18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-7.pdf
PDF 10 MB Posted
- Solicitation number
- 36C25023B0049
About this file
This file summary describes a federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is soliciting proposals for contract number 36C25023B0049 to construct a chiller plant at the Chalmers P. Wylie VA Ambulatory Care Center in Columbus, Ohio. This is a 100% SDVOSB set-aside opportunity with an estimated value over $5 million. Proposals are due by February 15, 2023 based on drawings and specifications contained in the related 10MB file. The selected contractor will be responsible for installing a new chiller plant to replace the existing infrastructure and ensure proper heating and cooling capabilities at the VA medical facility.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design Interior
Engineering
T
T
Y
Y
W
W
V
V
X
X
U
U
MD-151AMD-151B
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:4
P M
MD-151B
ACC FIRST FLOOR HVAC PIPING DEMOLITION
PLAN
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
CONSULT
1A544
CONSULT
1A543
OFFICE
1A529
OFFICE
1A528
OFFICE
1A527
OFFICE
1A526
OFFICE
1A525
OFFICE
1A524
OFFICE
1A522
OFFICE
1A521
OFFICE
1A520
OFFICE
1A519
OFFICE
1A518
VESTIBULE
1A404
CONSULT
1A517
CONSULT
1A515
CONSULT
1A513
CONSULT
1A511
CONSULT
1A509
CONSULT
1A507
CONSULT
1A505
CONSULT
1A503
CONSULT
1A502
OFFICE
1A501
CORRIDOR
JAN
1A456
CONSULT
1A532
CONSULT
1A534
CONSULT
1A536
CORRIDOR
1A409
CONSULT
1A531
CONSULT
1A533
CONSULT
1A535
CONSULT
1A537
CONSULT
1A539
CONSULT
1A538
CONSULT
1A540
SOILED
1A541
CONSULT
1A504
CONSULT
1A506
CONSULT
1A508
QUIET
1A510
QUIET
1A512
QUIET
1A514
MECH
1A463
ELEC
1A459
TOILET
1A461
MED
1A516
CORRIDOR
1A402
OPEN
OFFICE
1A530CORRIDOR
1A405
CORRIDOR
1A406
CORRIDOR
1A403
CORRIDOR
1A408
Vestibule
1A023
OFFICE
1A550
OFFICE
1A549
CONSULT
1A548
CONSULT
1A547
CONSULT
1A546
CONSULT
1A545
CONSULT
1A545
LOUNGE
1A400
CORRIDOR
1A401
TELECOM
1A462
WAITING
1A560
OFFICE
1A542
CORRIDOR
1A562
TOILET
1A451
TOILET
1A453
TOILET
1A454
TOILET
1A452
CORRIDOR
1A412
CORRIDOR
1A563
GROUP
1A568
GROUP
1A565
GROUP
1A566
GROUP
1A567
CORRIDOR
1A564
CORRIDOR
1A407
1A409
OFFICE
1A460
OFFICE
1A458
OFFICE
1A457
ELEC
1A455
Group
1A561
CORRIDOR
1A410
Stair No. 1
1S001
XR-CHP1
XR-CHP2
XR-ET1
XR-BT
XR-AS1
XR-3" CHWS/R
XR-3" CHWS/R
XR-4" CHWS
XR-4" CHWS/R
XR-4" CHWR
XR-4" CHWS/R
XR-4" CHWR
XR-4" CHWS/R UP TO
ROOF MOUNTED AIR
COOLED CHILLER
XR- 3" CHWS/R UP
NOT TO SCALE
ACC 1ST FLOOR KEY PLAN
DEMOLITION CODED NOTES
REMOVE EXISTING CHWS & CHWR PIPING AND ALL ASSOCIATED HANGERS AND SUPPORTS COMPLETE.
REMOVE EXISTING CHWS & CHWR PIPING UP THROUGH DECK COMPLETE. CONTRACTOR SHALL FILL AND
PATCH DECK PENETRATION TO MATCH SURROUNDING SURFACES.
REMOVE EXISTING BUFFER TANK AND ALL ASSOCIATED PIPING COMPLETE.
REMOVE EXISTING CHILLED WATER PUMPS AND ALL ASSOCIATED PIPING, WIRING, CONTROLS, ETC.
COMPLETE.
REMOVE EXISTING EXPANSION TANK COMPLETE.
REMOVE EXISTING FILTER/SHOT FEEDER AND ALL ASSOCIATED PIPING COMPLETE.
REMOVE EXISTING CHWS & CHWR PIPING UP TO JUST BELOW DECK PENETRATION.
REMOVE AND REINSTALL PORTION OF EXISTING SUPPLY DUCTWORK SERVING VAV BOX AS INDICATED TO
FACILITATE PIPING WORK.
D1
D2
D3
D4
D5
XR-SF1
D6
D1
D1
D3
D4
D5
D6
D7
D7
GENERAL NOTES
EXISTING EQUIPMENT SHALL NOT BE SHUTDOWN AND REMOVED UNTIL NEW CHWS/R PIPE MAINS HAVE BEEN INSTALLED AND SUCCESSFUL START-UP, TEST, AND CHANGEOVER TO NEW CHILLER PLANT HAS
OCCURRED.
COORDINATE SHUTDOWN OF EXISTING EQUIPMENT WITH VA COR.
REMOVE ALL CONCRETE HOUSEKEEPING PADS AT LOCATIONS OF REMOVED EQUIPMENT.
ALL PIPING ABANDONED ABOVE CEILING SHALL BE DRAINED, CAPPED, AND LABELED. CONTRACTOR SHALL LABEL PIPING EVERY 5-FT ALONG ENTIRE LENGTH. LABELS SHALL READ "ABANDONED ON X" WHERE "X" IS
THE DATE ABANDONED.
ALL WORK ON THIS DWG SHALL BE COMPLETED DURING OFF-HOURS.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILE AND GRID AS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY DAMAGED CEILING TILES/GRID AS A RESULT OF THIS WORK.
A.
B.
C.
D.
E.
F.
ALTERNATE NOTES
ALTERNATE NO. 3:
AS PART OF ALTERNATE NO. 3, ALL WORK ON THIS DRAWING SHALL BE DELETED, WHICH INCLUDES WORK RELATED TO REMOVING EXISTING DEDICATED CHILLED WATER SYSTEM SERVING EXISTING RTU-14, AND RE-
FEEDING RTU-14 FROM THE NEW CHILLED WATER SYSTEM.
A.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
ACC FIRST FLOOR HVAC PIPING DEMOLITION PLAN 1N
CAP
D1
D1
D1 D1
D1
D1
D1
D1
D1
D1
D1
D8
X-SAD8
D2
Revisions: Date:
FINAL BID & CONSTRUCTION 11/24/2021
FINAL BID & CONSTRUCTION (REVISED) 05/06/2022
Automated Line
X-CU
X-CU
X-RTU-14
XR-ACC
X-EF
D1D2
Y
Y
W
W
V
V
X
X
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:5
P M
MD-152
ACC SECOND FLOOR HVAC PIPING
DEMOLITION PLAN
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
ACC SECOND FLOOR HVAC PIPING DEMOLITION
PLAN 1
DEMOLITION CODED NOTES
REMOVE EXISTING AIR COOLED CHILLER AND ALL ASSOCIATED PIPING, WIRING, CONTROLS, CURBS, ETC.
COMPLETE. PATCH ROOF WATERTIGHT.
REMOVE EXISTING 3"Ø CHWS & CHWR PIPING DOWN THROUGH ROOF COMPLETE. CAP PIPE CURB
WEATHERTIGHT.
D1
D2
GENERAL NOTES
EXISTING EQUIPMENT SHALL NOT BE SHUTDOWN AND REMOVED UNTIL NEW CHWS/R PIPE MAINS HAVE BEEN INSTALLED AND SUCCESSFUL START-UP, TEST, AND CHANGEOVER TO NEW CHILLER PLANT HAS
OCCURRED.
COORDINATE SHUTDOWN OF EXISTING EQUIPMENT WITH VA COR.
A.
B.
ALTERNATE NOTES
ALTERNATE NO. 3:
AS PART OF ALTERNATE NO. 3, ALL WORK ON THIS DRAWING SHALL BE DELETED, WHICH INCLUDES WORK RELATED TO REMOVING EXISTING DEDICATED CHILLED WATER SYSTEM SERVING EXISTING RTU-14, AND RE-
FEEDING RTU-14 FROM THE NEW CHILLED WATER SYSTEM.
A.
NOT TO SCALE
ACC 2ND FLOOR KEY PLAN
N
Revisions: Date:
K
K
L
L
M
M
N
N
9.2
9.2
XR - 14"ø
XR - 14"ø
XR - 14"ø
XR - 8"ø
XR - 8"ø
X-14"Ø TWS &
TWR DOWN
XR-8"Ø
TWS UP
XR-8"Ø
TWS UP
CAP
XR-8"Ø
TWR UP
XR-8"Ø
TWR UP
XR-3"Ø
NPCW UP XR-3"Ø
NPCW UP
XR - 3"ø
XR - 3"ø
X-3"Ø
NPCW UP
CAP
D1 D1
D2 D2
D2
D2
D4 D4
D3
Geriatrics Chief
3A415
Conference Room
3A413
Open Office
3A411
Telecom.
