18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-3.pdf
PDF 9 MB Posted
- Solicitation number
- 36C25023B0049
About this file
This file contains construction drawings and specifications for a federal contract opportunity to construct a chiller plant at the Chalmers P. Wylie VA Ambulatory Care Center in Columbus, Ohio. The project involves demolishing portions of existing structures and site features, installing new chilled water piping, and constructing a new chiller plant and associated site work. Key work includes removing concrete slabs and curbs, relocating mechanical equipment, installing erosion and sediment controls, mass grading, utility and paving work. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses and will be awarded prior to May 6, 2022. The construction drawings provide demolition, site, and floor plans along with construction details to guide the work.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 DLM TBARevisions: Date:
757-15-102BID & CONSTRUCTION
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
18912
FINAL BID & CONSTRUCTION 11/24/2021
FINAL BID & CONSTRUCTION (REVISED) 05/06/2022 C-300
EROSION & SEDIMENT
CONTROL NOTES & DETAILS
SEDIMENT POLLUTANT CONTROLS (GENERAL NOTES):
1. PERIMETER SEDIMENT CONTROLS (I.E. SEDIMENT TRAPS, SILT FENCE, COMPOST
SOCKS, COMPOST BERMS, ETC… SHALL BE IMPLEMENTED AS THE FIRST STEP OF
GRADING AND WITHIN SEVEN DAYS FROM THE START OF GRUBBING ANS SHALL
CONTINUE TO FUNCTION UNTIL UPSLOPE AREAS DRAINING TO THEM ARE
PERMANENTLY STABILIZED, OR AS DIRECTED BY THE CITY/VILLAGE ENGINEER, OR
DESIGNATED REPRESENTATIVE.
2. NO EROSION AND SEDIMENT CONTROL BMP'S SHALL BE REMOVED FROM THE SITE
PRIOR TO ADEQUATE PERMANENT STABILIZATION OF THE ASSOCIATED UPLAND
DRAINAGE AREAS AND WITHOUT FIRST OBTAINING AUTHORIZATION FROM THE
CITY/VILLAGE ENGINEER, OR HIS DESIGNATED REPRESENTATIVE, UNLESS THEIR
REMOVAL IS SPECIFICALLY PROVIDED FOR WITHIN THE SITE'S APPROVED PLAN.
3. THERE SHALL BE NO SEDIMENT-LADEN OR TURBID DISCHARGES TO WATER
RESOURCES OR WETLANDS RESULTING FROM DEWATERING ACTIVITIES. IF TRENCH OR
GROUNDWATER CONTAINS SEDIMENT, IT MUST PASS THROUGH A SEDIMENT TRAP OR
OTHER EQUALLY EFFECTIVE SEDIMENT CONTROL DEVICE, PRIOR TO BEING DISCHARGED
FROM THE CONSTRUCTION SITE. ALTERNATIVELY, SEDIMENT MAY BE REMOVED BY
SETTLING IN PLACE OR BY DEWATERING INTO A SUMP PIT, FILTER BAG OR COMPARABLE
PRACTICE. GROUND WATER DEWATERING WHICH DOES NOT CONTAIN SEDIMENT OR
OTHER POLLUTANTS IS NOT REQUIRED TO BE TREATED PRIOR TO DISCHARGE.
HOWEVER, CARE MUST BE TAKEN WHEN DISCHARGING GROUND WATER TO ENSURE
THAT IT DOES NOT BECOME POLLUTANT-LADEN BY TRAVERSING OVER DISTURBED SOILS
OR OTHER POLLUTANT SOURCES.
4. STREETS DIRECTLY ADJACENT TO CONSTRUCTION ENTRANCES AND RECEIVING
TRAFFIC FROM THE DEVELOPMENT AREA, SHALL BE CLEANED DAILY TO REMOVE
SEDIMENT TRACKED OFF-SITE. IF APPLICABLE, THE CATCH BASINS ON THESE STREETS
NEAREST TO THE CONSTRUCTION ENTRANCES SHALL ALSO BE CLEANED WEEKLY.
