B08_Attachment_1_Price_Schedule_Rev_1_0001.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
GOGA - NHL BALCLUTHA HAUL OUT
Solicitation number
140P8526Q0019
Issued by

About this file

This is a Price Schedule for a National Historic Landmark (NHL) maintenance and restoration contract for the Balclutha vessel at San Francisco Maritime National Historical Park. The solicitation number is 140P8526Q0019, issued by the Department of the Interior National Park Service, with associated PMIS numbers 216463, 216467, 255310, 234120, 255311, and 165428.

The contract encompasses a comprehensive haul out and restoration project for the Balclutha with both base bid and optional line items. Base bid services include vessel transportation and delivery with mob/demob and tug services, haul out and blocking, temporary services, hull cleaning and inspection, sea valve servicing, wheelchair lift repair, ultrasonic hull thickness measurements, underwater and above-waterline hull surface preparation and painting, replacement of name and homeport letters, and replacement of sacrificial anodes (20 each). Optional bid items include extensive steel repairs categorized by plate size and type (3/8" and 1/2" doublers, inserts, and replacements), CLAD weld repairs, structural steel shape repairs for various angle irons and T-bars, bowsprit repair and painting, rivet repairs and caulking operations, preparation and coating work for multiple interior spaces with various coating options (Fluid Film, Tank Paint, AC Paint, and Vinyl-Ester), epoxy void filling, carpentry repairs including deck caulking and wood decking replacement for forecastle, main deck, poop deck, and deckhouse areas, and hardwood margin board replacement. All pricing must be submitted as lump-sum totals for applicable items or as unit prices with extended totals for unit-priced line items. The Government reserves the right to award any combination of options in any order, with the option exercise period extending 180 calendar days from the ship haul out date. Award will be based on best value determination.

View the file

Other files

File Type Posted
Sol_140P8526Q0019_Amd_0005.pdf PDF
B08_Attachment_23-BALCLUTHA_2026_DRYDOCK_RFI_5_0004.pdf PDF
B08_Attachment_25-Price_Schedule_Revised_0004.xlsx XLSX spreadsheet
B08_Attachment_22-BALCLUTHA_2026_DRYDOCK_RFI_4_0004.pdf PDF
Sol_140P8526Q0019_Amd_0004.pdf PDF
B08_Attachment_24-BALCLUTHA_2026_DRYDOCK_RFI_6_0004.pdf PDF
B08_Attachment_19-BALCLUTHA_2026_DRYDOCK_RFI_3_0003.pdf PDF
B08_Attachment_21-Folder_2_Balclutha_Specs_0003.pdf PDF
B08_Attachment_20-Folder_1_Balclutha_Specs_0003.pdf PDF
Sol_140P8526Q0019_Amd_0003.pdf PDF
B08_Attachment_18-BALCLUTHA_2026_DRYDOCK_RFI_2_0003.pdf PDF
Balclutha_Drydock_Question_Responses_0002.pdf PDF
Sol_140P8526Q0019_Amd_0002.pdf PDF
B08_Attachment_8_-_USCGSF_-MSIB_13-01_0001.pdf PDF
B08_Attachment_16_-_International_Paint_Specifications_0001.pdf PDF
B08_Attachment_10_-_WCLIB_0001.pdf PDF
B08_Attachment_5_-_NPS_Balclutha_Reference_Drawings_0001.pdf PDF
B08_Attachment_14_-_Draft_Submittal_List_0001.pdf PDF
Sol_140P8526Q0019_Amd_0001.pdf PDF
B08_Attachment_15_-_Balclutha_Docking_Plan_0001.pdf PDF
B08_Attachment_9_-_ABS_Section_25_0001.pdf PDF
B08_Attachment_6_-_SAFR_Process_and_Material_Specificaitons_0001.pdf PDF
B08_Attachment_12_-_SSPC_Standards_0001.pdf PDF
B08_Attachment_13_-_Balclutha_Map_of_Anticipated_Repairs_0001.pdf PDF
B08_Attachment_4_-_Balclutha_International_Inspections_UT_Report_2017_0001.pdf PDF
B08_Attachment_7_-_USCG_NAVIC_7-01_0001.pdf PDF
B08_Attachment_11_-_AWPA_Standards_0001.pdf PDF
Synopsis_Solicitation_Revision_1_0001.pdf PDF
B08_Attachment_2_Scope_of_Work.pdf PDF
B08_Attachment_1_Price_Schedule.xlsx XLSX spreadsheet
Sol_140P8526Q0019.pdf PDF
B08_Attachment_3_WD_2015-5367_Rev_31.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P8526Q0019
PARK: San Francisco Maritime National Historical Park (SAFR)
PMIS # 216463, 216467, 255310, 234120, 255311, 165428
PROJECT TITLE: NHL Balclutha Maintenance and Restoration Haul Out 2026

Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of errors in summations, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of ship haul out. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

