B08_Solic_Contract_Price_Schedule_ORCA150025_FINAL.xls
XLS spreadsheet 30 KB Posted
- Solicitation number
- 140P2019R0045
About this file
This price schedule template and related solicitation are for a construction contract to correct life safety and critical deficiencies at Oregon Caves Chateau, a National Historic Landmark located in Oregon Caves National Monument and Preserve. The National Park Service seeks to address fire suppression, egress, accessibility, and structural issues through improvements such as installing a fire detection and suppression system, converting the first floor guest rooms to be fully accessible, adding an elevator, replacing plumbing and electrical systems, and adding steel balconies and plywood shear walls to meet current fire codes. Offerors must submit pricing for the base scope of work as well as fourteen options, such as replacing carpeting and light fixtures throughout the historic building. The estimated value of the contract is over $10 million and the period of performance is from April 2020 to September 2021. The solicitation is expected to be issued on or around October 21, 2019.
Contract Price Schedule
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| CONTRACT PRICE SCHEDULE | |||||
| SOLICITATION NUMBER: 140P2019R0045 | |||||
| PARK - PMIS: ORCA - 150025 | |||||
| DEVELOPED AREA: Oregon Caves National Monument | |||||
| PROJECT TITLE: Correct Life Saftey and Critical Deficiencies at Oregon Caves Chateau | |||||
| Notice: Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all Option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. Refer to Solicitation Section "H" for additional information regarding contract options. | |||||
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 1 | Base Scope | 1 | Lump Sum | ||
| TOTAL BASE PRICE (Contract Line Item Number 1) ----------------------------------------------------------- | |||||
| 2 | OPTION A - Balcony Reconstruction | 1 | Lump Sum | ||
| 3 | OPTION B - Coffee Shop Lighting | 1 | Lump Sum | ||
| 4 | OPTION C - Wainscot Paneling at Level B1 to be African Cherry veneer versus redwood | 1 | Lump Sum | ||
| 5 | OPTION D - Mist Sprinkler System at Building Exterior | 1 | Lump Sum | ||
| 6 | OPTION E - Replacment of plumbing piping at Basement 3. | 1 | Lump Sum | ||
| 7 | OPTION F - Replacment high efficiency Boiler | 1 | Lump Sum | ||
| 8 | OPTION G - Replacement of electric strip heaters at office areas with hydronic radiator | 1 | Lump Sum | ||
| 9 | OPTION H - Replacement of electric forced air heaters remaining in B2 employee and cafeteria areas with new electric heaters | 1 | Lump Sum | ||
| 10 | OPTION J - Full renovation of bathrooms including replacement of existing bathtub or shower pan, wall, floor, and ceiling finishes, new light fixture, and new toilet room accessories at Levels 2 and 3 | 1 | Lump Sum | ||
| 11 | OPTION K - Replacement of carpeting throughout levels 2 and 3 | 1 | Lump Sum | ||
| 12 | OPTION L - Replacement of all non-historic light fixtures throughout Levels 2 and 3 and at staff bedrooms at B2 | 1 | Lump Sum | ||
| 13 | OPTION M - Relocation of new Transformer | 1 | Lump Sum | ||
| 14 | OPTION N - Addiitonal grounding electrodes | 1 | Lump Sum | ||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 2 through 14) ---------------------------------- | |||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 14) --------- | |||||