18912 Columbus VA Chiller Plant Revision Final BC Revised - Drawings - Part-6.pdf
PDF 9 MB Posted
- Solicitation number
- 36C25023B0049
About this file
This solicitation from the Department of Veterans Affairs seeks proposals for the construction of a chiller plant at the Chalmers P. Wylie VA Ambulatory Care Center in Columbus, Ohio. The project involves building a new chiller plant to replace the existing system and provide chilled water to the medical center. Proposals are due by July 15th, 2022 and the contract is slated for award in September 2022. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS
OHIO, 43219
05/06/2022Revisions: Date:
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
FINAL BID & CONSTRUCTION 11/24/2021
NTRACTOR TO VERIFY ALL
DIMENSIONS, ELEVATIONS AND
CONDITIONS IN THE FIELD
S-302
SECTIONS
ASK CJA
CHILLER ROOF
SEE PLAN FOR EL.
SECTION 1
3/4"=1'-0"
3.13
SECTION 2
3/4"=1'-0"
1 1/2" EXP. JT.
3.13
SECTION 3
3/4"=1'-0"
1 1/2" EXP. JT.
RD-3 - SEE PLAN
E.3
SECTION 4
3/4"=1'-0"
RD-3
3/8" CONT. BENT PLATE
W/ 6" VERT. LEG
W COLUMN
SEE PLAN
W BEAM
SEE PLAN
12" CMU WALL
EXISTING
CMU WALL
RD-3 - SEE PLAN
W BEAM
SEE PLAN
W COLUMN
SEE PLAN
W BEAM
SEE PLAN
EXISTING
CMU WALL
W BEAM
SEE PLAN
RD-3
3/8" CONT. BENT PLATE
W/ 6" VERT. LEG 12" CMU WALL
CHANNEL
SEE PLAN
CHANNEL
SEE PLAN
CONT. BOND BEAM
W/ 2#5 CONT. TYP.
1/2" Ø THREADED RODS
@2'-0" O.C. INSTALLED
W/ HILTI HIT HY 270
ADHESIVE SYSTEM
AND CENTERED IN 2"
LONG SLOTTED HOLE.
EMBEDMENT = 4 1/2"
1/4
1/4
TYP.
CHILLER ROOF
SEE PLAN FOR EL.
CHILLER ROOF
SEE PLAN FOR EL.
CHILLER ROOF
SEE PLAN FOR ELEV.
T.O.WALL
EL. 817'-8"
EIFS - SEE ARCHITECTURAL
DRAWINGS
NOTE:
SEE PLAN NOTE FOR CMU
REINFORCING (TYPICAL)
T.O. WALL
EL. 817'-8"
EIFS - SEE ARCHITECTURAL
DRAWINGS
SEE SECTION 1 THIS SHEET
FOR ADDITIONAL INFO.
SEE PLAN
1'-9"± 1'-9 3/8"±
SEE ARCH.
DWGS.
SEE ARCH.
DWGS
4"
SEE PLAN
2'-0"
1/2"
COOLING
TOWER
SECTION 5
3/4"=1'-0"
3/16
3/16
5/16
5/16
1/4
1/4
1/4" STIFFENER
PLATE - CUT TO FIT
AT EACH HANDRAIL
POST
W-BEAM - SEE PLAN
DOUBLE ANGLE
SHEAR CONNECTION
(TYP.)
RD-3 - SEE PLAN
W-BEAM
SEE PLAN
UNIT CURB AND ITS
ATTACHMENT TO STEEL
FRAME BY EQUIPMENT
SUPPLIER (TYP.)
2' -0
KB-1 (TYP.)
SEE PLAN
P-1 - SEE PLAN
GR-1 - SEE
PLAN
W-BEAM
SEE PLAN
3/8" STIFFENER
PLATES - CUT TO
FIT (TYP.)
AB-1 BRACING AND
PERPENDICULAR KB-1 FRAMING
NOT SHOWN FOR CLARITY.
SECTION 6
3/4"=1'-0"
SEE SECTION 5 FOR ALL
ADDITIONAL INFORMATION
3/8" STIFFENER PLATES
W-BEAM
SEE PLAN
RD-3
SEE PLAN
GR-1
SEE PLAN
W-BEAM
SEE PLAN
HANDRAIL
ASSEMBLY
W-BEAM
SEE PLAN
CHILLER ROOF
SEE PLAN FOR EL.
COOLING TOWER
SEE PLAN FOR EL.
1/4
1/4
TYP
TYP
TYP
3' -6
HANDRAIL ASSEMBLY:
VERTICAL POST:
1 1/2"Ø GALV. EXTRA
STRONG PIPE @
4'-0" O.C. MAX
HORIZONTAL POST:
1 1/2"Ø GALV. STD.
PIPE. COORDINATE W/
ARCHITECTURAL
DRAWINGS.
HORIZONTAL FILLER
1"Ø GALV. STD. PIPE
(TYP.)
5/16"x4" GALV. TOE
PLATE (TYP.)
COOLING
TOWER
3/16
TYP.
MAKE HSS 5x5x1
ADD KICKER OPP.
BID & CONSTRUCTION
(REVISED)
STEEL BEAMS - SEE PLAN
STANDARD SHEAR CONN.
3/4"x3"x0'-8" WIDE PLATE W/
(2) 3/4"ø A325N BOLTS
(TYP. OF 2)
10 3/4" 3/4"x8"x1'-0" PLATE W/ (4) 3/4"ø A325N BOLTS THUS:
1/4
TYP.
ROOFING AND ROOF DECK
NOT SHOWN FOR CLARITY
ROOF EL.
SEE PLAN
2 5/8"
2 3/4"2 5/8"
/8
/4
/8
3/8
TYP.
1"ø CLAMP
6" STD. PIPE (O.D. = 6 5/8")
1'-2"
3/4"x8"x1'-2" PLATE W/
(8) 3/4"ø A325N BOLTS
SECTION 7
3/4"=1'-0"
BARBER & HOFFMAN, INC.
S T
A T E O F O HIO
P R
O F
E
S S I O N A L E N G
I N E
E R
R E G I S T E R E D
NIRANJAN
S.
DABHOLKAR
E-69058
Tech Col Text Box
FINAL BID & CONSTRUCTION (REVISED)
Tech Col Text Box 05/06/2022
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS
OHIO, 43219
05/06/2022Revisions: Date:
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
FINAL BID & CONSTRUCTION 11/24/2021
CONTRACTOR TO VERIFY ALL
DIMENSIONS, ELEVATIONS AND
CONDITIONS IN THE FIELD
S-303
SECTIONS
ASK CJA
10"
1'-7"
35°
T.O. PILE CAP
SEE PLAN
PC-1
SEE PLAN
DETAIL 1
3/4"=1'-0"
DETAIL 2
3/4"=1'-0"
1'-7" W21 - SEE PLAN
1/2" GUSSET PLATE - ALIGN
W/ WEB OF STEEL BEAM
10"
1' -2
3/4"Ø A325
BOLTS STD.
HOLES (TYPICAL)
(2) MC8 - SEE ELEVATION
(TYPICAL)
W.P.
T.O. STEEL EL.
SEE PLAN
DETAIL 3
3/4"=1'-0"
SEE DETAIL 1/ S303
FOR ALL ADDITIONAL
INFORMATION
2" TYP.
2" TYP.
3"
3/16
3/16
4 3/4"
1'-3 1/2"
4"
1' -1
1"
3/16
1/2" GUSSET PLATE - ALIGN
W/ WEB OF STEEL COLUMN
C-2 - SEE PLAN
W.P.
BASE PLATE - SEE PLAN
AND TYPICAL DETAILS
FOR ADDITIONAL INFO.
3/16
TYP.
35.0°
1/2" GUSSET PLATE - ALIGN
W/ WEB OF STEEL COLUMN
AND WEB OF STEEL BEAM
1'-3 1/2" 1'
-1
3"
1'-1"
1/
2"
1'-9 1/2" 1/2"
CLR.
T.O. STEEL EL.
SEE PLAN
2"
57.5°
(2)L4x4x3/8x0'-11 1/2" LONG
DOUBLE ANGLE CONNECTION
W/ (8) 3/4"Ø A325N BOLTS
(2)L4x4x3/8x0'-8 1/2" LONG
DOUBLE ANGLE CONNECTION
W/ (6) 3/4"Ø A325N BOLTS
W.P.
3/16
3/16
1'-1" LONG
3/4"Ø A325N BLOTS
STD. HOLES (TYPICAL)
(2)MC8 - SEE ELEVATION
W16 - SEE PLAN
DETAIL 4
3/4"=1'-0"
SEE DETAIL 2/ S303
FOR ALL ADDITIONAL
INFORMATION
3/16
3/16
1' -2
1/ 2"
6 3/4"
1'-0 3/4"
1 3/4"
T.O. PILE CAP
SEE PLAN
BASE PLATE - SEE PLAN
AND TYPICAL DETAILS
FOR ADDITIONAL INFO.
W.P.
C-2A - SEE PLAN
1/2" GUSSET PLATE - ALIGN
W/ WEB OF STEEL COLUMN
57.5°
ELEVATION 1
(VB-1)
1/4"=1'-0"
W21 - SEE PLAN
T.O. STEEL
EL.(16'-0")
DETAIL 1
S-303
1ST FLOOR
EL.(0'-0")
T.O. PILE CAP
EL.(-1'-4")
DETAIL 3
S-303
GB-# / TB-# SEE PLAN
ELEVATION 2
(DB-1)
1/4"=1'-0"
W16 - SEE PLAN
C-2 SEE PLAN
DETAIL 2
S-303
(2) MC8x22.8 - PROVIDE 1/2" x 5" x 0'-8" LONG PLATE @ 3'-0"
O.C. W/ MIN. (2) A325N BOLTS
DETAIL 4
S-303
PC-1 SEE PLAN
(TYPICAL)
GB-# / TB-# SEE PLAN
T.O. STEEL
EL.(16'-0")
1ST FLOOR
EL.(0'-0")
T.O. PILE CAP
EL.(-1'-4")
C-2 SEE PLAN
(TYPICAL)
PC-1 SEE PLAN
(TYPICAL)
C2A SEE PLAN
DETAIL 3 OPP.
