About this file

This document contains multiple attachments related to a solicitation for wastewater services at Marine Corps Mountain Warfare Training Center in Bridgeport, California. The attachments define key terms, reference applicable technical documents, and outline a historical critical spare parts inventory. The related federal contract opportunity is solicitation number N6247322R3616 for wastewater services at the Bridgeport BOSC, Liberty Military Housing Complex in Coleville, California, Hawthorne Army Depot and surrounding areas. The Department of the Navy, Naval Facilities Engineering Command is the contracting agency, and the contractor will provide all labor, equipment, transportation and other resources necessary to deliver recurring and non-recurring wastewater services as outlined in the Performance Work Statement.

View the file

Other files for this federal contract opportunity

Other files attached to Bridgeport BOSC, newest first.
File Type Posted
Amendment 01.pdf PDF
Attachment J-0200000-10 UnPopulated ELINS MCMWTC Bridgeport BOS rFc.xlsx XLSX spreadsheet
EXHIBIT E.docx DOCX document
0100000 C General Information rF.pdf PDF
1700000 C BSVE Rental rF.pdf PDF
1604000 F Wastewater rF.pdf PDF
1503060-02 J Pavement Clearance rF.xlsx XLSX spreadsheet
1606000 C Water rF.pdf PDF
1606000 J Water rF.pdf PDF
1503030 J Integratd Solid Waste Management rF.pdf PDF
1700000 F BSVE rF.pdf PDF
1503020 F Pest Control rF.pdf PDF
1503050 F Grounds Maintenance and Landscaping rF.pdf PDF
EXHIBITS A-F.docx DOCX document
J-L-01 RFI Form.docx DOCX document
1502000 J Facility Investment rF.pdf PDF
1503050 J Grounds Maintenance and Landscaping rF.pdf PDF
Attachment J-0200000-10 UnPopulated ELINS MCMWTC Bridgeport BOS rF.xlsx XLSX spreadsheet
1700000 J BSVE Rental rF.pdf PDF
1502000 F Facility Investment rF.pdf PDF
1503060 F Pavement Clearance rF.pdf PDF
1503020 C Pest Control rFa.pdf PDF
Sponsorship Form.pdf PDF
1502000 C Facility Investment rF.pdf PDF
1503050 C Grounds Maintenance and Landscaping rF.pdf PDF
1503030 C Integrated Solid Waste Management rF.pdf PDF
0200000 F Management and Administration rF.pdf PDF
1503030 F Integratd Solid Waste Management rF.pdf PDF
1503050-05 J Grounds Maintenance rF.xlsx XLSX spreadsheet
N62473-22-R-3616 Bridgeport BOSC.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WASTEWATER SECTION J - 1604000

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER ATTACHMENT TITLE

J‐1604000‐01 Definitions and Acronyms

J‐1604000‐02 References and Technical Documents

J‐1604000‐03 Historical Critical Spare Parts Inventory

ATTACHMENT J-1604000-01

DEFINITIONS AND ACRONYMS

DEFINITIONS

Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.

Equipment, Installed

Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.

Equipment, Personal Property

Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.

Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.

Facilities Maintenance Management

The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”

Integrated Maintenance Plan

IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness.

Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

Repair

Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.

Replacement

Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.

Restoration Restoration of real property to such a condition that it can be used for its intended purpose.

Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.

Sustainment

Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.

SCADA

A version of telemetry commonly used in wide-area industrial applications, such as electrical power generation and distribution and water distribution, which includes supervisory control of

ATTACHMENT J-1604000-01

DEFINITIONS AND ACRONYMS

remote stations as well as data acquisition from those stations over a bidirectional communications link.

ACRONYM TITLE

ANSI American National Standards Institute

ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers

ASME American Society of Mechanical Engineers

MACP Manhole Assessment and Certification Program

NASSCO National Association of Sewer Service Companies

NPDES National Pollutant Discharge Elimination System

PACP Pipeline Assessment and Certification Program

SCADA Supervisory Control and Data Acquisition

SRM Sustainment, Restoration and Modernization

UFC Unified Facilities Criteria

WEF Water Environmental Federation

WWTP Wastewater Treatment Plant

ATTACHMENT 1604000-02

REFERENCES AND TECHNICAL DOCUMENTS

REFERENCE TITLE

EI 11C201 Wastewater Collection and Pumping MO-209 Engineering Criteria MIL-HDBK-1005/9 Industrial and Oily Wastewater Control

UFC 3-240-02N Wastewater Treatment Systems UFC 3-240-04A Wastewater Collection UFC 3-240-07FA Sanitary and Industrial Wastewater Collection: Gravity Sewers and

Appurtenances UFC 3-240-09FA Domestic Wastewater Treatment UFC 4-832-01N Design: Industrial and Oily Wastewater Control Non-Government Publications.

National Association of Sewer Service Companies, (NASSCO) 11521 Cronridge Drive, Suite J, Ownings, MD 21117

American National Standards Institute, Inc. (ANSI) 11 West 42nd Street, New York, NY 10036

ATTACHMENT J-1604000-03

HISTORICAL CRITICAL SPARE PARTS INVENTORY

The Contractor shall develop a critical spare parts inventory for submittal to the KO/COR, per section F.

File details come from the government source that posted it. Updated .