CLIN ITEM # TITLE QUANTITY UNIT OF MEASURE UNIT PRICE TOTAL PRICE

NPS IGE BreakdownERROR:#REF!
INFORMATIONAL CLINs
88.01LaydaysBalclutha LOD
ADrydock256.5$/Day/Foot$ - 0
BPierside$/Day/Foot$ - 0
8.02Temporary Services$/Day/Foot$ - 0
8.03Labor RateHour
Overhead
M&S Markup
Profit
8.04FleetingLump
BASE BID ITEMS
1TRANSPORT, HAULOUT AND TEMP SVCS
1.01VESSEL TRANSPORTATION AND DELIVERY
AMob/DemobLump
BTug0Knotical Mile$ - 0
1.02HAUL OUT AND BLOCKINGLump
1.03TEMPORARY SERVICESLump
2HULL CLEANING, INSPECTION, VALVE SERVICING
2.01Cleaning and Inspection
AInitial Hull InspectionLump
BHull CleaningLump
CClean Sea Chest StrainersLump
DRudder Cleaning and InspectionLump
2.02SERVICE SEA VALVES AND OVERBOARD DISCHARGE VALVESLump
2.03REPAIR AND SERVICE WHEELCHAIR LIFTLump
2.04ULTRASONIC MEASUREMENTS OF HULL PLATING THICKNESSLump
3PREPARATIONS AND PAINTING
3.01PREPARATIONS AND PAINTING THE UNDERWATER BODY
ASSPC-SP-6 Preparation and PaintingLump
BSSPC-SP-7 Preparation and PaintingLump
3.02PREPARATIONS AND PAINTING THE ABOVE WATERLINE HULL SURFACES
ASSPC-SP-6 Preparation and PaintingLump
BSSPC-SP-7 Preparation and PaintingLump
3.03Replace Missing Name and Homeport LettersLump
3.04Replace Sacraficial Anodes20Each
Base Subtotal (A)$ - 0
Base Subtotal (B)$ - 0
OPTIONAL BID ITEMS
4STEEL REPAIRS
4.01Plate Repairs
A3/8" Plate Doublers
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
B3/8" Plate Inserts
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
C3/8" Plate Replacements
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
D1/2" Plate Inserts
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
E1/2" Plate Replacements
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
4.02CLAD Welds, groups of 251Group$ - 0
4.03Structural Steel Shapes Repair
A3” x 3” x 3/8” Angle Iron (per pound)1Pound$ - 0
BB2.5" X 2.5" X 5/16" Angle Iron (per pound)1Pound$ - 0
CC3" X 2.5" X 5/16" Angle Iron (per pound)1Pound$ - 0
DD3" X 2.5" X 1/2" Angle Iron (per pound)1Pound$ - 0
EE5” x 3” x 1/2” T-Bar (per pound)1Pound$ - 0
FFHalf Round Caprail (per pound)1Pound$ - 0
4.04Repair, Preparation and Painting of BowspritLump
5RIVET REPAIRS AND CAULKING
5.011 - Bobbing, groups of 501Group$ - 0
5.022 - Frenching, groups of 251Group$ - 0
5.033 - Ring Welding - groups of 501Group$ - 0
5.044 - Replacment - groups of 251Group$ - 0
5.055 - Plate Seam Caulking- 25 LF25LF$ - 0
6PREPARATION, REPAIRS, AND COATINGS
6.01Prepare and Coat the FigureheadLump
6.02APrepare and Coat the Forepeak (Fluid Film)Lump
BPrepare and Coat the Forepeak (Tank Paint)Lump
CPrepare and Coat the Forepeak (AC Paint)Lump
6.03APrepare and Coat the Chain Locker (Fluid Film)Lump
BPrepare and Coat the Chain Locker (Tank Paint)Lump
CPrepare and Coat the Chain Locker (AC Paint)Lump
6.04Prepare and Coat the Main HoldLump
6.05APrepare and Coat the Forecastle (Approx 40% of area @ SP-3)Lump
BPrepare and Coat the Forecastle (Prep 40% @ SP-3/60% @ SP-1/Coat 100%)Lump
6.06APrepare and Coat the 'Tween Deck (Approx 40% of area @ SP-3)Lump
BPrepare and Coat the 'Tween Deck (Prep 40% @ SP-3/60% @ SP-1/Coat 100%)Lump
6.07Prepare and Coat the UWH with Vinyl-EsterLump
6.08Epoxy Void Filling1SqFt$ - 0
7CARPENTRY REPAIRS
7.01Deck Caulking25LF$ - 0
7.02Wood Decking Replacement
AComplete Forecastle Deck
1Long Leaf Pine DeckingLump
2Pitch/Yellow Pine DeckingLump
BApproximately 500 SQFT Main (Shelter Deck)Lump
CAdditional Main (NTE 1000 LF)1LF$ - 0
DCApproximately 1,500 SQFT PoopLump
EApproximately 600 SQFT PoopLump
FAdditional Poop (NTE 1000 LF)1LF$ - 0
GDMain DeckhouseLump
HAdditional Decking Material
1Long Leaf Pine Decking (NTE 5000 LF)1LF$ - 0
2Pitch/Yellow Pine Decking (NTE 5000 LF)1LF$ - 0
7.03AHardwood Margin Board Replacement (Main Deck) (NTE 1000 BF)1BF$ - 0
BHardwood Margin Board Replacement (Poop Deck) (NTE 1000 BF)1BF$ - 0
Option Subtotal$ - 0
Base Plus All Option Subtotal(A)$ - 0
Base Plus All Option Subtotal(B)$ - 0
**CONTRACTORS ARE RESPONSIBLE FOR VARIFYING CALCULATIONS FOR ACCURACY