BASED ON SITE CONDITIONS, THE CITY/VILLAGE ENGINEER, OR HIS DESIGNATED
REPRESENTATIVE, MAY REQUIRE ADDITIONAL BEST MANAGEMENT PRACTICES TO
CONTROL OFF-SITE TRACKING OF DUST.
5. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER, OR REPRESENTATIVE, TO
PROVIDE INSPECTION OF ALL CONTROLS ON THE SITE AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS, AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN
ONE-HALF INCH OF RAIN PER 24 HOUR PERIOD. WHEN INPSECTIONS REVEAL THE NEED
FOR REPAIR, REPLACEMENT, OR INSTALLATION OF EROSION AND SEDIMENT CONTROL
BMP'S, THE FOLLOWING PROCEDURES SHALL BE FOLLOWED:
A. WHEN PRACTICES REQUIRE REPAIR OR MAINTENANCE: THE BMP SHALL
BE REPAIRED WITHIN 3 DAYS OF INSPECTION. EXCEPTION: SEDIMENT
PONDS SHALL BE REPAIRED OR MAINTAINED WITH 10 DAYS OF
INSPECTION.
B. WHEN PRACTICES FAIL TO PROVIDE THEIR INTENDED FUNCTION: A
MORE APPROPRIATE BMP SHALL BE SELECTED AND IMPLEMENTED
WITHIN 10 DAYS OF THE INSPECTION.
C. WHEN PRACTICES DEPICTED IN THE EROSION AND SEDIMENT CONTROL
PLAN ARE NOT INSTALLED: THE BMP SHALL BE INSTALLED WITHIN 10
DAYS OF THE INSPECTION. IF THE INSPECTION REVEALS THAT THE BMP
IS NOT NECESSARY, THE RECORD MUST CONTAIN AN EXPLANATION
FOR THE DECISION.
INSPECTION SHALL BE COMPLETED BY A QUALIFIED PROFESSIONAL IN EROSION AND
SEDIMENT CONTROL PRACTICES. SHOULD THE SITE BECOME DORMANT FOR AN
EXTENDED PERIOD OF TIME AND IS STABILIZED, A WAIVER MAY BE SENT TO THE OHIO
EPA TO REQUEST A REDUCTION TO MONTHLY INSPECTIONS. AFTER EVERY INSPECTION,
A SIGNED CHECKLIST SHALL BE PROVIDED BY THE INSPECTOR.
6. ALL EROSION AND SEDIMENT CONTROL PRACTICES SPECIFIED ON THIS PLAN
SHALL CONFORM WITH THE DETAILS AND SPECIFICATIONS OUTLINED IN THE CURRENT
VERSION OF THE OHIO DEPARTMENT OF NATURAL RESOURCES, "RAINWATER AND LAND
DEVELOPMENT" MANUAL, OR AS SPECIFIED BY THE CITY/VILLAGE ENGINEER, OR
DESIGNATED REPRESENTATIVE.
7. EROSION AND SEDIMENT CONTROL PRACTICES NOT ALREADY SPECIFIED ON THIS
PLAN MAY BE NECESSARY DUE TO UNFORESEEN ENVIRONMENTAL CONDITIONS AND/OR
CHANGES IN DRAINAGE PATTERNS CAUSED BY EARTH-MOVING ACTIVITY. ADDITIONAL
PRACTICES SHALL BE IMPLEMENTED AT THE DEVELOPER'S EXPENSE AS DIRECTED BY
THE CITY/VILLAGE ENGINEER, OR DESIGNATED REPRESENTATIVE.
8. NO STRUCTURAL SEDIMENT CONTROLS (SILT FENCE, SEDIMENT TRAPS, ETC.)
SHALL BE USED IN A WATER RESOURCE OR WETLAND, UNLESS THEIR USE IS
SPECIFICALLY PROVIDED FOR WITHIN THE SITE'S APPROVED PLAN.
