B08_Attachment_25-Price_Schedule_Revised_0004.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
GOGA - NHL BALCLUTHA HAUL OUT
Solicitation number
140P8526Q0019
Issued by

About this file

This is a Price Schedule for the NHL Balclutha Maintenance and Restoration Haul Out 2026 project at San Francisco Maritime National Historical Park under solicitation number 140P8526Q0019. The price schedule is structured with base bid items and optional bid items that offerors must price individually, with all unit prices and extended total prices required for evaluation. The Government reserves the right to award any combination of options and may exercise options within 180 calendar days from the ship haul out date.

The base bid items include vessel transportation and delivery (mob/demob and tug services), temporary services, haul out and blocking, hull cleaning and inspection, sea valve servicing, wheelchair lift repair and service, ultrasonic hull measurements, underwater and above-waterline hull preparation and painting per SSPC standards, replacement of name and homeport letters, and replacement of 20 sacrificial anodes. Optional items encompass steel repairs including plate doublers, inserts, and replacements in various thicknesses and locations; clad welds; structural steel shape repairs for angle irons and T-bars; rivet repairs and caulking through bobbing, frenching, ring welding, and replacements; plate seam caulking; preparation and coating of internal spaces including the figurehead, forepeak, chain locker, main hold, forecastle, tween deck, and underwater hull with various coating options; epoxy void filling; deck caulking; wood decking replacement across multiple deck areas with options for long leaf pine or pitch/yellow pine; and hardwood margin board and belt replacements. The price schedule template shows all line items with blank pricing fields requiring contractor completion, with instructions that contractors are responsible for verifying calculation accuracy.

View the file

Other files

File Type Posted
Sol_140P8526Q0019_Amd_0005.pdf PDF
B08_Attachment_23-BALCLUTHA_2026_DRYDOCK_RFI_5_0004.pdf PDF
B08_Attachment_22-BALCLUTHA_2026_DRYDOCK_RFI_4_0004.pdf PDF
Sol_140P8526Q0019_Amd_0004.pdf PDF
B08_Attachment_24-BALCLUTHA_2026_DRYDOCK_RFI_6_0004.pdf PDF
B08_Attachment_19-BALCLUTHA_2026_DRYDOCK_RFI_3_0003.pdf PDF
B08_Attachment_21-Folder_2_Balclutha_Specs_0003.pdf PDF
B08_Attachment_20-Folder_1_Balclutha_Specs_0003.pdf PDF
Sol_140P8526Q0019_Amd_0003.pdf PDF
B08_Attachment_18-BALCLUTHA_2026_DRYDOCK_RFI_2_0003.pdf PDF
Balclutha_Drydock_Question_Responses_0002.pdf PDF
Sol_140P8526Q0019_Amd_0002.pdf PDF
B08_Attachment_8_-_USCGSF_-MSIB_13-01_0001.pdf PDF
B08_Attachment_16_-_International_Paint_Specifications_0001.pdf PDF
B08_Attachment_10_-_WCLIB_0001.pdf PDF
B08_Attachment_1_Price_Schedule_Rev_1_0001.xlsx XLSX spreadsheet
B08_Attachment_5_-_NPS_Balclutha_Reference_Drawings_0001.pdf PDF
B08_Attachment_14_-_Draft_Submittal_List_0001.pdf PDF
Sol_140P8526Q0019_Amd_0001.pdf PDF
B08_Attachment_15_-_Balclutha_Docking_Plan_0001.pdf PDF
B08_Attachment_9_-_ABS_Section_25_0001.pdf PDF
B08_Attachment_6_-_SAFR_Process_and_Material_Specificaitons_0001.pdf PDF
B08_Attachment_12_-_SSPC_Standards_0001.pdf PDF
B08_Attachment_13_-_Balclutha_Map_of_Anticipated_Repairs_0001.pdf PDF
B08_Attachment_4_-_Balclutha_International_Inspections_UT_Report_2017_0001.pdf PDF
B08_Attachment_7_-_USCG_NAVIC_7-01_0001.pdf PDF
B08_Attachment_11_-_AWPA_Standards_0001.pdf PDF
Synopsis_Solicitation_Revision_1_0001.pdf PDF
B08_Attachment_2_Scope_of_Work.pdf PDF
B08_Attachment_1_Price_Schedule.xlsx XLSX spreadsheet
Sol_140P8526Q0019.pdf PDF
B08_Attachment_3_WD_2015-5367_Rev_31.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P8526Q0019
PARK: San Francisco Maritime National Historical Park (SAFR)
PMIS # 216463, 216467, 255310, 234120, 255311, 165428
PROJECT TITLE: NHL Balclutha Maintenance and Restoration Haul Out 2026

Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of errors in summations, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of ship haul out. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