S-303
(2) MC8x22.8 - PROVIDE 1/2" x 5" x 0'-8" LONG PLATE @ 3'-0"
O.C. W/ MIN. (2) A325N BOLTS
C8 - SEE PLAN C6
SEEPLAN
3/16
TYP.
BASE PLATE - SEE PLAN
TYP.
P-2A
L2x2x1/4 x 9" LONG
TREAD SUPPORT TYP.
P-2A
ATTACH ANGLE TO
FACE OF POST
3.1
T.O. CHP BOILER STEEL
822' - 5 1/2"±
EX. W18 BEAM
T.O. STEEL
SEE PLAN
3/16
3/16
TYP. AT
CHANNELS
HANDRAIL ASSEMBLY SEE
SECTION 5 ON S-302
GR-2 GRATING AT
TREADS SEE PLAN
C8 - SEE PLAN
3/16 3-12
3/16 3-12
3/16
SEE NOTE B
NOTE B:
WELD THRU DECK TO EX.
W STEEL BEAM FLANGE
COPED C12x20.7 STRINGER W/L3x3x1/4
P-2 SEE PLANP-2 SEE PLAN
SECTION 1
3/4"=1'-0"
EX. WALL
7'-1"±
CL OF POST
2'-1"±
SEE NOTE A
TYP.
C12 STRINGER
- SEE PLAN
EX. W24
BEAM
1 1/2"
2"
CL CL
3'-8"
NOTE A:
COORDINATE AND FIELD MEASURE
EXISTING CONDITIONS PRIOR TO
FABRICATION OF CHANNELS AND
POSTS
TYP.
SEE PLAN
FOR EL.
BID & CONSTRUCTION
(REVISED)
BARBER & HOFFMAN, INC.
S T
A T E O F O HIO
P R
O F
E
S S I O N A L E N G
I N E
E R
R E G I S T E R E D
NIRANJAN
S.
DABHOLKAR
E-69058
Tech Col Text Box
FINAL BID & CONSTRUCTION (REVISED)
Tech Col
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS
OHIO, 43219
05/06/2022Revisions: Date:
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
FINAL BID & CONSTRUCTION 11/24/2021
TOR TO VERIFY ALL
DIMENSIONS, ELEVATIONS AND
CONDITIONS IN THE FIELD
S-501
TYPICAL DETAILS
ASK CJA
SLOPE
JOINT-FILLER STRIP
SEE DRAWINGS
FOR BUILDING
CONSTRUCTION
4" POCKET
AIR SPACE - 5" MIN.
NOTES:
1. SLAB TO BE 5" MINIMUM (INCLUDING FORM) REINFORCED WITH #4@8" O.C. BOTTOM
AND #4@12" O.C. TEMPERATURE. FORM TO BE CORRUGATED GALVANIZED STEEL
FORM DECK (GAUGE AS REQUIRED TO SUPPORT WET WEIGHT OF CONCRETE PLUS
CONSTRUCTION LOADS. MAXIMUM DEFLECTION OF DECK TO BE 1/240 OF THE SPAN.).
2. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR SLOPE.
FROST FREE SLAB DETAIL
3" 4" MIN.
1'-0"
MIN.
3' -6
" M
IN
FINISHED FLOOR
(2)#5 DOWELS TOP
AND BOTTOM AT WALLS
POCKET AND DOWELS
OCCUR AT FOUNDATION
WALL ONLY
1'-0" WIDE FOOTING AT
SIDES WITH (2)#5 TOP
AND BOTTOM U.O.N.
(2)#5 TOP
AND BOTTOM
SEE SITE
DRAWING
#4@12" DOWELS
SOLID OR GROUTED MASONRY
S E
E P
LA
N
SEE PLAN FOR DIMENSION
TYPICAL GENERATOR CONC. PAD DETAIL
1'-0"
2' -8
8"
2 #5 CONT.
TURN DOWN CONC. SLAB
AT PERIMETER - TYPICAL
#4 @ 12" O.C.
TOP AND BOTTOM
EXPOXY COATED EACH WAY
NOTES:
1. CONTRACTION JOINTS SHALL BE
INSTALLED IN SLABS ON GROUND AT
A MAXIMUM SPACING IN FEET OF
3 TIMES THE SLAB THICKNESS IN
INCHES IN EACH DIRECTION (15'-0"
MAXIMUM) BY EITHER OF THE
METHODS SHOWN. MAXIMUM LENGTH
OF ANY SLAB ON GROUND POUR TO
BE 50'-0" BETWEEN CONSTRUCTION
JOINTS. THIS SPACING OF JOINTS
SHALL APPLY UNLESS SPECIFICALLY
SHOWN OTHERWISE ON DRAWINGS.
2. REINFORCING TO BE DISCONTINUOUS
THROUGH CONSTRUCTION JOINTS.
ADD #4 CONTINUOUS W/
#4 x 3'-0" TOP DIAGONAL
BAR AT CORNERS
OPTIONAL CONSTRUCTION JOINT
8" MIN.
S E
E P
LA
N
F O
R D
E P
R E
S S
IO
N
1" M
IN
1- 1/
2" M
A X
C
LE
A
R C
O V
E R
T
CONSTRUCTION JOINT
WHEN T IS 6" OR
DEEPER, USE A
RECTANGULAR KEY
SAW-CUT JOINT
(SEE SPECS)
T/
E Q
U A
L
3/4" MIN.
1/
T M
IN
1- 1/
2" C
LE
A
R C
O V
E R
SLAB ON GROUND JOINTS
SAWED CONTRACTION JOINTCONSTRUCTION JOINT
2' -0
" M
IN
AT DISCONTINUOUS JOINTS
S.O.G. AT INSIDE CORNERS
SLAB REINFORCING DETAILS
ADD (1)#5 x 4'-0"
TOP AND BOTTOM
#3 TOP
C.J.
ADD (1)#5 x 3'-0" TOP & BOTT.
ADD (1)#5 x 3'-0" TOP & BOTT.
NOTE (FOR S.O.G.):
OMIT DIAGONAL & (1) SIDE IF
C.J. ALIGNS WITH CORNER
1/
2" C
LE
A
R
C O
V E
R
3" C
LE
A
R
C O
V E
R
3" C
LR
#4 U1 @ 16" O.C.
4#8
7#8
4#8
7#8
3" C
LR
3" MAX.
3'-0"
3'-0"
2'-0"
4'-0"
GB-1
GB-2
2"
NOTE:
ALL BARS TO BE CONTINUOUS WITH CLASS "A" SPLICES. SPLICE
BOTT. BARS AT SUPPORTS. SPLICE TOP BARS AT MID-SPAN.
CONTR. MAY PROVIDE FULL LENGTH BARS IN LIEU OF SPLICES.
SEE SCHEDULE FOR STIRRUPS
GRADE BEAM SCHEDULE
S
TD
H
O O
K
REMARKSTOPBOTTOMDEPTHWIDTHMARK
MARK WIDTH DEPTH
BOTTOM
BARS
TOP
BARS STIRRUPS
5" M
IN
UP TO 2'-6"
8"
MIN.
OVER 2'-6"
1'-0"
MIN.
EXISTING S.O.G. CUT
AND REPLACE DETAIL
EXIST. S.O.G.
REINFORCING - SEE NOTES
EXIST. S.O.G.
T
NOTES:
1. BASE SLAB PREPARATION:
A. NEW: CLEAN & WET SLAB PRIOR TO POURING PAD.
B. EXISTING: CLEAN & ROUGHEN SLAB AND APPLY BONDING AGENT PER
SUPPLIER'S DIRECTIONS.
2. CURING - CURE FOR 7 DAYS BY EITHER OF THE FOLLOWING METHODS:
A. COVER W/ BURLAP & KEEP CONTINUOUSLY WET.
B. COVER W/ 6 MIL. VISQUEEN. TAPE ALL JOINTS & TAPE VISQUEEN TO BASE SLAB.
DRILL 1"Ø HOLE IN
EXISTING SLAB. SET 1/2"Ø
DEFORMED ROD IN
NON-SHRINK GROUT
REINFORCING:
(@ MID DEPTH OF SLAB)
T=3" (4x4-W2.9xW2.9 WWF) T=4" (#3@12" O.C. E.W.)
T=5" (#3@9" O.C. E.W.)
T=6" (#3@9" O.C. E.W.)
1/
2" C
LE
A
R
4"
3" M
IN
.1 1/
2" C
LE
A
R
6" FROM CORNERS
& 3'-0" O.C. MAX.
AROUND PERIMETERCHAMFER
#3 DOWEL
MECHANICAL HOUSEKEEPING PAD DETAIL
NEW
CONSTRUCTION
EXISTING
CONSTRUCTION
CONCRETE SLAB
EXISTING SLAB
T
NOTES:
REINFORCING:
T = 4" (WWF6x6 - W2.1xW2.1)
T = 5" (#3@12" O.C. EACH WAY)
T = 6" (#3@ 9" O.C. EACH WAY)
3" CLR
S E
E P
LA
N
FO
R
S
TE
P
1'-6"
TYPICAL DETAIL AT GRADE BEAM STEP
(SEE PLAN FOR LOCATIONS)
MAX.
