This is a Questions and Answers document for the Balclutha 2026 Drydock Request for Information (RFI 3).
The document addresses clarifications on two primary work items. For Item 2.03 (Wheelchair Lift Servicing), responses confirm that the wheelchair lift unit was last serviced in November 2022, is currently non-operational, and no planned maintenance service agreement from installation remains in effect. For Item 2.04.B (UT Spars), clarifications specify that ultrasonic testing of spars encompasses the full length of all three steel masts and the bowsprit up to the same elevation as surveyed in 2017, with additional bowsprit coverage, below-deck mast areas, and increased readings using a ten-inch grid spacing. The document explicitly excludes cross spars (yards) from the current year's scope of work. The RFI also requests access to Builder's Specifications per discussions conducted during vessel check.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BALCLUTHA 2026 DRYDOCK: RFI 3
References: Please provide access to Builder’s Specs per discussion during vessel check.
Item 2.03: Wheelchair Lift Servicing
1. When is the last time the unit was serviced by the installer/OEM?
The unit was last serviced approx. November 2022.
2. During shipcheck it was suggested the unit is currently non-op. Please confirm status of unit.
The unit is currently non-op.
3. Is the planned maintenance service agreement from installation still in effect?
No.
Item 2.04.B: UT Spars
4. 3.A.7 indicates to include spar plates up to the cap iron. Is this to the top of the lower masts (just above the 3rd cross spar) or does it extend all the way to the top of the gallant masts?
Item 2.04.B is intended to encompass the full length of each of the three steel masts and the bowsprit. This is up to the same elevation as surveyed in 2017 (Attachment 4), with the addition of the bowsprit, below deck areas of the masts and, with increased readings (ten inch [10”] grid).
5. Does the above include the cross spars (yards) as in the provided UT report, or are they excluded from this year’s SOW?
Correct, the yards are not included in this SOW.