1503050 F Grounds Maintenance and Landscaping rF.pdf
PDF 124 KB Posted
- Attached to
- Bridgeport BOSC Federal contract opportunity
- Solicitation number
- N6247322R3616
About this file
This document outlines the deliverables required under a grounds maintenance and landscaping contract. The contractor must submit certifications, training records, and licenses within 15 calendar days prior to start of work and annually thereafter. Plans for pesticide and herbicide use must be submitted within 15 calendar days prior to start and at least 10 days before any changes. Pest management reports are due by the 15th of each month. Permits and water conservation plans are due within 15 days of award and annually. Safety data sheets and product information must be provided as specified. Work schedules are due within 15 calendar days of start and five days before any changes. This opportunity is a solicitation for grounds maintenance services at various Department of the Navy and Marine Corps facilities in Bridgeport, California under a performance-based contract.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1503050 – GROUNDS MAINTENANCE AND LANDSCAPING
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title
Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
1503050/ 2.2.1
N/A Certification, Training, and
Licensing
Within 15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO/COR 2
Annually and as required by Section H
– Special Contract Requirements, FAC
5252.237-9301 Substitutions of Key
Personnel (JUN 1994)
1503050 / 2.3.1.1
N/A Business Licensing
Within 15 calendar days prior to contract start. Copies of renewed licenses shall also be submitted.
KO/COR 2 As required
1503050 / 2.3.1.4
N/A
Planned Pesticide/Herbicide Use Sheets including Pesticide/ Herbicide
Labels and Safety Data Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO/COR
Annually for each pesticide/herbicide, as required.
1503050 / 2.3.1.5
N/A Pest Management Operations Report
Electronically by the 15th of the following month (Example: July data must be submitted by August
15) on the format approved by PMC.
KO/COR 2 Monthly
1503050 / 2.3.2
N/A Permits Within 15 calendar days prior to start of work.
KO/COR 2 As required
1503050 / 2.3.9.1
N/A Water
Conservation Plan As specified KO/COR 2
15 days after award/Annually
1503050/ 3 N/A SDS sheets and catalog cut sheets or samples for
As specified KO/COR 2 As required
1503050/ 3 N/A Contractor Work
Schedules
Within 15 calendar days prior to contract start
KO/COR 2
Annually and five calendar days prior to implementing any changes to the schedule
File details come from the government source that posted it. Updated .