUND CABLE : 1#4/0 BARE COOPER.

REPLACE EXISTING PAGING SYSTEM AMPLIFIER WITH NEW IN THE SAME LOCATION. MAINTAIN EXISTING CIRCUIT, CONDUIT, ETC,. FOR RECONNECTION OF NEW PAGING SYSTEM AMPLIFIER. NEW AMPLIFIER SHALL BE COORDINATED WITH VA COR TO MATCH EXISTING PAGING SYSTEM SPECIFICATIONS. RECONNECT ALL

EXISTING PAGING CIRCUITS COMPLETE AND TEST OPERATION OF SYSTEM.

REMOVE EXISTING 2000kVA, 480V:13.2kV STEP-UP TRANSFORMER COMPLETE DURING DEMOLITION OF EXISTING 1750KW, 480V GENERATOR. DEMOLITION SHALL OCCUR AT THE END OF CONSTRUCTION AFTER NEW GENERATOR IS ACTIVATED, TESTED, AND IN-SERVICE. DEMOLISH CONDUIT AND CABLING FROM TRANSFORMER SECONDARY TO GENERATOR BREAKER. PRIMARY CABLING SHALL BE REMOVED FROM CONDUIT. TRANSFORMER PAD SHALL REMAIN. PRIMARY CONDUITS SHALL BE CAPPED AFTER PROVIDING NEW

PULLWIRE.

REMOVE CIRCUIT BACK TO THE SOURCE FOR CHEMICAL FEED PUMPS FOR INSTALLATION OF NEW MECHANICAL PIPING AND TRENCHING. CONTRACTOR IS RESPONSIBLE TO MAINTAIN EQUIPMENT TO CONNECT TO NEW CIRCUIT. PROVIDE NEW CIRCUIT OVERHEAD. REFER TO POWER PLAN (E-105) FOR ADDITIONAL

INFORMATION.

REMOVE CIRCUIT BACK TO THE SOURCE FOR OVERHEAD COILING DOOR FOR INSTALLATION OF NEW MECHANICAL PIPING AND TRENCHING. PROVIDE NEW CIRCUIT OVERHEAD. REFER TO POWER PLAN (E-105)

FOR ADDITIONAL INFORMATION.

RELOCATE EXISTING BOILER AIR COMPRESSOR AND ASSOCIATED DISCONNECT SWITCH, WIRING, CONDUIT, ETC. TO LOCATION INDICATED ON NEW PLANS. PROVIDE CONDUIT AND WIRING EXTENSIONS. REFER TO

POWER PLAN (E-105) FOR ADDITIONAL INFORMATION.

N

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0" 1

BOILER PLANT / CHILLER PLANT

ELECTRICAL DEMOLITION PLAN

BID ALTERNATE #5:

A5 DELETE SCOPE OF WORK ASSOCIATED WITH THE DEMOLITION OF THE EXISTING 1750KW EMERGENCY

GENERATOR.

ELECTRICAL DEMOLITION NOTES

D1 ALL EXISTING LIGHTING FIXTURES, RECEPTACLES, SPECIAL SYSTEMS OUTLETS, CONDUIT, WIRING ETC. THAT

WILL NOT BE REUSED IN THE REMODELED INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE NOTED. THIS DEMOLITION SHALL INCLUDE ALL ELECTRICAL ITEMS SHOWN ON THIS PLAN THAT ARE DESIGNATED BY "XR" OR "XB" AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT MUST BE REMOVED IN ORDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING ELECTRICAL INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING REUSED ELECTRICAL SYSTEMS COMPONENTS - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE THE SAME. THE CONTRACTOR SHALL FIELD VERIFY THE NATURE AND EXTENT

OF ALL DEMOLITION WORK AND SHALL INCLUDE COST FOR THE SAME IN THE BID SUBMITTAL.

D2 ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT RETAINED BY THE OWNER

SHALL BE DISPOSED OF BY THE ELECTRICAL CONTRACTOR.

D3 DASHED WALLS ON PLAN INDICATE EXISTING CONSTRUCTION TO BE REMOVED.

D4 REFER TO ELECTRICAL LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION TO SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED XB, XRR OR XN, AND REMOVE/BLANK OFF, RELOCATE OR REPLACE

THESE COMPONENTS AS REQUIRED.

D5 MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS IN AREAS NOT BEING REMODELED UNLESS OTHERWISE NOTED. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS NECESSARY TO

ACHIEVE SAME.

D6 THE ELECTRICAL CONTRACTOR SHALL CLOSELY COORDINATE ALL ELECTRICAL DEMOLITION WORK WITH THE GENERAL AND MECHANICAL CONTRACTORS, AND SHALL DISCONNECT ALL REQUIRED CIRCUITS IN A TIMELY

MANNER.

Revisions: Date:

S S

S

S

D

D

DD

D

D

D

D

CB

D

D

D

D D

D

EX GATE

EXISTING 4-STORY MEDICAL

BUILDING

CO

PROPERTY LINE

EX CHAIN LINK FENCE

EX 6" DIWATER PIPE

W

10" F 8" F.

LOOP

EX 4" GAS

F

F

UP

Tectonic Copyright 2007

CHILLER PLANT

EC-114

A41

EXISTING MAIN BUILDING

(NOT IN SCOPE UNLESS OTHERWISE NOTED)

EXISTING CHILLER AND ELECTRICAL ROOMS

(REFER TO SUBSEQUENT DRAWINGS)

PROJECT SCOPE

PROJECT SCOPE

P R

O J E

C T

S C

O P

E

P R

O J E

C T

S C

O P

E

E X

IS

T

IN

G U

N D

E R

G R

O U

N D

E L E

C T R

IC

A

L

(F E

E D

E R

S T

O A

N D

F R

O M

M A

IN

B U

IL

D

IN

G

A N

D E

X

IS

T

IN

G G

E N

E R

A T O

R

E X

IS

T

IN

G

U N

D E

R G

R O

U N

D E

L E

C T

R

IC

L

(F E

E D

E R

S T

O A

N D

F R

O M

M

IN

B U

IL

D

IN

G

A N

D E

X

IS

T

IN

G G

E N

E R

A T

O R

BOILER PLANT

E.3-5E.3-3.1 E.3-6

D.4-5D.4-3.1 D.4-6

C.3-5C.3-3.1 C.3-6

B.8-5B.8-3.1 B.8-6

B.5-5B.5-3.1 B.5-6

B.2-5 B.2-6

B-3

C-3

B-2

C-2

B-1

C-1

D-3D-2D-1

E-3E-2E-1

F-1

A.2-2A.2-1

G-1.8 G-3

B.4-4

B-4

A-4A-2.7

A.2-3A.2-2.6

B.4-3B.4-2B.4-1

A-1F-1 B-1C-1D-1E-1

A-2B-2C-2D-2F-2

A-3E-3

E-2

C-3

C-4

C-5 A-5

A-4

A-6C-6 B-6

A-7B-7C-7D-7

B-5

B-4

D-5F-5G-5

B-3D-3F-3

D-4

H-5

E-4

E-5

E-7

J-4 H-4 G-4 F-4

F-6G-6H-6

H-7 G-7 F-7

E-7.3F-7.3G-7.3H-7.3J-7.3

J-6

J-5

J-3

J-2

H-3 G-3

H-2 G-2

J-1 H-1 G-1

D-6

L-4.3

M-4.3

N-4.3

K-4.3

L-6.2

M-6.2

O-6

K-7

K-6.2

K-3

K-4

K-5L-5M-5

N-6.2

O-7Q-7

L-3M-3

O-5Q-5

Q-6

Q-4

K-9.2

L-9.2

M-9.2

L-4M-4

O-4.3

P-3(3' - 9 1/4")