9. SOIL STOCKPILES, TOPSOIL OR OTHERWISE, SHALL BE SITUATED AWAY FROM
STREETS, SWALES, OR OTHER WATERWAYS AND SHALL BE SEEDED AND/OR MULCHED
IMMEDIATELY.
10. ON-SITE PERSONNEL SHALL TAKE ALL NECESSARY MEASURES TO COMPLY WITH
APPLICABLE REGULATIONS REGARDING FUGITIVE DUST EMISSIONS, INCLUDING
OBTAINING NECESSARY PERMITS FOR SUCH EMISSIONS. THE CITY/VILLAGE ENGINEER,
OR DESIGNATED REPRESENTATIVE, MAY REQUIRE DUST CONTROLS INCLUDING, BUT NOT
LIMITED TO, THE USE OF WATER TRUCKS TO WET DISTURBED AREAS, TAPPING
STOCKPILES, TEMPORARY STABILIZATION OF DISTURBED AREAS, AND REGULATION OF
THE SPEED OF VEHICLES ON THE SITE.
11. ANY DISTURBED AREA NOT PAVED, SODDED, OR BUILT UPON SHALL HAVE A
MINIMUM OF 80% UNIFORM VEGETATIVE COVER PRIOR TO FINAL INSPECTION AND, IN THE
OPINION OF THE CITY/VILLAGE ENGINEER OR DESIGNATED REPRESENTATIVE, WILL BE
MATURE ENOUGH TO CONTROL EROSION SATISFACTORILY AND SURVIVE SEVERE
WEATHER.
12. CONTRACTOR MUST FILE SWPPP CO-PERMITEE WITH THE EPA. CONTRACTOR MUST
DEVELOP AND MAINTAIN FULLY COMPLIANT SWPP PLAN.
NON-SEDIMENT POLLUTANT CONTROLS (GENERAL NOTES):
1. ALL SANITARY WASTE SHALL BE COLLECTED FROM PORTABLE UNITS A MINIMUM OF ONE TIME PER WEEK BY A LICENSED SANITARY WASTE
MANAGEMENT CONTRACTOR, AS REQUIRED BY LOCAL REGULATION.
2. THE FOLLOWING GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED ON SITE DURING THE CONSTRUCTION PROJECT:
A. AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO DO THE JOB.
B. ALL MATERIALS STORED ON SITE WILL BE STORED IN A NEAT, ORDERLY MANNER, IN THEIR APPROPRIATE CONTAINERS, AND, IF
POSSIBLE, UNDER A ROOF OR OTHER ENCLOSURE.
C. PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE MANUFACTURER'S LABEL. SUBSTANCES WILL NOT BE MIXED
WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER.
D. WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE DISPOSING OF THE CONTAINER.
E. THE MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WILL BE FOLLOWED.
F. THE SITE SUPERINTENDENT WILL INSPECT DAILY TO ENSURE PROPER USE AND DISPOSAL OF MATERIALS ON SITE.
3. IN ADDITION TO PREVIOUS NOTES, THE FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION AND CLEAN-UP:
A. CONTRACTOR MUST CONTACT OHIO EPA AT 1-800-282-9378, THE LOCAL FIRE DEPARTMENT, AND THE LOCAL EMERGENCY
PLANNING COMMITTEE (LEPC) WITHIN 30 MINUTES OF A SPILL 25 GALLONS OR GREATER.
B. MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEAN-UP WILL BE POSTED AND SITE PERSONNEL MADE AWARE OF THE
PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEAN-UP SUPPLIES.
C. MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE AREA ON SITE.
EQUIPMENT AND MATERIALS WILL INCLUDE, BUT NOT LIMITED TO: BROOMS, DUSTPANS, MOPS, RAGS, GLOVES, GOFFLES, CAT LITTER, SAND, SAWDUST, AND PLASTIC AND METAL TRASH CONTAINERS SPECIFICALLY DESIGNATED FOR THIS PURPOSE.
D. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
E. THE SPILL AREA WILL BE KEPT WELL-VENTILATED AND PERSONNEL WILL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT
INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE.