3A015
Group
3A418
Exam Room
3A421
Corridor
3A420A
Telehealth Supv 3A423
Reception
3A414
Social Work Chief
3A456
HBHC Supv Office
3A455
Nurse Office
3A454
Social Work
3A426
Home Telehealth
3A424
Home Telehealth
3A422
Telehealth Exam
3A439
Social Work
3A435
Exam
3A433
Geriatrics
3A431
MD/RN Office
3A440
SW/MD Office
3A438
SW Office
3A436
Exam
3A434
C&P Psychologist
3A432
Corridor
3A430
Corridor
3A420
Corridor
3A410
Corridor
3A450
Men's Toilet
3A007
Women's Toilet
3A008
Toilet Room
3A403
Corridor
3A401
Geriatric Waiting
3A400
Work Room
3A404
Staff Toilet
3A405
Staff Toilet
3A405A
Chaplain
3A017
Elevator Lobby
3A014
Stair No. 2
3S002Electrical Room
3A016
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:0
P M
MD-153
ACC THIRD FLOOR HVAC PIPING DEMOLITION
PLAN
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
ACC THIRD FLOOR HVAC PIPING DEMOLITION
PLAN 1
DEMOLITION CODED NOTES
REMOVE EXISTING 14"Ø TWS & TWR PIPING BACK TO SHAFT PENETRATION AS INDICATED AND CAP.
REMOVE EXISTING 14"Ø TWS & TWR PIPING UP THROUGH DECK COMPLETE.
REMOVE EXISTING 3"Ø NPCW PIPING BACK TO POINT AS INDICATED AND CAP. PIPING MUST BE REMOVED TO
WITHIN 2 PIPE DIAMETERS OF MAIN (COMPLY WITH VA DIRECTIVE 1061).
REMOVE EXISTING 3"Ø NPCW PIPING UP THROUGH DECK COMPLETE.
D1
D2
GENERAL NOTES
EXISTING EQUIPMENT SHALL NOT BE SHUTDOWN AND REMOVED UNTIL NEW CHWS/R PIPE MAINS HAVE BEEN INSTALLED AND SUCCESSFUL START-UP, TEST, AND CHANGEOVER TO NEW CHILLER PLANT HAS
OCCURRED.
COORDINATE SHUTDOWN OF EXISTING EQUIPMENT WITH VA COR.
ALL WORK ON THIS DWG SHALL BE COMPLETED DURING OFF-HOURS.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILE AND GRID AS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY DAMAGED CEILING TILES/GRID AS A RESULT OF THIS WORK.
A.
B.
C.
D.
N
NOT TO SCALE
ACC 3RD FLOOR/ROOF KEY PLAN
D3
D4
Revisions: Date:
DN
UP
K
K
L
L
M
M
N
N
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:0
P M
MD-154
ACC FOURTH LEVEL ROOF HVAC DEMOLITION
PLAN
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
XR-CT-1 XR-CT-2
NOT TO SCALE
ACC 4TH FLOOR KEY PLAN
DEMOLITION CODED NOTES
REMOVE EXISTING COOLING TOWER COMPLETELY. REMOVE ALL ASSOCIATED CONDENSER WATER DRAINS, MAKE-UP WATER, ETC. DOWN TO BELOW ROOF AND CAP BACK AT MAINS. PATCH ROOF WEATHERTIGHT.
COORDINATE WORK ABOVE 3RD FLOOR CEILING WITH VA COR AND DEPARTMENT. REMOVE ALL
ASSOCIATED CONTROLS, HEAT TRACE, TOWER SUPPORT FRAME, ETC. COMPLETE. REFER TO PD-153 AND
MD-153 FOR EXTENT OF PIPING DEMOLITION ON THIRD FLOOR BELOW.
D1
GENERAL NOTES
EXISTING EQUIPMENT SHALL NOT BE SHUTDOWN AND REMOVED UNTIL NEW CHWS/R PIPE MAINS HAVE BEEN INSTALLED AND SUCCESSFUL START-UP, TEST, AND CHANGEOVER TO NEW CHILLER PLANT HAS
OCCURRED.
COORDINATE SHUTDOWN OF EXISTING EQUIPMENT WITH VA COR.
A.
B.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
ACC FOURTH LEVEL ROOF
HVAC DEMOLITION PLAN 1N
D1D1
Revisions: Date:
V F
D V
F D
V F
D V
F D
V F
D V
F D
V F
D
VFDVFD
V F
D V
F D
V F
D
CH-1
x
S
A x
S
A
40 x 14 EA
40 x 14 EA
24 x 18
S1 1435
24 x 18
S1 1435
24 x 18
S1 1435
24 x 18
S1 1435
24 x 18
S1 1435
24 x 18
S1 1435
24 x 18
S1 1435
18 x 12
S2 730
18 x 12
S2 730
34 x 34
E1 3835
34 x 34
E1 3835
34 x 34
E1 3835
P-1
P-2
P-3
AS-1
TP-1
TP-2
TP-3
x
S
A x
S
A
CH-2
CH-3
ET-1
T
BOTTOM
OF SA AT
14'-1'' AFF.
B.2 B.2
B.5 B.5
B.8 B.8
C.3 C.3
D.4 D.4
E.3 E.3
CHILLER PLANT
EC-114
42.7
2.7
B.4 B.4
P-4
TP-4
CH-4
40 x 14 EA
FTP-1
(TYP)
(TYP)
(TYP)
(TYP)
x
E
A x
E
A
40 x 14 EA
SSF-1
BOILER ROOM
CONTROL ROOM
STORAGE
TOILET
CORRIDOR
TELE/ DATA ROOM
JANITOR
BREAK ROOM
LOCKER/SHOWER
MANAGER'S OFFICE
VESTIBULE
STORAGE
ELEC. ROOM
STORAGE
EMERGENCY
PARALLEL
SWITCHGEAR
NORMAL PARALLEL
SWITCHGEAR
OUTLINE OF RTU
ON ROOF ABOVE
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:0
P M
M-111
HVAC DUCTWORK PLAN - CHILLER PLANT
FLOOR
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0" 1
HVAC DUCTWORK PLAN - CHILLER PLANT
FLOOR
CODED NOTES
1 20X60 EA UP TO EF-1. TRANSITION TO EXHAUST FAN INLET SIZE PRIOR TO PENETRATING ROOF.
56X20 SA UP TO PAC-AHU-4. TRANSITION DUCT TO RTU SA DUCT OUTLET. PROVIDE FLEXIBLE CONNECTOR
AT CONNECTIONS BETWEEN DUCT AND RTU.
EXTEND RA DUCT DOWN FROM RTU TO 14'-1" AFF. DUCT FULL SIZE OF RTU INLET. PROVIDE WIRE MESH
GRILLE (PER SPECIFICATION 23 37 00) AT DUCT INLET.
MOUNT BOTTOM OF GRILLE AT 7" ABOVE FLOOR.
MAINTAIN CHILLER MANUFACTURER'S RECOMMENDED SERVICE CLEARANCE ON ALL SIDES OF CHILLER.
N
Revisions: Date:
F
D V
F D
V F
D V
F D
B
M-301
C
M-302
2 1 20"ø TWS
AS-1
TP-1
TP-2
TP-3
"ø
C H
W R
"ø
T W
R
20"ø TWS
17 17
A
M-301
"ø
T W
S
"ø
T W
S "ø
T W
S
3"ø NPCW
4"ø CW
3"ø NPCW
2"ø NPCW
S
S
B.2 B.2
B.5 B.5
B.8 B.8
C.3 C.3
CHILLER PLANT
EC-114
RS
CH-4
"ø
C H
W S
"ø
T W
R
1 / M-121
20"ø TWS
B.4 B.4
E
M-303
"ø
T W
S
TP-4 10
18"ø CHWR
10"ø CHWS
10"ø CHWR
BFP
RS
M -1
TYP.
TYP.
TYP.
CONTROL ROOM
"ø
T W
R
3"ø NPCW
TELE/ DATA ROOM
STORAGE
CORRIDOR
1 / M-122
1 / M-121
1 / M-122
M -1
M -1
M -1
18"ø CHWS
DIVERTER VALVE
CONTROL PANEL
FTP-1
FUEL OIL PUMP
CONTROL PANEL
10"ø CHWS
10"ø CHWR
10"ø CHWS
10"ø CHWR
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:1
P M
M-121
ENLARGED HVAC PIPING PLAN - CHILLER
PLANT FLOOR - NORTH
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0" 1
ENLARGED HVAC PIPING PLAN - CHILLER
PLANT FLOOR - NORTH
CODED NOTES
18"Ø CHWS & CHWR PIPING THROUGH WALL INTO BOILER ROOM. RAISE PIPING AS HIGH AS POSSIBLE UPON
ENTERING BOILER ROOM. REFER TO SECTION E ON DWG M-303 FOR MORE INFORMATION.
18"Ø CHWS & CHWR PIPING THROUGH BOILER ROOM. REFER TO DWG M-123 FOR CONTINUATION.