PILE CAP BOTTOM
REINFORCING
5'-0"
PILE CAP GRADE BEAM
EXTEND GRADE BEAM
BOTTOM REINFORCING
2'-0" INTO PILE CAP
EXTEND TOP REINFORCING
BARS (4" MIN.) FROM PILE
CAP INTO GRADE BEAM
STEEL COLUMN AND PILE CAP ACP-1 DETAIL
LC
SEE PLAN
3" CLEAR
SEE TYPICAL
ISOLATION JOINT
DETAILS
SEE TYPICAL COLUMN
BASE PLATE DETAILS
AND PLAN DWGS.
FINISHED FLOOR
STEEL COLUMN
LC LC
PILE
6"
1" C
LE
A
R
FOR SIZE AND REINFORCINGCASING IF
REQUIRED
IF CASING IS
REQUIRED
INCREASE SHAFT
SIZE AS REQUIRED
FOR METHOD OF
INSTALLATION
(1) #8 CENTERED.
FULL LENGTH OF PILE
STEEL COLUMN AND PILE CAP ACP-2 DETAIL
LC
SEE PLAN
3" CLEAR
SEE TYPICAL
ISOLATION JOINT
DETAILS
SEE TYPICAL COLUMN
BASE PLATE DETAILS
AND PLAN DWGS.
FINISHED FLOOR
STEEL COLUMN
LC LC
PILE
6"
1" C
LE
A
R
FOR SIZE AND REINFORCINGCASING IF
REQUIRED
IF CASING IS
REQUIRED
INCREASE SHAFT
SIZE AS REQUIRED
FOR METHOD OF
INSTALLATION (1) #8 CENTERED. FULL
LENGTH OF PILE
#3 TIES MIN OF
(3) IN PILE CAP
(6) #8 VERTICAL REINFORCING
EXTEND 10'-0" INTO PILE
#3 TIES@
16" O.C.
U1
9"
TYP. U.O.N.
9"
TYP. U.O.N.
V A
R
IE
S 6"
M
IN
1'-0"
MIN.
1'-0"
MIN.
NOTE: PROVIDE CONCRETE PROTECTION AROUND UTILITY LINE
WHEN LINE IS WITHIN FOOTING INFLUENCE ZONE. SEE DETAIL
ABOVE FOR INFLUENCE ZONE DEFINITION
FOOTING DETAIL WITH UTILITY LINES BELOW
INFLUENCE ZONE
LINE PERPENDICULAR
TO FOOTING
LEAN CONCRETE
SEE DETAIL BELOW
FOOTING
INFLUENCE ZONE LINE
LINE PARALLEL TO FOOTING
COORDINATE W/ CIVIL, SITE, OR
MECHANICAL DRAWINGS FOR SIZE
AND ELEVATION OF SLEEVE
2" COMPRESSIBLE FILLER PLACED
UNIFORMLY AROUND PIPE
LEAN CONCRETE
FILL f'c=1500 psi
SEE PLAN AND SCHEDULES
FOR GRADE BEAM SIZE AND
REINFORCING. (EXISTING
GRADE BEAM MAY OCCUR)
LC
12" MIN.
LAP
FINISHED FLR.
V A
R
IE
S S
E E
P
LA
N
FINISHED FLR.
3"
TYPIC
AL
3"
MIN
3"
TYPIC
AL
3"
MIN
0"
SLAB ON GROUND - ISOLATION JOINTS
WITH STEEL COLUMNS
LC
TYPICAL EXTERIOR COLUMN
SECTIONSECTION
TYPICAL INTERIOR COLUMN
3" MINIMUM COVER
AROUND BASE PL.
PLAN PLAN
#3 BARS
JOINT-FILLER STRIP
JOINT-FILLER
STRIP
CONSTRUCTION OR
CONTROL JOINTS
#3 BARS
STEEL COL.NO REINFORCING
THROUGH JOINT
STEEL COL.
NO REINFORCING
THROUGH JOINT
STEEL COL.
#3 BAR
STEEL COL.
EXT. WALL
#3 BAR
TOP OF PILE CAP
3" MINIMUM COVER
AROUND BASE PL.
NOTE:
SEE TYPICAL SLAB ON GROUND JOINT DETAILS,
SLAB REINFORCING DETAILS, AND SPECIFICATIONS
FOR ADDITIONAL REQUIREMENTS
1/
2" C
LE
A
R C
O V
E R
1"
S
TO
N
E 5"
W E
LL
G
R A
D E
D G
R A
N U
LA
R
F
IL
L
O
R
S
TO
N E
SLAB ON GROUND DETAIL
BASE
VAPOR RETARDER
(SEE SPECIFICATIONS)
SUB-BASE
(SEE GEOTECHNICAL REPORT
FOR PREPARATION)
TURN VAPOR RETARDER
UP WALL TO TOP OF SLAB
CONCRETE SLAB ON GROUND
(SEE PLAN FOR THICKNESS
AND REINFORCING)
OPEN
REINFORCING AT WALL OPENINGS
(1)#4 - SAME LENGTH
AS WALL STEEL
(1)#4 TOP AND BOTTOM.
LENGTH EQUALS
OPENING WIDTH + 4'-0".
(HOOK IF 2'-0" IS NOT
AVAILABLE BEYOND
OPENING)
(1)#4 x4'-0" DIAGONAL AT EACH
CORNER AND EACH FACE
BID & CONSTRUCTION
(REVISED)
BARBER & HOFFMAN, INC.
S T
A T E O F O HIO
P R
O F
E
S S I O N A L E N G
I N E
E R
R E G I S T E R E D
NIRANJAN
S.
DABHOLKAR
E-69058
Tech Col Text Box
FINAL BID & CONSTRUCTION (REVISED)
Tech Col
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS
OHIO, 43219
05/06/2022Revisions: Date:
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
FINAL BID & CONSTRUCTION 11/24/2021
CONTRACTOR TO VERIFY ALL
DIMENSIONS, ELEVATIONS AND
CONDITIONS IN THE FIELD
S-502
TYPICAL DETAILS
ASK CJA
CLEAR OPENINGS 4'-0" WIDE TO 8'-0" WIDE
3/ 4"
C
LE
A R
W A
LL
O
P N
G
BLOCK LINTEL
2 COURSES DEEP
(2) # 4 CONT. HORZ.
REINF.
(BL-1)
MAIN WALL REINF.
SEE SECTION ON S4.1
NOTES:
1. PROVIDE BLOCK LINTELS OVER ALL OPENINGS U.O.N.
IN PLAN
2. COMPRESSIVE STRENGTH OF BLOCK LINTEL AND
GROUT TO MATCH MINIMUM SPECIFIED
STRENGTH ON DWG. S-001.
3. REFER TO ARCH. DRAWINGS FOR LOCATION AND SIZE
OF THE WALL OPENINGS.
4. BLOCK LINTELS TO BEAR A MINIMUM OF 8" BEYOND THE
CMU WALL OPENING AT EACH
BEARING END AND ARE CONT. AT STEEL POSTS.
TYPICAL REINFORCED CMU LINTELS
NOT TO SCALE
5/16"
TYP.
3/8" BENT PLATES OR ANGLES
AS REQUIRED FOR SLAB EDGE
CONSTRUCTION. WELD TO
COLUMN AND EACH OTHER
L3x3x5/16 COPE
AND WELD TO
BEAMS (TYP.)
COLUMN DIRECTION
MAY VARY
L3x3x5/16
TYPICAL
6" T
Y P
AT CORNERS BEAMS ON 4 SIDES
BEAMS ON LESS THAN 4 SIDES
PLAN DETAIL OF DECK
SUPPORT AT COLUMNS
DECK
DIRECTION
NOTES:
1. IF "X" IS 4" OR LESS, ELIMINATE ANGLE
PARALLEL TO BEAM.
2. PROVIDE ANGLE FRAME FOR ALL
OPENINGS GREATER THAN 10" DIA. OR
10" SQUARE.
3. CONTRACTOR TO VERIFY SIZE AND
LOCATION OF ALL OPENINGS. SEE
ARCHITECTURAL, MECHANICAL, ETC.
DRAWINGS FOR OPENINGS NOT
SHOWN ON STRUCTURAL DRAWINGS.
OPENING
"X"
O
PE
N
PLAN
SECTION A-A
ROOF DECK OPENING DETAIL
L4x4x1/4 (4 SIDES) L4x4x5/16 x 0'-6" LONG
TOP OF ANGLE
FRAME TO BE FLUSH
WITH TOP OF BEAM
BEAM
A-A
PER AISC
COLUMN
FINISHED
FLOOR
TOP OF CONCRETE
WASHER
REQUIRED
FI
N
C
O L.
1" M
IN
. S
H
IM
A N
D G
R O
U T
1' -0
M
IN
NOTES:
1. GROUT TO BE 5000 psi MIN.
2. LEVELING PLATES (OPTIONAL).
3. SEE PLAN NOTES AND TYPICAL DETAILS FOR INFORMATION RELATED
TO BASE PLATE AND ANCHOR BOLTS.
6 d MIN.
LONG DIM.
COLUMN BASE PLATE DETAIL
b
2" TY
P
3/8" PLATE WASHER
WITH STANDARD HOLE
BASE PLATE WITH
OVERSIZE HOLE
A36 THREADED ROD (SEE
COLUMN SCHEDULE FOR SIZE)
3/8"x3"x3" PLATE WASHER
LOCK NUT OR DOUBLE NUTS
TOP OF
CONCRETE
NOTE:
COLUMN NOT
SHOWN FOR
CLARITY
1' -0
" M
IN
TENSION ANCHOR BOLT DETAIL
WALL
OPENING
MASONRY WALL.