CLIN ITEM # TITLE QUANTITY UNIT OF MEASURE UNIT PRICE TOTAL PRICE

NPS IGE BreakdownERROR:#REF!
INFORMATIONAL CLINs
88.01Laydays
RevisedADrydockDay$ - 0
BPiersideDay$ - 0
8.02Temporary ServicesDay$ - 0
8.03Labor RateHour$ - 0
Overhead
M&S Markup
Profit
8.04FleetingLump
BASE BID ITEMS
1TRANSPORT, HAULOUT AND TEMP SVCS
1.01VESSEL TRANSPORTATION AND DELIVERY
AMob/DemobLump
BTug0Knotical Mile$ - 0
Revised1.02TEMPORARY SERVICESLump
1.03HAUL OUT AND BLOCKINGLump
2HULL CLEANING, INSPECTION, VALVE SERVICING
2.01Cleaning and Inspection
AInitial Hull InspectionLump
BHull CleaningLump
CClean Sea Chest StrainersLump
DRudder Cleaning and InspectionLump
2.02SERVICE SEA VALVES AND OVERBOARD DISCHARGE VALVESLump
2.03REPAIR AND SERVICE WHEELCHAIR LIFTLump
2.04ULTRASONIC MEASUREMENTS OF HULL PLATING THICKNESSLump
3PREPARATIONS AND PAINTING
3.01PREPARATIONS AND PAINTING THE UNDERWATER BODY
ASSPC-SP-6 Preparation and PaintingLump
BSSPC-SP-7 Preparation and PaintingLump
3.02PREPARATIONS AND PAINTING THE ABOVE WATERLINE HULL SURFACES
ASSPC-SP-6 Preparation and PaintingLump
BSSPC-SP-7 Preparation and PaintingLump
3.03Replace Missing Name and Homeport LettersLump
3.04Replace Sacraficial Anodes20Each
Base Subtotal (A)$ - 0
Base Subtotal (B)$ - 0
OPTIONAL BID ITEMS
4STEEL REPAIRS
Revised4.01Plate Repairs
A3/8" Plate Doublers
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
B3/8" Plate Inserts
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
C3/8" Plate Replacements
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
D1/2" Plate Inserts
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
E1/2" Plate Replacements
1Shell Plate1Pound$ - 0
2Deck Plate (tie, stringer, margin, etc)1Pound$ - 0
3Spar Plate1Pound$ - 0
4.02CLAD Welds, groups of 251Group$ - 0
4.03Structural Steel Shapes Repair
A3” x 3” x 3/8” Angle Iron (per pound)1Pound$ - 0
BB2.5" X 2.5" X 5/16" Angle Iron (per pound)1Pound$ - 0
CC3" X 2.5" X 5/16" Angle Iron (per pound)1Pound$ - 0
DD3" X 2.5" X 1/2" Angle Iron (per pound)1Pound$ - 0
EE5” x 3” x 1/2” T-Bar (per pound)1Pound$ - 0
FFHalf Round Caprail (per pound)1Pound$ - 0
4.04Repair, Preparation and Painting of BowspritLump
5RIVET REPAIRS AND CAULKING
5.011 - Bobbing, groups of 501Group$ - 0
5.022 - Frenching, groups of 251Group$ - 0
5.033 - Ring Welding - groups of 501Group$ - 0
5.044 - Replacment - groups of 251Group$ - 0
5.055 - Plate Seam Caulking- 25 LF25LF$ - 0
6PREPARATION, REPAIRS, AND COATINGS
6.01Prepare and Coat the FigureheadLump
6.02APrepare and Coat the Forepeak (Fluid Film)Lump
BPrepare and Coat the Forepeak (Tank Paint)Lump
CPrepare and Coat the Forepeak (AC Paint)Lump
6.03APrepare and Coat the Chain Locker (Fluid Film)Lump
BPrepare and Coat the Chain Locker (Tank Paint)Lump
CPrepare and Coat the Chain Locker (AC Paint)Lump
6.04Prepare and Coat the Main HoldLump
6.05APrepare and Coat the Forecastle (Approx 40% of area @ SP-3)Lump
BPrepare and Coat the Forecastle (Prep 40% @ SP-3/60% @ SP-1/Coat 100%)Lump
6.06APrepare and Coat the 'Tween Deck (Approx 40% of area @ SP-3)Lump
BPrepare and Coat the 'Tween Deck (Prep 40% @ SP-3/60% @ SP-1/Coat 100%)Lump
6.07Prepare and Coat the UWH with Vinyl-EsterLump
6.08Epoxy Void Filling1SqFt$ - 0
7CARPENTRY REPAIRS
7.01Deck Caulking25LF$ - 0
7.02Wood Decking Replacement
AComplete Forecastle Deck
1Long Leaf Pine DeckingLump
2Pitch/Yellow Pine DeckingLump
BApproximately 500 SQFT Main (Shelter Deck)Lump
CAdditional Main (NTE 1000 LF)1LF$ - 0
DCApproximately 1,500 SQFT PoopLump
EApproximately 600 SQFT PoopLump
FAdditional Poop (NTE 1000 LF)1LF$ - 0
GDMain DeckhouseLump
HAdditional Decking Material
1Long Leaf Pine Decking (NTE 5000 LF)1LF$ - 0
2Pitch/Yellow Pine Decking (NTE 5000 LF)1LF$ - 0
Revised7.03A.1Hardwood Margin Board Replacement (Main Deck)1BF$ - 0
A.2Hardwood Belt Replacement (Main Deck)1BF$ - 0
B.1Hardwood Margin Board Replacement (Poop Deck)1BF$ - 0
B.2Hardwood Belt Replacement (Poop Deck)1BF$ - 0
Option Subtotal$ - 0
Base Plus All Option Subtotal(A)$ - 0
Base Plus All Option Subtotal(B)$ - 0
**CONTRACTORS ARE RESPONSIBLE FOR VARIFYING CALCULATIONS FOR ACCURACY