WATER TREATMENT INSTRUMENTATION AND CONTROLS STATION. MOUNT RIGIDLY TO SLAB WITH
UNISTRUT/ANGLE IRON BASE.
10" CHWS/R DOWN TO CHILLER. PROVIDE MINIMUM OF 2 OFFSETS PRIOR TO CONNECTION. REFER TO PIPING DIAGRAMS, DWG M-603 FOR ADDITIONAL INFORMATION (i.e. VALVES, DEVICES, ETC.).
MOUNT CHILLER ON 6-INCH THICK CONCRETE PAD. REFER TO STRUCTURAL PLANS FOR ADDITIONAL INFORMATION. PROVIDE VIBRATION ISOLATION PER SPECIFICATIONS. PROVIDE MANUFACTURER'S
RECOMMENDED SERVICE CLEARANCE ON ALL SIDES OF CHILLER.
12" TWS/R UP TO COOLING TOWER. REFER TO DWG M-131 FOR CONTINUATION.
CONNECT TO CHILLER RELIEF VENT OUTLET LOCATION(S) PER MANUFACTURER'S RECOMMENDATIONS.
ROUTE FULL SIZE UP THROUGH ROOF. WHERE CHILLERS ARE PROVIDED MULTIPLE VENTS, PIPE EACH VENT INDEPENDENTLY. PROVIDE PIPE CURB AT ROOF PENETRATION. FLASH CURB TO ROOF. REFER TO DETAIL #4, DWG M-503.
PROVIDE UNDERGROUND CHILLED WATER PIPING LEAK DETECTION ALARM PANEL. WIRE ALARMS TO BAS.
FIELD VERIFY LOCATION FOR INSTALLATION.
MOUNT AIR AND DIRT SEPARATOR AT HEIGHT THAT PERMITS BOTTOM ACCESS AND MAINTENANCE.
COORDINATE WITH MANUFACTURER'S REQUIREMENTS. REFER TO DETAIL #3, DWG M-504.
MOUNT PUMP ON VIBRATION ISOLATION BASE. REFER TO DETAIL #10, DWG M-502.
CONDENSER (TOWER) WATER PUMP SPEED MOTOR CONTROLLER. MOUNT TO WALL. FINAL LOCATION SHALL BE COORDINATED TO MAINTAIN ALL REQUIRED CLEARANCES AROUND AND IN FRONT OF VFD.
PROVIDE NEW TEMPERATURE CONTROLS ECC. REFER TO SPECIFICATION 23 09 23 FOR ADDITIONAL
INFORMATION. FIELD VERIFY LOCATION FOR INSTALLATION.
MAINTAIN CLEAR HEIGHT AND WIDTH REQUIRED TO REMOVE CHILLERS. CLEARANCE SHALL BE FREE FROM OBSTRUCTION AND SHALL NOT REQUIRE ANY REMOVAL OF DUCTWORK/PIPING/ETC IN ORDER TO CLEAR
PATH. COORDINATE WITH ALL OTHER TRADES.
PIPE 2" NPCW TO SERVE MAKE UP FILL LINE FOR CHILLED WATER SYSTEM. REFER TO DWG M-603 FOR POINT
OF CONNECTION TO SYSTEM.
2" NPCW UP THRU ROOF TO SERVE COOLING TOWER FILL LINE. REFER TO DWG M-131 FOR CONTINUATION.
4" DOMESTIC COLD WATER LINE PIPED BACK TO DOMESTIC COLD WATER MAIN. SEE DWG P-102 FOR
CONTINUATION.
CHEMICAL TREATMENT FEED TANKS AND ASSOCIATED PUMPS. PIPE PER WATER TREATMENT SYSTEM DIAGRAM AND MANUFACTURER'S RECOMMENDATIONS. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
FILL LINE STATION. REFER TO DETAIL #5 ON DWG M-502 FOR ADDITIONAL INFORMATION.
REFRIGERANT MONITOR PANEL. PROVIDE REFRIGERANT SENSORS AS INDICATED ON PLANS OR AS
RECOMMENDED BY MANUFACTURER.
REFRIGERANT ALARM SYSTEM STROBE LIGHT AND HORN. WHERE LOCATED OUTDOORS, PROVIDE
WEATHER PROOF-TYPE.
REFRIGERANT ALARM BREAK GLASS STATION.
CHILLED WATER BTU/FLOW METER PROCESSOR DISPLAY UNIT. MOUNT ON WALL AT 54" AFF. FIELD VERIFY
LOCATION FOR INSTALLATION.
CHILLED WATER BYPASS.
CHILLED WATER BTU/FLOW METER SENSING DEVICE. REFER TO CHILLED WATER PIPING DIAGRAM ON DWG M-603.
INSTALL CHILLERS TO PERMIT MANUFACTURER'S RECOMMENDED TUBE BUNDLE PULL CLEARANCE.
COORDINATE CLEARANCES WITH ROOM EQUIPMENT/SYSTEMS LAYOUT. PROVIDE PAINT/TAPE OUTLINE ON
FLOOR DENOTING CHILLER TUBE BUNDLE MAINTENANCE CLEARANCE.
REFRIGERANT SENSORS. WIRE TO REFRIGERANT MONITOR PANEL. INSTALL PER MANUFACTURER'S
INSTRUCTIONS.
EXHAUST DUCT DROPS. REFER TO DWG M-111 FOR MORE INFORMATION.
12" TWS/TWR DOWN TO CHILLER. REFER TO PIPING DIAGRAMS, DWG M-603 FOR ADDITIONAL INFORMATION (i.e. VALVES, DEVICES, ETC.).
10"Ø CHWS & CHWR PIPING DOWN ALONG INTERIOR OF WALL. PENETRATE THROUGH EXTERIOR WALL AT 3'-0" ABOVE GRADE AND TERMINATE WITH BLIND FLANGE. PROVIDE SLEEVE AND SEAL AT WALL
PENETRATION.
PROVIDE FIELD FABRICATED EXTERIOR LOCKABLE ENCLOSURE FOR EMERGENCY CHILLED WATER
CONNECTIONS.
N
ENERGY TRENDING
TCC SHALL CONNECT TO ELECTRICAL POWER METER SERVING EACH CHILLER AND TREND INDIVIDUAL
POWER CONSUMPTION (KW/TON).
TCC SHALL TREND POWER CONSUMPTION FROM EACH PUMP VFD.
TCC SHALL CREATE SEPARATE ENERGY TRENDING GRAPHIC IN BAS AND INCORPORATE THE FOLLOWING
DATA FOR EACH CHILLER/PUMP. TREND DATA AND STORE FOR A MINIMUM OF TWO (2) YEARS:
1. CHILLER STATUS (ON/OFF)
2. CHILLER CAPACITY (TONS)
3. CHILLER ENERGY CONSUMPTION (KW)
4. CHILLER EFFICIENCY (KW/TON)
5. PUMP STATUS (ON/OFF)
6. PUMP SPEED (RPM)
7. PUMP ENERGY CONSUMPTION (KW)
8. TOTAL CHILLED WATER OUTPUT (TONS)
9. TOTAL CHILLER ENERGY CONSUMPTION (KW)
10. TOTAL EFFICIENCY (KW/TON)
A.
B.
C.
GENERAL NOTES
REFER TO DETAILS AND DIAGRAMS FOR DETAILED PIPING REQUIREMENTS (i.e. VALVES, METERS, ETC.) FOR
INDIVIDUAL EQUIPMENT.
SEE TEMPERATURE CONTROL SPECIFICATIONS AND COORDINATE WITH TC CONTRACTOR FOR
INSTRUMENTATION AND DEVICES REQUIRED TO BE INSTALLED IN PIPING AND AT EQUIPMENT.
ALL OVERHEAD PIPING SHALL BE SUPPORTED BY STRUCTURE UNLESS SPECIFICALLY APPROVED BY
ENGINEERS.
COORDINATE CHILLER ROOM WALL SPACE AVAILABILITY WITH TC CONTRACTOR FOR NEW TC PANEL
LOCATIONS.
NO PIPING WEIGHT SHALL BE SUPPORTED BY EQUIPMENT (i.e. CHILLER, PUMP, ETC.).
COORDINATE FINAL FLOOR DRAIN AND FLOOR SINK LOCATIONS WITH PC. LOCATIONS SHALL BE
COORDINATED WITH FINAL EQUIPMENT SELECTION AND LAYOUT.
ALL EXTERIOR PIPING INCLUDING, BUT NOT LIMITED TO MAKE-UP WATER, DRAIN, CHILLED WATER, TOWER WATER, EQUALIZER PIPING SHALL BE HEAT TRACED, INSULATED, AND JACKETED. HEAT TRACE TO BE SIZED
TO PROTECT FROM FREEZING IN A ZERO FLOW CONDITION AT -5 DEG F.
PROVIDE ALL NECESSARY DRAINS AND DRAIN LINES AS INDICATED ON DETAILS AND DIAGRAMS AND AS RECOMMENDED BY EQUIPMENT MANUFACTURERS. WHERE NECESSARY, ROUTE ALL DRAIN LINES TO LOCAL
FLOOR DRAIN.