Q-3(12' - 7 3/4")

K-8

M-7

M-9

M-8

N-3

N-5

N-4O-4P-4

P-5

P-6

P-7 L-7

Q-10

Q-9

Q-8 P-8

P-9

P-10 O-10

O-9

O-8 N-8

N-9

N-10

L-8

L-9

L-4.9

M-4.9

N-4.9

E-0.8 D-0.8 C-0.8

B-0.5 A-0.5

A.1-0.1

A.2-0.5

A.2-0.8A-0.8B-0.8

A.2-1 A.8-1

A.2-2 A.8-2

A.2-4 A.8-4

A.2-5 A.8-5

A-0.1

B-0.1

C-0.1

D-0.1

E-0.1

F-0.1

G-0.1

A.2-3 A.8-3

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:4

P M

E-101

PARTIAL ELECTRICAL SITE PLAN CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00

0' 10' 20' 40' 80'0' 10' 20' 40' 80'0' 10' 20' 40' 80'0' 10' 20' 40' 80'0' 10' 20' 40' 80'

1" = 20'-0"

PARTIAL ELECTRICAL SITE PLAN 1N

EXISTING UNDERGROUND

ELECTRICAL CONTINUED

BID ALTERNATE #3:

A4 DELETE SCOPE OF WORK ASSOCIATED WITH THE DEMOLITION OF THE EXISTING 1750KW EMERGENCY

GENERATOR.

CODED NOTE:

1 EXISTING 1750KW, 480V GENERATOR, ENCLOSURE, SUB-BASE TANK AND ALL ASSOCIATED EQUIPMENT AND ACCESSORIES SHALL BE DEMOLISHED COMPLETE. EXISTING GENERATOR SHALL REMAIN IN PLACE AND ACTIVE UNTIL NEW CHILLER PLANT GENERATOR IS ACTIVE AND COMMISSIONED. DURING DEMOLITION OF GENERATOR, WIRING SHALL BE REMOVED COMPLETE BACK TO SOURCE. EXISTING UNDERGROUND, CONCRETE-ENCASED DUCT BANK SHALL BE CAPPED AT BOTH ENDS AND MAINTAINED IN PLACE. PROVIDE PULL-WIRE IN CONDUITS PRIOR TO CAPPING. PROVIDE CONCRETE POLYMER IN-GRADE BOX AT EXTERIOR LOCATION, FLUSH WITH GRADE, AND TRIM CONDUITS BACK TO FIT WITHIN BOX TO REDUCE TRIPPING HAZARD. REFER TO BOILER

PLANT / CHILLER PLANT ELECTRICAL DEMOLITION PLAN FOR ADDITIONAL INFORMATION.

• CONTRACTOR SHALL REMOVE THE GENERATOR, SUB-BASE TANK, AND ALL ASSOCIATED COMPONENTS COMPLETE. THE VA WILL NOT BE PARTICIPATING IN ANY SALVAGE OR RECLAMATION EFFORTS.

• CONTRACTOR SHALL REMOVE THE EXISTING STEP-UP TRANSFORMER AND NEUTRAL GROUND RESISTOR WITHIN THE BOILER PLANT BETWEEN THE GENERATOR AND THE PARALLELING SWITCHGEAR. THE VA WILL NOT BE PARTICIPATING IN ANY SALVAGE OR RECLAMATION EFFORTS. REFER TO ED-106 FOR LOCATION OF

WORK

• CONTRACTOR SHALL REMOVE EXISTING CONDUCTORS BETWEEN GENERATOR AND TRANSFORMER.

EXISTING UNDERGROUND DUCT BANK SHALL REMAIN. PROVIDE A NEW SITE BOX AT THE FORMER GENERATOR LOCATION. STUB AND CAP THE EXISTING CONDUITS THE NEW BOX AND AT THE LOCATION

WHERE THE CONDUITS ENTER THE BOILER PLANT.

• CONTRACTOR SHALL REMOVE EXISTING CONDUIT AND CONDUCTORS BETWEEN THE STEP-UP

TRANSFORMER, THE NEUTRAL GROUND RESISTOR, AND THE PARALLELING SWITCHGEAR.

• CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SYSTEM REPROGRAMMING REQUIRED TO REMOVE THE

EXISTING GENERATOR FROM THE SEQUENCE OF OPERATIONS.

Revisions: Date:

5 5

6 6

A

AB

B

C

CD

D

E

E

F

F

G

G

H

H

J

J

K

K

3.8

0.2

0.5 0.5

0.8 0.8

A.2

A.2

A.1

A.1

A.8

A.8

0.7

B.4 B.4 X

-R T

U -1

X-ACH-1

X-ACH-2

X -R

T U

-1

X -R

T U

-7

X-RTU-9

X -R

T U

-6

X-RTU-8

X-RTU-15

X-RTU-12

X-GEF-5

X-TEF-7

X-TEF-5

X-GEF-6

X-TEF-6

X-CU-2X-CU-3

X -R

T U

-1

X-EF-7

X-EF-6

X-EF-2

X-EF-3

X-GEF-4 X-TEF-4

X-CU

ROOF

ROOF

CC-1

PENTHOUSE

HEAT TRACE PANEL 1

HEAT TRACE PANEL 2

X X X

X X

D3DEA

D3DEA

X X X X

X

XX

D3CA - 13

D3CA - 15

X

X

D E

D

C

D D

N A

D D

E B

D C

A

HEAT TRACE CIRCUITS

1-A AND 1-B

HEAT TRACE CIRCUIT 1-B

HEAT TRACE CIRCUITS

2-A AND 2-B

HEAT TRACE CIRCUIT 2-B

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:0

P M

E-102

PARTIAL MAIN BUILDING THIRD FLOOR

ELECTRICAL PLAN

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 1

CODED NOTES:

1 HEAT TRACE CONTROL PANEL - 277V-1Ø, REFER TO M-504, DETAIL #1 FOR BASIS OF DESIGN WATTAGE PER FOOT. CONNECT COMPLETE TO PANEL AND CIRCUIT INDICATED ON PLANS PER MANUFACTURER'S WIRING DIAGRAMS. ROUTE HEAT TRACE CABLES PER MECHANICAL PIPING AND CONNECT COMPLETE AT BOTH ENDS.

