B08_Attachment_25-Price_Schedule_Revised_0004.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- GOGA - NHL BALCLUTHA HAUL OUT
- Solicitation number
- 140P8526Q0019
About this file
This is a Price Schedule for the NHL Balclutha Maintenance and Restoration Haul Out 2026 project at San Francisco Maritime National Historical Park under solicitation number 140P8526Q0019. The price schedule is structured with base bid items and optional bid items that offerors must price individually, with all unit prices and extended total prices required for evaluation. The Government reserves the right to award any combination of options and may exercise options within 180 calendar days from the ship haul out date.
The base bid items include vessel transportation and delivery (mob/demob and tug services), temporary services, haul out and blocking, hull cleaning and inspection, sea valve servicing, wheelchair lift repair and service, ultrasonic hull measurements, underwater and above-waterline hull preparation and painting per SSPC standards, replacement of name and homeport letters, and replacement of 20 sacrificial anodes. Optional items encompass steel repairs including plate doublers, inserts, and replacements in various thicknesses and locations; clad welds; structural steel shape repairs for angle irons and T-bars; rivet repairs and caulking through bobbing, frenching, ring welding, and replacements; plate seam caulking; preparation and coating of internal spaces including the figurehead, forepeak, chain locker, main hold, forecastle, tween deck, and underwater hull with various coating options; epoxy void filling; deck caulking; wood decking replacement across multiple deck areas with options for long leaf pine or pitch/yellow pine; and hardwood margin board and belt replacements. The price schedule template shows all line items with blank pricing fields requiring contractor completion, with instructions that contractors are responsible for verifying calculation accuracy.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| CONTRACT PRICE SCHEDULE |
| SOLICITATION NUMBER: 140P8526Q0019 |
| PARK: San Francisco Maritime National Historical Park (SAFR) |
| PMIS # 216463, 216467, 255310, 234120, 255311, 165428 |
| PROJECT TITLE: NHL Balclutha Maintenance and Restoration Haul Out 2026 |
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of errors in summations, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of ship haul out. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
CLIN ITEM # TITLE QUANTITY UNIT OF MEASURE UNIT PRICE TOTAL PRICE
| NPS IGE Breakdown | ERROR:#REF! | |||||
| INFORMATIONAL CLINs | ||||||
| 8 | 8.01 | Laydays | ||||
| Revised | A | Drydock | Day | $ - 0 | ||
| B | Pierside | Day | $ - 0 | |||
| 8.02 | Temporary Services | Day | $ - 0 | |||
| 8.03 | Labor Rate | Hour | $ - 0 | |||
| Overhead | ||||||
| M&S Markup | ||||||
| Profit | ||||||
| 8.04 | Fleeting | Lump | ||||
| BASE BID ITEMS | ||||||
| 1 | TRANSPORT, HAULOUT AND TEMP SVCS | |||||
| 1.01 | VESSEL TRANSPORTATION AND DELIVERY | |||||
| A | Mob/Demob | Lump | ||||
| B | Tug | 0 | Knotical Mile | $ - 0 | ||
| Revised | 1.02 | TEMPORARY SERVICES | Lump | |||
| 1.03 | HAUL OUT AND BLOCKING | Lump | ||||
| 2 | HULL CLEANING, INSPECTION, VALVE SERVICING | |||||
| 2.01 | Cleaning and Inspection | |||||
| A | Initial Hull Inspection | Lump | ||||
| B | Hull Cleaning | Lump | ||||
| C | Clean Sea Chest Strainers | Lump | ||||
| D | Rudder Cleaning and Inspection | Lump | ||||
| 2.02 | SERVICE SEA VALVES AND OVERBOARD DISCHARGE VALVES | Lump | ||||
| 2.03 | REPAIR AND SERVICE WHEELCHAIR LIFT | Lump | ||||
| 2.04 | ULTRASONIC MEASUREMENTS OF HULL PLATING THICKNESS | Lump | ||||
| 3 | PREPARATIONS AND PAINTING | |||||
| 3.01 | PREPARATIONS AND PAINTING THE UNDERWATER BODY | |||||
| A | SSPC-SP-6 Preparation and Painting | Lump | ||||
| B | SSPC-SP-7 Preparation and Painting | Lump | ||||
| 3.02 | PREPARATIONS AND PAINTING THE ABOVE WATERLINE HULL SURFACES | |||||
| A | SSPC-SP-6 Preparation and Painting | Lump | ||||
| B | SSPC-SP-7 Preparation and Painting | Lump | ||||
| 3.03 | Replace Missing Name and Homeport Letters | Lump | ||||
| 3.04 | Replace Sacraficial Anodes | 20 | Each | |||
| Base Subtotal (A) | $ - 0 |
| Base Subtotal (B) | $ - 0 | |
| OPTIONAL BID ITEMS |