GROUT SOLID (3)
COURSES
3/4"ø ANCHOR BOLTS.
SEE PLAN AND SCHEDULE
FOR NUMBER AND LAYOUT
TH
IC
K N
E S
S 3/
4" N
O N
-S H
R
IN
K A
N D
N O
N -M
E
TA
LL
IC
G R
O U
T
3"
2" B
N
S
C B
E A
M A
N D
C M
U L
PLAN DETAIL
(PARALLEL TO WALL)
NOM.
CMU 2
TYPICAL WALL REINFORCING
BEARING PLATE SCHEDULE (SIZE & REINFORCING)
1/2"x7"x1'-0"
SIZE (THICKNESSxNxB)
BP-1
MARK
(2)
MASONRY PIER REINFORCING*
* GROUT REINFORCED CELLS SOLID FOR FULL HEIGHT OF WALL -TYPICAL
(S) 8"±
(FULL HEIGHT OF CMU WALL BELOW PLATE U.O.N. IN PLAN)
TYPICAL BEAM BEARING PLATE DETAILS
C OF PIER
TO MATCH
C OF BEAM
L
L
2"
ELEVATION DETAIL
(PARALLEL TO WALL)
CMU WALL PIER REINFORCING
DETAILS UNDER BEARING PLATES
# ANCHORS
GROUT BEAM POCKET
SOLID SOLID BLOCK (CUT
TO FIT) TO BE INSTALLED
WITHIN THE BEAM DEPTH.
PROVIDE GALVANIZED
FLEXIBLE MASONRY TIES
TO SECURE BLOCK TO
BEAM WEB
(C-2A COLUMNS ONLY)
TYPICAL DETAIL AT (BLAST DESIGN) DOOR JAMBS
(2)#5 VERTICAL REBAR
*GROUT REINFORCED CELLS
SOLID FOR FULL HEIGHT OF
WALL TYPICAL
D.4
ROOF FRAMING
SEE PLAN FOR EL.
1/2" STIFFNER PLATES E.F. AT
CORNER COLUMNS - SEE
DETAIL (COLUMN WEAK AXIS)
FOR ADD'L INFO.
1/2"x9" WIDE TOP & BOTT. PLATE (TYP.)
DOUBLE ANGLE CONNECTION
3/4"ø BOLTS (TYP. TOP &
BOTT.) - SEE TABLE 1
STEEL BEAM - SEE PLAN
STEEL COLUMN - SEE PLAN
CLOPPOSITE BEAM MAY
OCCUR SAME CONNECTION
5/16 B.2
ROOF FRAMING
SEE PLAN FOR EL.
CL
5/16
3 SIDES
3/4"ø BOLTS (TYP. TOP &
BOTT.) - SEE TABLE 1
1/2" TOP & BOTT.
PLATE (TYP.)
DOUBLE ANGLE CONNECTION
STEEL BEAM - SEE PLAN
STEEL COLUMN - SEE PLAN
1/2"
STIFFNER
PLATE E.F.
3" 3"
3" 3"
1/4
1/4
3 SIDES
3" 3"
3" 3"
1/4
1/4
AXIAL CONNECTION FOR BLAST
(PERIMETER COLUMN STRONG AXIS)
AXIAL CONNECTION FOR BLAST
(PERIMETER COLUMN WEAK AXIS)
C-2A 3/4"øA325N
COLUMN
STRONG AXIS
BOLT
SIZE/TYPE
3 6
C-3A
C-2
C-3
C-2C
COLUMN
MARK
ROWS BOLTS
COLUMN
WEAK AXIS
ROWS BOLTS
BEAM TO COLUMN TOP & BOTTOM PLATE
CONNECTION (BLAST DESIGN)
3/4"øA325N
3/4"øA325N
3/4"øA325N
3/4"øA325N
3 6 2 4
2 4 - -
2 4 - -
3 6 - -
TABLE 1
1/4
1/4
3 SIDES
W16X36 56
BEAM
REACTION
EACH END
(LRFD KIPS)
BEAM
SIZE
SHEAR VERTICAL
(BLAST DESIGN)
W18X50 88
W21X50 98
W21X55 180
W21X62 200
W21X68 222
W21X93 190
TABLE 2
BEAM SHEAR TABLE
FOR ALL ROOF FRAMING CONNECTIONS
COLUMN, C-2A, 3A,
(SEE PLAN)
SHEAR LUG
BASE PL.
(SEE SCHED.)
W.P.
COLUMN
SEE PLAN
1/2"
5"
1 1/2"
(TYP.)
NOTE: ORIENT SHEAR
LUG PERPENDICULAR
TO BRACE
CHANNELS BRACES MAY
OCCUR SEE S-303 FOR ADD'L
INFORMATION
TYPICAL SHEAR LUG DETAIL
AT C-2A & C-3A CORNER COLUMNS
2" T
Y P
3/4" Ø TENSION
ANCHOR BOLTS
SEE TYP. DETAILS
1' -0
" M
IN
2" MIN. GROUT
SPACE (ALL SIDES)
1" S
H
IM
A N
D G
R O
U T
2"
Y P
2"
Y P
1 1/2"
@ COLUMN C-2C
1"
@ COLUMN C-3
@ COLUMN C-2
SEE ARCH. DRAWINGS
AND SPECS. FOR WALL
CONSTRUCTION.
AND OPENING HEIGHTS
CMU MAY OCCUR W/ OR
W/O BRICK
BID & CONSTRUCTION
(REVISED)
BARBER & HOFFMAN, INC.
S T
A T E O F O HIO
P R
O F
E
S S I O N A L E N G
I N E
E R
R E G I S T E R E D
NIRANJAN
S.
DABHOLKAR
E-69058
Tech Col Text Box
FINAL BID & CONSTRUCTION (REVISED)
Tech Col
FLOOR
WATERFLOW
SWITCH
SYSTEM WATER GAUGE
WET PIPE ALARM VALVE
MAIN DRAIN VALVE
SUPPLY WATER
GAUGE AND VALVE
INDICATING
BUTTERFLY
CONTROL
VALVE
TAMPER
SWITCH
NOTES:
1. REFER TO ELECTRICAL PLANS FOR
SUPERVISORY SYSTEM CONNECTIONS
FOR TAMPER AND FLOW SWITCHES.
TO EXISTING
BOILER ROOM
X-6"
X-6"
X-6"
6"
6"
6" TO CHILLER PLANT
ADDITION
X-F
X-D
NOT TO SCALE
CHECK VALVE
RELOCATE EXISTING FLOW
SWITCH SERVING
EXTERIOR FDC
DOWNSTREAM OF NEW
CHILLER PLANT BRANCH
REPLACE EXISTING ELBOW WITH
TEE. RECONNECT TO EXISTING FDC
PIPING AND EXTEND TO NEW
CHILLER PLANT RISER.
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:4
:2
P M
FP-001
FIRE PROTECTION SYMBOLS, NOTES, &
DETAILS
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00
TS
FS
DETAIL MARK
DETAIL NO.
DRAWING
A. THIS PROJECT CONSISTS OF MULTIPLE TRADES OF WORK PERFORMED WITHIN AN EXISTING BUILDING
AND NEW CHILLER PLANT, ALL OF WHICH ALLOWS VERY LITTLE PERMISSIBLE RANGE OF VARIATION.
THE CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION WITH THE COORDINATION AND INSTALLATION
OF THE MULTITUDE OF NEW SYSTEMS WHILE ALSO ACCOMMODATING ANY EXISTING SYSTEMS TO REMAIN.
B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH THIS
PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE OF
CONSTRUCTION.
C. THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS! THE
CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN ORDER TO
ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
D. IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS, THE
CONTRACTOR SHALL NOTIFY THE VA COR OF ANY CONDITIONS WHICH WILL NOT PERMIT THE WORK TO
BE PERFORMED AS INDICATED ON THE PROJECT PLANS.
E. A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE
CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOWN CONFLICTS HAVE
BEEN ADDRESSED.
FP-001
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
CONTRACTOR SHALL FIELD VERIFY CONDITIONS SHOWN ON DESIGN DOCUMENTS PRIOR TO
COMMENCEMENT OF CONSTRUCTION. NOTIFY COR OF ANY CONDITIONS WHICH WILL NOT PERMIT THE
WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
ANY AND ALL SHUTDOWNS MUST BE SCHEDULED DURING OFF-HOURS. COORDINATE ALL SHUT-DOWNS OF EXISTING SYSTEMS WITH VA COR A MINIMUM OF FOURTEEN (14) CALENDAR DAYS IN ADVANCE.
PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH VA COR.
PROVIDE SERVICE CLEARANCE FOR ALL EQUIPMENT. REFER TO INSTRUCTIONS FROM THE EQUIPMENT
MANUFACTURER.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAWINGS AND
FIELD VERIFY FOR LOCATION OF PANELS.
THE CONTRACTOR SHALL PROVIDE DETAILED DESIGN OF THE SPRINKLER SYSTEM. REFER TO
SPECIFICATIONS.
UNLESS OTHERWISE NOTED, NEW SPRINKLERS SHALL BE AS FOLLOWS:
G.1. EXPOSED STRUCTURE: UPRIGHT OR PENDENT TYPE.
THE FIRE PROTECTION SYSTEM IS PERFORMANCE SPECIFIED. ALL SPRINKLER PIPE SIZES SHALL BE
DETERMINED BY FIRE PROTECTION CONTRACTOR, BASED ON HYDRAULIC CALCULATIONS.
PROVIDE SUPPLEMENTAL DRAINS AS NECESSARY TO PROVIDE 100% SYSTEM DRAINAGE. LOCATE DRAINS
IN ACCESSIBLE LOCATIONS.