F. SPILLS OF TOXIC OR HAZARDOUS MATERIALS WILL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL GOVERNMENT AGENCY, REGARDLESS OF SIZE.
G. THE SPILL PREVENTION PLAN WILL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE IS ANOTHER ONE. A DESCRIPTION OF THE SPILL, WHAT CAUSED IT, AND THE CLEANUP
MEASURES WILL ALSO BE INCLUDED.
H. THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY-TO-DAY OPERATIONS WILL BE THE SPILL PREVENTION AND CLEANUP COORDINATOR. THEY WILL DESIGNATE SITE PERSONNEL WHO WILL RECEIVE SPILL PREVENTION AND CLEANUP TRAINING. THESE INDIVIDUALS WILL EACH BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND CLEANUP. THE NAMES OF RESPONSIBLE SPILL PERSONNEL WILL BE POSTED IN THE MATERIAL STORAGE AREA AND IN THE OFFICE TRAILER ON SITE.
ER-35N.T.S.
CONCRETE WASHOUT PIT DETAIL
10'
MIN. SANDBAG
AA
PLAN
LATH & FLAGGING
ON ALL SIDES
BERM
10 MIL
PLASTIC
LINING
10 MIL
PLASTIC LINING
BERM
SANDBAG
SECTION A-A
10'
MIN.
B B
PLAN
10 MIL
PLASTIC LINING
TWO-STACKED
2 X 12 ROUGH
WOOD FRAME
STAKE
(TYP)
10 MIL
PLASTIC LINING
WOOD FRAME SECURELY FASTENED
AROUND ENTIRE PERIMETER WITH
TWO STAKES
SECTION A-A
10'
MIN. STAKE (TYP.)
BB
STRAW BALE
(TYP.)
10 MIL
PLASTIC LINING PLAN
2"
1/8" DIA.
STEEL WIRE
STAPLE DETAIL
SECTION B-B
10 MIL
PLASTIC
LINING
STAPLES
(2 PER BALE) BINDING
WIRE
STRAW BALE
(TYP.)
WOOD OR METAL
STAKES (TWO PER
BALE)
NATIVE MATERIAL
(OPTIONAL)
IMPLEMENTATION SCHEDULE & SEQUENCE OF MAJOR CONSTRUCTION OPERATIONS:
NOTE:
ALL SEDIMENT AND EROSION CONTROLS WILL BE INSTALLED WITHIN 7 DAYS OF ALL CLEARING AND GRUBBING OF THE PROPOSED SITE.
A. BEFORE ANY GRADING ACTIVITIES BEGIN:
1. CONSTRUCT 6' HIGH CHAIN LINK CONSTRUCTION FENCING AS NECESSARY TO ENCLOSE SITE
2. INSTALL PERIMETER SILT FENCE PER DETAIL
3. PROVIDE ORANGE CONSTRUCTION FENCING PROTECTION FOR AREAS TO REMAIN UNDISTURBED
4. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE
B. CLEARING AND GRUBBING:
1. INSTALL REMAINING SILT FENCE, PER PLAN REQUIREMENTS
2. CLEAR AND GRUB REMAINING AREAS DESIGNATED ON THE PLAN
3. CONSTRUCT CONCRETE WASHOUT AREA, VEHICLE FUELING AREA, CONSTRUCTION DUMPSTER AREA, AND SOLID, SANITARY, AND
TOXIC WASTE AREA
C. STRIPPING AND STOCKPILING OF TOPSOIL:
1. STRIP TOPSOIL WHERE APPLICABLE AND PLACE IN DESIGNATED STOCKPILE AREA
2. CONSTRUCT SILT FENCE AROUND STOCKPILE
3. INSTALL SOIL STABILIZATION MEASURES AS NEEDED
4. DISTURBED AREAS WHERE CONSTRUCTION WILL CEASE FOR MORE THAN 14 DAYS WILL BE STABILIZED
D. MASS GRADING OPERATIONS:
1. BEGIN MASS GRADING OF SITE PER PLAN
