B08_Attachment_5_-_NPS_Balclutha_Reference_Drawings_0001.pdf
PDF 41 MB Posted
- Attached to
- GOGA - NHL BALCLUTHA HAUL OUT
- Solicitation number
- 140P8526Q0019
About this file
This is a reference drawing document for the National Historic Landmark (NHL) Balclutha, specifically depicting doubler plate shell expansion diagrams and poop deck replacement schedules for hull encapsulation work. The document contains technical ship construction drawings at a scale of 1:196, showing port and starboard side shell expansions with detailed strake identifications (labeled PA, PB, PC, PD, PE, PK for port side and SA, SB, SC, SD, SE, SK for starboard side) and corresponding location zones. The drawings include dimensional specifications with tolerances noted as fractional (1/32"), two-place decimal (.010"), and angular (1°), and dimensions are specified in inches.
The document includes two replacement schedules dated 2018 for the poop deck replacement work, one for starboard and one for port sides, detailing specific strake numbers (ranging from 1 to 68) with corresponding measurements and quantities needed for replacement. The drawings were prepared by Bay Design and Engineering on 12/14/2018 and revised per a descope described in CFR 034. This technical documentation serves as a reference guide for the hull encapsulation and poop deck replacement maintenance activities required for the Balclutha haul out project under the National Park Service solicitation 140P8526Q0019.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5
BALCLUTHA NPS REFERENCE DRAWINGS
PA12
PB18
5120 115 110 105
PK16
PA01
80 75 70 65 60 55 50 45
PD04
PK22
PK04
PK23
PE13
PC22B
PK26
fwd
PK27
PD05PD06PD07PD08PD09PD10
PK05
PD11
PK24
PK29PK30
PD14
PD01PD02
PD15
PC16
PD20 PD19 PD18 PD17
PE03PE04PE05PE06PE07PE08
PE09PE10PE11PE12
PC03PC04PC05PC06PC07PC08PC09PC10PC11PC12PC13PC14
PD12
PC15PC17
PA18
PC18
PD13
PE14
PC19
PE15
PC20
PC22A
PB04PB05
PB06PB07
PC01
PC02
PB14 PB08
PB01
PB15 PB09
PB02
PB10
PB16
PE16
PA20
PB19
PA03PA04PA05PA06PA07PA08PA09PA10PA11
PD16
PD03
PA13
PC21
PA14PA15
PB13
PA16
PB20
PA17 PK06
PK25
PA02
PA19
PB17
PB03
PB11
PK01
PB12
PK02PK03PK07PK08PK09PK10PK11PK12PK13PK14PK15
PK17PK18PK19PK20PK21
PK31
PK28
port side shell expansion − all strakes scale: 1:196
ZONE REV. DESCRIPTION DATE APP'D
REVISIONS
A REVISED PER DESCOPE DESCRIBED IN CFR 034 12/14/2018 KAG
A 170060 90.18
WEIGHT:
SIZE
SHEET: 1 of 1
D
C
B
AA
B
C
D
12345678
8 7 6
DOUBLER SHELL EXPANSIONTHREE PLACE DECIMAL
DRAWING IS THE SOLE PROPERTY OF
Location: I:\bsy\historic vessels\BALCLUTHA\2018 Doubler Plate Installation\Doubler Plate Shell Expansion\ Filename: Doubler Plate Shell Expansion Date: 12/14/2018
170060−06
PERMISSION OF BAY DESIGN AND
UNLESS OTHERWISE SPECIFIED:
BAY DESIGN AND ENGINEERING. ANY
SCALE: 1:196
REV
WHOLE WITHOUT THE WRITTEN
DWG. NO.
B
PROPRIETARY AND CONFIDENTIAL
TITLE:
KAG
REPRODUCTION IN PART OR AS A
.005
INTERPRET GEOMETRIC
THE INFORMATION CONTAINED IN THIS
ENGINEERING IS PROHIBITED.
TOLERANCING PER:
JOB #
ITEM #
DRAWN
CHECKED
ENG APPR.
OWNER APPR.
DATENAME
DIMENSIONS ARE IN INCHES
TOLERANCES:
FRACTIONAL: 1/32
ANGULAR: 1
BEND
TWO PLACE DECIMAL .010
NPS BALCLUTHA
HULL ENCAPSULATION
10/31/18
SD02
10 15
SK08
25 4035 45 50
SE13
SK22 SK24SK01 SK26
SK03
SK27
SD14
SC04
115110
SK06
SK30
stbd side shell expansion − all strakes
SK07
fwd
SK31
SE14SE04 SE12SE11SE10SE08SE07SE06SE05
SK04
SK28
SE03SE02
SD03 SD04 SD05
SB07
SD07 SD08
SE01
SD09 SD10 SD11 SD12 SD13
SC18
SC03 SC17SC16SC15SC14SC13SC12SC11SC10SC09
SD17
SC08
SD16
SC07
SD15
SC06SC05
SK05
90 105 scale: 1:196
SK29SK21SK19
SB15SB14SB13SB12SB11SB10SB09SB08
SA06
SD01
SB06SB05SB04
SC02
SB03
SC01
SB02
SD06
SA21
SA20
856560
SA15
SK17
SA13SA12SA11SA10SA09SA08
SA19
SA05
SA18
SA04
SA17
SA03
SA16
SA02
SA01
SA07
SK09
SK10 SK13SK12 SK14
SA14
SK15 SK16 SK18 SK20 SK23
SB01
SB16
SK11 SK25
SK02
strake no. 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 Subtotal Notes
113 0
111 18 18
109 0
107 0
105 0
103 0
101 0
99 0
97 22 22
95 30 30
93 20 20
91 8 8
89 16 16
87 12 12
85 8 8
83 16 20 36
81 0
79 0
77 0
75 0
73 0
71 32 32 crosses BKHD
69 0
67 0
65 0
63 0
61 12 12 24
59 0
57 12 12
55 0
53 0
51 12 12
49 8 8
47 13 13
45 10 12 14 36
43 14 14
41 4 16 20
39 12 12
37 0
35 4 12 16
33 12 12
31 0
29 0
27 8 8
25 16 16
23 16 16 32
21 8 24 32
19 32 16 48
17 24 20 16 60
15 32 32
13 8 8
11 28 28
9 16 16
7 28 28
5 12 12
3 28 28
1 20 20
2018 Poop Deck Replacement Schedule - Starboard strake no. 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 Subtotal Notes
2 12 16 28
4 0
6 0
8 20 20
10 0
12 0
14 16 28 44
16 0
18 28 28
20 20 16 36
22 28 16 44
24 16 16 32
26 16 16 32
28 18 18
30 0
32 32 32
34 0
36 0
38 30 30
40 30 30
42 24 18 12 54
44 10 12 22
46 12 12
48 0
50 24 24
52 0
54 28 28
56 0
58 0
60 12 12
62 0
64 0
66 0
68 0
70 30 30
72 0
74 26 30 56
76 0
78 20 30 50
80 16 16
82 12 12
84 32 32
86 0
88 0
90 0
92 0
94 0
96 12 16 28
98 16 16
100 8 16 24
102 16 16 12 44
104 12 16 28
106 0
108 12 12
110 0
112 0
114 16 16 4.25" wide
2018 Poop Deck Replacement Schedule - Port
File details come from the government source that posted it. Updated .