REFER TO ARCHITECTURAL PLANS FOR EXACT PHASING REQUIREMENTS.
REFER TO SPECIFICATIONS FOR FIRE SUPPRESSION HAZARD OCCUPANCY CLASSIFICATIONS.
SPRINKLER PIPING SHALL BE A MINIMUM OF ONE INCH.
UNLESS OTHERWISE STATED ON DRAWINGS OR IN THE SPECIFICATIONS, ALL SPRINKLER HEADS SHALL
BE QUICK RESPONSE.
ALL HEADS SHALL BE UL LISTED AND FM APPROVED.
ALL SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS. REFER TO ARCHITECTURAL PLANS FOR
INFORMATION ON SMOKE COMPARTMENTS, SMOKE PARTITIONS AND FIRE BARRIERS.
PROVIDE PROTECTIVE CAGE FOR SPRINKLER HEADS MOUNTED AT OR BELOW 7'-6" AFF.
SPRINKLER PIPING SYSTEMS SHALL BE SUPPORTED FROM STRUCTURE INDEPENDENTLY OF OTHER
SYSTEMS.
REFER TO SPECIFICATION SECTION 01 35 26 FOR ADDITIONAL SHUTDOWN REQUIREMENTS.
FIRE PROTECTION SYMBOLS
D DRAIN PIPING
FR FIRE RISER
SP STAND PIPE
FDV FIRE DEPARTMENT VALVE
TAMPER SWITCH ON VALVE
FLOW SWITCH
EXISTING TO REMAIN
EXISTING TO BE REMOVED
X
XR
MANUAL AIR VENT
VALVED AND CAPPED FIRE DEPARTMENT VALVE
MAV
PRESSURE GAUGE
ISOLATION VALVE
ABOVE FINISHED FLOORAFF
LIGHT HAZARD OCCUPANCYL
ORDINARY HAZARD GROUP 1 OCCUPANCY
ORDINARY HAZARD GROUP 2 OCCUPANCY
OH1
OH2
FIRE PROTECTION GENERAL NOTES
PROJECT COORDINATION NOTES
SPRINKLER ZONE VALVE DETAIL 1
LIMIT OF DEMOLITION
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
F FIRE PROTECTION PIPING
Revisions: Date:
FINAL BID & CONSTRUCTION 11/24/2021
FINAL BID & CONSTRUCTION (REVISED) 05/06/2022
Design Interior
Engineering
K
K
L
L
M
M
N
N
7.37.3
X-1-1/4"Ø F X-1-1/4"Ø F X-1-1/4"Ø F X-1-1/4"Ø F X-1-1/4"Ø F
X-1-1/4"Ø F X-1-1/4"Ø F X-1-1/4"Ø F X-1-1/4"Ø F
X-1-1/4"Ø F X-1-1/4"Ø F X-1-1/4"Ø F
X-1-1/4"Ø F
X-2-1/2"Ø FX-2-1/2"Ø F X-2-1/2"Ø F
X-1-1/4"Ø F
X-1-1/4"Ø F X-2-1/2"Ø F
X-2-1/2"Ø F
X-2-1/2"Ø F
X-2-1/2"Ø F
X-2-1/2"Ø F X-1-1/4"Ø F X-3"Ø F
X-3"Ø F
X-3"Ø FX-2-1/2"Ø F
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:4
:3
P M
FP-101
FIRE PROTECTION PLAN - FIRST FLOOR CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
FIRE SUPPRESSION LEGEND
REWORK EXISTING SPRINKLER MAIN PIPING IN OUTLINED AREA TO
ACCOMMODATE RENOVATIONS AND INSTALLATION OF ALL NEW
TRADES. PROVIDE NEW BRANCH PIPING AND UPRIGHT SPRINKLER
HEADS AS REQUIRED. SPRINKLER PER NFPA 13, ORDINARY
HAZARD GROUP 1 OCCUPANCY.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
FIRE PROTECTION PLAN - FIRST FLOOR 1
CRC
Office
CRC
Office
CRC
Office
CRC
Office
CRC
Office
CRC
Office
CRC
Office
CRC
Office
MECHANICAL
ROOM
1A350A
FIRE PUMP
ROOM
1A351
ELECTRICAL
ROOM
1A360A
EMERGENCY ELEC.
DISTRIBUTION
1A013
X- FIRE PUMP
N
NOT TO SCALE
ACC 1ST FLOOR KEY PLAN
GENERAL NOTES
FIRE SUPPRESSION ISOLATION VALVE SERVING MECHANICAL ROOM IS LOCATED IN "STAIR 2". A.
STAIR 2
TELECOM.
1A014
ELECTRICAL
1A015
HVAC CONTROL
ROOM
1A340
MECHANICAL
ROOM
1A009
TOILET
ROOM
1A010
PUBLIC TOILET
1A008
Revisions: Date:
UP
V F
D V
F D
V F
D V
F D
V F
D V
F D
V F
D
VFDVFD
V F
D V
F D
V F
D
6"ø F
6"ø F
FP-001
B.2 B.2
B.5 B.5
B.8 B.8
C.3 C.3
D.4 D.4
E.3 E.3
CHILLER PLANT
EC-114
2.7
2.7
B.4 B.4
BOILER ROOM
BREAK ROOM
JANITOR
TELE/ DATA ROOM
MANAGER'S OFFICE
LOCKER/SHOWER
VESTIBULE
CORRIDOR
CONTROL ROOM
STORAGE
ELEC. ROOM
STORAGE
STORAGE
NORMAL PARALLEL
SWITCHGEAR
EMERGENCY
PARALLEL
SWITCHGEAR
X - 6"ø F
X - 6"ø F
FS
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:4
:4
P M
FP-102
FIRE PROTECTION PLAN - CHILLER PLANT
FLOOR
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0" 1
FIRE PROTECTION PLAN - CHILLER PLANT
FLOOR
CODED NOTES:
1 NEW SPRINKLER ZONE MAIN PIPING EXTENDED FROM ADJACENT BOILER PLANT. EXTEND MAIN AND
BRANCH PIPING TO PROVIDE FULL COVERAGE TO CHILLER PLANT.
FIELD VERIFY EXACT ROUTING. PROVIDE ALL NECESSARY OFFSETS, FITTINGS, ETC.
PROVIDE SLEEVE IN WALL AT PENETRATION. FIRESTOP AS REQUIRED.
MODIFY EXISTING FIRE PROTECTION MAIN ELBOWS AND FITTINGS AS REQUIRED TO ACCOMMODATE NEW
ZONE BRANCH.
RELOCATE EXISTING FLOW SWITCH DOWNSTREAM OF NEW CHILLER PLANT CONNECTION.
WATER FLOW TEST RESULTS *
WATER SUPPLY AVAILABLE/MAX DEMAND
DATE: 04.09.2014
STATIC: 71 PSI
RESIDUAL: 63 PSI
FLOW: 920 GPM
* BASED ON FLOW TEST DATA FROM BOILER PROJECT.
WATER SUPPLY AVAILABLE: 920 GPM
MAX DEMAND: 550 GPM
PRESSURE REQUIRED: 30 PSI
FIRE PROTECTION LEGEND
AREA SHALL BE FULLY SPRINKLERED WITH A WET-TYPE SPRINKLER SYSTEM IN FULL
COMPLIANCE WITH NFPA 13 AND VA REQUIREMENTS. PROVIDE UPRIGHT SPRINKLERS
THROUGHOUT. SPRINKLER TO ORDINARY HAZARD GROUP 1. REFER TO
SPECIFICATION 21 13 13 FOR SPRINKLER LAYOUT/DESIGN REQUIREMENTS.
* AS PART OF THIS PROJECT, CONTRACTOR SHALL PROVIDE NEW FLOW TEST IN ORDER TO VERIFY CAPACITY
AVAILABLE TO ACCOMMODATE FLOW/PRESSURE REQUIRED FOR PROJECT.
N
Revisions: Date:
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:1
P M
P-001
PLUMBING SYMBOLS AND NOTES CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00
PLUMBING PIPING:
DEMOLITION SYMBOLS:
PLUMBING SYMBOLS:
CALL OUTS:
ABBREVIATIONS:
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER SUPPLY
DOMESTIC COLD WATER SUPPLY
SANITARY WASTE
PLUMBING VENT
SAN
ST
OVERFLOW STORM
USAN SANITARY WASTE BELOW GRADE
V
STORM
OST
PIPE DOWN
PIPE RISE UP
PIPE CAP
FLOOR DRAIN
CW
HW
HWR
NATURAL GASG
FIRE SUPPRESSION PIPINGF
VENT THROUGH ROOFVTR
ELECTRICAL CONTRACTOR
GENERAL TRADES CONTRACTOR
TEMPERATURE CONTROL CONTRACTOR
HVAC CONTRACTOR
FIRE SUPPRESSION CONTRACTOR
PLUMBING CONTRACTOR
CONNECT TO EXISTING
EC
GC
FC
PC
TC
HC
CTE
REFERENCE TO CODED NOTE
ABOVE FINISHED FLOORAFF
ROOF OPENINGRO
RD
FD
ROOF DRAIN
FLOOR DRAIN
PRESSURE GAUGE
STRAINER
PIPE EXPANSION ANCHOR
PIPE GUIDE
FLEXIBLE PIPE CONNECTOR
THERMOMETER IN PIPE WELL
BALANCING VALVE
X
HEIGHT OF BOTTOM OF PIPE ABOVE FLOOR9'-2"
ISOLATION VALVE
REDUCER
UNION
CHECK VALVE
GAUGE PORT (PETE'S PLUG)
DRAIN VALVE WITH HOSE FITTING
LOCAL DRAIN, VALVED WITH 3/4" THREADED CONNECTOR
MANUAL AIR VENTMAV
PRESSURE RELIEF VALVE
EXISTING TO REMAIN
EXISTING TO BE REMOVED
X
XR
EXISTING TO BE RELOCATEDXRL
EQUIPMENT OR FIXTURE MARK
UNIT NUMBER
EQUIPMENT
TYPE
BRANCH PIPE CONNECTION
EQ-#
TWO POSITION VALVE
PRESSURE REDUCING VALVE
LIMIT OF DEMOLITIONLOD
A.