2. INSTALL EROSION CONTROLS MEASURES (ROCK DAMS, EROSION CONTROL MATTING, ETC.), AS NEEDED
3. DISTURBED AREAS WHERE CONSTRUCTION WILL CEASE FOR MORE THAN 14 DAYS WILL BE STABILIZED
E. UTILITY CONSTRUCTION:
1. CONSTRUCT ROOF DOWNSPOUTS, PER PLAN
2. INSTALL SOIL STABILIZATION MEASURES AS NEEDED
F. PAVING OPERATIONS:
1. CONSTRUCT ASPHALT AND CONCRETE PAVING, SIDEWALK, CURB
2. CLEAN AND RESET ALL UTILITY STRUCTURES TO FINAL GRADE
G. FINAL GRADING OPERATIONS:
1. REMOVE TEMPORARY CONCRETE WASHOUT AREA
2. REMOVE ALL TEMPORARY BMPs AND STABILIZE ANY AREAS DISTURBED BY THERE REMOVAL WITH EROSION CONTROLS
3. PREPARE FINAL SEEDING AND LANDSCAPING
H. POST-GRADING OPERATIONS:
1. MONITOR PROGRESS OF SITE STABILIZATION
2. RE-SEED AND REPAIR DAMAGED AREAS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 DLM TBARevisions: Date:
757-15-102BID & CONSTRUCTION
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
18912
FINAL BID & CONSTRUCTION 11/24/2021
FINAL BID & CONSTRUCTION (REVISED) 05/06/2022 C-301
EROSION & SEDIMENT
CONTROL NOTES & DETAILS
ASPHALT
GRAVEL
ASPHALT
BENCH
BENCH
EOI
PIV
K
SC
K
K
K
WV
WV
WV
WV
WV
WV
A-1012
D08
D05
EXISTING
GENERATOR AND PAD
EXISTING STORM LINE
EXISTING STORM LINE
EXISTING BOILER
PLANT
EXISTING SURGERY
CENTER ADDITION
E X
IS
T
IN
G S
T O
R M
L
IN
E
WASHINGTON
W A S H
IN
G
T O
N
EXISTING
DETENTION POND
EXISTING
SURGERY CENTER D09
D10
D10
D11
EXISTING
OXYGEN
STORAGE
D13D13D13D13
D14
D12
OUTLINE OF EXISTING
CHAIN LINKED FENCE
OUTLINE OF EXISTING
CHAIN LINKED FENCE
266'-8 5/8" (+/-)
/4
D22
D11D11
EXISTING LIGHT
POLE, (TYP.)
MAINTAIN
HANDICAPP ACCESS
EXISTING
LANDSCAPE ISLAND
EXISTING FIRE
HYDRANT
A-1014
D01
1. SEE SHEET A-200 FOR GENERAL SITE PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
C U s e rs
\j c h o \D o c u m e n ts
\R e v it M o d e ls
\1
R
V A
C o lu m b u s C h ill e r
P la n t R e v is io n
C e n tr a l_ jd c h o
.r v t
/5
/2
:0
:1
A
M
A-100
DEMOLITION SITE PLAN / ROOF PLAN CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 RG jdc
BID & CONSTRUCTION
(REVISED)18912
SCALE: 1" = 20'-0"A-100
1 DEMOLITION SITE PLAN / ROOF PLAN
DEMOLITION CODED NOTES
D05 REMOVE EXISTING METAL COPING. PROTECT WALL CAVITY DURING
CONSTRUCTION.
D08 REMOVE EXISTING SCREEN WALL, LOUVERS AND ASSOCIATED SUPPORTS.
SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
D09 REMOVE EXISTING EMERGENCY GENERATOR, SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
D10 REMOVE PORTION OF EXISTING CONCRETE CURB, SEE CIVIL DRAWINGS FOR
ADDITIONAL INFORMATION.
D11 REMOVE EXISTING CONCRETE SLAB / PARKING AREA, SEE CIVIL DRAWINGS
FOR ADDITIONAL INFORMATION.