PROTECT ALL EXPOSED INSULATED PIPING WITHIN 6'-0" OF FINISHED FLOOR WITH ALUMINUM JACKET.
A.
B.
C.
D.
E.
F.
G.
H.
I.
Revisions: Date:
F
D V
F D
V F
D V
F D
VFDVFD
V F
D V
F D
B
M-301
C
M-302
CH-1
20"ø TWR
"ø
T W
R
"ø
T W
S
P-1
P-2
P-3
AS-1
SSF-1
ET-1
"ø
T W
R
CH-2
CH-3
"ø
T W
S "ø
T W
S
18"ø CHWR
18"ø CHWR
"ø
C H
W S
A
M-301
"ø
T W
R
"ø
T W
S
18"ø CHWR
"ø
C H
W R
"ø
C H
W S
1"ø CHWR
RS
RS
RS
3"ø NPCW
3"ø NPCW
18"ø CHWR
T W
B Y
P A
S S
C.3 C.3
D.4 D.4
E.3 E.3
CHILLER PLANT
EC-114
"ø
C H
W R
RS
P-4 4
1"ø CHWR
TYP.
"ø
T W
R
8"ø TWS
HEAT TRACE
PANEL 5
HEAT TRACE
PANEL 4
HEAT TRACE
PANEL 3
8"ø TWS
NC
18"ø CHWR
1 / M-121
1 / M-122
1 / M-121
1 / M-122
23' - 8 15/32"
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:2
P M
M-122
ENLARGED HVAC PIPING PLAN - CHILLER
PLANT FLOOR - SOUTH
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0" 1
ENLARGED HVAC PIPING PLAN - CHILLER
PLANT FLOOR - SOUTH
CODED NOTES
GENERAL NOTES
12" TWS AND TWR UP TO COOLING TOWER. REFER TO DWG M-131 FOR CONTINUATION.
MOUNT CHILLER ON 6-INCH THICK CONCRETE PAD. REFER TO STRUCTURAL PLANS FOR ADDITIONAL INFORMATION. PROVIDE VIBRATION ISOLATION PER SPECIFICATIONS. PROVIDE MANUFACTURER'S
RECOMMENDED SERVICE CLEARANCE ON ALL SIDES OF CHILLER.
EXHAUST DUCT DROPS. REFER TO DWG M-111 FOR MORE INFORMATION.
MOUNT PUMP ON VIBRATION ISOLATION BASE. REFER TO DETAIL #10, DWG M-502.
INSTALL CHILLERS TO PERMIT MANUFACTURER'S RECOMMENDED TUBE BUNDLE PULL CLEARANCE.
COORDINATE CLEARANCES WITH ROOM EQUIPMENT/SYSTEMS LAYOUT. PROVIDE PAINT/TAPE OUTLINE ON
FLOOR DENOTING CHILLER TUBE BUNDLE MAINTENANCE CLEARANCE.
CONNECT TO CHILLER RELIEF VENT OUTLET LOCATION(S) PER MANUFACTURER'S RECOMMENDATIONS.
ROUTE FULL SIZE UP THROUGH ROOF. WHERE CHILLERS ARE PROVIDED MULTIPLE VENTS, PIPE EACH VENT INDEPENDENTLY. PROVIDE PIPE CURB AT ROOF PENETRATION. FLASH CURB TO ROOF. REFER TO DETAIL #4, DWG M-503.
MAINTAIN CLEAR HEIGHT AND WIDTH REQUIRED TO REMOVE CHILLERS. CLEARANCE SHALL BE FREE FROM OBSTRUCTION AND SHALL NOT REQUIRE ANY REMOVAL OF DUCTWORK/PIPING/ETC IN ORDER TO CLEAR
PATH. COORDINATE WITH ALL OTHER TRADES.
2" NPCW UP THRU ROOF TO SERVE COOLING TOWER FILL LINE. REFER TO DWG M-131 FOR CONTINUATION.
REFRIGERANT ALARM SYSTEM STROBE LIGHT AND HORN. WHERE LOCATED OUTDOORS, PROVIDE
WEATHERPROOF -TYPE.
REFRIGERANT ALARM BREAK GLASS STATION.
EMERGENCY SHOWER AND EYEWASH STATION. REFER TO PLUMBING DRAWINGS.
CHILLED WATER PUMP VARIABLE SPEED MOTOR CONTROLLER. MOUNT TO WALL. FINAL LOCATION SHALL BE
COORDINATED TO MAINTAIN ALL REQUIRED CLEARANCES AROUND AND IN FRONT OF VFD.
MOUNT EXPANSION TANK ON 4-INCH THICK CONCRETE HOUSEKEEPING PAD. REFER TO STRUCTURAL
PLANS FOR MORE INFORMATION. TIE INTO CHWR PER DETAIL #1 ON DWG M-502.
COOLING TOWER FAN VARIABLE SPEED MOTOR CONTROLLER. PROVIDE WITH BYPASS. MOUNT TO WALL.
RECOMMENDED TEMPERATURE CONTROL PANELS LOCATIONS. FINAL QUANTITY OF PANELS TO BE
DETERMINED BY TCC.
HEAT TRACE PANEL FOR EXTERIOR (ROOF) PIPING. WIRE 2 CIRCUITS TO ABOVE-ROOF, EXTERIOR PIPING.
REFER TO SPECIFICATIONS AND DETAILS FOR ADDITIONAL INFORMATION.
CHEMICAL POT FEEDER. REFER TO PIPING DIAGRAMS, DWG M-603 FOR ADDITIONAL INFORMATION.
REFRIGERANT SENSORS. WIRE TO REFRIGERANT MONITOR PANEL.
10" CHWS/R DOWN TO CHILLER. PROVIDE MINIMUM OF 2 OFFSETS PRIOR TO CONNECTION. REFER TO PIPING DIAGRAMS, DWG M-603 FOR ADDITIONAL INFORMATION (i.e. VALVES, DEVICES, ETC.).
TOWER WATER BYPASS AND CONTROL VALVE.
SIDE STREAM FILTER SYSTEM. MOUNT ON 4-INCH THICK CONCRETE HOUSEKEEPING PAD. REFER TO STRUCTURAL PLANS FOR MORE INFORMATION. MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES.
8"Ø DOWN TO SSF-1 INLET. COORDINATE POINT OF CONNECTION WITH EQUIPMENT.
8"Ø DOWN TO SSF-1 DISCHARGE. COORDINATE POINT OF CONNECTION WITH EQUIPMENT.
8"Ø UP THROUGH ROOF. SEE DWG M-131 FOR CONTINUATION.
12" TWS/TWR DOWN TO CHILLER. REFER TO PIPING DIAGRAMS, DWG M-603 FOR ADDITIONAL INFORMATION (i.e. VALVES, DEVICES, ETC.).
REFER TO DETAILS AND DIAGRAMS FOR DETAILED PIPING REQUIREMENTS (i.e. VALVES, METERS, ETC.) FOR
INDIVIDUAL EQUIPMENT.
SEE TEMPERATURE CONTROL SPECIFICATIONS AND COORDINATE WITH TC CONTRACTOR FOR
INSTRUMENTATION AND DEVICES REQUIRED TO BE INSTALLED IN PIPING AND AT EQUIPMENT.
ALL OVERHEAD PIPING SHALL BE SUPPORTED BY STRUCTURE UNLESS SPECIFICALLY APPROVED BY
ENGINEERS.
COORDINATE CHILLER ROOM WALL SPACE AVAILABILITY WITH TC CONTRACTOR FOR NEW TC PANEL
LOCATIONS.
NO PIPING WEIGHT SHALL BE SUPPORTED BY EQUIPMENT (i.e. CHILLER, PUMP, ETC.).
COORDINATE FINAL FLOOR DRAIN AND FLOOR SINK LOCATIONS WITH PC. LOCATIONS SHALL BE
COORDINATED WITH FINAL EQUIPMENT SELECTION AND LAYOUT.
ALL EXTERIOR PIPING INCLUDING, BUT NOT LIMITED TO MAKE-UP WATER, DRAIN, CHILLED WATER, TOWER WATER, EQUALIZER PIPING SHALL BE HEAT TRACED, INSULATED, AND JACKETED. HEAT TRACE TO BE SIZED
TO PROTECT FROM FREEZING IN A ZERO FLOW CONDITION AT -5 DEG F.
PROVIDE ALL NECESSARY DRAINS AND DRAIN LINES AS INDICATED ON DETAILS AND DIAGRAMS AND AS RECOMMENDED BY EQUIPMENT MANUFACTURERS. WHERE NECESSARY, ROUTE ALL DRAIN LINES TO LOCAL
FLOOR DRAIN.
PROTECT ALL EXPOSED INSULATED PIPING WITHIN 6'-0" OF FINISHED FLOOR WITH ALUMINUM JACKET.
A.
B.
C.
D.
E.
F.
G.
H.
I.
N
ENERGY TRENDING
TCC SHALL CONNECT TO ELECTRICAL POWER METER SERVING EACH CHILLER AND TREND INDIVIDUAL
POWER CONSUMPTION (KW/TON).
TCC SHALL TREND POWER CONSUMPTION FROM EACH PUMP VFD.