B.
C.
D.
E.
THIS PROJECT CONSISTS OF MULTIPLE TRADES OF WORK PERFORMED WITHIN AN EXISTING BUILDING AND NEW CHILLER PLANT, ALL OF WHICH ALLOWS VERY LITTLE PERMISSIBLE RANGE OF VARIATION. THE CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION WITH THE COORDINATION AND INSTALLATION OF THE MULTITUDE OF NEW SYSTEMS WHILE ALSO ACCOMMODATING ANY EXISTING SYSTEMS TO REMAIN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED WITH THIS
PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE OF
CONSTRUCTION.
THE COORDINATION DRAWINGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS! THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN ORDER TO
ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS, THE CONTRACTOR SHALL NOTIFY THE VA COR OF ANY CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE PERFORMED
AS INDICATED ON THE PROJECT PLANS.
A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE
CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOWN CONFLICTS HAVE
BEEN ADDRESSED.
LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK , AND EQUIPMENT IS PRESUMED FROM
EXISTING DRAWINGS. CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO COMMENCEMENT OF
CONSTRUCTION. NOTIFY COR OF ANY CONDITIONS WHICH WILL NOT PERMIT THE WORK TO BE
PERFORMED AS INDICATED ON THESE DRAWINGS.
ANY AND ALL SHUTDOWNS MUST BE SCHEDULED DURING OFF-HOURS. COORDINATE ALL SHUT-DOWNS OF EXISTING PLUMBING SYSTEMS WITH VA COR A MINIMUM OF TWENTY ONE (21) CALENDAR DAYS IN
ADVANCE.
PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW WALL MOUNTED DEVICES WITH VA COR.
PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL MECHANICAL EQUIPMENT. REFER TO INSTRUCTIONS
FROM THE EQUIPMENT MANUFACTURER.
NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAWINGS FOR
LOCATION OF PANELS.
WHERE EXISTING FIXTURES ARE TO BE REMOVED, REMOVE ALL ASSOCIATED BRANCH PIPING WHICH IS NOT TO BE REUSED BACK TO ACTIVE MAIN. REMOVE TEES AND ALL BRANCH PIPING, PER DIRECTIVE 1061, TO PREVENT LEGIONELLA GROWTH IN THE DOMESTIC WATER SYSTEM.
PLUMBING PIPING SYSTEMS SHALL BE SUPPORTED FROM STRUCTURE INDEPENDENTLY OF OTHER
SYSTEMS.
LIMIT OF DEMOLITION
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PLUMBING GENERAL NOTES
PROJECT COORDINATION NOTES
A.
B.
C.
D.
E.
F.
G.
FLOOR CLEANOUTFCO
NON-POTABLE COLD WATERNPCW
NON-POTABLE HOT WATERNPHW
UST STORM BELOW GRADE
AD ACCESS DOOR
CLEANOUTCO
NON-POTABLENP
OVERFLOW ROOF DRAINORD
NORMALLY CLOSEDNC
NORMALLY OPENNO
FLOOR CLEANOUT
COMPRESSED AIR PIPINGCA
TRENCH DRAIN
Revisions: Date:
K
K
L
L
M
M
N
N
X-4"Ø ST
X-4"Ø ST
XR-3"Ø ST
XR-3"Ø ST
D1 D2
D2
CAP
Geriatrics Chief
3A415
Conference Room
3A413
Open Office
3A411
Telecom.
3A015
Electrical Room
3A016
Group
3A418
Exam Room
3A421
Corridor
3A420A
Telehealth Supv
3A423
Reception
3A414
Social Work Chief
3A456
HBHC Supv Office
3A455
Nurse Office
3A454
Social Work
3A426
Home Telehealth
3A424
Home Telehealth
3A422
Telehealth Exam
3A439
Social Work
3A435
Exam
3A433
Geriatrics
3A431
MD/RN Office
3A440
SW/MD Office
3A438
SW Office
3A436
Exam
3A434
C&P Psychologist
3A432
Corridor
3A430
Corridor
3A420 Corridor
3A410
Corridor
3A450
Men's Toilet
3A007
Women's Toilet
3A008
Toilet Room
3A403
Corridor 3A401
Geriatric Waiting
3A400
Admin.
Assistant
Office
3A402 Work Room
3A404
Staff Toilet
3A405
Staff Toilet
3A405A
Chaplain
3A017
Elevator Lobby
3A014
Stair No. 2
3S002
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C ra ig
.A .B ri g g s .r v t
/6
/2
:1
:5
P M
PD-153
ACC THIRD FLOOR PLUMBING DEMOLITION
PLAN
CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 1
NOT TO SCALE
ACC 3RD FLOOR/ROOF KEY PLAN
DEMOLITION CODED NOTES
REMOVE EXISTING 3"Ø ST PIPING UP THROUGH DECK TO HUB DRAIN ABOVE. REMOVE HUB DRAIN
COMPLETE AND PATCH ROOF WATERTIGHT.
REMOVE EXISTING 3"Ø ST PIPING BACK TO MAIN AS INDICATED.
D1
D2
GENERAL NOTES
EXISTING EQUIPMENT SHALL NOT BE SHUTDOWN AND REMOVED UNTIL SUCCESSFUL START-UP, TEST, AND
CHANGEOVER TO NEW CHILLER PLANT HAS OCCURRED.
COORDINATE SHUTDOWN OF EXISTING EQUIPMENT WITH VA COR.
ALL WORK ON THIS DWG SHALL BE COMPLETED DURING OFF-HOURS.
CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILE AND GRID AS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY DAMAGED CEILING TILES/GRID AS A RESULT OF THIS WORK.
A.
B.
C.
D.
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
ACC THIRD FLOOR PLUMBING DEMOLITION PLAN 1N
Revisions: Date:
6"ø USAN
4"ø USAN
2TYP.
X - 6" USAN
789.46'
790.3'
4"ø UST
6"ø UST
788.7'788.0'
4"ø USAN
6"ø USAN
788.5'
B.2 B.2
B.5 B.5
B.8 B.8
C.3 C.3
D.4 D.4
E.3 E.3
2TYP.
42.7
2.7
B.4 B.4
4"ø USAN
4"ø USAN
6"ø UST
4"ø UST
6"ø UST 4"ø USAN
4"ø USAN
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:2
P M
P-101
PLUMBING PLAN - UNDERSLAB CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0" 1
PLUMBING PLAN - UNDERSLAB
CODED NOTES
GENERAL NOTES
COORDINATE FLOOR DRAIN AND CLEANOUT LOCATIONS WITH FINAL EQUIPMENT AND CONCRETE PAD LAYOUT.
ALL UNDERSLAB SANITARY PIPING SHALL BE MINIMUM 3"Ø.
6" ST TO SITE STORM MAIN. REFER TO CIVIL DRAWINGS FOR CONTINUATION.
ROUTE 1/2" CONTINUOUS SOFT COPPER LINE (BURIED) TO FLOOR DRAIN TRAP.
ELECTRONIC TRAP PRIMER MANIFOLD (MOUNTED ABOVE FLOOR LEVEL). ROUTE LINES UP TO MANIFOLD AS
INDICATED. REFER TO DETAIL #1 ON DWG P-501.
FIELD SURVEY LOCATION OF EXISTING, CAPPED USAN MAIN. COORDINATE ROUTING WITH NEW CHILLER PLANT STRUCTURE. CUT AND PATCH SLAB, IF NECESSARY, IN ORDER TO RE-ROUTE MAIN TO ACCOMMODATE
STRUCTURE.
4" STORM UP TO EXTERIOR CLEANOUT. REFER TO DWG P-102 FOR CONTINUATION.
PROVIDE FLOOR DRAIN IN NEW PIT AS INDICATED. ROUTE DRAIN PIPING FROM NEW FLOOR DRAIN, UNDER SLAB, AND INTO EXISTING PIT. TERMINATE PIPING ABOVE FLOOR OF EXISTING PIT WITH 3" AIR GAP. SEE DWG
P-102 FOR MORE INFORMATION.
A.
B.