POWER CONDUCTORS TO HEAT TRACE CONNECTION POINTS SHALL BE PROVIDED WITH NEW ROOF

SUPPORTS ON 5'-0" CENTERS AND ARE PERMITTED TO BE MOUNTED TO PIPING SUPPORTS WHERE AVAILABLE.

HEAT TRACE CONTROL PANEL CIRCUITS SHALL BE PROVIDED WITH INTEGRAL GROUND FAULT PROTECTION FOR EQUIPMENT. CONNECT COMPLETE TO SPARE 20A-1P CIRCUIT BREAKER IN PANEL INDICATED VIA 3/4"C- 2#

12 AND 1#12RG.

PROVIDE ADDITIONAL JUNCTION BOX WITH 3/4"C AND CAT6A CABLE FOR NETWORK CONNECTION TO PANEL.

ROUTE CAT6A CABLE TO NEAREST TELECOM ROOM #4A041 AND TERMINATE PER VA STANDARDS.

NOT TO SCALE

ACC 3RD FLOOR/ROOF KEY PLAN

MECHANICAL CONNECTIONS GENERAL NOTES

M1 CONNECT MECHANICAL EQUIPMENT PER MANUFACTURER'S WIRING DIAGRAMS AND DETAILS. NOTIFY ENGINEER

OF ANY DISCREPANCIES BETWEEN MANUFACTURER'S REQUIREMENTS AND BID DOCUMENTS PRIOR TO

INSTALLATION.

M2 CONCEAL CONDUIT AND WIRING IN WALLS AND ABOVE CEILING IN FINISHED AREAS.

M3 PROVIDE LIQUID-TIGHT FLEXIBLE METAL CONDUIT FOR FINAL CONNECTION TO MOTORS AND OTHER EQUIPMENT

THAT MAY PRODUCE VIBRATION.

M4 SEAL ALL EXTERIOR PENETRATIONS WATER-TIGHT.

M5 SEAL ALL WALL PENETRATIONS TO MAINTAIN FIRE RATINGS.

M6 PROVIDE LOCAL DISCONNECTING MEANS FOR MECHANICAL EQUIPMENT, UNLESS EQUIPMENT IS FURNISHED WITH INTEGRAL SAFETY SWITCHES. LABEL ALL SAFETY SWITCHES TO INDICATE POWER SOURCE AND

EQUIPMENT SERVED.

M7 COORDINATE EXACT INSTALLATION LOCATION OF ALL MECHANICAL EQUIPMENT WITH MECHANICAL PLANS

PRIOR TO ROUGH-IN.

M8 CONDUITS SHALL BE RIGID ALUMINUM AT EXTERIOR LOCATIONS.

M9 SHARED NEUTRALS ARE NOT PERMITTED FOR BRANCH CIRCUITS.

M10 REFER TO ONE LINE DIAGRAM FOR ALL FEEDER SIZES

0' 8' 16' 32' 64'0' 8' 16' 32' 64'0' 8' 16' 32' 64'0' 8' 16' 32' 64'0' 8' 16' 32' 64'

1/16" = 1'-0"

PARTIAL MAIN BUILDING

THIRD FLOOR ELECTRICAL PLAN 1N

Revisions: Date:

T ectonic Cop yright 2007

UP

Tectonic Copyright 2007

V F

D V

F D

V F

D V

F D

V F

D V

F D

V F

D

VFDVFD

V F

D V

F D

V F

D

B.2 B.2

B.5 B.5

B.8 B.8

C.3 C.3

D.4 D.4

E.3 E.3

21 3 4

0.2 0.2

0.8 0.8

CPDP2 CPDP1

PSG - NORMAL

X

X

NEW EMERGENCY

GENERATOR CUBICLE

FUTURE GENERATOR

CUBICLE LOCATION

NEW GENERATOR

CONTROLS CUBICLE

FUTURE GENERATOR

CONTROLS CUBICLE

X

X X

X X X X

X

X X

X X

X

X X

GENERATOR

FEEDER/CONTROLS

STUB-UP LOCATION

H1TS2

H1S2

(ABOVE)

X

X

H1EC

X

X

GENERATOR INTAKE

HOOD OVERHANG

GENERATOR #2

EXISTING UNDER

PROJECT NUMBER:

757-20-205

X

X

PULLBOX

X

DC PANEL

X

X

BATTERY RACK

IN-GRADE

ELECTRICAL

BOX

X

CHILLER PLANT

EC-114

PULLBOX

X

CH-4

CH-3

CH-2

CH-1

SSF-1

SSF

P-1

PP

P-2

PP

P-3

PP

P-4

PP

AS-1

AS

ET-1

ET

TP-1

TP

TP-2

TP

TP-3

TP

TP-4

TP

NEW NEW

BOILER ROOM

CONTROL ROOM

STORAGE

XNGR

NGR

H1S3

H1TS3

(ABOVE)

GENERATOR

FEEDER/CONTROLS

STUB-UP LOCATION

GENERATOR #3

NEW

NEW

H1ED

GENERATOR INTAKE

HOOD OVERHANG

H1C2 X

EXISTING

UNDERGROUND

CONDUIT

P S

G

E M

E R

G E

N C

Y

P S

G C

O N

T R

O L S

X

2.7

B.4 B.4

X X

E-105

FTP-1

HEAT TRACE

PANEL 5

TEMPERATURE

CONTROL PNL

TEMPERATURE

CONTROL PNL

TEMPERATURE

CONTROL PNL

TEMPERATURE

CONTROL PNL

FUEL SUPPLY

PUMP SET

WATER TREATMENT

CONTROL PANEL

REFRIGERANT

MONITOR PANEL

X

CHEMICAL

TREATMENT

TANKS

CT-1 CT-2

CT-3

CT-4

EF-1

P-1

P-2

P-3

P-4

TP-1

TP-2

TP-4

TP-3

ALL DEVICES IN THE BOILER PLANT

ARE EXISTING TO REMAIN,

UNLESS OTHERWISE NOTED.