| 4 | STEEL REPAIRS | ||||||
| Revised | 4.01 | Plate Repairs | |||||
| A | 3/8" Plate Doublers | ||||||
| 1 | Shell Plate | 1 | Pound | $ - 0 | |||
| 2 | Deck Plate (tie, stringer, margin, etc) | 1 | Pound | $ - 0 | |||
| 3 | Spar Plate | 1 | Pound | $ - 0 | |||
| B | 3/8" Plate Inserts | ||||||
| 1 | Shell Plate | 1 | Pound | $ - 0 | |||
| 2 | Deck Plate (tie, stringer, margin, etc) | 1 | Pound | $ - 0 | |||
| 3 | Spar Plate | 1 | Pound | $ - 0 | |||
| C | 3/8" Plate Replacements | ||||||
| 1 | Shell Plate | 1 | Pound | $ - 0 | |||
| 2 | Deck Plate (tie, stringer, margin, etc) | 1 | Pound | $ - 0 | |||
| 3 | Spar Plate | 1 | Pound | $ - 0 | |||
| D | 1/2" Plate Inserts | ||||||
| 1 | Shell Plate | 1 | Pound | $ - 0 | |||
| 2 | Deck Plate (tie, stringer, margin, etc) | 1 | Pound | $ - 0 | |||
| 3 | Spar Plate | 1 | Pound | $ - 0 | |||
| E | 1/2" Plate Replacements | ||||||
| 1 | Shell Plate | 1 | Pound | $ - 0 | |||
| 2 | Deck Plate (tie, stringer, margin, etc) | 1 | Pound | $ - 0 | |||
| 3 | Spar Plate | 1 | Pound | $ - 0 | |||
| 4.02 | CLAD Welds, groups of 25 | 1 | Group | $ - 0 | |||
| 4.03 | Structural Steel Shapes Repair | ||||||
| A | 3” x 3” x 3/8” Angle Iron (per pound) | 1 | Pound | $ - 0 | |||
| B | B | 2.5" X 2.5" X 5/16" Angle Iron (per pound) | 1 | Pound | $ - 0 | ||
| C | C | 3" X 2.5" X 5/16" Angle Iron (per pound) | 1 | Pound | $ - 0 | ||
| D | D | 3" X 2.5" X 1/2" Angle Iron (per pound) | 1 | Pound | $ - 0 | ||
| E | E | 5” x 3” x 1/2” T-Bar (per pound) | 1 | Pound | $ - 0 | ||
| F | F | Half Round Caprail (per pound) | 1 | Pound | $ - 0 | ||
| 4.04 | Repair, Preparation and Painting of Bowsprit | Lump | |||||
| 5 | RIVET REPAIRS AND CAULKING | ||||||
| 5.01 | 1 - Bobbing, groups of 50 | 1 | Group | $ - 0 | |||
| 5.02 | 2 - Frenching, groups of 25 | 1 | Group | $ - 0 | |||
| 5.03 | 3 - Ring Welding - groups of 50 | 1 | Group | $ - 0 | |||
| 5.04 | 4 - Replacment - groups of 25 | 1 | Group | $ - 0 | |||
| 5.05 | 5 - Plate Seam Caulking- 25 LF | 25 | LF | $ - 0 | |||
| 6 | PREPARATION, REPAIRS, AND COATINGS | ||||||
| 6.01 | Prepare and Coat the Figurehead | Lump | |||||
| 6.02 | A | Prepare and Coat the Forepeak (Fluid Film) | Lump | ||||
| B | Prepare and Coat the Forepeak (Tank Paint) | Lump | |||||
| C | Prepare and Coat the Forepeak (AC Paint) | Lump | |||||
| 6.03 | A | Prepare and Coat the Chain Locker (Fluid Film) | Lump | ||||
| B | Prepare and Coat the Chain Locker (Tank Paint) | Lump | |||||
| C | Prepare and Coat the Chain Locker (AC Paint) | Lump | |||||
| 6.04 | Prepare and Coat the Main Hold | Lump | |||||
| 6.05 | A | Prepare and Coat the Forecastle (Approx 40% of area @ SP-3) | Lump | ||||
| B | Prepare and Coat the Forecastle (Prep 40% @ SP-3/60% @ SP-1/Coat 100%) | Lump | |||||
| 6.06 | A | Prepare and Coat the 'Tween Deck (Approx 40% of area @ SP-3) | Lump | ||||
| B | Prepare and Coat the 'Tween Deck (Prep 40% @ SP-3/60% @ SP-1/Coat 100%) | Lump | |||||
| 6.07 | Prepare and Coat the UWH with Vinyl-Ester | Lump | |||||
| 6.08 | Epoxy Void Filling | 1 | SqFt | $ - 0 | |||
| 7 | CARPENTRY REPAIRS | ||||||
| 7.01 | Deck Caulking | 25 | LF | $ - 0 | |||
| 7.02 | Wood Decking Replacement | ||||||
| A | Complete Forecastle Deck | ||||||
| 1 | Long Leaf Pine Decking | Lump | |||||
| 2 | Pitch/Yellow Pine Decking | Lump | |||||
| B | Approximately 500 SQFT Main (Shelter Deck) | Lump | |||||
| C | Additional Main (NTE 1000 LF) | 1 | LF | $ - 0 | |||
| D | C | Approximately 1,500 SQFT Poop | Lump | ||||
| E | Approximately 600 SQFT Poop | Lump | |||||
| F | Additional Poop (NTE 1000 LF) | 1 | LF | $ - 0 | |||
| G | D | Main Deckhouse | Lump | ||||
| H | Additional Decking Material | ||||||
| 1 | Long Leaf Pine Decking (NTE 5000 LF) | 1 | LF | $ - 0 | |||
| 2 | Pitch/Yellow Pine Decking (NTE 5000 LF) | 1 | LF | $ - 0 | |||
| Revised | 7.03 | A.1 | Hardwood Margin Board Replacement (Main Deck) | 1 | BF | $ - 0 | |
| A.2 | Hardwood Belt Replacement (Main Deck) | 1 | BF | $ - 0 | |||
| B.1 | Hardwood Margin Board Replacement (Poop Deck) | 1 | BF | $ - 0 | |||
| B.2 | Hardwood Belt Replacement (Poop Deck) | 1 | BF | $ - 0 | |||
| Option Subtotal | $ - 0 | ||||||
| Base Plus All Option Subtotal | (A) | $ - 0 | |||||
| Base Plus All Option Subtotal | (B) | $ - 0 | |||||
| **CONTRACTORS ARE RESPONSIBLE FOR VARIFYING CALCULATIONS FOR ACCURACY |