TCC SHALL CREATE SEPARATE ENERGY TRENDING GRAPHIC IN BAS AND INCORPORATE THE FOLLOWING
DATA FOR EACH CHILLER/PUMP. TREND DATA AND STORE FOR A MINIMUM OF TWO (2) YEARS:
1. CHILLER STATUS (ON/OFF)
2. CHILLER CAPACITY (TONS)
3. CHILLER ENERGY CONSUMPTION (KW)
4. CHILLER EFFICIENCY (KW/TON)
5. PUMP STATUS (ON/OFF)
6. PUMP SPEED (RPM)
7. PUMP ENERGY CONSUMPTION (KW)
8. TOTAL CHILLED WATER OUTPUT (TONS)
9. TOTAL CHILLER ENERGY CONSUMPTION (KW)
10. TOTAL EFFICIENCY (KW/TON)
A.
B.
C.
Revisions: Date:
B.2 B.2
B.5 B.5
B.8 B.8
C.3 C.3
A.8
A.8
18"ø CHWS
18"ø CHWR
18"ø CHWS
18"ø CHWR
2.7
2.7
B.4 B.4
G
M-303
F
M-303
E
M-303
M -1
2"ø BD
2"ø BD
X - 2"ø BD
X - 2"ø BD X - 1"ø D
1"ø D
BOILER ROOM
CONTROL ROOM
TELE/ DATA ROOM
M -1
M -1
M -1
X - 8"ø HPS
X - 6"ø HPS
X - 4"ø LPS X - 3"ø LPS
X - 3"ø LPS X - 4"ø LPS X - 6"ø HPS
X - 8"ø HPS
X - 3"ø HPR
X - 3"ø HPR
18"ø CHWS
18"ø CHWR
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:2
P M
M-123
BOILER ROOM AND UNDERGROUND CHILLED
WATER PIPING PLAN
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
BOILER ROOM AND UNDERGROUND CHILLED
WATER PIPING PLAN 1
CODED NOTES
18"Ø CHWS AND CHWR PIPING THROUGH WALL FROM CHILLER PLANT. SLEEVE AND FIRESTOP
PENETRATION. SEE DWG M-121 FOR CONTINUATION.
OFFSET PIPING AS HIGH AS POSSIBLE. SEE SECTION E ON SHEET M-303 FOR MORE INFORMATION.
18" DIA CHWS AND CHWR DOWN ALONG INTERIOR SIDE OF BOILER ROOM BLAST WALL AND INTO PIT. PIPING SHALL BE SUPPORTED FROM FLOOR AND FROM STRUCTURE ABOVE. PROVIDE MANUAL ISOLATION VALVES IN ACCESSIBLE LOCATION IN VERTICAL. COORDINATE DEPTH OF HORIZONTAL PIPING IN PIT WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. SEE SECTION F ON SHEET M-303 FOR MORE INFORMATION.
18"Ø CHWS AND CHWR PIPING ROUTED UNDERGROUND. COORDINATE WITH EXISTING PIPING/UTILITIES. SEE CIVIL SITE UTILITY PLAN FOR MORE INFORMATION. EXPLORATORY HYDRO TRENCHING SHALL BE COMPLETED TO VERIFY EXISTING UNDERGROUND UTILITIES AND DETERMINE EXACT CHWS/CHWR PIPE
ROUTE PRIOR TO FULL EXCAVATION.
18"Ø CHWS AND CHWR PIPING UP ALONG EXTERIOR WALL TO ROOF AT THIRD FLOOR LEVEL. SEE SECTION G ON SHEET M-303 FOR MORE INFORMATION. SUPPORT PIPING FROM GROUND AND STRUCTURE ABOVE.
PROVIDE PIPE GUIDES IN VERTICAL. HEAT TRACE ALL EXTERIOR ABOVE-GROUND PIPING PER DETAIL. SEE
DWG M-153A FOR CONTINUATION.
PROVIDE PIPE SLEEVE AND SEAL WITH MECHANICAL LINK SEAL AT PIT PENETRATION.
PROVIDE 2" DRAIN TAP, VALVE, AND THREADED CAP ON BOTTOM OF PIPE TO ALLOW DRAINAGE OF
UNDERGROUND PIPE.
PROVIDE 1" TAP, VALVE, AND THREADED CAP ON TOP OF PIPE AT HIGH POINT IN PIPING FOR AIR REMOVAL
IN ACCESSIBLE LOCATION.
N
GENERAL NOTES
A.
B.
C.
CONTRACTOR SHALL FIELD VERIFY EXISTING BOILER PLANT AND SUBMIT PROPOSED CHILLED WATER MAINS
ROUTING AS PART OF THE PROJECT COORDINATION DRAWINGS.
BURIED UNDERGROUND CHILLED WATER MAINS ROUTING SHOWN ON THIS DRAWING WERE COORDINATED WITH THE BOILER PLANT SITE UTILITY DRAWINGS AND A SURVEY COMPLETED BY GPRS, INC. (PRIVATE
UTILITY LOCATOR).
PRIOR TO EXCAVATION/CONSTRUCTION, THE CONTRACTOR SHALL COMPLETE A CONSTRUCTION-PERIOD PRIVATE UTILITY LOCATION SURVEY TO CONFIRM FINAL UNDERGROUND PIPE ROUTING. PIPE DEPTHS SHALL
BE DETERMINED BY EXPLORATORY HYDRO TRENCHING.
Revisions: Date:
DN
EF-1
G (10#) G (10#)
1 1/2"ø G
PAC-AHU-4 1
12TYP.
A
M-301
10'-0" MIN
M
IN
D
M-302
B.2 B.2
B.5 B.5
B.8 B.8
C.3 C.3
D.4 D.4
E.3 E.3
2.7
2.7
B.4 B.4
181 1/2"ø G
CT-1
CT-2
CT-3
CT-4
HEAT TRACE
CIRCUIT 3-A
HEAT TRACE
CIRCUIT 3-B
HEAT TRACE
CIRCUIT 4-A
HEAT TRACE
CIRCUIT 4-B
HEAT TRACE CIRCUIT 5-B
HEAT TRACE CIRCUIT 5-A
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:3
P M
M-131
MECHANICAL PLAN - CHILLER PLANT ROOF CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0" 1
MECHANICAL PLAN - CHILLER PLANT ROOF
GENERAL NOTES
CODED NOTES
REFER TO DETAILS AND DIAGRAMS FOR DETAILED PIPING REQUIREMENTS (i.e. VALVES, METERS, ETC.) FOR
INDIVIDUAL EQUIPMENT.
SEE TEMPERATURE CONTROL SPECIFICATIONS AND COORDINATE WITH TC CONTRACTOR FOR
INSTRUMENTATION AND DEVICES REQUIRED TO BE INSTALLED IN PIPING AND AT EQUIPMENT.
ALL EXTERIOR PIPING INCLUDING, BUT NOT LIMITED TO MAKE-UP WATER, DRAIN, CHILLED WATER, TOWER WATER, EQUALIZER PIPING SHALL BE HEAT TRACED, INSULATED, AND JACKETED. REFER TO SPECIFICATION
23 21 13 FOR ADDITIONAL INFORMATION.
PROVIDE ALL NECESSARY DRAINS AND DRAIN LINES AS INDICATED ON DETAILS AND DIAGRAMS AND AS RECOMMENDED BY EQUIPMENT MANUFACTURERS. WHERE NECESSARY, ROUTE ALL DRAIN LINES TO LOCAL
FLOOR DRAIN.
REFER TO PIPING DIAGRAMS, DWG M-603 FOR ADDITIONAL INFORMATION.
COORDINATE STRUCTURAL STEEL AND ACCESS PLATFORM WITH FINAL COOLING TOWER MANUFACTURER.
PROVIDE ALL COOLING TOWER ACCESSORIES, ACCESS, APPURTENANCES, ETC. AS REQUIRED PER
SPECIFICATION 23 65 00.
A.
B.
C.
D.
E.
F.
G.
1 MOUNT PAC-AHU-4 ON MANUFACTURER'S ROOF CURB. FLASH CURB TO ROOF. COORDINATE OPENING LOCATIONS WITH STRUCTURE. TRANSITION DUCTS AS NECESSARY TO AVOID BEAMS. LOCATE RTU MINIMUM 10'-0" FROM ROOF EDGE. BASIS OF DESIGN MAINTAINS ALL MANUFACTURER-REQUIRED CLEARANCES.
CONTRACTOR SHALL CONFIRM REQUIRED CLEARANCES ARE MAINTAINED FOR SUBMITTED EQUIPMENT.
12" TWS DOWN THROUGH ROOF.
CONNECT 12" TWS TO GRAVITY OUTLET AT BOTTOM OF COOLING TOWER. COORDINATE EXACT OUTLET
LOCATION WITH COOLING TOWER MANUFACTURER.
12" TWR DOWN THROUGH ROOF.
CONNECT 12" TWR TO COOLING TOWER INLET CONNECTION. PROVIDE ISOLATION VALVE WITH CHAINWHEEL (WITH CHAINS DOWN TO 5'-0" ABOVE ACCESS PLATFORM) AND SEPARATE FULL-SIZE VENTURI BALANCE
VALVE. PROVIDE LOCKS FOR CHAINS.