D12 REMOVE TO RELOCATE EXISTING WEATHER STATION. COORDINATE WITH
COR.
D13 REMOVE EXISTING BOLLARDS FOR NEW CONCRETE PAD. SEE CIVIL AND
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
D14 REMOVE TO RAISE EXISTING MANHOLE STRUCTURE FLUSH WITH NEW
CONCRETE GENERATOR PAD. VERIFY IN FIELD, SEE CIVIL DRAWINGS AND
COORDINATE WITH STRUCTURAL DRAWINGS.
D22 REMOVE TO REUSE PORTION OF EXISTING PARAPET ASSEMBLY INCLUDING
METAL PANEL SYSTEM, COPING, AND WALL AS REQUIRED FOR NEW CHILLED
WATER PIPING ROUTE. SEE MEP DRAWINGS FOR CHILLED WATER PIPING
LAYOUT
SITE GENERAL NOTES
Revisions: Date:
FINAL BID & CONSTRUCTION 11/24/2021
FINAL BID & CONSTRUCTION (REVISED) 05/06/2022
UP
A
A.2
B
B.4
C
D
E
F
G
1.8
2 2.6 2.7 3 4
EXISTING AREA N.I.C.
A-1012
D01
D03
D02D02D03D03
D03
D07
D03
D03
D10
D10
D11D11
D17
D16
D12
9'-1"
8 3/4" 8'-4 1/4"
D18
EXISTING
STRUCTURAL POST
EXISTING
STRUCTURAL COLUMN
2'-2" 10'-3 1/8"
/8
EXISTING TRENCH DRAIN
TO REMAIN (TYP.)
D04
1. CONTRACTOR SHALL COORDINATE DEMOLITION WITH OWNER; SALVAGE,
AND TURN OVER TO OWNER ANY ITEMS DESIGNATED BY OWNER.
2. DISPOSITION OF MECHANICAL, PLUMBING, GAS, AIR, VAC. PIPING, FIRE
PROTECTION, AND ELECTRICAL ITEMS ENCOUNTERED IN AREAS TO BE
DEMOLISHED ARE DESCRIBED IN RESPECTIVE DRAWINGS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE WORK WITH ALL
TRADES.
3. WALLS, DOORS, FIXTURES, ETC. TO BE REMOVED ARE SHOWN DASHED.
SELECTED ITEMS ARE LABELED TO IDENTIFY THE ITEM TO BE REMOVED.
4. LOOSE EQUIPMENT NOT IDENTIFIED FOR REMOVAL, RE-USE, OR RELOCATION
ARE TO BE TURNED OVER TO OWNER.
5. INSTALL SECURE TEMPORARY DUST PARTITIONS TO SEPARATE DEMOLITION
AND CONSTRUCTION AREAS FROM OCCUPIED SPACE.
6. SEE STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION ITEMS AND REQUIREMENTS.
7. DEMOLITION CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND
UTILITIES. NOTIFY OWNER AND ARCHITECT OF ANY DISCREPANCIES.
8. ALL DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM
DEMOLITION OPERATIONS TO BE REMOVED FROM PROJECT SITE IN
ACCORDANCE WITH LOCAL, STATE, AND FEDERAL LAWS. BURNING OF
REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE.
9. COORDINATE WITH OWNER FOR SHUTOFF, CAPPING, AND CONTINUATION OF
UTILITY SERVICES AS REQUIRED. DO NOT INTERRUPT EXISTING UTILITIES
SERVING OCCUPIED OR FACILITIES USED.
10. MAKE PORTABLE FIRE EXTINGUISHERS AVAILABLE DURING DEMOLITION
PROCESS.
11. USE OF EXPLOSIVES IS NOT PERMITTED.
12. COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO
ENVIRONMENTAL PROTECTION (FEDERAL, STATE, AND LOCAL).
13. CONTRACTOR TO PATCH AND REPAIR ALL EXISTING FIREPROOFING AFTER
INSTALLATION OF NEW WORK AS REQUIRED TO MAINTAIN REQUIRED FIRE
RATING. CONTRACTOR TO USE MATERIALS COMPATIBLE WITH EXISTING
FIREPROOFING FOR PATCH WORK.