N
Revisions: Date:
CO
FD-S
FD-E
FD-E
FD-E
FD-E
FD-E
FD-E
3"ø CW
4"ø CW
FCO
FD-S
P-801
P-801
FD-E
FD-E
1"ø HW
3/4"ø HWR
3/4"ø CW
3/4"ø CW
X - 4" CW
P-502
1.0
GPM
1.0
GPM
P-534
FCO
3"ø V
3" VTR
CO
CO
CO
1"ø HW
4"ø ST
4"ø OST
FCO
FCO
P-801
1 1/4"ø CW
3/4"ø CW
3/4"ø HWR
1"ø HW
2 1/2"ø CW
3/4"ø HWR
3/4"ø HWR
1"ø HW
4"ø OST
FCO
P-804
P-804
3/4"ø CW
STORM MAIN
CLEANOUT
B.2 B.2
B.5 B.5
B.8 B.8
C.3 C.3
D.4 D.4
E.3 E.3
3" VTR
CHILLER PLANT
EC-114
3/4"ø HWR 1"ø HW
1 1/4"ø CW
4"ø OST
10 3/4"ø CW
2.7
2.7
B.4 B.4
FD-E
P-707
FD-T
VTR
P-707
3/4"ø CA
3/4"ø CA
3/4"ø CA
3/4"ø CW
X - 3/4"ø CA
X - 3/4"ø CA
CO
4"ø OST
4"ø OST
4"ø ST
STORAGE
NORMAL PARALLEL
SWITCHGEAR
EMERGENCY
PARALLEL
SWITCHGEAR
STORAGE
ELEC. ROOM
BOILER ROOM
CONTROL ROOM
STORAGE
CORRIDOR
LOCKER/SHOWER
MANAGER'S OFFICE
VESTIBULE
1 1/4"ø CW
4"ø OST
3/4"ø CW
1 1/4"ø CW
3/4"ø HWR
2 1/2"ø CW
1"ø HW
1"ø HW
FD-E
P-804
P-804
P-804
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:4
P M
P-102
PLUMBING PLAN - CHILLER PLANT FLOOR CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0" 1
PLUMBING PLAN - CHILLER PLANT FLOOR
CODED NOTES
N
1 ELECTRONIC TRAP PRIMER MANIFOLD. REFER TO DETAIL #1 ON DWG P-501.
CONNECT TO EXISTING CAPPED 4" DOMESTIC COLD WATER PIPING. PROVIDE SHUTOFF VALVE AT POINT OF
CONNECTION. FIELD VERIFY EXACT LOCATION.
4" OST DOWN WALL. PIPE TO EXTERIOR WITH OVERFLOW DOWNSPOUT OUTLET. OUTLET SHALL BE 1'-6"
ABOVE GRADE. REFER TO DETAIL #3 ON DWG P-501.
4" ST DOWN ALONG COLUMN TO BELOW SLAB. PROVIDE CLEANOUT AT BASE OF STACK PER DETAIL #10 ON
DWG P-501. REFER TO DWG P-101 FOR CONTINUATION.
RECIRCULATED HOT WATER. REFER TO DETAIL #2, DWG P-501. BALANCE HWR BALANCE VALVE TO
INDICATED FLOW.
SIDESTREAM FILTRATION SYSTEM. PIPE (2) 2" BACKWASH DRAIN LINES TO LOCAL TRENCH DRAIN.
3" CW TO FILL LINE STATION. REFER TO DETAIL #2, DWG P-502.
CONNECT NEW 1" DOMESTIC HOT WATER PIPING TO EXISTING PIPING AT WATER HEATER. PROVIDE ISOLATION VALVE IN NEW PIPING AS INDICATED. PROVIDE ISOLATION VALVE IN EXISTING 1" BRANCH PIPING
FEEDING BOILER PLANT. FIELD VERIFY EXACT LOCATION.
CONNECT TO EXISTING CAPPED 3/4" DOMESTIC HOT WATER RETURN PIPING. PROVIDE SHUTOFF VALVE AT
POINT OF CONNECTION. FIELD VERIFY EXACT LOCATION.
3/4" CW UP. REFER TO DWG P-103 FOR CONTINUATION.
PROVIDE CHECK VALVES IN HORIZONTAL PORTION OF CW AND HW LINES SERVING P-502.
PROVIDE FLOOR DRAIN IN NEW PIT AS INDICATED. ROUTE DRAIN PIPING FROM NEW FLOOR DRAIN, UNDER SLAB, AND INTO EXISTING PIT. TERMINATE PIPING ABOVE FLOOR OF EXISTING PIT WITH 3" AIR GAP. SEE DWG
P-101 FOR MORE INFORMATION.
3/4"Ø COMPRESSED AIR PIPING DOWN TO SSF-1.
CONNECT NEW 3/4"Ø COMPRESSED AIR PIPING TO EXISTING PIPING IN BOILER PLANT UPPER LEVEL.
PROVIDE ISOLATION VALVE IN PIPING AS INDICATED.
RELOCATE EXISTING AIR COMPRESSOR TO LOCATION INDICATED. COORDINATE EXACT LOCATION WITH VA COR AND BOILER PLANT SUPERVISOR. EXTEND CA PIPING AND ELECTRICAL FROM NEW LOCATION AND CONNECT TO EXISTING . REMOVE EXISTING CONCRETE PAD COMPLETELY AND PATCH/FINISH FLOOR TO MATCH EXISTING. PROVIDE NEW 4" THICK CONCRETE PAD AT NEW LOCATION. REFER TO STRUCTURAL DRAWINGS FOR MORE INFORMATION. COORDINATE SHUTDOWN OF SYSTEM WITH VA COR AND BOILER
PLANT SUPERVISOR.
GENERAL NOTES
A.
B.
C.
COORDINATE FLOOR DRAIN AND CLEANOUT LOCATIONS WITH FINAL EQUIPMENT AND CONCRETE PAD LAYOUT.
SLEEVE ALL FLOOR AND WALL PENETRATIONS. FIRESTOP ALL PENETRATIONS OF RATED CONSTRUCTION.
PROTECT ALL EXPOSED INSULATED PIPING WITHIN 6'-0" OF FINISHED FLOOR WITH ALUMINUM JACKET.
Revisions: Date:
DN
ORD-1
ORD-1
ORD-1RD-1
RD-1
RD-1
2430 sf
910 sf
2850 sf
P-801
B.2 B.2
B.5 B.5
B.8 B.8
C.3 C.3
D.4 D.4
E.3 E.3
P-801
2.7
2.7
B.4 B.4
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:5
P M
P-103
PLUMBING PLAN - ROOF CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00 3
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0" 1
PLUMBING PLAN - ROOF
CODED NOTES
1 3" VENT THRU ROOF. REFER TO DETAIL #4 ON DWG P-501.
3/4" CW DOWN TO FIRST FLOOR. REFER TO DWG P-102 FOR CONTINUATION.
GENERAL NOTES
A.
B.
COORDINATE ROOF DRAINS WITH ROOF MOUNTED EQUIPMENT LAYOUT.
ALL WATER PIPING EXPOSED TO OUTDOORS SHALL BE PROVIDED FREEZE PROTECTION (HEAT TRACE).
N
Revisions: Date:
1/8" BEND
FINISH FLOOR
SECURE RIM
FLUSH WITH
FINISH FLOOR
ADJUSTABLE HOUSING
INSIDE CAULK
SANITARY WYE FITTING
NOTE:
NO-HUB
INSTALLATION IS
SIMILAR.
NOT TO SCALE
VERTICAL
SERVICE
PIPE
CLEAN CAP
"NO-HUB" CLAMP
ASSEMBLY (TYP)
WYE FITTING
CLEAN CAP
HORIZONTAL
SERVICE
PIPE
VERTICAL SERVICE PIPE HORIZONTAL SERVICE PIPE
TEE FITTING
NOT TO SCALE
INTEGRAL
VACUUM
BREAKER
NICKEL
BRONZE
BOX FACE
KEY
3/4" HOSE
CONNECTION
20 GA.
STAINLESS
STEEL BOX
ADJUSTABLE
WALL CLAMP
1/2" FEMALE
NPT INLET
3/4" MALE
NPT INLET
2-1/2"
WALL THICKNESS
1-1/2"
NOT TO SCALE
H W
C W
MIXING VALVE. ASSE 1071 COMPLIANT.
TEPID WATER TO PLUMBING
FIXTURE.
T W
NOTES:
1.
2.
INSTALL IN AN ACCESSIBLE LOCATION.
REFER TO SPECIFICATION 22 05 23 FOR
ADDITIONAL INFORMATION.
NOT TO SCALE
FAUCET. SEE
SPECIFICATIONS
OFFSET WASTE
TRAP PARALLEL TO WALL.
PROVIDE PROTECTIVE TRAP
COVER PER SPECIFICATIONS.
LOOSE KEY STOP
ESCUTCHEON
FINISHED FLOOR
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
A R
C H
IT
E
C T
U R
A L
D R
A W
IN
G
S
NOTES:
1.
2.
REFER TO SPECIFICATION 22 40 00 FOR CARRIER
REQUIREMENTS.
REFER TO SPECIFICATION 22 40 00 FOR ASSE 1070
ANTI-SCALD DEVICE REQUIREMENTS.
NOT TO SCALE
10 3/4"
METAL ROOF DECK
ROOF
STRUCTURE
(BEYOND)
STORM OUTLET
(REFER TO PLANS)
ADJUSTABLE
EXTENSION
ROOF INSULATION
GRAVEL STOP
ROOF DRAIN STRAINER (TYP)
48"x24" METAL PAN
2" HIGH WATER DAM
NOTES:
1.
2.
3.
COORDINATE WITH OTHER TRADES FOR INSTALLATION OF FLASHING
AT FLASHING CLAMP.
REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
FASTEN METAL PAN TO ROOF DECK WITH SELF-TAPPING SCREWS IN
ACCORDANCE WITH MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
INSULATE DRAIN BODY AND PIPING.
ROOF DRAIN OVERFLOW ROOF DRAIN
NOT TO SCALE
4.
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
TUBING 5 FT
NOM. SIZE
PIPE
THRU (20)
6 8 10
(32)(25) (40)
(65)
(50)
(75)
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
SADDLE
WELD
1312 14 16
(125)(100)
(150)
(200)
TRAPEZE HANGER FOR UP TO 1000 LB. (453 KG) UNIFORM LOAD
PROVIDE INSULATION SHIELD
AND INSERT FOR ALL PIPING
(8" (200 MM) MIN.)
SIDE VIEW
1 5/8" (43 MM) 12 GAGE
1" (25 MM) MAX.