CONNECT 12" TO EQUALIZER CONNECTION AT BOTTOM OF COOLING TOWER. INSTALL ISOLATION VALVE IN VERTICAL AND TEE INTO HORIZONTAL HEADER BELOW TOWER STRUCTURAL PLATFORM. COORDINATE
EXACT OUTLET CONNECTION LOCATION WITH COOLING TOWER MANUFACTURER.
14" EQUALIZER HEADER ROUTED BENEATH COOLING TOWERS. FULL-SIZE HEADER SERVING ALL COOLING
TOWERS.
PROVIDE REMOVABLE BLIND FLANGE AT INDICATED LOCATION FOR CLEANING.
INSTALL DRAIN VALVE AT BOTTOM OF EQUALIZER HEADER IN CONVENIENT LOCATION.
REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL STEEL FRAMING AND ACCESS GRATING FOR
COOLING TOWER EQUIPMENT. CONTRACTOR SHALL COORDINATE STEEL AND PLATFORM FABRICATION
DRAWINGS WITH FINAL COOLING TOWER MANUFACTURER.
PROVIDE PIPE SLEEVE AND FIRESTOPPING AT WALL PENETRATION.
PROVIDE ROOF CURB PIPE SUPPORT AT EVERY 5'-0" AND AT EACH CHANGE IN DIRECTION. FLASH CURB TO
ROOF. REFER TO DETAIL #2, DWG M-501.
CONNECT TO EXISTING VALVED AND CAPPED 2-1/2" NATURAL GAS PIPING WITHIN BOILER PLANT. FIELD
VERIFY EXACT LOCATION.
2" NPCW MAKE-UP WATER DOWN THROUGH ROOF. PROVIDE PIPE PENETRATION CURB AT ROOF. FLASH
CURB TO ROOF. REFER TO DWG'S M-121 & M-122 FOR CONTINUATION.
CONNECT 2" NPCW TO COOLING TOWER MAKE UP WATER CONNECTION.
PROVIDE WATER LEVEL SENSOR STANDPIPE. EXTEND UP THROUGH GRATING.
PIPE GAS LINE TO RTU. CONFIRM POINT OF CONNECTION WITH FINAL MANUFACTURER. REFER TO DETAIL #5, DWG M-501 FOR GAS CONNECTION DETAIL.
6"Ø TAP WITH ISOLATION VALVE. CONNECT TO COOLING TOWER BASIN SWEEPERS PER MANUFACTURER'S
RECOMMENDATIONS.
8"Ø TOWER WATER FILTER PIPING DOWN THROUGH ROOF. SEE ENLARGED HVAC PIPING PLAN - CHILLER
PLANT FLOOR - SOUTH FOR CONTINUATION.
N
HEAT TRACE HATCHING LEGEND
HEAT TRACE CIRCUIT 1-A / 1-B (FROM HEAT TRACE PANEL # 1)
HEAT TRACE CIRCUIT 2-A / 2-B (FROM HEAT TRACE PANEL # 2)
HEAT TRACE CIRCUIT 3-A / 3-B (FROM HEAT TRACE PANEL # 3)
HEAT TRACE CIRCUIT 4-A / 4-B (FROM HEAT TRACE PANEL # 4)
HEAT TRACE CIRCUIT 5-A / 5-B (FROM HEAT TRACE PANEL # 5)
A. HATCHING INDICATES PIPING REQUIRING HEAT TRACE. REFER TO DETAIL #1, DWG M-504 FOR MORE
INFORMATION.
Revisions: Date:
F
D V
F D
V F
D V
F D
V F
D V
F D
V F
D
VFDVFD
V F
D V
F D
V F
D
B.2
B.5
B.8
C.3 C.3
D.4 D.4
E.3 E.3
CHILLER PLANT
EC-114
42.7
2.7
B.4 B.4
3"ø FOR
3"ø FOR
2"ø FOS
2"ø FOS
3"ø FOR
2"ø FOS
3"ø FOR
2"ø FOS
GENERATOR. REFER TO
ELECTRICAL PLANS FOR
ADDITIONAL INFORMATION.
GENERATOR. REFER TO
ELECTRICAL PLANS FOR
ADDITIONAL INFORMATION.
FTP-1
1"ø FOS 1 1/2"ø FOR
5 5
13 13
1"ø FOS 1 1/2"ø FOR
DIVERTER VALVE
CONTROL PANEL
BOILER ROOM
CONTROL ROOM
STORAGE
TOILET
MANAGER'S OFFICE
LOCKER/SHOWER
115JANITOR
TELE/ DATA ROOM
BREAK ROOM
ELEC. ROOM
STORAGE
EMERGENCY
PARALLEL
SWITCHGEAR
NORMAL PARALLEL
SWITCHGEAR
STORAGE
E.3 E.3
NC
1"ø FOS
1 1/2"ø FOR
3"ø FOR
2"ø FOS
1"ø FOS
1 1/2"ø FOR
1"ø FOS
1 1/2"ø FOR
1"ø FOS 1 1/2"ø FOR
CHILLER PLANT
EC-114
CH-1
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:5
P M
M-141
FUEL OIL PIPING PLAN CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0" 1
FUEL OIL PIPING PLAN
N
GENERAL NOTES
CODED NOTES
A.
B.
C.
REFER TO SPECIFICATION 23 10 00 FOR FUEL SYSTEM PIPING REQUIREMENTS.
EXISTING UNDERGROUND FUEL OIL STORAGE TANKS LAYOUT IS BASED ON "BOILER PLANT" PROJECT
CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL FIELD VERIFY EXACT CONDITIONS PRIOR TO
INSTALLATION.
CONTRACTOR SHALL PROVIDE EXPLORATORY HYDRO TRENCHING FOR DETERMINING BURIED PIPE PATHS.
FIELD VERIFY EXACT ROUTING THROUGH CHILLER ROOM. PROVIDE ANY AND ALL OFFSETS REQUIRED FOR
ROUTING.
ROUTE 2" FOS/ 3" FOR LINES DOWN WALL. PIPE TO 3-WAY DIVERTER VALVES. MOUNT VALVES ON WALL.
PENETRATE EXTERIOR WALL WITH SLEEVE AT 12" AFF. COORDINATE WITH OTHER PIPES ALONG WALL.
VALVES SHALL BE FULL PORT, ANSI CLASS 150, BLOWOUT PROOF STEM WITH RTFE SEATS, HAVE AN ELECTRIC ACTUATOR, 115 VAC / 1 PHASE, TWO POSITION. SUPPLY ACTUATOR SHALL HAVE A 40 WATT MOTOR AND RETURN ACTUATOR SHALL HAVE A 90 WATT MOTOR. VALVES SHALL ALSO HAVE LOCKABLE
MANUAL HANDLE.
PIPE FOS/R DOWN TO BELOW GRADE. PROVIDE TRANSITION SUMP. SUMP SHALL BE SINGLEWALL FRP VENT/ TRANSITION SUMP WITH 4, 2" AST FITTINGS. PROVIDE LEAK DETECTION SENSORS IN SUMP. WIRE
LEAK DETECTION TO EXISTING PNEUMERCATOR SYSTEM IN BOILER PLANT.
ROUTE 1" FOS AND 1-1/2" FOR AT GRADE TO GENERATOR DAY TANK CONNECTIONS. PROVIDE PIPE
SUPPORTS. FIELD VERIFY PATH.
PIPE TO DAY TANK CONNECTION POINTS. INSTALL FOOT VALVE ON FOR. FOOT VALVE PROVIDED WITH
GENERATOR.
PROVIDE FUEL FILTER AND FLOW CONTROL MANIFOLD. PIPE HORIZONTALLY. REFER TO PIPING DIAGRAM
FOR ADDITIONAL INFORMATION.
MOUNT FUEL SUPPLY PUMP CONTROL SYSTEM TO WALL.
BURIED FOS/R TO/FROM UNDERGROUND FUEL OIL STORAGE TANKS. SLOPE PIPING BACK TO TANK AT 1/8" PER FOOT MINIMUM. REFER TO SPECIFICATIONS FOR ADDITIONAL PIPE REQUIREMENTS. PAVEMENT SHALL
BE CUT/PATCHED ALONG PATH.
PIPE FOS/R LINES TO UNDERGROUND STORAGE TANK MANWAY. REPLACE EXISTING COVER WITH NEW.
NEW COVER SHALL ACCOMMODATE EXISTING AND NEW PORT QUANTITIES. FIELD VERIFY EXISTING
CONDITIONS. REWORK EXISTING CONNECTIONS AS REQUIRED.