HEAT TRACE

PANEL 4

HEAT TRACE

PANEL 3

E-103

E-202

DIVERTER VALVES

CONTROL PANEL

GENERATOR

DAY TANK 1

GENERATOR

DAY TANK 2

X

UP TO

SS-CP2

DOWN FROM

NPSS1

UP TO

SS-CP1

F U

E L D

E L

IV

E R

Y

M

S T

E R

A L A

M

P

N

E L

TEMPERATURE

CONTROLS ECC

LEAK

DETECTION

ALARM PANEL

FLOW METER

TEMPORARY

CHILLER

CONNECTIONS

BOX

D.4E.30.5 0.8

TEMPERATURE

CONTROL PANEL

TEMPERATURE

CONTROL PANEL

CONDUIT TO

GENERATOR

ANNUNCIATOR PANEL

3' - 0"

" 1

1' - 0"

EXHAUST

DUCT

EXHAUST

DUCT

EXHAUST

DUCT

GENERATOR

CONTROLS

PULLBOX

GENERATOR

POWER

PULLBOX

G E

N E

R A

T O

D

Y T

A N

K

EXHAUST

DUCT

GENERATOR

PANELBOARD

PULLBOXES

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:1

P M

E-103

BOILER PLANT / CHILLER PLANT ELECTRICAL

SITE PLAN

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 3

SITE PLAN GENERAL NOTES:

ALL SITE CONDUITS SHALL BE 18"-30" BELOW GRADE AND SHALL BE SCHEDULE 80 PVC CONDUITS (MIN. 1"C) UNLESS OTHERWISE NOTED. CONDUITS INSTALLED UNDER PAVED AREAS SHALL BE ENCASED IN CONCRETE -

3" MINIMUM COVER.

PROVIDE #8 AWG WIRING FOR ALL NEW SITE LIGHTING BRANCH CIRCUIT WIRING.

PROVIDE ALL TRENCHING, BACKFILL, SAW CUTTING, ETC. NECESSARY TO INSTALL NEW CONDUITS. PROVIDE ALL NECESSARY BACKFILL, GRAVEL, GRASS, CONCRETE, ASPHALT, ETC. TO RESTORE AREA TO EXISTING

CONDITION.

NEW ELECTRICAL CONDUIT LINES SHALL CROSS STORM SEWERS, GAS AND WATER LINES AT PERPENDICULAR

ANGLES AND SHALL NOT RUN ADJACENT TO THEM.

MAINTAIN 12" SEPARATION BETWEEN ELECTRICAL CONDUITS AND TELEPHONE LINES.

EXISTING UNDERGROUND UTILITY AND BRANCH CIRCUITS ARE SHOWN AT APPROXIMATE LOCATIONS FOR REFERENCE PURPOSES ONLY. CONTRACTOR SHALL IDENTIFY ALL UNDERGROUND SERVICE UTILITIES BY

HAND DIGGING PRIOR TO ANY EXCAVATION.

CONTRACTOR SHALL REPAIR ANY COOLING SYSTEM, IRRIGATION, DOMESTIC WATER, GAS LINES, ETC.

DAMAGED WHILE EXCAVATING AND RESTORE SYSTEMS TO EXISTING CONDITION.

THE CONTRACTOR SHALL NOTIFY OHIO UTILITIES PROTECTION SERVICE AT 1-800-362-2764 AT LEAST 48 HOURS PRIOR TO ANY EXCAVATING TO INSURE THAT PUBLIC UTILITIES WILL NOT BE DAMAGED BY CONSTRUCTION

WORK. MAKE ANY ADDITIONAL NOTIFICATIONS TO OTHER UTILITY SERVICES AS REQUIRED.

REFERENCE LANDSCAPE PLANS FOR LIMITS OF SITE WORK.

REFER TO SPECIFICATIONS FOR ANY ADDITIONAL REQUIREMENTS.

S1.

S2.

S3.

S4.

S5.

S6.

S7.

S8.

S9.

S10.

FEEDER ROUTING GENERAL NOTES:

ELECTRICAL FEEDER ROUTING LOCATIONS SHOWN ARE FOR BIDDING PURPOSE ONLY. CONTRACTOR SHALL COORDINATE EXACT ROUTING OF FEEDERS IN FIELD AND PROVIDE ALL JUNCTION BOXES, BENDS, OFFSETS, CONNECTORS, SUPPORTS, ETC. AS NECESSARY FOR A COMPLETE SYSTEM.

DRAWING DOES NOT SHOW ALL NEW FEEDERS. REFER TO POWER DISTRIBUTION ONE-LINE DIAGRAM FOR

ADDITIONAL FEEDER REQUIREMENTS.

REFER TO ELECTRICAL DETAILS DRAWINGS FOR UNDERGROUND CONDUIT INFORMATION.

F1.

F2.

F3.

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0"

BOILER PLANT / CHILLER PLANT

ELECTRICAL SITE PLAN 1N

CODED NOTES:

1 ROUTE CONDUIT TO NEW GENERATOR ANNUNCIATOR PANEL (REFER TO SHEET E-105) AND CONNECT COMPLETE. INSTALL NEW GENERATOR ALARM PANEL AT LOCATION INDICATED. COORDINATE WITH VA COR PRIOR TO ROUGH-IN. EXTEND POWER FROM LOCAL ALARM PANELS TO NEW ALARM PANEL AND CONNECT

COMPLETE. REFER TO GENERATOR CONTROLS DIAGRAM FOR ADDITIONAL INFORMATION.

GENERATOR #3 - 2MVA, 13.2KV-3Ø-3W - PROVIDE NEW EMERGENCY, DIESEL GENERATOR. PROVIDE NEW CONCRETE MOUNTING PAD PER STRUCTURAL PLANS, INSTALL NEW GENERATOR AND CONNECT COMPLETE NEW PARALLELING SWITCHGEAR AND CONTROLS. REFER TO ONE LINE DIAGRAM FOR ADDITIONAL

INFORMATION. NEW GENERATOR SHALL BE BY CATERPILLAR AND SHALL MATCH EXISTING 2MVA

GENERATOR. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND WORK REQUIREMENTS.

PROVIDE NEW EMERGENCY GENERATOR CIRCUIT BREAKER SECTION AND CONNECT COMPLETE TO EXISTING EMERGENCY PARALLELING SWITCHGEAR. NEW SECTION SHALL MATCH EXISTING GENERATOR SECTION (DRAW-OUT, POWER CIRCUIT BREAKER WITH ELECTRONIC POWER METER). EXISTING SWITCHGEAR IS RUSSELECTRIC. PROVIDE NEW RELAYS, ACCESSORIES, CONTROLLER UPGRADES, AND PROGRAMMING AS REQUIRED TO CONNECT NEW EMERGENCY GENERATOR COMPLETE. REFER TO ELECTRICAL ONE-LINE

DIAGRAM FOR ADDITIONAL INFORMATION AND WORK REQUIREMENTS.

PROVIDE NEW NEUTRAL GROUND RESISTOR (NGR) IN A OUTDOOR, NEMA 3R ENCLOSURE. PAD MOUNT NGR ADJACENT TO GENERATOR ENCLOSURE AND CONNECT COMPLETE TO CONCRETE-ENCASED GROUNDING

ELECTRODE (GENERATOR SUPPORT PAD) AND GENERATOR'S NEUTRAL CONNECTION.

NGR SHALL (BASIS OF PROJECT NUMBER: 757-20-205):

• BE 13.2KV RATED,

• BE 76.2 OHMS RESISTANCE,

• BE 100A CURRENT RATING,

• HAVE 15KV (200:5 RATIO) CURRENT TRANSFORMER,

• HAVE MAXIMUM ON TIME OF 10 SECONDS,

• HAVE MAXIMUM TEMPERATURE RISE OF 760 DEG C.