AA.2BB.4CDEFG
CHP FIRST FLOOR
795' - 0"
BOILER PLANT T.O.S.
822' - 5 1/2"
D01
D05
D03D03
D06D06 D06D06
D06 D03
D06 D03
D07
D01
3.12.6 2.7 3 4
CHP FIRST FLOOR
795' - 0"
BOILER PLANT T.O.S.
822' - 5 1/2"
D02D02
D07
D03D03
D05
BOILER PLANT
FIRST FLOOR
795' - 0"
SC 2nd FLOOR 811' - 0"
SC 3rd FLOOR 827' - 0"
D22 16'-7 3/4" (+/-) 8'-0" (+/-)
D23D23
D24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
C U s e rs
\j c h o \D o c u m e n ts
\R e v it M o d e ls
\1
R
V A
C o lu m b u s C h ill e r
P la n t R e v is io n
C e n tr a l_ jd c h o
.r v t
/5
/2
:0
:1
A
M
A-101
DEMOLITION PLANS AND ELEVATIONS CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 RG jdc
BID & CONSTRUCTION
(REVISED)18912
SCALE: 1/8" = 1'-0"A-101
1 FIRST FLOOR DEMOLITION PLAN
DEMOLITION GENERAL NOTES
D01 REMOVE EXISTING KNOCK OUT PANEL (BEHIND EIFS MATERIAL) FOR
INSTALLATION OF NEW HM DOOR AND FRAME. GC TO VERIFY
KNOCK-OUT PANEL. COORDINATE WITH COR AND ARCHITECT.
D02 REMOVE EXISTING KNOCK OUT PANEL (BEHIND EIFS MATERIAL) FOR
INSTALLATION OF NEW ALUMINUM VISION LITE. GC TO VERIFY
KNOCK-OUT PANEL. COORDINATE WITH COR AND ARCHITECT.
D03 REMOVE EXISTING EIFS TO NEAREST JOINT AND ALL ASSOCIATED
ACCESSORIES. REMOVE ADHESIVES TO THE EXTENT THAT ONLY
EXISTING MASONRY WILL REMAIN. PREPARE SURFACE FOR NEW WORK
AND FINISH.
D04 REMOVE EXISTING HOUSEKEEPING PAD, AND REMOVE TO RELOCATE
EXISTING AIR COMPRESSOR.
D05 REMOVE EXISTING METAL COPING. PROTECT WALL CAVITY DURING
CONSTRUCTION.
D06 EXISTING EIFS TO REMAIN. PROTECT DURING NEW WORK OF CONTRACT.
ANY EIFS DAMAGED DURING WORK SHALL BE REPAIRED BY THE
CONTRACTOR AT NO EXPENSE TO THE OWNER.
D07 REMOVE EXISTING OVERHEAD DOOR AND FRAME. SEE STRUCTURAL
DRAWINGS FOR ADDITIONAL INFORMATION.
D10 REMOVE PORTION OF EXISTING CONCRETE CURB, SEE CIVIL DRAWINGS
FOR ADDITIONAL INFORMATION.
D11 REMOVE EXISTING CONCRETE SLAB / PARKING AREA, SEE CIVIL
DRAWINGS FOR ADDITIONAL INFORMATION.
D12 REMOVE TO RELOCATE EXISTING WEATHER STATION. COORDINATE
WITH COR.
D16 REMOVE PORTION OF EXISTING CONCRETE SLAB AS REQUIRED FOR
NEW CONCRETE PIT CONSTRUCTION. GC TO VERIFY AND COORDINATE
SHORING REQUIREMENTS.
D17 REMOVE PORTION OF TRENCH DRAIN. SEE FLOOR PLAN FOR NEW
CONFIGURATION.
D18 CUT INTO EXISTING SLAB ON GRADE FOR NEW TRENCH DRAIN.
