B08_Attachment_7_-_USCG_NAVIC_7-01_0001.pdf

PDF 3 MB Posted

Attached to
GOGA - NHL BALCLUTHA HAUL OUT
Solicitation number
140P8526Q0019
Issued by

About this file

This is a United States Coast Guard Navigation and Inspection Circular (NVIC 7-01) dated October 9, 2001, providing guidance on procedures for hull inspection and repair on vessels built with riveted construction.

The circular addresses the shortage of reliable information available to marine inspectors, surveyors, and vessel owners regarding best practices for inspecting and repairing older riveted hull steel vessels. The document establishes standards and procedures for rivet repair and replacement, referencing American Bureau of Shipping (ABS) Rules for Classification and Construction of Steel Vessels (1862-1969), Section 25, which specifies rivet diameter, spacing, plate thickness, and material testing standards. Key procedures include pre-inspection protocols requiring examination of the underwater body and assessment of any protective mastic coatings that may conceal defects; plate and joint preparation involving drilling, punching, reaming, and bolting techniques; riveting operations performed by five-person teams; and caulking to create watertight seals. The circular provides detailed guidance on inspection and testing of new rivets, inspection of existing rivets, and replacement and repair criteria. Acceptable repair methods for deteriorated rivets include bobbing (cold working the point), frenching (wedging the lip into the countersink with fine welding), and ring welding (temporary repairs only). The document specifies areas requiring special attention such as riveted butts in midbody deck and bottom plating, side shell plating seams, and locations subject to high stress or corrosive conditions. Documentation requirements mandate that Coast Guard marine inspectors record all examination details, mastic removal scope, and repairs completed in the Marine Safety Information System (MSIS). The circular emphasizes that improper repairs such as drilling plates and injecting epoxy between them are not acceptable.

View the file

Other files

File Type Posted
Sol_140P8526Q0019_Amd_0005.pdf PDF
B08_Attachment_23-BALCLUTHA_2026_DRYDOCK_RFI_5_0004.pdf PDF
B08_Attachment_25-Price_Schedule_Revised_0004.xlsx XLSX spreadsheet
B08_Attachment_22-BALCLUTHA_2026_DRYDOCK_RFI_4_0004.pdf PDF
Sol_140P8526Q0019_Amd_0004.pdf PDF
B08_Attachment_24-BALCLUTHA_2026_DRYDOCK_RFI_6_0004.pdf PDF
B08_Attachment_19-BALCLUTHA_2026_DRYDOCK_RFI_3_0003.pdf PDF
B08_Attachment_21-Folder_2_Balclutha_Specs_0003.pdf PDF
B08_Attachment_20-Folder_1_Balclutha_Specs_0003.pdf PDF
Sol_140P8526Q0019_Amd_0003.pdf PDF
B08_Attachment_18-BALCLUTHA_2026_DRYDOCK_RFI_2_0003.pdf PDF
Balclutha_Drydock_Question_Responses_0002.pdf PDF
Sol_140P8526Q0019_Amd_0002.pdf PDF
B08_Attachment_8_-_USCGSF_-MSIB_13-01_0001.pdf PDF
B08_Attachment_16_-_International_Paint_Specifications_0001.pdf PDF
B08_Attachment_10_-_WCLIB_0001.pdf PDF
B08_Attachment_1_Price_Schedule_Rev_1_0001.xlsx XLSX spreadsheet
B08_Attachment_5_-_NPS_Balclutha_Reference_Drawings_0001.pdf PDF
B08_Attachment_14_-_Draft_Submittal_List_0001.pdf PDF
Sol_140P8526Q0019_Amd_0001.pdf PDF
B08_Attachment_15_-_Balclutha_Docking_Plan_0001.pdf PDF
B08_Attachment_9_-_ABS_Section_25_0001.pdf PDF
B08_Attachment_6_-_SAFR_Process_and_Material_Specificaitons_0001.pdf PDF
B08_Attachment_12_-_SSPC_Standards_0001.pdf PDF
B08_Attachment_13_-_Balclutha_Map_of_Anticipated_Repairs_0001.pdf PDF
B08_Attachment_4_-_Balclutha_International_Inspections_UT_Report_2017_0001.pdf PDF
B08_Attachment_11_-_AWPA_Standards_0001.pdf PDF
Synopsis_Solicitation_Revision_1_0001.pdf PDF
B08_Attachment_2_Scope_of_Work.pdf PDF
B08_Attachment_1_Price_Schedule.xlsx XLSX spreadsheet
Sol_140P8526Q0019.pdf PDF
B08_Attachment_3_WD_2015-5367_Rev_31.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7

United States Coast Guard Navigation and Inspection Circular 7-01 Procedures for Hull

Inspection and Repair on Vessels built of Riveted Construction dated 9 October 2001.

File details come from the government source that posted it. Updated .