• HAVE AN ENCLOSURE HEATER (APPROX. 100W FOR CONDENSATION) MITIGATION

CONTRACTOR SHALL RETAIN RUSSELECTRIC FOR PROGRAMMING OF THE NEW PARALLELING SWITCHGEAR

SECTION AND REPROGRAMMING OF THE EXISTING PARALLELING SWITCHGEAR TO CONNECT NEW

EMERGENCY GENERATOR COMPLETE AND PARALLEL/LOAD SHARE WITH EXISTING GENERATOR.

ROUTE POWER AND CONTROL CONDUITS FROM CEILING SPACE OF EXISTING BOILER AND CHILLER PLANT, DOWN WALL TO BELOW CONCRETE SLAB AND OVER TO STUB-UP LOCATION WITHIN GENERATOR

ENCLOSURE. COORDINATE EXACT STUB-UP LOCATION WITH GENERATOR MANUFACTURER PRIOR TO ROUGH-IN. SLEEVE CONDUITS THROUGH SLAB FOOTERS AS REQUIRED. CONDUITS AND BOXES SHALL BE MOUNTED AS HIGH AS POSSIBLE IN CEILING SPACE. PULLBOXES SHALL BE SIZED PER NEC. PROVIDE (4) FLEXIBLE INNER DUCTS IN CONTROLS CONDUITS TO SEPARATE CONTROLS BY TERMINATION LOCATION AND

PRESERVE SPACE FOR FUTURE PULLS. PROVIDE PULL WIRE IN SPARE INNER DUCT(S).

PROVIDE CONDUIT AND WIRING AS INDICATED ON GENERATOR CONTROL DIAGRAM ON E-603 FOR CONNECTION TO FUEL OIL TRANSFER SYSTEM. TERMINATE CONDUIT TO FUEL OIL TRANSFER SYSTEM. REFER TO ONE LINE DIAGRAM ON E-602 AND MECHANICAL CONNECTION SCHEDULE FOR ADDITIONAL INFORMATION.

PROVIDE FEEDERS FROM EXISTING EQUIPMENT PANELBOARD 'H1EB' AND LIFE SAFETY PANELBOARD 'H1SA' TO NEW PANELBOARD AND TRANSFORMER, RESPECTIVELY, THAT ARE PROVIDED WITH GENERATOR ENCLOSURE. REFER TO ONE-LINE DIAGRAM FOR FEEDER SIZING. COORDINATE STUB UP LOCATION WITH

GENERATOR MANUFACTURER.

FUEL OIL CONTROL WIRING FROM EXISTING GENERATOR #2 PROVIDED UNDER A SEPARATE CONTRACT TO THIS POINT. SPLICE AND EXTEND CONDUIT AND WIRING AS INDICATED ON GENERATOR CONTROL DIAGRAM

ON E-603. TO NEW GENERATOR FUEL OIL TRANSFER SYSTEM AND CONNECT COMPLETE PER

MANUFACTURER'S WIRING DIAGRAMS.

PROVIDE 36"SQ. x 12"D (MINIMUM) NEMA 1 RATED PULLBOX FOR GENERATOR POWER IN LOCATION INDICATED ON PLANS. PULLBOX IS SIZED BASED ON A MEDIUM VOLTAGE CABLE WITH A 1" OUTER DIAMETER.

THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE OUTER DIAMETER OF THE APPROVED MEDIUM VOLTAGE CONDUCTOR PRIOR TO CONSTRUCTION AND MODIFY PULLBOX SIZE AS REQUIRED PER NEC. BOX SHALL BE SIZED SUCH THAT THE DISTANCE BETWEEN THE EXIT AND ENTRY CONDUITS MUST BE 36x THE

CABLE DIAMETER. COORDINATE THE EXACT CONDUIT ROUTE PRIOR TO INSTALLATION.

PROVIDE 36"SQ. x 12"D (MINIMUM) NEMA 1 RATED PULLBOX FOR GENERATOR CONTROL WIRING IN LOCATION INDICATED ON PLANS. PROVIDE FLEXIBLE INNER DUCT IN CONTROLS CONDUITS TO SEPARATE CONTROLS BY TERMINATION LOCATION AND PRESERVE SPACE FOR FUTURE PULLS. PROVIDE PULL WIRE IN

SPARE INNER DUCT(S). COORDINATE THE EXACT CONDUIT ROUTE PRIOR TO INSTALLATION.

PROVIDE 12"SQ. x 6"D (MINIMUM) NEMA 1 RATED PULLBOX FOR PANELBOARD FEEDERS IN LOCATION

INDICATED ON PLANS. COORDINATE THE EXACT CONDUIT ROUTE PRIOR TO INSTALLATION.

CONDUIT ROUTING INDICATED FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING CONDUIT ROUTING COORDINATION DRAWINGS WITH ELECTRICAL EQUIPMENT SUBMITTAL FOR APPROVAL. ROUTING DRAWINGS SHALL INCLUDE FIELD VERIFIED ROUTING, BENDS, PULLBOXES, CONDUIT BODIES, PENETRATIONS, ETC. ALONG WITH NEW SYSTEMS (MECHANICAL, ELECTRICAL, PLUMBING, STRUCTURAL, ETC.) CONTRACTOR SHALL INCLUDE EXISTING CONDITIONS WHERE NECESSARY TO CONVEY ROUTING INFORMATION. MAINTAIN NEC REQUIRED ACCESSIBILITY TO ALL EXISTING PULLBOXES, JUNCTION BOXES, ETC. TO REMAIN. ELECTRICAL EQUIPMENT

SUBMITTAL WILL NOT BE APPROVED WITHOUT CONDUIT ROUTING DRAWINGS.

CONDUIT ROUTING GENERAL NOTE

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

EQUIPMENT CONDUIT SECTION VIEW 2

UNDERGROUND

ABOVE GROUND

CONDUIT LEGEND

Revisions: Date:

F

F

F

F

F

LVF

F

TS WF

L V

LV

RC

F

F

AA

A A A

A A A

AA

A A a

H1SA -4

D

DX

H1CA -15,a

H1CA -15,aH1CA -15,a

H1SA -4

H1SA -4 H1CA -15,a

H1SA -4 H1CA -15,a

H1CA -15,a

H1CA -15,a

H1SA -4

CPDP2 CPDP1

a

H1CA -15,a

A a

NEW

SECTION

EL

EL

EL

EL

EL

H1CA -15

H1CA -15

H1CA -15

H1CA -15

H1CA -15

A

B.2 B.2

B.5 B.5

B.8 B.8

C.3 C.3

D.4 D.4

E.3 E.3

H1CA -15,a

H1SA -4

H1SA -4

a

PSG - NORMAL

P S

G C

O N

T R

O L S

X

X

P S

G

E M

E R

G E

N C

Y

NEW

CONTROLS

X

EL

H1CA -15

21 3 4

0.2 0.2

0.5 0.5

0.8 0.8X X X X X X

XX

X

X

X

XX

X X

X

X

FUTURE

CONTROLS

FUTURE

SECTION

X

XX

X

X

X

X

GENERATOR #2

EXISTING UNDER

PROJECT NUMBER:

757-20-205

GENERATOR #3

NEW

NEW NEW

NL

NL

NL

NL

NL

STORAGE

CONTROL ROOM

BOILER ROOM

2.7

B.4 B.4

TYP

TYP

X

H1SA -4

TYP

TYP

TYP

TYP

96"

96"

E-105

NEWNEW

B 156"

D 96"

EL EL

H1S3

H1ED

NEW

NEW

120"

120"

120"

120"120"

120"

ALL DEVICES IN THE BOILER

PLANT ARE EXISTING TO

REMAIN, UNLESS OTHERWISE

NOTED.

