1604000 J Wastewater rF.pdf
PDF 204 KB Posted
- Attached to
- Bridgeport BOSC Federal contract opportunity
- Solicitation number
- N6247322R3616
About this file
This document contains multiple attachments related to a solicitation for wastewater services at Marine Corps Mountain Warfare Training Center in Bridgeport, California. The attachments define key terms, reference applicable technical documents, and outline a historical critical spare parts inventory. The related federal contract opportunity is solicitation number N6247322R3616 for wastewater services at the Bridgeport BOSC, Liberty Military Housing Complex in Coleville, California, Hawthorne Army Depot and surrounding areas. The Department of the Navy, Naval Facilities Engineering Command is the contracting agency, and the contractor will provide all labor, equipment, transportation and other resources necessary to deliver recurring and non-recurring wastewater services as outlined in the Performance Work Statement.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WASTEWATER SECTION J - 1604000
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT NUMBER ATTACHMENT TITLE
J‐1604000‐01 Definitions and Acronyms
J‐1604000‐02 References and Technical Documents
J‐1604000‐03 Historical Critical Spare Parts Inventory
ATTACHMENT J-1604000-01
DEFINITIONS AND ACRONYMS
DEFINITIONS
Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
Equipment, Installed
Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
Equipment, Personal Property
Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
Facilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Plan
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness.
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Repair
Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.
Replacement
Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
Restoration Restoration of real property to such a condition that it can be used for its intended purpose.
Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment
Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
SCADA
A version of telemetry commonly used in wide-area industrial applications, such as electrical power generation and distribution and water distribution, which includes supervisory control of
ATTACHMENT J-1604000-01
DEFINITIONS AND ACRONYMS
remote stations as well as data acquisition from those stations over a bidirectional communications link.
ACRONYM TITLE
ANSI American National Standards Institute
ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers
ASME American Society of Mechanical Engineers
MACP Manhole Assessment and Certification Program
NASSCO National Association of Sewer Service Companies
NPDES National Pollutant Discharge Elimination System
PACP Pipeline Assessment and Certification Program
SCADA Supervisory Control and Data Acquisition
SRM Sustainment, Restoration and Modernization
UFC Unified Facilities Criteria
WEF Water Environmental Federation
WWTP Wastewater Treatment Plant
ATTACHMENT 1604000-02
REFERENCES AND TECHNICAL DOCUMENTS
REFERENCE TITLE
EI 11C201 Wastewater Collection and Pumping MO-209 Engineering Criteria MIL-HDBK-1005/9 Industrial and Oily Wastewater Control
UFC 3-240-02N Wastewater Treatment Systems UFC 3-240-04A Wastewater Collection UFC 3-240-07FA Sanitary and Industrial Wastewater Collection: Gravity Sewers and
Appurtenances UFC 3-240-09FA Domestic Wastewater Treatment UFC 4-832-01N Design: Industrial and Oily Wastewater Control Non-Government Publications.
National Association of Sewer Service Companies, (NASSCO) 11521 Cronridge Drive, Suite J, Ownings, MD 21117
American National Standards Institute, Inc. (ANSI) 11 West 42nd Street, New York, NY 10036
ATTACHMENT J-1604000-03
HISTORICAL CRITICAL SPARE PARTS INVENTORY
The Contractor shall develop a critical spare parts inventory for submittal to the KO/COR, per section F.
File details come from the government source that posted it. Updated .