STRENGTH INSULATION
PROVIDE HIGH COMPRESSIVE
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
HANGER ROD
ABOVE INSULATION SHIELD
AT HANGER
INSULATION SHIELD
TEMPERATURE PIPE)
REQUIRED FOR LOW
BARRIER TYPE IS
INSULATION (VAPOR
BAND
(9 PCF MIN. DENSITY)
CHANNEL OR 2"x2"x1/4"
(50x50x8 MM) ANGLE
864 532 2 1/21 1/21 1 1/4IN.
(MM)
(M)
FT.
FT.
(M)
(5.8)(5.2)(4.1) (4.9)(3.7)(3.0) (3.4)(2.7)(2.1)
(4.9)(4.1)(3.7) (4.0)(3.0)(2.4)(1.8)5 FT
THRU 3/4
(2.1) (2.1)
(2.1)
(2.7)
(2.4)
1/2" (15 MM) DIA. HANGER RODS
WITH 36" (900 MM) MAX. SPACING
ON EACH CHANNEL
NOT TO SCALE
INSULATION ROOFING. REFER TO
ARCH PLANS FOR ROOF
CONSTRUCTION.
VENT (SEE PLANS
FOR SIZES,
MINIMUM 3-INCHES)
FLASH VENT WITH
COPPER CAP AND BASE.
ROLL CAP 1" INTO TOP
OF VENT. BASE TO BE
2'-0" SQUARE.
M
IN
12" MIN. SKIRT
SECURELY FASTEN VENT PIPE
TO STRUCTURE USING STEEL
ANGLES, BOLTED.
NOT TO SCALE
FLOOR
18"
WALL ASSEMBLY. REFER
TO ARCH. PLANS.
SLEEVE. WATERPROOF
AND SEAL BETWEEN PIPE
AND SLEEVE.
OVERFLOW STORM DRAIN
OUTLET. MATCH BOILER
PLANT OUTLET STYLE.
O S
T
COORDINATE EXACT
LOCATION WITH ARCH.
PLANS.
SUPPORT VERTICAL
STORM LINE WITH
WELDED ANGLE IRON.
NOT TO SCALE
ISOLATION VALVE
BALANCE VALVECHECK VALVE
HWR
FLOW
HW
NOT TO SCALE
NOTES:
1. BALANCE TO FLOW RATES INDICATED ON FLOOR PLANS.
NEAREST COLD
WATER SOURCE
SHUT-OFF VALVE
ELECTRONIC TRAP
PRIMER MANIFOLD
1/2" CONTINUOUS SOFT
COPPER TUBING, TYP.
(NO JOINTS)
TO OTHER FLOOR DRAINS AND
FLOOR SINKS AS REQUIRED
(TYP.)
FLOOR DRAIN
FLOOR
NOTES:
1. ALL FLOOR DRAINS AND FLOOR SINKS SHALL
BE PROVIDED WITH A TRAP PRIMER.
TO SANITARY SYSTEM
M O
U N
T A
A P
P R
O X
A F
F
PROVIDE SLEEVE AND
WATERPROOF SEAL IN ANNULAR
SPACE AT FLOOR PENETRATION.
(TYP.)
NOT TO SCALE
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:5
P M
P-501
PLUMBING DETAILS CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00
FLOOR CLEANOUT DETAIL 11 EXPOSED CLEANOUT DETAIL 10 NON-FREEZE HOSE-BIBB 9
TEMPERED WATER MIXING VALVE DETAIL 8 TYPICAL LAVATORY DETAIL 7 PRIMARY AND OVERFLOW ROOF DRAINS DETAIL 6 TYPICAL PIPE HANGERS 5
VENT THROUGH ROOF DETAIL 4 OVERFLOW STORM DOWNSPOUT NOZZLE 3 RECIRCULATED HOT WATER DIAGRAM 2 TRAP PRIMER (DISTRIBUTION) DETAIL 1
Revisions: Date:
SEE NOTE 2
INSULATION
PIPE
BANDS TO SECURE
INSULATION IN PLACE
INSULATION
PIPE
BANDS TO SECURE
INSULATION IN PLACE
METAL JACKET WITH
TOP LAP FACING DOWN
METAL JACKET WITH
TOP LAP FACING DOWN
RIVETS OR SCREWS AT
SEAMS (DO NOT
PENETRATE INSULATION)
METAL BAND OR
BELT INSTALLED
PER MFG'S
INSTRUCTIONS
MIN OF 1"
BETWEEN FIRST
BAND AND OVER-
LAPPING JOINT
NOTES:
1. LONGITUDINAL JACKETING SEAMS POSITIONED AT
3 OR 9 O'CLOCK ONLY WITH TOP LAP FACING
DOWN FOR WEATHER PROOFING.
2. OVERLAP JACKETING A MINIMUM OF 1-1/2".
3. INSTALL HEAT TRACE PER MANUFACTURER'S RECOMMENDATIONS.
NOT TO SCALE
M
M
CW
NPCW
2"
N P
C W
3"
FLOOR
NC
EXTEND DRAIN LINE
TO NEAREST FLOOR
DRAIN. TERMINATE
WITH AN AIR GAP.
ISOLATION
VALVE (TYP.)
3"
3"
3"
3"
2"
2"
N P
C W
2"
UNION
(TYP.)
NC
2" CHILLED
WATER MAKE-UP.
BY-PASS
3" TO TOWER WATER
RETURN MAIN.
PRESSURE
GAUGE
(TYP.)
REDUCED
PRESSURE
BACKFLOW
PREVENTER
PRESSURE
REDUCING VALVE.
SET TO 33 PSI
DIGITAL MAKE-UP
WATER METER. WIRE
TO BAS (TYP.)
STRAINER W/
BLOWDOWN
(TYP.)
N P
C W
3" TO COOLING
TOWERS
3"
REFER TO
PLUMBING
PLANS FOR
CONTINUATION.
MAKE-UP FILL
CONTROL VALVE
PRESSURE
REDUCING VALVE.
SET TO 28 PSI
BY HC
BY PC
NOT TO SCALE
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:0
P M
P-502
PLUMBING DETAILS CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00
FIELD APPLIED METAL JACKETING OVER PIPE INSULATION. 1MAKE-UP FILL LINE STATION DETAIL 2
Revisions: Date:
FD-E
FD-E
FD-S
FD-E
FD-E
FD-E
FD-E
FD-E
FD-E
P-502
P-534
FD-S
4"ø USAN
3"ø USAN
3"ø USAN
4"ø USAN
4"ø USAN
4"ø USAN
3"ø V
3"ø V
1 1/2"ø V
3"ø V
3" VTR
3" VTR
3"ø V
3"ø USAN
X - 6" USAN
4"ø USAN
6"ø USAN
FCO
FCO
FCO
FCO
3" VTR
3"ø V
2"ø V
6"ø USAN
6"ø USAN
FD-E
4"ø USAN
P-707
FD-T
P-707
1 1/2"ø V
1 1/2"ø USAN
P-TRAP
P-TRAP
P-TRAP
P-TRAP
4"ø USAN
4"ø USAN
4"ø USAN
4"ø USAN
4"ø USAN
P-TRAP
4"ø ST
4"ø ST
4"ø UST
4"ø ST
4"ø ST
6"ø UST
ORD-1
RD-1
ORD-1
RD-1
ORD-1
RD-1
CO
CO
4"ø OST
4"ø OST
4"ø OST
CO
FCO
CO
CO
4"ø OST
4"ø OST
CO
CO
CO
CO
CO
4"ø UST
6"ø UST
OST OUTLET PER DETAIL
#3 DRAWING P-501
OST OUTLET PER DETAIL
#3 DRAWING P-501
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
757-15-102
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
20045
C R e v it L o c a l F ile s \2
F
F H
C F
R
C h ri s to p h e r.
P
.C a m p b e ll.
rv t
/6 /2
:5
:1
P M
P-601
PLUMBING SCHEDULES AND ISOMETRICS CONSTRUCT CHILLER PLANT
420 N. JAMES ROAD, COLUMBUS,
OHIO 43219
05/06/2022 LDH CAB
BID & CONSTRUCTION
18902.00
PLUMBING FIXTURE SCHEDULE
MARK FIXTURE
CW
BRANCH PIPE SIZE
HW WASTE VENT
NOTES:
1. UNDER SLAB SANITARY SHALL BE A MINIMUM OF 3"Ø.
2. REFER TO SPECIFICATION 22 40 00 FOR ADDITIONAL INFORMATION.
P-534 3/4" 3/4" 2" 3"
2-BAY STAINLESS
STEEL W/
DRAINBOARD
P-707 1" 1" 2"
EMERGENCY
SHOWER EYE
& FACE WASH
P-801 3/4" - - -
FREEZE PROOF
WALL HYDRANT
FD-E - - 4" 2"FLOOR DRAIN
1.5"
P-502 3/4" 3/4" 3" 2"
SERVICE
SINK
FD-S - - 4" 2"FLOOR SINK
P-804 3/4" - - -HOSE BIBB
NOT TO SCALE
PLUMBING ISOMETRIC 1
NOT TO SCALE
PRIMARY AND OVERFLOW STORM ISOMETRIC 2
NOTES:
1. EACH FLOOR DRAIN AND FLOOR SINK SHALL BE
PROVIDED WITH A TRAP IN HORIZONTAL BRANCH
LINE.
FCO - -
FLOOR
CLEANOUT
STORM
RD ROOF DRAIN
ORD
OVERFLOW
ROOF DRAIN
4"
4"
FD-T - - 4" 2"TRENCH DRAIN -
Revisions: Date:
74490
L.D. HENDRIX, JR
GN
S S
A
ION EL
T
F EGE
P R O
R
SI NRE I
E E R
D
E
AT
S
ET
O
OI
HO
F
Project Number
Building Number
Dr…
This is the start of the file's text. The full file is on GovTribe.