TYP

TYP

H1CA -15

E-202

D 96"

D 96"

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:2

P M

E-104

BOILER PLANT / CHILLER PLANT LIGHTING AND

FIRE ALARM PLAN

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 3

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0" 1

BOILER PLANT / CHILLER PLANT

LIGHTING AND FIRE ALARM PLAN

N

LIGHTING GENERAL NOTES

L1 REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR FINAL LOCATION OF ALL NEW CEILING MOUNTED

LIGHTING FIXTURES. CLOSELY COORDINATE LOCATION OF LIGHTING FIXTURES AND SMOKE DETECTORS WITH HVAC DUCTS, DIFFUSERS, SPRINKLERS, PLUMBING, ETC. AND ADJUST LOCATIONS OF SELECTED ELECTRICAL

EQUIPMENT IN ACCORDANCE WITH ENGINEER'S INSTRUCTIONS.

L2 REFER TO THE ARCHITECTURAL PLANS FOR EQUIPMENT LAYOUT. CLOSELY COORDINATE THE EXACT LOCATION OF ALL OUTLETS AND DEVICES WITH ARCHITECTURAL ELEVATIONS. ADJUST LOCATIONS AND MOUNTING HEIGHTS WHERE NECESSARY TO PREVENT INTERFERENCE WITH FURNITURE, FIXED CASEWORK, EQUIPMENT, ETC. VERIFY ALL CHANGES PRIOR TO ROUGH-IN.

L3 REFER TO ELECTRICAL DETAILS PLANS FOR OCCUPANCY SENSOR WIRING DIAGRAMS AND PROGRAM SCHEDULE

FOR ADDITIONAL INFORMATION.

L4 A DEDICATED NEUTRAL SHALL BE PROVIDED FOR EACH AND EVERY 120V AND 277V BRANCH CIRCUIT. MULTIWIRE

BRANCH CIRCUITS WITH SHARED NEUTRALS ARE NOT PERMITTED.

L5 NO MORE THAN (3) SINGLE-PHASE BRANCH CIRCUITS SHALL BE INSTALLED IN ANY ONE CONDUIT. DIFFERENT POWER SYSTEMS (NORMAL, CRITICAL, LIFE SAFETY) SHALL NOT BE INSTALLED IN THE SAME CONDUIT.

CODED NOTES:

1 CONNECT LIFE SAFETY LIGHTING FIXTURES AND EXIT SIGNS TO PANEL AND CIRCUIT INDICATED ON PLANS

COMPLETE VIA 3/4"C - 2#12 AND 1#12EG.

MOUNT LIGHTING FIXTURE BELOW MECHANICAL PIPING AND DUCTWORK. COORDINATE LIGHTING FIXTURE HEIGHT WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN AND CONNECT COMPLETE TO PANEL AND

CIRCUIT INDICATED ON PLANS VIA 3/4"C - 2#12 AND 1#12EG.

PROVIDE NEW EXTERIOR LIGHTING FIXTURE ABOVE BOILER PLANT/CHILLER PLANT DOORS AND GENERATOR PAD AS SHOWN. LIGHTING FIXTURE SHALL MATCH EXISTING EXTERIOR LIGHTING FIXTURE AND SHALL BE MOUNTED AT THE SAME HEIGHT AND CONNECT COMPLETE TO EXISTING LIGHTING CONTROLS AND CIRCUIT.

EXISTING BOILER PLANT LIGHTING IS CONTROLLED BY EXISTING LIGHTING CONTROL PANEL IN ELECTRICAL

ROOM 109.

CONNECT CHILLER PLANT LIGHTING TO EXISTING BOILER PLANT LIGHTING CONTROL PANEL. EXISTING EQUIPMENT IS WATTSTOPPER. USE EXISTING SPARE RELAYS FOR LIGHTING CONTROLS AND CONNECT COMPLETE TO PANEL AND CIRCUIT INDICATED ON PLANS VIA 3/4"C - 2#12 AND 1#12EG. REFER TO LIGHTING

CONTROL PANEL FOR ADDITIONAL INFORMATION.

FIRE ALARM GENERAL NOTES

F1. ALL FIRE ALARM SYSTEM DEVICES SHALL BE CONNECTED COMPLETE TO THE MAIN FIRE ALARM SYSTEM

CONTROL PANEL IN ACCORDANCE WITH ENGINEER APPROVED MANUFACTURER'S SHOP DRAWING WIRING

DIAGRAMS AND DETAILS.

F2. ALL FIRE ALARM SYSTEM CONDUCTORS SHALL BE INSTALLED IN 3/4" MINIMUM SIZE CONDUIT SYSTEM.

F3. IN GENERAL ALL MANUAL PULL STATIONS SHALL BE INSTALLED AT 48" ABOVE FINISHED FLOOR. MANUAL PULL STATIONS SHALL BE INSTALLED WITHIN 5'-0" OF ALL EXIT DOORWAY OPENINGS AT EACH EXIT ON EACH FLOOR.

ADDITIONAL MANUAL PULL STATIONS SHALL BE PROVIDED SO THAT THE TRAVEL DISTANCE TO THE NEAREST

PULL STATION WILL NOT EXCEED 200' MEASURED HORIZONTALLY ON THE SAME FLOOR.

F4. ALL AUDIO/VISUAL AND VISUAL ONLY FIRE ALARM SYSTEM DEVICES SHALL BE ADA TYPE. IN ALL CASES VISUAL DEVICES SHALL BE WALL MOUNTED AT 80" ABOVE FINISHED FLOOR. VISUAL DEVICES SHALL BE LOCATED NOT MORE THAN 15' FROM THE END OF ALL CORRIDORS WITH A SEPARATION NOT GREATER THAN 100' BETWEEN DEVICES. AUDIO DEVICES SHALL BE INSTALLED THROUGHOUT THE BUILDING TO ATTAIN MINIMUM DECIBEL LEVELS REQUIRED BY CODE. COMBINATION AUDIO/VISUAL DEVICES AND ADDITIONAL VISUAL ONLY DEVICES

SHALL BE INSTALLED AT LOCATIONS AS INDICATED ON FLOOR PLANS.