D22 REMOVE TO REUSE PORTION OF EXISTING PARAPET ASSEMBLY
INCLUDING METAL PANEL SYSTEM, COPING, AND WALL AS REQUIRED
FOR NEW CHILLED WATER PIPING ROUTE. SEE MEP DRAWINGS FOR
CHILLED WATER PIPING LAYOUT
D23 FIELD VERIFY STEEL POST LOCATION AND NOTIFY COR AND ARCHITECT,
PRIOR TO CHILLED WATER PIPE LAYOUT.
D24 CUT TO REUSE, EXISTING STEEL CHANNEL, AS REQUIRED FOR NEW
OPENING AT PARAPET.
SCALE: 1/8" = 1'-0"A-101
2 DEMOLITION ELEVATION - EAST
DEMOLITION CODED NOTES
SCALE: 1/8" = 1'-0"A-101
3 DEMOLITION SOUTH ELEVATION / SECTION
Revisions: Date:
FINAL BID & CONSTRUCTION 11/24/2021
FINAL BID & CONSTRUCTION (REVISED) 05/06/2022
SCALE: 1/8" = 1'-0"A-101
4 PARTIAL EAST ELEVATION (SURGERY CENTER)
M
M
N
N
O
O
P
P
Q
Q
R
R
S
S
T
T
T.2
T.2
6.2
6.2
9.2
9.2
U
U
T.3
T.3
D19
EXISTING CEILING
TO REMAIN
EXISTING CEILING TO REMAIN
D20
MENTAL HEALTH SURGERY CENTER
EXISTING
MECHANICAL ROOM
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXISTING
WAITING AREA
EXIST.
VESTIBULE
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXIST.
OFFICE
EXISTING CORRIDOR EXISTING CORRIDOR
EXIST.
OFFICE
EXISTING CORRIDOR
EXISTING ENTRY
CANOPY
NEW CHILLED WATER PIPING.
REFER TO MECHANCIAL DRAWINGS
FOR ADDITIONAL INFORMATION
EXIST. OFFICE EXIST. OFFICE EXIST. OFFICE EXIST. OFFICE EXIST. OFFICE EXIST. OFFICE
EXIST. OFFICE
D19 D19
D21 D21
D01
1. EXISTING CEILING NOT SHOWN FOR CLARITY
2. CEILING WORK TO BE DONE OFF HOURS, COORDINATE WITH REFLECTED CEILING PLAN, AND MEP
DRAWINGS. COORDINAT SCHEDULE WITH COR. AREA TO BE RETURNED TO ORIGINAL CONDITION AFTER
EACH WORKING DAY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
C U s e rs
\j c h o \D o c u m e n ts
\R e v it M o d e ls
\1
R
V A
C o lu m b u s C h ill e r
P la n t R e v is io n
C e n tr a l_ jd c h o
.r v t
/5
/2
:0
:2
A
M
A-110
PARTIAL FIRST FLOOR DEMOLITION
REFLECTED CEILING PLAN (SURGERY
CENTER) - BID ALTERNATE NO. 3
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 RG jdc
BID & CONSTRUCTION
(REVISED)18912
SCALE: 1/8" = 1'-0"A-110
1 DEMOLITION REFLECTED CEILING PLAN
D19 REMOVE EXISTING LAY IN CEILING SYSTEM AS REQURIED FOR NEW CHILLED
WATER PIPING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION.
D20 REMOVE EXISTING GYP. BD. CEILING AS REQURIED FOR NEW CHILLED WATER
PIPING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION
D21 EXISTING LIGHT FIXTURE AND DIFFUSERS TO REMAIN, PROTECT DURING
CONSTRUCTION / INSTALLATION. SEE MEP DRAWINGS FOR ADDITIONAL
INFORMATION
DEMOLITION CODED NOTESDEMOLITION REFLECTED CEILING PLAN GENERAL NOTES
Revisions: Date:
FINAL BID & CONSTRUCTION 11/24/2021
FINAL BID & CONSTRUCTION (REVISED) 05/06/2022
File details come from the government source that posted it. Updated .