PROVIDE DAY TANK LEVEL AND LEAK CONTROL SYSTEM. MOUNT TO WALL. SYSTEM SHALL INCLUDE NEMA 13R ENCLOSURE, DUAL MAIN POWER DISCONNECT SWITCHES WITH DOOR INTERLOCK, POWER SWITCH OVER RELAYS, DUAL CONTROL CIRCUIT 24VDC POWER SUPPLIES, DUAL PLC LOGIC CONTROLLERS, TOUCH SCREEN DISPLAY, MOTOR STARTER/CIRCUIT BREAKER, RETURN PUMP MANUAL/OFF/AUTO SWITCH, FLOW
MANIFOLD SOLENOID VALVE CIRCUIT BREAKERS, ALARM HORN W/ SILENCE BUTTON, MODBUS
COMMUNICATION, ALARM DRY CONTACT, FUEL REQUIRED SIGNAL, DAY TANK ANALOG LEVEL CONTROLS, DAY TANK LEAK SWITCH, AND OIL IN VENT SWITCH. ALL STATUS/ALARMS SHALL BE WIRED TO THE BAS.
FUEL OIL RETURN PUMP SYSTEM WITH 1-1/2” ANGLE VALVES, PUMP RELIEF VALVE. PUMP SHALL BE 25 GPM @ 50 PSI, 2 HP INLINE FOR FUEL OIL RETURN. SYSTEM SHALL BE PRE-PIPED IN VENTED NEMA 13R
ENCLOSURE, MOUNTED ALONG WALL WITH ENCLOSURE FOOT KIT.
PROVIDE FUSIBLE LINK VALVE IN FOS PIPE AT ACCESSIBLE ELEVATION ON WALL. VALVE SHALL BE FULL PORT, COLD NON-SHOCK PRESSURE RATED FOR 200 PSI W.O.G. AND 165°F UL LISTED FUSIBLE LINK.
PROVIDE AUTOMATED FUEL MAINTENANCE SYSTEM FOR GENERATOR DAY TANK. SYSTEM SHALL INCLUDE TWO-POINT CONTROLLER (ONE SUCTION, ONE RETURN), PRESSURE RELIEF VALVE PRESSURE AND VACUUM SWITCHES, SOLENOID VALVES AND FOOT VALVE. PROVIDE SOLENOID AND ISOLATION VALVE QUANTITIES PER MANUFACTURER’S RECOMMENDATIONS. SYSTEM SHALL BE SINGLE POINT POWER, 120V.
SYSTEM SHALL BE INSTALLED WITHIN GENERATOR VESTIBULE. COORDINATE ALLOCATED SPACE FOR SYSTEM AND TANK PORTS WITH OHIO CAT. CONTRACTOR SHALL INSTALL SYSTEM PER MANUFACTURER’S RECOMMENDATIONS. PIPE SUPPLY/RETURN LINES TO OHIO CAT-PROVIDED PORTS. RELAY STATUS AND
ALARMS TO BAS.
FUEL OIL BACKPRESSURE CONTROL VALVE. VALVE SHALL BE STAINLESS STEEL, HAVE A MAX INLET PRESSURE OF 150 PSI AND A RATED PRESSURE AT 300 PSI. COORDINATE REQUIRED SPRING FOR APPROPRIATE PRESSURE RANGE WITH GENERATOR MANUFACTURER. REFER TO PIPING DIAGRAM FOR
ADDITIONAL INFORMATION.
REFER TO ENLARGED FUEL OIL PIPING PLAN,THIS DWG., FOR MORE DETAIL IN THIS AREA.
CONTRACTOR SHALL REPLACE EXISTING 6-CHANNEL ANALOG CONTROL CARD IN EXISTING
PNEUMERCATOR PANEL WITH NEW 12-CHANNEL ANALOG CARD TO PROVIDE SUFFICIENT TERMINATIONS FOR ALL NEW CONTROLS ADDED UNDER THIS PROJECT. PROVIDE WITH EXTERNAL BACNET GATEWAY
DEVICE FROM PNEUMERCATOR TO ALLOW COMMUNICATION WITH EXISTING BAS.
0' 1' 2' 4' 8'0' 1' 2' 4' 8'0' 1' 2' 4' 8'0' 1' 2' 4' 8'0' 1' 2' 4' 8'
1/2" = 1'-0"
ENLARGED FUEL OIL PIPING PLAN 2N
Revisions: Date:
CRC
Office
CRC
Office
CRC
Office
CRC
Office
CRC
Office
CRC
Office
CRC
Office
CRC
Office
VFD
T
M
M
X-UH
X -P
C X
-L P
S (1
X -L
P R
X-DOMESTIC
WATER METER
X-BACKFLOW
PREVENTER
X-DOMESTIC
WATER PUMP
X-EF
X-DWH
X-DWH
X-CP
X -6
"G
X-14x14
X-36x24
MECHANICAL
ROOM
1A350A
FIRE PUMP
ROOM
1A351
ELECTRICAL
ROOM
1A360A
EMERGENCY ELEC.
DISTRIBUTION
1A013
Design Interior
Engineering
M-151AM-151B
L
L
M
M
N
N
9.2
9.2
M -1
B
M -1
A
M -1
B
M -1
A
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:5
P M
M-151A
ACC FIRST FLOOR MECHANICAL PLAN CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
NOT TO SCALE
ACC 1ST FLOOR KEY PLAN
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
ACC FIRST FLOOR MECHANICAL PLAN 1
"WEST" "EAST"
X-8"Ø CHWR
X-10"Ø CHWR
N
X-8"Ø CHWS
10"Ø CHWS
10"Ø CHWR
X-10"Ø CHWS
4"Ø CHWR
4"Ø CHWS
4"Ø CHWR
4"Ø CHWS
4"Ø CHWS
4"Ø CHWR
4"Ø CHWS
4"Ø CHWR
ALTERNATE NO. 3
ALTERNATE NO. 3
ALTERNATE NOTES
ALTERNATE NO. 3:
AS PART OF ALTERNATE NO. 3, ALL WORK RELATED TO REMOVING EXISTING DEDICATED CHILLED WATER SYSTEM SERVING EXISTING RTU-14, AND RE-FEEDING RTU-14 FROM THE NEW CHILLED WATER SYSTEM SHALL BE PRICED SEPARATELY. ALL NEW CHILLED WATER SUPPLY & RETURN PIPING DOWNSTREAM OF 4" ISOLATION VALVES ON THIS SHEET SHALL BE INCLUDED IN ALTERNATE. ISOLATION VALVES AND UPSTREAM
CHILLED WATER PIPING SHALL BE INCLUDED IN BASE BID.
A.
SEQUENCING NOTES
EXISTING CHILLERS SHALL REMAIN OPERATIONAL WHILE NEW CHILLER PLANT IS CONSTRUCTED.
REFER TO DWG M-604 FOR CONNECTIONS AND SYSTEM START-UP/TEST SEQUENCE FOR NEW CHILLED
WATER PLANT.
ISOLATE "EAST" BRANCH DURING CONNECTION TO NEW CHWS & CHWR PIPING ON 2ND FLOOR (SEE DWG
M-152). "WEST" BRANCH SHALL REMAIN ACTIVE DURING CONNECTION.
UPON COMPLETION OF 2ND FLOOR CONNECTION AND ACTIVATION OF NEW CHILLED WATER SYSTEM, "WEST" BRANCH SHALL BE ISOLATED. RE-WORK EXISTING 10"Ø PIPING AS INDICATED AND OPEN ISOLATION
VALVES TO RE-FEED "WEST" BRANCH FROM NEW CHILLED WATER SYSTEM.
UPON COMPLETION OF RE-FEEDING "WEST" BRANCH, COMPLETE DEMOLITION OF EXISTING EQUIPMENT AND
PIPING AS INDICATED ON DWG MD-151.
REFER TO DWG M-604 FOR RE-BALANCING OF EXISTING SYSTEM.
A.
B.
C.
D.
E.
F.
CODED NOTES
SEE DWG M-151B FOR CONTINUATION.
SLEEVE AND FIRESTOP PENETRATION THROUGH WALL.
GENERAL NOTES
FIELD VERIFY ROUTING OF CHILLED WATER PIPING WITHIN EXISTING MECHANICAL ROOM. COORDINATE ROUTING OF PIPING WITH EXISTING ELECTRICAL CONDUIT MAINS, HEATING HOT WATER SYSTEMS, PNEUMATIC TUBE SYSTEMS, ETC. ROUTE ALL NEW PIPING AS HIGH AS POSSIBLE WITHIN MECHANICAL ROOM. PROVIDE ANY AND ALL OFFSETS AS NECESSARY FOR OPTIMAL PIPE ROUTING THROUGH ROOM.
COORDINATE SHUTDOWN OF EXISTING EQUIPMENT WITH VA COR.
A.
B.