F5. IN GENERAL SMOKE DETECTORS SHALL BE INSTALLED ON CEILINGS WITH SPACING NOT TO EXCEED

MANUFACTURER'S RECOMMENDATION.

F6. SPRINKLER SYSTEM WATERFLOW ALARM INITIATING DEVICES SHALL BE CONNECTED COMPLETE TO THE FIRE

ALARM SYSTEM.

F7. DUCT TYPE SMOKE DETECTORS SHALL BE PROVIDED FOR ALL HVAC RETURN AIR SYSTEMS WITH DESIGN CAPACITY GREATER THAN 2,000 CFM. WHERE RETURN AIR RISERS SERVE TWO OR MORE STORIES, AND ARE PART OF A RETURN AIR SYSTEM HAVING A DESIGN CAPACITY GREATER THAN 15,000 CFM, DUCT DETECTORS SHALL BE PROVIDED AT EACH STORY. COORDINATE EXACT DETECTOR LOCATIONS AND PROVISION OF

ADEQUATE DUCT LENGTHS WITH THE MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN.

F8. PROVIDE ALL FIRE ALARM SYSTEM COMPONENTS NECESSARY FOR SHUT DOWN OF HVAC EQUIPMENT BY THE

FIRE ALARM SYSTEM WHERE SAME IS REQUIRED.

F9. PROVIDE ALL FIRE ALARM SYSTEM COMPONENTS NECESSARY FOR ELEVATOR CAPTURE BY THE FIRE ALARM

SYSTEM WHERE SAME IS REQUIRED.

F10. SMOKE DETECTORS SHALL BE INSTALLED WITHIN 5'-0" OF CENTERLINE OF SMOKE DOORS ON HOLD-OPEN.

F11. SMOKE DETECTORS SHALL NOT BE LOCATED CLOSER THAN 3'-0" FROM AN AIR SUPPLY DIFFUSER.

F12. AUTOMATIC DOORS LOCATED ON A 2-HOUR FIRE RATED WALL SHALL HAVE A FIRE ALARM INTERFACE THAT INTERRUPTS 120V POWER FOR THE AUTOMATIC DOOR OPENER UNDER A FIRE ALARM CONDITION. PROVIDE (1) CONTROL MODULE FROM EACH BUILDING FIRE ALARM SYSTEM IF LOCATED ALONG THE BORDER OF TWO

BUILDINGS.

F13. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADDITIONAL AUDIBLE NOTIFICATION APPLIANCES AS REQUIRED TO ACHEIVE NFPA 72 REQUIREMENT FOR SOUND LEVELS A MINIMUM OF 15db ABOVE AMBIENT.

ADDITIONAL LOCATIONS SHALL BE NOTED AND ESTIMATED SOUND PRESSURE LEVEL OF SYSTEM IN CHILLER

PLANT SHALL BE STATED ON SHOP DRAWING SUBMITTAL FOR REVIEW.

F14 CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FIRE WATCH FOR ANY FIRE ALARM OR SPRINKLER SHUTDOWN GREATER THAN FOUR HOURS. ALL SHUTDOWNS MUST BE DONE OFF HOURS AND SCHEDULED (21) DAYS IN ADVANCE IF LESS THAN (8) HOURS. ANY SHUTDOWN GREATER THAN (8) HOURS SHALL BE SCHEDULED

(40) DAYS IN ADVANCE.

Revisions: Date:

P

P

P

P

W

W

W

D1

D1

PR

PR

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

J

J

C2

C2

C1

J

J

JJ

J

E-105

PSG - NORMAL

P S

G C

O N

T R

O L S

E-105

X

X

WP

H1N1-28

H1N1-30

H1N1-28

H1N1-28

H1N1-28

H1N1-30

H1N1-32

WP

WP

H1N1-32

H1N1-32

X

H1N1-30

H1N1-30

H1N1-32

WP

B.2 B.2

B.5

B.5

B.8

B.8

C.3 C.3

D.4 D.4

E.3 E.3

P S

G

E M

E R

G E

N C

Y

X

NEWNEW

ALL DEVICES IN THE BOILER

PLANT ARE EXISTING TO

REMAIN, UNLESS OTHERWISE

NOTED.

21 3 4

0.2

0.5

0.8 X

X X X X

X

X X X

X X

X

X X

XX

X

NEW

SECTION

NEW

CONTROLS

FUTURE

CONTROLS

FUTURE

SECTION

PULLBOX

DC PANELBOARD

BATTERY RACK

X

X

X

GENERATOR #2

EXISTING UNDER

PROJECT NUMBER:

757-20-205

GENERATOR #3

NEW

X

X

CPDP2 CPDP1

BOILER ROOM

CONTROL ROOM

STORAGE

2.7

B.4

X

H1N1-34

DOOR

X NEW

TYP

NGR

H1S3-10

H1E1-33

H1E1-31

WP

H1N1-32

TYP

TYP

TYP

HEAT TRACE

PANEL 5

HEAT TRACE

PANEL 4

HEAT TRACE

PANEL 3

H1E1-26

CHEMICAL

FEED PUMP

X

X

X

X

XXX

X X

XX

E-202

H1ED

H1S3

XL

COMPRESSOR

H1EB-26,28,30

H1S3-11

H1S2

H1EC

H1S2-9

TCP

TCP

TCP

TCP

DAY TANK CONTROLLERS

DOOR

TEMPORARY

CHILLER

CONNECTIONS

BOX

H1E1-35

RMP

D.4

0.8

UPS-1

H1TS1

H1S1 H1SA

LIGHTING CONTROL PANEL

LIGHTING CONTROL PANEL

H1EA SEC 1 H1E1 H1EB

H1TE1

H1N1 H1NA

H1TN1

H1CA

H1C1

H1TC1

X

X

X X X X X X

X X

X

X

XX

XX

X

2.7

ELEC. ROOM

H1EA SEC 2

H1C2 4 5 6

7 8

X

X X

X X

X X XN

B.2

32.7

TELE/ DATA ROOM

S

59459

M.P. LONG

R

E

S

O F

I

R

G E

NO

I

S

P

E

N

E

D

ERT

L EA

E I N

G

R

T

S

TEA

H

F OO

IO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

757-15-102

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

20045

C R e v it L o c a l F ile s \2

F

F H

C F

R

C h ri s to p h e r.

P

.C a m p b e ll.

rv t

/6 /2

:4

:3

P M

E-105

BOILER PLANT / CHILLER PLANT POWER AND

TECHNOLOGY PLAN

CONSTRUCT CHILLER PLANT

420 N. JAMES ROAD, COLUMBUS,

OHIO 43219

05/06/2022 CPC LV

BID & CONSTRUCTION

18902.00 3

0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'

1/8" = 1'-0" 1

BOILER PLANT / CHILLER PLANT

POWER AND TECHNOLOGY PLAN

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0" 2 Enlarged Electrical Room 109

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0" 3 Enlarged Telecom Room 104

CODED NOTES:

1 PROVIDE NEW GENERATOR REMOTE ANNUNCIATOR ALARM PANEL. COORDINATE WITH VA COR PRIOR TO ROUGH-IN. EXTEND POWER FROM LOCAL ALARM PANELS TO NEW ALARM PANEL AND CONNECT COMPLETE.

EXISTING GENERATOR REMOTE ALARM PANEL.

EXISTING PARALLELING SWITCHGEAR REMOTE ALARM PANEL. PROVIDE MODIFICATIONS AS REQUIRED TO

ACCOMMODATE NEW GENERATOR.

EXISTING CCTV CONTROL PANEL.

EXISTING CATV AMPLIFIER.

PROVIDE NEW PAGING SYSTEM AMPLIFIER AT LOCATION AND CONNECT COMPLETE TO NEW SPEAKERS WITHIN PROJECT AREA. EXTEND EXISTING PAGING SYSTEM CIRCUIT OUTSIDE OF THE PROJECT AREA TO THE NEW PAGING SYSTEM AMPLIFIER. CONNECT COMPLETE TO EXISTING PAGING ELECTRICAL CIRCUIT. VA

SHALL PROVIDE AMPLIFIER REQUIREMENTS TO MATCH SYSTEM UPGRADE.

EXISTING INTERCOM CONTROL PANEL.

EXISTING ACCESS CONTROL PANEL.

MOTOR OPERATED DOOR - 120V-1Ø-3/4HP, PROVIDE POWER FOR NEW MOTOR OPERATED DOOR AND CONTROL BOX. CONNECT COMPLETE VIA 3/4"C - 2#12 AND 1#12EG PER MANUFACTURE'S WIRING DIAGRAM.

COORDINATE EXACT LOCATION OF CONTROL BOX IN FIELD PRIOR TO ROUGH-IN.

EXISTING SIMPLEX-GRINNELL FIRE ALARM CONTROL PANEL

PROVIDE NEW SOFTWARE LICENSES AS REQUIRED FOR ALL NEW VIDEO SURVEILLANCE CAMERAS AND

CARD READER DEVICES.

PROVIDE 120V-50A NEMA 5-50R RECEPTACLE FOR WELDING EQUIPMENT. COORDINATE LOCATION WITH VA

COR PRIOR TO ROUGH-IN AND CONNECT COMPLETE VIA 3/4"C - 2#6 AND 1#10EG.

PROVIDE DATA OUTLET FOR ALL MECHANICAL EQUIPMENT CONTROL PANELS. ROUTE CAT6A CABLE TO TELE/DATA ROOM 104 FOR BUILDING AUTOMATION SYSTEM MONITORING. TERMINATE PER VA STANDARDS.

PROVIDE NEW CIRCUIT FOR OVERHEAD COILING DOOR, 15A-3P-3/4HP-480V-3PH RECONNECT COMPLETE TO CIRCUIT AND PANEL INDICATED ON PLAN VIA 3/4"C - 3#12 AND 1#12. PROVIDE WIRING FOR INTERIOR AND

EXTERIOR CONTROL STATIONS, SAFETY DEVICES AND ANCILLARY DEVICES FOR A COMPLETE

INSTALLATION.

PROVIDE NEW CIRCUIT FOR CHEMICAL FEED PUMP(S). RECONNECT COMPLETE TO CIRCUIT AND PANEL

INDICATED ON PLAN VIA 3/4"C - 3#12 AND 1#12.

MOUNT PANELBOARDS ON STRUT SUPPORT SYSTEM.

PROVIDE CIRCUIT FOR NEUTRAL GROUND RESISTOR (NGR) HEATER AND CONNECT TO PANEL AND CIRCUIT INDICATED ON PLAN VIA 3/4"C - 2#12 AND 1#12 EG. REFER TO ELECTRICAL SITE PLAN FOR ADDITIONAL

INFORMATION.

NEW LOCATION FOR EXISTING BOILER AIR COMPRESSOR. COORDINATE EXACT LOCATION WITH VA COR PRIOR TO ROUGH-IN. RELOCATE EXISTING DISCONNECTING MEANS ALONG WITH EQUIPMENT. REFER TO

DEMOLITION PLAN FOR ADDITIONAL INFORMATION.

PROVIDE 120V-20A DEDICATED CIRCUIT FOR FUEL POLISHER. MOUNT PANEL ON STRUT SUPPORTS IN GENERATOR VESTIBULE. COORDINATE LOCATION WITH VA COR PRIOR TO ROUGH-IN AND CONNECT

COMPLETE TO PANEL AND CIRCUIT INDICATED ON PLANS VIA 3/4"C - 2#12 AND 1#12EG.

PROVIDE 120V-20A DEDICATED LIFE SAFETY CIRCUIT FOR EMERGENCY GENERATOR FUEL DELIVERY SYSTEM MASTER ALARM AND DATA COMMUNICATION PANEL. COORDINATE LOCATION WITH VA COR PRIOR TO ROUGH-IN AND CONNECT COMPLETE TO PANEL AND CIRCUIT INDICATED ON PLANS VIA 3/4"C - 2#12 AND 1

#12EG. REFER TO FUEL OIL TRANSFER PUMP PACKAGE.

POWER GENERAL NOTES

P1 REFER TO THE ARCHITECTURAL PLANS FOR EQUIPMENT LAYOUT. CLOSELY COORDINATE THE EXACT LOCATION

OF ALL OUTLETS AND DEVICES WITH ARCHITECTURAL ELEVATIONS. ADJUST LOCATIONS AND MOUNTING HEIGHTS WHERE NECESSARY TO PREVENT INTERFERENCE WITH FURNITURE, FIXED CASEWORK, EQUIPMENT, ETC. VERIFY ALL CHANGES PRIOR TO ROUGH-IN.

P2 ELECTRICAL CONTRACTOR SHALL VERIFY ALL EQUIPMENT LOCATIONS, MOUNTING HEIGHTS, AND CONNECTION REQUIREMENTS (RECEPTACLES, SWITCHES, DISCONNECTS) WITH EQUIPMENT VENDOR PRIOR TO ROUGH-IN.

P3 A DEDICATED NEUTRAL SHALL BE PROVIDED FOR EACH AND EVERY 120V AND 277V BRANCH CIRCUIT. MULTIWIRE

BRANCH CIRCUITS WITH SHARED NEUTRALS ARE NOT PERMITTED.

P4 PROVIDE #10 SIZE CONDUCTORS FOR 20A-120V CIRCUITS WITH DISTANCE LENGTHS THAT EXCEED 100 FT.

N

Revisions: Date:

C

C

C

NEW

SS-CP2

NEW

SS-CP1

EXISTING

NPSS-1

EXISTING

GPSS-1

ATS-HLS ATS-

HEQ

ATS-

HCR

X X X

EF-1

EF

C

C

C

H1N1…