10"Ø CHWR 10"Ø CHWS
10"Ø CHWR 10"Ø CHWS
10"Ø CHWS AND CHWR
WITH VALVE AND BLIND
FLANGE FOR EMERGENCY
CONNECTION
6"Ø CHWS AND CHWR
WITH VALVE AND CAP FOR
FUTURE CONNECTION
6"Ø CHWR
6"Ø CHWS
10"Ø CHWR
10"Ø CHWS
Revisions: Date:
Design Interior
Engineering
N
N
O
O
P
P
Q
Q
R
R
S
S
4"ø CHWS 4"ø CHWR
4"ø CHWS
4"ø CHWR
W
W
V
V
X
X
U
U
Office
1A217
Exam
1A215 Exam
1A213
CRC Office
1A211
Reception
1A303
Entry
1A300
MSA
Reception
1A306
Physician Office
1A312
Physician Office
1A314
Physician Office
1A316
Physician Office
1A318
Physician Office
1A320
Physician Office
1A322
Physician Office
1A324Physician Office
1A326
Office
1A550
Office
1A549
Consult
1A548
Consult
1A547
Consult
1A546
Consult
1A545
Consult
1A544
Consult
1A543
Office
1A529
Office
1A528
Office
1A527
Office
1A526
Office
1A225
Triage
1A227
Triage
1A229
Open Office
1A530
Consult
1A531
Consult
1A533
Consult
1A535
Consult
1A537
Consult
1A539
Consult
1A504
Consult
1A506
Consult
1A508
Quiet
1A510
Elec
1A459
Mech
1A463
Corridor
1A408
Consult
1A532
Consult
1A534
Consult
1A536
Group
1A566
Group
1A565
Corridor
1A407
Corridor
1A564
Corridor
1A409
Consult
1A538
Consult
1A540
Soiled
1A541 Jan
1A456
Office
1A542
Telecom
1A462
Corridor
1A401
Waiting
1A560
Toilet
1A453
Toilet
1A451
Toilet
1A452
Toilet
1A454
Corridor
1A562
Corridor
1A412
Corridor
1A563
Group
1A567 Office
1A460
Group
1A568 Office
1A458
Stair No. 1
1S001
Electrical Room
1A025
Telecommunications
1A024
HAC
1A331
DTC Office
1A292
DTC Office
1A290
BFB Tech Office
1A288
Biofeedback Treatment
Room
1A286
ADL Toilet
1A028A
Shower
1A028B
PRRC/Basic Space
1A028
Rehab Counsel
1A273
Rehab Counsel
1A275
Rehab Counsel
1A277
Staff Toilet
1A279
Corridor
1A270
SW Office
1A278
Connected Care
1A276
Connected Care
1A274 Connected Care
1A253
Patient Toilet
1A255
Patient Toilet
1A257
Resident
1A259
Nurse/Pharm.
1A261
Corridor
1A250
Corridor
1A280
Corridor
1A330
Connected Care
1A260
Connected Care
1A258
Connected Care
1A256
Connected Care
1A254
Chief Office
1A262
Waiting
1A302
Corridor
1A310
Counsel Office
1A325
Counsel Office
1A323
Counsel Office
1A321
Counsel Office
1A319
Counsel Office
1A317
Consult
1A315
Exam
1A313
Quiet
1A311
Sub-Waiting
1A308
Counsel Office
1A281
Counsel Office
1A282
Counsel Office
1A283
Counsel Office
1A284
Counsel Office
1A285
Counsel Office
1A287
Counsel Office
1A289
DTC
Office
1A291
Corridor
1A200
Corridor
1A307
Corridor
1A301 Corridor
1A209
Public Toilet
1A304
Public Toilet
1A305
Conference
1A205
Corridor
1A207
Corridor
1A208
X-SA
M -1
B
M -1
A
M -1
B
M -1
A
3"ø CHWR 3"ø CHWS
M-151AM-151B
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:0
P M
M-151B
ACC FIRST FLOOR HVAC PIPING PLAN CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
ACC FIRST FLOOR HVAC PIPING PLAN 1
NOT TO SCALE
ACC 1ST FLOOR KEY PLAN
N
CODED NOTES
SEE DWG M-151A FOR CONTINUATION OF PIPING.
CONNECT TO EXISTING 3"Ø CHWS & CHWR PIPING AT DECK PENETRATION AS INDICATED. REFER TO
DRAWING M-604 FOR BALANCING REQUIREMENTS.
PROVIDE 3"Ø CHWS & CHWR BRANCH PIPING WITH VALVE AND CAP FOR FUTURE EXPANSION AS INDICATED.
REINSTALL EXISTING SUPPLY DUCTWORK AS INDICATED.
GENERAL NOTES
A.
B.
C.
FIELD VERIFY ROUTING OF CHILLED WATER PIPING. COORDINATE ROUTING OF PIPING WITH EXISTING ELECTRICAL CONDUIT MAINS, HEATING HOT WATER SYSTEMS, PNEUMATIC TUBE SYSTEMS, ETC. ROUTE ALL NEW PIPING AS HIGH AS POSSIBLE . PROVIDE ANY AND ALL OFFSETS AS NECESSARY FOR OPTIMAL
PIPE ROUTING.
ALL WORK ON THIS DWG SHALL BE COMPLETED DURING OFF-HOURS. OFFICES MUST BE BACK TO
NORMAL EACH DAY BY 6:00 AM.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILE AND GRID AS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY DAMAGED CEILING TILES/GRID AS A RESULT OF THIS WORK.
ALTERNATE NOTES
ALTERNATE NO. 3:
AS PART OF ALTERNATE NO. 3, ALL WORK ON THIS DRAWING SHALL BE DELETED, WHICH INCLUDES ALL WORK RELATED TO REMOVING EXISTING DEDICATED CHILLED WATER SYSTEM SERVING EXISTING RTU-14, AND RE-FEEDING RTU-14 FROM THE NEW CHILLED WATER SYSTEM.
A.
Revisions: Date:
Automated Line
H
H
J
J
X - 10"ø CHWS
X - 10"ø CHWR
X-10"Ø CHWS & CHWR
DOWN TO 1ST FLOOR
J
M-303
XNL-VAV
3/4"ø HHWR
3/4"ø HHWS
10ø 6
10ø
A
A
4.9
4.9
A.2
A.2
A.1
A.1
X - 6"ø CHWR
X - 6"ø CHWS
X - 6"ø CHWS
X - 6"ø CHWR
4"ø CHWS 4"ø CHWR
4"ø CHWS 4"ø CHWR
Logistics Storage
2B174A
4 Isolation
2B244
Clean Utility
2B325
Workstations
2B322
PACU
2B240
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:1
P M
M-152
ACC SECOND FLOOR HVAC PIPING PLANS CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
RE-ROUTE EXISTING SUPPLY DUCTWORK TO FACILITATE THE INSTALLATION OF NEW 18"Ø CHWS & CHWR
PIPING AND CONNECT TO EXISTING DUCTWORK AS INDICATED.
RE-ROUTE EXISTING PIPING TO FACILITATE THE INSTALLATION OF NEW 18"Ø CHWS & CHWR PIPING.
RECONNECT COMPLETE TO VAV IN NEW LOCATION.
18"Ø CHWS & CHWR PIPING UP TO ROOF ABOVE. SEE "ACC THIRD FLOOR HVAC PIPING PLAN" DWG M-153
FOR CONTINUATION.
CONNECT TO EXISTING 10"Ø CHWS AND CHWR PIPING ABOVE CEILING ON SECOND FLOOR AS INDICATED.
PROVIDE NEW ISOLATION VALVES AT CONNECTION TO EXISTING 10"Ø CHWS AND CHWR PIPING AS
INDICATED.
RELOCATE EXISTING VAV AND ASSOCIATED PIPING AND DUCTWORK AS INDICATED. EXTEND EXISTING
CONTROL WIRING AND CONNECT COMPLETE TO VAV IN NEW LOCATION.
PROVIDE NEW ISOLATION VALVES IN EXISTING PIPING AS INDICATED.
4" CHWS & CHWR PIPING UP THROUGH DECK TO RTU-15 VESTIBULE ABOVE. SEE "ACC THIRD FLOOR HVAC
PIPING PLAN" DWG M-153 FOR CONTINUATION.
NOT TO SCALE
ACC 2ND FLOOR KEY PLAN
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
ACC SECOND FLOOR HVAC PIPING PLAN - AREA C 1
Elect.
Closet
2BEC Storage
2B261
Point of Care Training
2B263
Exam/ Consult
2B032
Exam/ Consult
2B034
Exam 1
2B036
Women's Locker
2B258
Women's Toilet
2B258T
Office
2B257
Corridor
2B260
CODED NOTES
N
N
ALTERNATE NOTES
ALTERNATE NO. 2:
AS PART OF ALTERNATE NO. 2, ALL WORK ASSOCIATED WITH CONVERTING EXISTING RTU-15 FROM DX COOLING TO CHILLED WATER (ALL WORK SHOWN IN "ACC SECOND FLOOR HVAC PIPING PLAN - AREA D" THIS
SHEET) SHALL BE DELETED.
A.
GENERAL NOTES
A.
B.
C.
D.
FIELD VERIFY ROUTING OF CHILLED WATER PIPING. COORDINATE ROUTING OF PIPING WITH EXISTING ELECTRICAL CONDUIT MAINS, HEATING HOT WATER SYSTEMS, PNEUMATIC TUBE SYSTEMS, ETC. ROUTE ALL NEW PIPING AS HIGH AS POSSIBLE . PROVIDE ANY AND ALL OFFSETS AS NECESSARY FOR OPTIMAL
PIPE ROUTING.
ALL WORK ON THIS DWG SHALL BE COMPLETED DURING OFF-HOURS.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY DAMAGED CEILING TILES/GRID AS A RESULT OF THIS
WORK.
DUCTWORK SERVING LAB AREA SHALL REMAIN ACTIVE DURING BUSINESS HOURS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .