This is a pre-solicitation notice for a construction contract to correct life safety and critical deficiencies at the Oregon Caves Chateau. The National Park Service seeks to address fire suppression, egress, accessibility, and structural issues through upgrades such as installing code-compliant egress doors, a fire detection and suppression system, and replacing plumbing and electrical systems. Work also includes adding a three-story elevator, internal stairways, shear walls, and steel-framed balconies. The estimated price range is over $10 million, with an anticipated period of performance from April 2020 to September 2021. The pre-solicitation will be issued on or around October 21, 2019 via FedBizOpps, and small businesses are encouraged to participate as subcontractors.

Drawings - Plumbing

View the file

Other files

File Type Posted
01 27 00-Definition of Contract Line Items_ORCA Amend 4_0004.pdf PDF
140P2019R0045 Amend 4 SOC_0004.pdf PDF
07_ContractPriceSchedule_ORCA150025_Amend 4_0004.xls XLS spreadsheet
Sol_140P2019R0045_Amd_0004.pdf PDF
09 80 00 Fiberboard Wall Ceiling Treatment_ORCA_0003.pdf PDF
Sol_140P2019R0045_Amd_0003.pdf PDF
B03_Wage_Determination_OR20200039 1-3-2020_0003.pdf PDF
140P2019R0045 Amend 3 SOC_0003.pdf PDF
Sol_140P2019R0045_Amd_0001.pdf PDF
Sol_140P2019R0045_Amd_0002.pdf PDF
00 01 10 Table of Contents_ORCA_r1_0002.pdf PDF
140P2019R0045 Amend 1 SOC.updated_0002.pdf PDF
09 80 00 Fiberboard Wall & Ceiling Treatment_0002.pdf PDF
Sign-in sheet_0002.pdf PDF
L8.03 Landscape Details - A1_0002.pdf PDF
A06_Specs_03_XAPPENDIX-C_ORCA_Chateau_Hazardous_Materials_Report.pdf PDF
A06_Specs_03_XAPPENDIX-D_ORCA_Fire_Protection_Basis_of_Design.pdf PDF
A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_1_-_164.pdf PDF
A06_Specs_03_XAPPENDIX-A_ORCA_Geotech_Report.pdf PDF
A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_165_-_330.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
B08_Solic_Contract_Price_Schedule_ORCA150025_FINAL.xls XLS spreadsheet
A06_Dwgs_01_ORCA_100CD_FINAL_0_TITLE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_3_ARCHITECTURE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_8_ELECTRICAL.pdf PDF
B08_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Solic_140P2019R0045_SF_1442_&_Clauses.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-01.pdf PDF
B08_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Solic_SF24-16d.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_7_MECHANICAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_4_FIRE_SUPPRESSION.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_2_STRUCTURAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_5_FIRE_DETECTION.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-15-48.pdf PDF
B03_Wage_Determination_OR20190039_8-30-19.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-02-14.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_1_LANDSCAPE.pdf PDF
B08_Solit_PSP_Cover.rtf RTF text file
B08_Solit_PSP_Vol_II_Equals.doc DOC document
B08_Solit_PSP_Vol_II_HazMat.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M M

M M

S

T

P

VFD

PIPING DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCES AND DISPLACEMENTS PRESCRIBED IN ASCE 7-10 SECTION 13.3 AS DEFINED IN ASCE 7-10 SECTION 13.6.8, 13.6.7, 13.6.5.6.

COPIES OF THE BRACING SYSTEM INSTALLATION GUIDE OR MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO THE START OF HANGING AND BRACING OF THE PIPE, DUCTWORK, AND ELECTRICAL

DISTRIBUTION SYSTEM.

THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO

SUPPORT THE HANGER AND BRACE LOADS.

PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM

BRACING NOTE

GENERAL NOTES

1. PROVIDE COMPLETE AND FULLY FUNCTIONAL PLUMBING SYSTEMS AS INDICATED IN THE

CONTRACT DOCUMENTS. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE

INTERNATIONAL PLUMBING CODE, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE AND LOCAL RULES AND REGULATIONS, STATE AND LOCAL FIRE MARSHAL REGULATIONS, THE SAFETY ORDERS OF THE DIVISION OF INDUSTRIAL SAFETY, THE NATIONAL ELECTRIC CODE, THE

STANDARDS OF THE NATIONAL PARK SERVICE PROTECTION ASSOCIATION, AMERICAN GAS

ASSOCIATION, OCCUPATION AND SAFETY ACT, AMERICAN NATIONAL STANDARDS INSTITUTE,

AMERICAN SOCIETY OF MECHANICAL ENGINEERS, AMERICAN SOCIETY FOR TESTING AND

MATERIALS, INSTALLATION STANDARDS PUBLISHED BY THE INTERNATIONAL ASSOCIATION OF

PLUMBING AND MECHANICAL OFFICIALS (IAPMO) AND OTHER APPLICABLE LAWS, CODES, OR

REGULATIONS. NOTHING IN THESE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO PERMIT

WORK NOT CONFORMING TO THESE CODES.

2. VERIFY LOCATION OF UTILITIES PRIOR TO PERFORMING WORK. COORDINATE ALL WORK WITH

OTHER TRADES.

3. PLUMBING FIXTURES SHALL HAVE MAXIMUM FLOW RATES AS INDICATED ON SCHEDULES.

4. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS, MOUNTING HEIGHTS AND COLOR OF

PLUMBING FIXTURES.

5. COORDINATE ALL CORING OF FLOORS AND WALLS WITH CONTRACTING OFFICER PRIOR TO START

OF WORK.

6. PIPING SHALL HAVE SUFFICIENT CLEARANCE FROM STRUCTURE TO ALLOW FOR EXPANSION AND CONTRACTION OF THE PIPING. NO PIPING SHALL TOUCH WOOD, CONCRETE, OTHER PIPING, ETC.

7. ALL EQUIPMENT, FIXTURES, ETC. SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE

MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS.

8. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY AND

PERFORM ALL REQUIRED TESTING OF ALL PIPING AND ACCESSORIES INSTALLED. ALL SUCH

PLUMBING INSTALLATIONS SHALL BE TESTED, REPAIRED, AND ADJUSTED TO THE SATISFACTION OF

THE CONTRACTING OFFICER AND ALL GOVERNING AUTHORITIES.

9. ALL VALVES, UNIONS, ETC. SHALL BE ETC. TO BE SAME SIZE AS LINE SIZE UNLESS OTHERWISE

NOTED ON DRAWINGS.

10. PROVIDE UNIONS AFTER EACH THREADED VALVE AND PRIOR TO EQUIPMENT CONNECTIONS.

11. FOLLOW THE GENERAL ARRANGEMENT INDICATED ON THE DRAWINGS AS CLOSELY AS POSSIBLE, THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND ALL OTHER TRADES PRIOR TO INSTALLATION OF THE MATERIALS AND

EQUIPMENT TO VERIFY ADEQUATE SPACE AVAILABLE FOR INSTALLATION OF THE WORK SHOWN.

THE CONTRACTING OFFICER (CO) SHALL BE IMMEDIATELY NOTIFIED IF AN AREA OF CONFLICT

OCCURS BETWEEN TRADES.

12. SPECIFICATIONS ARE AN INTEGRAL PART OF THIS PROJECT. CONTRACTOR SHALL BE

RESPONSIBLE FOR COMPLYING WITH SPECIFICATION REQUIREMENTS.

13. ALL FIXTURES, FLOOR DRAINS, FLOOR SINKS, ETC. SHALL BE TRAPPED AND VENTED. PROVIDE

TRAP GAURD TO ALL FLOOR DRAINS, FLOOR SINKS, HUB DRAINS AND AS INDICATED ON THE

DRAWINGS. ALL TRAP GAURDS SHALL BE ACCESSIBLE AND PROVIDED WITH A 12"X12" ACCESS

PANEL (MINIMUM).

14. PROVIDE ALL PIPING, VALVES, FITTINGS AND OTHER APPURTENANCES FOR A COMPLETE AND

FULLY FUNCTIONAL SYSTEM.

15. PIPING TO BE SLOPED AS FOLLOWS UNLESS OTHERWISE NOTED:

A. SANITARY SEWER = 2%

B. SANITARY VENT (BELOW FLOOD RIM) = 1%

C. SANITARY VENT (ABOVE FLOOD RIM) = 0.25%

D. TRAP PRIMER = 1%

E. CONDENSATE = 1%

F. STORM DRAIN = 1%

16. VERIFY IN FIELD EXISTING CONDITIONS, SIZE AND EXACT LOCATION OF SERVICES PRIOR TO START

OF WORK.

17. THE CONSTRUCTION DOCUMENTS FOR THIS PROJECT WERE PREPARED BY THE DESIGN TEAM

USING 3-D MODELING SOFTWARE. USING THIS SOFTWARE BY THE DESIGN TEAM DOES NOT

RELIEVE THE CONTRACTOR FROM PERFORMING THE NECESSARY COORDINATION TO PROVIDE

COMPLETE, CODE COMPLIANT AND OPERATIONAL BUILDING SYSTEMS. THE PLANS AND SECTIONS

PROVIDED ARE NOT COMPLETE AND ARE TO BE CONSIDERED DIAGRAMMATIC ONLY. THE EXACT

LOCATION OF THE PIPING, DUCTWORK, ELECTRICAL AND SUPPORT COMPONENTS ARE TO BE

DETERMINED IN THE FIELD. ALL BUILDING SECTIONS AND DETAILS PROVIDED ARE FOR

INFORMATION ONLY AND DO NOT RELIEVE THE CONTRACTOR FROM PERFORMING FINAL

COORDINATION. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH ALL OTHER TRADES.

18. SUBMIT FOR APPROVAL MANUFACTURER’S SUBMITTAL DATA ON ALL MATERIALS, EQUIPMENT, AND

DEVICES PER SPECIFICATIONS.

19. REFER TO ARCHITECTURAL FOR HISTORIC TREATMENT PROCEDURES FOR REMOVAL AND

INSTALLATION OF NEW WORK.

20. WE'VE ADDED THE VARIOUS BID OPTIONS TO COORDINATE WITH OUR SPECS AND CONTRACT PRICE SCHEDULE. PLEASE PROVIDE ENOUGH INFORMATION FOR THESE BID ITEMS TO PROVIDE AN

APPROPRIATE DOLLAR AMOUNT (IF NOT DONE SO ALREADY).

1. 2015 INTERNATIONAL BUILDING CODE

2. 2015 INTERNATIONAL ELECTRICAL CODE

3. 2015 INTERNATIONAL MECHANICAL CODE

4. 2015 INTERNATIONAL PLUMBING CODE

5. 2016 OREGON ENERGY CODE

6. 2015 INTERNATIONAL FIRE CODE

OREGON CODES

AND STANDARDS

PLUMBING ABBREVIATIONS

PLUMBING LEGEND

CW COLD WATER

HW HOT WATER SUPPLY

HWR HOT WATER RETURN

SAN SANITARY SEWER

SAN SANITARY SEWER (UNDERFLOOR)

V SANITARY VENT

G NATURAL GAS

SYMBOL

CD CONDENSATE DRAIN

TAG DESCRIPTION

RW RECYCLED WATER

CW

HW

HWR

SAN

SAN

V

G

CD

RW

SD STORM DRAINSD

OD OVERFLOW DRAINOD

ABAS ARCHITECTURAL BARRIERS ACCESSIBILITY

STANDARD

ABV ABOVE

AC ALTERNATING CURRENT

ACU AIR-CONDITIONING UNIT(S)

ADDL ADDITIONAL

ADJ ADJUSTABLE

AF ABOVE THE FLOOR

AFF ABOVE FINISHED FLOOR

AGA AMERICAN GAS ASSOCIATION

AHU AIR-HANDLING UNIT

AIR COND AIR CONDITION(-ING, -ED)

ALT ALTERNATE

AMB AMBIENT

AMP AMPERE (AMP, AMPS)

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AP ACCESS PANEL

ARCH ARCHITECT, ARCHITECTURAL

ARF ABOVE RAISED FLOOR

ASC ABOVE SUSPENDED CEILING

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION AND AIR CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING

ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING AND MAINTENACE

ATM ATMOSPHERE

AWS AMERICAN WELDING SOCIETY

AWWA AMERICAN WATER WORKS ASSOCIATION

B&S BELL AND SPIGOT

BDY BOUNDARY

BEL BELOW

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BLDG BUILDING

BLR BOILER

BM BEAM

BOD BOTTOM OF DUCT

BOM BILL OF MATERIAL

BOP BOTTOM OF PIPE

BOT BOTTOM

BRF BELOW RAISED FLOOR

BSMT BASEMENT

BT BATHTUB

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

BV BUTTERFLY VALVE

CAB CABINET

CAP CAPACITY

CB CATCH BASIN

CD CONDENSATE DRAIN

CF CUBIC FEET

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CISP CAST IRON SOIL/SEWER PIPE

CISPI CAST IRON SOIL PIPE INSTITUTE

CL CENTERLINE

CLG CEILING

CNTR CENTER

CO CLEANOUT

COEF COEFFICIENT

COL COLUMN

COM COMMON

CONC CONCRETE

CONN CONNECTION

COND CONDENS(-ER, -ING, -ATION)

CONST CONSTRUCTION

CONTR CONTRACTOR

CTR CENTER

CU COPPER (CHEMICAL ABBREVIATION)

CU FT CUBIC FEET

CU IN CUBIC INCH

CV CHECK VALVE

CW COLD WATER

CWP CIRCULATING WATER PUMP

D DEEP

DBL DOUBLE

DC DIRECT CURRENT

DCV DETECTOR CHECK VALVE

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNIT

DIA DIAMETER

DIM DIMENSION

DN DOWN

DP DEPTH OR DEEP

DS DOWNSPOUT

DWG DRAWING

DWV DRAIN, WASTE AND VENT

E EXISTING

EA EACH

EFF EFFICIENCY

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENG ENGINEER

ENT ENTRANCE

EQ EQUAL

EST ESTIMATE

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EXP EXPOSED

EXT EXTINGUISH

F FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FF FINISHED FLOOR

FFE FINISHED FLOOR ELEVATION

FG FINISH GRADE

FHY FIRE HYDRANT

FIXT FIXTURE

FL FLOOR

FND FOUNDATION

FP FIRE PROTECTION MAIN

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RISER

FS FLOOR SINK

FT FEET

FU FIXTURE UNIT

FURN FURNISH

FUT FUTURE

G GAS

GA GAGE OR GAUGE

GAL GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUT

GND GROUND

GOVT GOVERNMENT

GP GALVANIZED PIPE

GPD GALLONS PER DAY

GPF GALLONS PER FLUSH GPM GALLONS PER MINUTE

GPH GALLONS PER HOUR

GPS GALLONS PER SECOND

GV GALVANIZED

GVA GATE VALVE

H HIGH

HB HOSE BIB

HD HEAD

HDR HEADER

HOR HORIZONTAL

HP HORSE POWER

HR HOUR

HRS HOURS

HT HEIGHT

HTG HEATING

HTR HEATER

HW HOT WATER

HWR HOT WATER RETURN

HZ HERTZ (CYCLES PER SECOND)

I IRON

ID INSIDE DIAMETER

IE INVERT ELEVATION

INC INCREASER, INCREASING

IN INCH

INCL INCLUDE

INCR INCREASE

INFO INFORMATION

INS INSULATION

INSP INSPECT

INSUL NSULATION

INT INTERIOR, INTERNAL

INV INVERT

IP IRON PIPE

IPS IRON PIPE SIZE

IW INDIRECT WASTE

JC JANITOR'S CLOSET

KF KITCHEN FIXTURE

KW KILOWATT

KWH KILOWATT HOUR

KVA KILOVOLT-AMPERE

KW KILOWATT

L LENGTH

LAT LATERAL

LAV LAVATORY

LBS POUNDS

LF LINEAR FEET

LG LENGTH

LH LEFT HAND

LPD LOW POINT DRAIN

MAX MAXIMUM

ME MECHANICAL ENGINEER

MECH MECHANICAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MS MOP SINK

MTR MOTOR

MWP MAXIMUM WORKING PRESSURE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NFWH NON-FREEZE WALL HYDRANT

NOM NOMINAL

N/A NOT APPLICABLE

NBS NATIONAL BUREAU OF STANDARDS

NC NOISE CRITERIA

NO, # NUMBER

NPS NOMINAL PIPE SIZE (ALSO CALLED IPS)

NTS NOT TO SCALE

OC ON CENTER

ODIA OUTSIDE DIAMETER

OD OVERFLOW DRAIN

OUT OUTLET

OZ OUNCE

P PITCH

PD PRESSURE DROP, OR DIFFERENCE

PDI PLUMBING DRAINAGE INSTITUTE

PE PROFESSIONAL ENGINEER

PERIM PERIMETER

PG PRESSURE GAUGE

PH PHASE (ELECTRICAL)

PIV POST INDICATOR VALVE

PL PROPERTY LINE

PLBG PLUMBING

POC POINT OF CONNECTION

PPM PARTS PER MILLION

PRESS PRESSURE

PRIM PRIMARY

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

PVC POLYVINYL CHLORIDE

PWR POWER

QT QUART

QTY QUANTITY

RAD RADIUS

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROOF DRAIN

RECIRC RECIRCULATE

REF REFERENCE

REQD REQUIRED

RET RETURN

REV REVISION

RF ROOF

RH RIGHT HAND

RL ROOF LEADER

RM ROOM

RPBFP REDUCED PRESSURE BACKFLOW PREVENTER

RPM REVOLUTIONS PER MINUTE

RW RAW WATER

RWL RAIN WATER LEADER

SAD SEE ARCHITECTURAL DRAWING(S)

SMD SEE MECHANICAL DRAWING(S)

SSD SEE STRUCTURAL DRAWING(S)

SD STORM WATER

SK SINK

S&W SOIL & WASTE

SAN SANITARY

SCH SCHEDULE

SD STORM DRAIN

SEC SECOND

SECT SECTION

SERV SERVICE

SF SQUARE FOOT

SH SHOWER

SHT SHEET

SIM SIMILAR

SLV SLEEVE

SOV SHUTOFF VALVE

SP STANDPIPE

SP PRESSURE, STATIC

SPEC SPECIFICATION

SPM SPRINKLER MAIN

SS SERVICE SINK

STD STANDARD

STL STEEL

SUCT SUCTION

SV SAFETY RELIEF VALVE

SQ SQUARE

SQ FT SQUARE FEET

SS SERVICE SINK

ST SANITARY TAP

STD STANDARD

T TEE

T&P TEMPERATURE & PRESSURE

RELIEF VALVE

TD TRENCH DRAIN

TEMP TEMPERATURE

TLT TOILET

TYP TYPICAL

TAP TAP, TAPPED

TYP TYPICAL

UR URINAL

UON UNLESS OTHERWISE NOTED

V VENT

VT VOLT

VOL VOLUME

VAR VARIABLE

VB VALVE BOX

VEL VELOCITY

VERT VERTICAL

VLV VALVE

VOL VOLUME

VP VENT PIPE

VS VENT STACK

VTR VENT THROUGH ROOF

W WATT

W WASTE

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WCO WALL CLEANOUT

WFS WATER FLOW SWITCH

WH WATER HEATER

WM WATER METER

WS WATER STOP

WH WALL HYDRANT

WL WATER LEVEL

WP WEATHERPROOF

WSFU WATER SUPPLY FIXTURE UNIT

WT WEIGHT

% PERCENT

(E) EXISTING

(N) NEW

@ AT (THE RATE OF)

& AND

# NUMBER

P6.02

DETAIL DESIGNATION

SHEET NUMBER

CH

EQUIPMENT TYPE

NUMBER TYPE

REVISION CLOUD AND DELTA

PRESSURE REDUCING VALVE

PRESSURE REDUCING VALVE

GAS

2-WAY CONTROL VALVE,

2-POS

2-WAY CONTROL VALVE,

MODULATING

3-WAY CONTROL VALVE,

2-POS

3-WAY CONTROL VALVE,

MODULATING

BALL VALVE

BUTTERFLY VALVE

BUTTERFLY VALVE

W/OPERATOR

CHECK VALVE

CIRCUIT SETTER

DRAIN VALVE

FLOATING VALVE

NEEDLE VALVE

T&P RELIEF VALVE

THERMOSTATIC MIXING

VALVE

VALVE

GLOBE VALVE

GLOBE VALVE ANGLE

WYE STRAINER

WAY STRAINER WITH BLOW

OFF

GATE VALVE

GATE VALVE ANGLE

MANUAL AIR VALVE

COCK VALVE

SOLENOID VALVE

HYDRONIC FLOW METER

TEMP GUAGE

PRESSURE GUAGE

LIQUID FILLED

THERMOMETER

UNION

VFD

FLEX CONNECTOR

PETES PLUG

VACUUM BREAKER

POINT OF DISCONNECTION

POINT OF CONNECTION

END OF PIPE - CLEANOUT

END OF PIPE - FLOOR

CLEANOUT

END OF PIPE - WALL

CLEANOUT

2 WAY CLEANOUT CLEANOUT

VTR (VENT)

WMXX

BFP-XX

WHA

TP TRAP PRIMER

WATER HAMMER ARRESTOR

WATER METER

BACKFLOW PREVENTER

METER INLINE ACCESSORY

SEISMIC JOINT

CW-1

FD-1

GD-1

LAV-1

WC-1

MS-1

OD-1

PD-1

RD-1

UR-1

SH-1

REDUCER

MOTOR

AIR SEPARATOR

EXPANSION TANK

PUMP

SYMBOLS (PLANS) VALVES DIAGRAMS

FLOOR DRAIN

FLOOR DRAIN OR FLOOR SINK

FLOOR SINK

COMBINATION ROOF / OVERFLOW DRAIN

ROOF DRAIN

ROOF RECEPTOR

FLOOR CLEANOUT

WALL CLEANOUT

HOSE BIBB

LINE BREAK

PIPE CAP

END OF PIPE

TEMPERATURE SENSOR

FLEX CONNECTION

UNION

FLOW DIRECTION

DWV FITTING, 45° ELBOW

DWV FITTING, 90° ELBOW

DWV FITTING, 45° TEE

DWV FITTING, 90° TEE

PIPE DROP

PIPE BRANCH, TOP

PIPE BRANCH, BOTTOM

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :0

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING COVER

P0.01 150 211

CONSTRUCTION DOCUMENTS

P .0

A

G

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and signature must be verified on any electronic copies.

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

MECHANICAL

B301

STAIRS

B300

(E) BOILER, SEE

MECHANICAL

(E) WATER HEATERS

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :4

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING DEMO FLOOR

PLAN - BASEMENT 3P1.B3

151 211

CONSTRUCTION DOCUMENTS

P .B

A

G

P1.B3

1 PLUMBING DEMO FLOOR PLAN - BASEMENT 3

SHEET NOTES

1. EXISTING 4" SANITARY SEWER TO REMAIN TO POINT OF

CONNECTION OF NEW 4" SANITARY SEWER IN

CRAWLSPACE.

2. REMOVE EXISTING 3" AND 4" SANITARY SEWER LINES TO

POINT JUST INSIDE CRAWLSPACE AFTER EXISTING 4" LINE

PASSES THROUGH CONCRETE WALL.

3. COORDINATE WITH ARCHITECTURAL ON EXPANSION OF

EXISTING HOLE THROUGH CONCRETE WALL FROM

BASEMENT 3 INTO CRAWLSPACE.

GENERAL NOTES

A. DEMOLITION OF EXISTING DISTRIBUTION PIPE:

ASSUMPTIONS ARE AS FOLLOWS:

DEMO SPECIFIC PIPING AS INDICATED IN SHEET NOTES

EXISTING DWV TO REMAIN UNLESS OTHERWISE INDICATED

OR IS VISIBLY DAMAGED

IN ADDITION:

TWO VERTICAL RISERS - ONE FOR DOMESTIC HOT WATER

(DHW) AND ONE FOR DOMESTIC COLD WATER (DCW) -

1-1/2" GALVANIZED STEEL PIPE - APPROXIMATELY 8'-0" OF

EACH FOR A TOTAL OF 16'-0".

ALL ESTIMATED PIPE DEMO LENGTHS ARE APPROXIMATE

AS THERE WAS NOT ACCESS TO THE MAJORITY OF PIPING

AS THE HOTEL WAS STILL OCCUPIED AND DEMOLITION

WAS NOT ALLOWED - ESTIMATES ALSO INCLUDE A 10%

SAFETY FACTOR

BID OPTION E: REPLACEMENT OF PLUMBING PIPING AT BASEMENT 3

PLUMBING PIPING BID ALTERNATE: DEMO EXISTING DOMESTIC WATER PIPING

AS FOLLOWS: 80'-0" OF 1-1/2" DOMESTIC COLD WATER PIPING, 80'-0 OF 1-1/2"

DOMESTIC HOT WATER PIPING 60'-0" OF 3/4" DOMESTIC HOT WATER PIPING,

60'-0" OF 3/4" DOMESTIC COLD WATER PIPING, 60'-0" OF 1/2" DOMESTIC COLD

WATER PIPING AND 60'-0" OF 1/2" DOMESTIC HOT WATER PIPING.

ALL PIPING IS GALVANIZED STEEL UNLESS OTHERWISE INDICATED.

REPALCE WITH SAME SIZED NEW PIPING PER SPECIFIED MATERIALS.

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

STORAGE

B211

LAUNDRY

B209B

RESTROOM

B210A

SERVICE ENTRY

B209

STAFF DINING

B208

ACCESSIBLE

STAFF BEDROOM

#3

B205

STAFF BEDROOM

#2

B206

STAFF BEDROOM

#1

B207

STAFF LOUNGE

B204

BATHROOM

B203A

STORAGE

B203

CORRIDOR

B201

WINE STOR

B202B

STORAGE

B202

STAIRS

B200

CLOSET

B207A

CLOSET

B206A

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :3

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING DEMO FLOOR

PLAN - BASEMENT 2P1.B2

152 211

CONSTRUCTION DOCUMENTS

P .B

A

G

P1.B2

1 PLUMBING DEMO FLOOR PLAN - BASEMENT 2

SHEET NOTES

1. REMOVE EXISTING SHOWER, LAVATORY AND WATER

CLOSET, CAP ALL DWV, DCW AND DHW BELOW FLOOR

JOISTS IN CRAWLSPACE.

2. REMOVE EXISTING SINK AND SMALL DOMESTIC HOT

WATER HEATER BELOW. CAP EXISTING DHW, DWV, AND

DCW LINES.

3. REMOVE EXISTING 4" SANITARY SEWER LINE FROM POINT

OF PENETRATION FROM BASEMENT LEVEL 1 TO BELOW

FLOOR OF BASEMENT LEVEL 2.

4. REMOVE EXISTING UTILITY SINK AND WASHING MACHINE

DWV, DCW AND DHW IN THIS AREA. CAP SANITARY SEWER

BELOW SLAB FOR FUTURE CONNECTION(S). WASHING

MACHINES TO BE SAVED AND RELOCATED.

5. CHANNEL EXISTING CONCRETE SLAB FOR FUTURE 4"

SANITARY SEWER CONNECTION FROM RE-LOCATED

WASHING MACHINES AND TWO NEW UTILITY SINKS.

6. REMOVE EXISTING WATER CLOSET AND LAVATORY

CONTROLS. LAVATORY TO REMAIN AND HAVE NEW

CONTROLS INSTALLED. WATER CLOSET TO BE REPLACED.

7. PROVIDE TRENCH FOR NEW 2" SANITARY DRAIN LINE FROM

ELEVATOR SUMP PIT INTO CENTER SECTION OF BASEMENT

LEVEL 3.

8. PLUMBING RISERS NEED TO BE RELOCATED.

GENERAL NOTES

A. DEMOLITION OF EXISTING DISTRIBUTION PIPE:

ASSUMPTIONS ARE AS FOLLOWS:

DEMO SPECIFIC PIPING AS INDICATED IN SHEET NOTES

EXISTING DWV TO REMAIN UNLESS OTHERWISE

INDICATED OR IS VISIBLY DAMAGED

IN ADDITION:

TWO VERTICAL RISERS PER WING - ONE FOR DOMESTIC

HOT WATER (DHW) AND ONE FOR DOMESTIC COLD

WATER (DCW) - 1-1/2" GALVANIZED STEEL PIPE -

APPROXIMATELY 25'-0" OF EACH FOR A TOTAL OF 50'-0".

FIXTURE CONNECTIONS - 6'-0" EACH OF 1/2"

GALVANIZED STEEL PIPE PER FIXTURE FOR DHW AND

DCW EXCEPT FOR WATER CLOSETS ONLY DCW

ADDITIONAL DEMO OF PIPING AS FOLLOWS:

INCOMING DOMESTIC COLD WATER SERVICE - 80'-0" OF

1-1/2" GALVANIZED STEEL PIPE

EXISTING PLUMBING SERVING KITCHEN AREA - DWV

PIPING TO REMAIN UNLESS VISIBLY DAMAGED. 60'-0" OF

1" DOMESTIC COLD WATER PIPING, 60'-0" OF 1"

DOMESTIC HOT WATER PIPING, 40'-0" OF 3/4" DOMESTIC

COLD WATER PIPING, 40'-0" OF 3/4" DOMESTIC HOT

WATER PIPING, 70'-0" OF 1/2" DOMESTIC COLD WATER

PIPING AND 70'-0" OF 1/2" DOMESTIC HOT WATER PIPING

ALL ESTIMATED PIPE DEMO LENGTHS ARE

APPROXIMATE AS THERE WAS NOT ACCESS TO THE

MAJORITY OF PIPING AS THE HOTEL WAS STILL

OCCUPIED AND DEMOLITION WAS NOT ALLOWED -

ESTIMATES ALSO INCLUDE A 10% SAFETY FACTOR

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

UP

UP

UP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

COFFEE SHOP

B104

KITCHEN

B103

WALK-IN REFRIG.

B103A

DINING ROOM

B102

STORAGE

B100A

GIFT SHOP

B101

STAIRS

B100

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :2

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING DEMO FLOOR

PLAN - BASEMENT 1P1.B1

153 211

CONSTRUCTION DOCUMENTS

P .B

A

G

P1.B1

1 PLUMBING DEMO FLOOR PLAN - BASEMENT 1

SHEET NOTES

1. REMOVE EXISTING WATER CLOSETS, URINALS AND

LAVATORYS. CAP EXISTING DWV, DCW AND DHW BELOW

FLOOR AT CONNECTION TO MAIN(S).

2. REMOVE EXISTING BAR SINK. CAP EXISTING DWV, DCW

AND DHW BELOW FLOOR AT CONNECTION TO MAIN(S).

GENERAL NOTES

A. DEMOLITION OF EXISTING DISTRIBUTION PIPE:

ASSUMPTIONS ARE AS FOLLOWS:

TWO VERTICAL RISERS - ONE FOR DOMESTIC HOT WATER

(DHW) AND ONE FOR DOMESTIC COLD WATER (DCW) -

1-1/2" GALVANIZED STEEL PIPE - APPROXIMATELY 15'-0" OF

EACH.

HORIZONTAL MAIN DISTRIBUTION PIPE - TWO EACH OF

DHW AND DCW - 1" GALVANIZED PIPE 30'-0" LONG FOR A

TOTAL OF 120'-0"

HORIZONTAL TERTIARY DISTRIBUTION PIPE - FOUR EACH

OF DHW AND DCW - 3/4" GALVANIZED PIPE 15'-0" LONG FOR

A TOTAL OF 120'-0"

FIXTURE CONNECTIONS - 6'-0" EACH OF 1/2" GALVANIZED

STEEL PIPE PER FIXTURE FOR DHW AND DCW EXCEPT FOR

WATER CLOSETS ONLY DCW

EXISTING DWV TO REMAIN UNLESS OTHERWISE INDICATED

OR IS VISIBLY DAMAGED

ALL ESTIMATED PIPE DEMO LENGTHS ARE APPROXIMATE

AS THERE WAS NOT ACCESS TO THE MAJORITY OF PIPING

AS THE HOTEL WAS STILL OCCUPIED AND DEOLITION WAS

NOT ALLOWED - ESTMATES ALSO INCLUDE A 10% SAFETY

FACTOR

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

DNUP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

LOBBY

OFFICE #1

OFFICE #2

CORRIDOR

LINEN

GUEST ROOM

BATHROOM

105A

GUEST ROOM

BATHROOM

103A

BATHROOM

101A

GUEST ROOM

GUEST ROOM

CLOSET

101B

BATHROOM

102A

GAME ROOM

SITTING ROOM

108 BATHROOM

104A

GUEST ROOM

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :0

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING DEMO FLOOR

PLAN - LEVEL 1P1.01

154 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P1.01

1 PLUMBING DEMO FLOOR PLAN - LEVEL 1

GENERAL NOTES

A. REMOVE ALL EXISTING WATER CLOSETS, BATHTUBS AND

LAVATORIES, INCLUDING ALL CONTROLS. SAVE

LAVATORIES FOR POSSIBLE RE-USE AND RE-

INSTALLATION WITH NEW CONTROLS. SERVICE SINK IN

LINENS ROOM TO REMAIN.

B. DEMOLITION OF EXISTING DISTRIBUTION PIPE:

ASSUMPTIONS ARE AS FOLLOWS:

TWO VERTICAL RISERS - ONE FOR DOMESTIC HOT WATER

(DHW) AND ONE FOR DOMESTIC COLD WATER (DCW) -

1-1/2" GALVANIZED STEEL PIPE - APPROXIMATELY 15'-0" OF

EACH.

HORIZONTAL MAIN DISTRIBUTION PIPE - TWO EACH OF

DHW AND DCW - 1" GALVANIZED PIPE 30'-0" LONG FOR A

TOTAL OF 120'-0"

HORIZONTAL TERTIARY DISTRIBUTION PIPE - FOUR EACH

OF DHW AND DCW - 3/4" GALVANIZED PIPE 15'-0" LONG FOR

A TOTAL OF 120'-0"

FIXTURE CONNECTIONS - 6'-0" EACH OF 1/2" GALVANIZED

STEEL PIPE PER FIXTURE FOR DHW AND DCW EXCEPT FOR

WATER CLOSETS ONLY DCW

EXISTING DWV TO REMAIN UNLESS OTHERWISE INDICATED

OR IS VISIBLY DAMAGED

ALL ESTIMATED PIPE DEMO LENGTHS ARE APPROXIMATE

AS THERE WAS NOT ACCESS TO THE MAJORITY OF PIPING

AS THE HOTEL WAS STILL OCCUPIED AND DEOLITION WAS

NOT ALLOWED - ESTMATES ALSO INCLUDE A 10% SAFETY

FACTOR

BID OPTION J: REMOVE ALL BATHTUBS AND SHOWER PANS

FOR REPLACEMENT WITH NEW.

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

DN

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

STAIRS

BATHROOM

214A

BATHROOM

204A

BATHROOM

203A

BATHROOM

201A

BATHROOM

212A

BATHROOM

210A

GUEST ROOM

BATHROOM

209A

GUEST ROOM

202BATHROOM

202A

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

CORRIDOR

200A

STAIRS

BATHROOM

211A

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

STORAGE

200C

CORRIDOR

200B

GUEST ROOM

GUEST ROOM

BATHROOM

205A

CLOSET

212B

CLOSET

211B

CLOSET

210B

CLOSET

209B

CLOSET

215A

CLOSET

214B

CLOSET

202B

CLOSET

201B

CLOSET

203B

CLOSET

206B

CLOSET

204B

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :1

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING DEMO FLOOR

PLAN - LEVEL 2P1.02

155 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P1.02

1 PLUMBING DEMO FLOOR PLAN - LEVEL 2

SHEET NOTES

1. REPLACE LAVATORIES AT GUEST ROOMS

2. SALVAGE LAVATORY FOR REINSTALLATION

3. REMOVE LAUNDRY SINK AND CONTROLS

GENERAL NOTES

A. REMOVE ALL EXISTING WATER CLOSETS, BATH/SHOWER

CONTROLS AND FAUCETS AND CONTROLS ON

LAVATORIES.

B. COORDINATE WITH ARCHITECTURAL FOR WALL FINISH

REMOVAL ONLY ON WALL WHERE BATH/SHOWER

CONTROLS ARE BEING REMOVED AND PIPING PREPARED

FOR REPLACEMENT OF CONTROLS WITH NEW CONTROLS.

C. DEMOLITION OF EXISTING DISTRIBUTION PIPE:

ASSUMPTIONS ARE AS FOLLOWS:

TWO VERTICAL RISERS - ONE FOR DOMESTIC HOT WATER

(DHW) AND ONE FOR DOMESTIC COLD WATER (DCW) -

1-1/2" GALVANIZED STEEL PIPE - APPROXIMATELY 15'-0" OF

EACH.

HORIZONTAL MAIN DISTRIBUTION PIPE - TWO EACH OF

DHW AND DCW - 1" GALVANIZED PIPE 30'-0" LONG FOR A

TOTAL OF 120'-0"

HORIZONTAL TERTIARY DISTRIBUTION PIPE - FOUR EACH

OF DHW AND DCW - 3/4" GALVANIZED PIPE 15'-0" LONG FOR

A TOTAL OF 120'-0"

FIXTURE CONNECTIONS - 6'-0" EACH OF 1/2" GALVANIZED

STEEL PIPE PER FIXTURE FOR DHW AND DCW EXCEPT

FOR WATER CLOSETS ONLY DCW

EXISTING DWV TO REMAIN UNLESS OTHERWISE

INDICATED OR IS VISIBLY DAMAGED

ALL ESTIMATED PIPE DEMO LENGTHS ARE APPROXIMATE

AS THERE WAS NOT ACCESS TO THE MAJORITY OF PIPING

AS THE HOTEL WAS STILL OCCUPIED AND DEMOLITION

WAS NOT ALLOWED - ESTMATES ALSO INCLUDE A 10%

SAFETY FACTOR.

BID OPTION J: REMOVE ALL BATHTUBS AND SHOWER

PANS FOR REPLACEMENT WITH NEW.

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

LINEN RM.

300C

SHOWER RM.

312B

GUEST ROOM

CLOSET

301B

BATHROOM

301A

TOILET RM

310A

CLOSET

310B

GUEST ROOM

BATHROOM

309A

BATHROOM

307A

GUEST ROOM

GUEST ROOM

BATHROOM

305A

BATHROOM

311A

GUEST ROOM

GUEST ROOM

GUEST ROOM

TOILET RM

312A

GUEST ROOM

GUEST ROOM

BATHROOM

304A

BATHROOM

302A

CORRIDOR

GUEST ROOM

GUEST ROOM

BATHROOM

303A

EAVES

300B

EAVES

311B

EAVES

300A

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :2

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING DEMO FLOOR

PLAN - LEVEL 3P1.03

156 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P1.03

1 PLUMBING DEMO FLOOR PLAN - LEVEL 3

GENERAL NOTES

A. REMOVE ALL EXISTING WATER CLOSETS, BATH/SHOWER

CONTROLS AND FAUCETS AND CONTROLS ON

LAVATORIES.

B. COORDINATE WITH ARCHITECTURAL FOR WALL FINISH

REMOVAL ONLY ON WALL WHERE BATH/SHOWER

CONTROLS ARE BEING REMOVED AND PIPING PREPARED

FOR REPLACEMENT OF CONTROLS WITH NEW CONTROLS.

C. DEMOLITION OF EXISTING DISTRIBUTION PIPE:

ASSUMPTIONS ARE AS FOLLOWS:

TWO VERTICAL RISERS - ONE FOR DOMESTIC HOT WATER

(DHW) AND ONE FOR DOMESTIC COLD WATER (DCW) -

1-1/2" GALVANIZED STEEL PIPE - APPROXIMATELY 15'-0" OF

EACH.

HORIZONTAL MAIN DISTRIBUTION PIPE - TWO EACH OF

DHW AND DCW - 1" GALVANIZED PIPE 30'-0" LONG FOR A

TOTAL OF 120'-0"

HORIZONTAL TERTIARY DISTRIBUTION PIPE - FOUR EACH

OF DHW AND DCW - 3/4" GALVANIZED PIPE 15'-0" LONG FOR

A TOTAL OF 120'-0"

FIXTURE CONNECTIONS - 6'-0" EACH OF 1/2" GALVANIZED

STEEL PIPE PER FIXTURE FOR DHW AND DCW EXCEPT

FOR WATER CLOSETS ONLY DCW

EXISTING DWV TO REMAIN UNLESS OTHERWISE

INDICATED OR IS VISIBLY DAMAGED

ALL ESTIMATED PIPE DEMO LENGTHS ARE APPROXIMATE

AS THERE WAS NOT ACCESS TO THE MAJORITY OF PIPING

AS THE HOTEL WAS STILL OCCUPIED AND DEMOLITION

WAS NOT ALLOWED - ESTMATES ALSO INCLUDE A 10%

SAFETY FACTOR.

BID OPTION J: REMOVE ALL BATHTUBS AND SHOWER

PANS FOR REPLACEMENT WITH NEW.

BLDG.

TRUE

NORTH

.6

SHEET NOTES

1. REPLACE LAVATORIES AT GUEST ROOMS

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

MECHANICAL

B301

STAIRS

B300

POC TO

EXISTING 4"

SANITARY

SEWER 4" SAN

4" SAN

EXISTING 4" SAN

EXISTING 4"

SAN TO

REMAIN

POC TO EXISTING

1-1/2" DHW

POC TO EXISTING

1-1/2" DCW

PROVIDE

ISOLATION

VALVE

PROVIDE

ISOLATION

VALVE

1-1/2" DCW & DHW UPCO

POC TO

EXISTING 4"

SANITARY

SEWER

4" SAN

4" SAN

SEE SHEET P2.B2

FOR CONTINUATION

2" SUMP PUMP

DISCHARGE PIPING

POC TO EXISTING 4"

SANITARY SEWER.

PROVIDE CLEANOUT

CO

4" SAN

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :3

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING FLOOR PLAN -

BASEMENT 3P2.B3

157 211

CONSTRUCTION DOCUMENTS

P .B

A

G

P2.B3

1 PLUMBING FLOOR PLAN - BASEMENT 3

GENERAL NOTES

A. RECONFIGURE & REPLACE EXISTING DWV, CW, HW &

HWR IN BASEMENT 3 ONLY AS NEEDED TO

ACCOMMODATE NEW PLUMBING LAYOUT(S) & FIXTURES,

UNLESS OTHERWISE INDICATED. COORDINATE WITH

PHASING & ARCHITECTURAL WORK. INSULATE ALL NEW

PIPING PER SPECIFICATIONS.

B. PROVIDE ALL NEW COPPER PIPING FOR FIXTURES. SEE

DEMOLITION PLANS FOR SIZE AND QUANTITIES OF PIPE.

REPLACE PIPING LIKE FOR LIKE UNLESS OTHERWISE

INDICATED IN BID DOCUMENTS.

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

STORAGE

B211

LAUNDRY

B209B

RESTROOM

B210A

SERVICE ENTRY

B209

STAFF DINING

B208

ACCESSIBLE

STAFF BEDROOM

#3

B205

STAFF BEDROOM

#2

B206

STAFF BEDROOM

#1

B207

STAFF LOUNGE

B204

BATHROOM

B203A

STORAGE

B203

CORRIDOR

B201

WINE STOR

B202B

STORAGE

B202

STAIRS

B200

ELEV MACHINE

B211B

ELEC RM

B211A

CLOSET

B209A

STORAGE

B202A

CLOSET

B205A

CLOSET

B207A

CLOSET

B206A

P4.01

P4.01

LV-3

WC-1

SK-1

POC 4" SANITARY

AT CEILING LEVEL

4" SANITARY

BELOW SLAB

2" SUMP PUMP

DISCHARGE PIPING

TERMINATE NEAREST FLOOR

SINK AT BASEMENT 1

SP-1

MS-1

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :2

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING FLOOR PLAN -

BASEMENT 2P2.B2

158 211

CONSTRUCTION DOCUMENTS

P .B

A

G

P2.B2

1 PLUMBING FLOOR PLAN - BASEMENT 2

GENERAL NOTES

A. REPLACE ALL EXISTING DWV, CW, HW & HWR PIPING THAT

IS EXPOSED DURING REMOVAL & REPLACEMENT OF INDOOR

FINISHES. INSULATE ALL NEW PIPING PER

SPECIFICATIONS. COORDINATE WITH ARCHITECTURAL.

SHEET NOTES

1. NOT USED.

2. PROVIDE NEW 4" SANITARY SEWER LINE AT CEILING

LEVEL.

3. NEW 4" SANITARY SEWER LINE TO RUN DOWN WALL TO

BELOW SLAB. PROVIDE FITTINGS TO PICK UP RELOCATED

WASHING MACHINE DRAIN LINES.

4. RUN NEW 4" SANITARY DRAIN BELOW SLAB TO POINT OF

CONNECTION IN CENTER OF ROOM. CONNECT BELOW

SLAB THEN GROUT SLAB CUT TO COVER NEW DRAIN LINE.

5. PROVIDE NEW WASHING MACHINE BOXES AND HOSE

CONNECTIONS FOR RE-CONFIGURED WASHING

MACHINES.

6. PROVIDE NEW 3" SANITARY SEWER LINE AND 1-1/2" VENT

FOR NEW UTILITY SINK. ROUTE 3" SS TO POINT OF

CONNECTION BELOW SLAB. GROUT SLAB CUT TO COVER

NEW DRAIN LINE. CONNECT TO EXISTING 1-1/2" VENT

ABOVE.

7. RECONFIGURE EXISTING DCW AND DHW, AS WELL AS ALL

DWV IN THIS AREA TO ACCOMMODATE NEW LAYOUT OF

REUSED WASHING MACHINES.

8. INSULATE (MIN.2") EXISTING 4" FOUNTAIN SANITARY

DRAIN FROM FLOOR ABOVE TO EXTERIOR WALL.

9. PROVIDE ALL NEW COPPER PIPING FOR FIXTURES. SEE

DEMOLITION PLANS FOR SIZE AND QUANTITIES OF PIPE.

REPLACE PIPING LIKE FOR LIKE UNLESS OTHERWISE

INDICATED IN BID DOCUMENTS.

10. MOP SINK CONNECT TO NEAREST EXISTING DCW, DHW,

SAN, AND VENT PIPING.

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

UP

UP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

COFFEE SHOP

B104

KITCHEN

B103

WALK-IN REFRIG.

B103A

DINING ROOM

B102

MEN'S

RESTROOM

B101B

WOMEN'S

RESTROOM

B101A

STORAGE

B100A

GIFT SHOP

B101

STAIRS

B100

P4.02

HB-1

MS-1

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :2

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING FLOOR PLAN -

BASEMENT 1P2.B1

159 211

CONSTRUCTION DOCUMENTS

P .B

A

G

P2.B1

1 PLUMBING FLOOR PLAN - BASEMENT 1

GENERAL NOTES

A. REPLACE ALL EXISTING DWV, CW, HW & HWR PIPING

THAT IS EXPOSED DURING REMOVAL & REPLACEMENT OF

INDOOR FINISHES. INSULATE ALL NEW PIPING PER

SPECIFICATIONS. COORDINATE WITH ARCHITECTURAL.

B. PROVIDE ALL NEW COPPER PIPING FOR FIXTURES. SEE

DEMOLITION PLANS FOR SIZE AND QUANTITIES OF PIPE.

REPLACE PIPING LIKE FOR LIKE UNLESS OTHERWISE

INDICATED IN BID DOCUMENTS.

SHEET NOTES

1. SEE SHEET P4.02 - ENLARGED PLUMBING PLANS.

2. CONNECT TO EXISTING DCW LINE INSIDE BUIDLING.

3. MOP SINK CONNECT TO NEAREST EXISTING DCW, DHW,

SAN, AND VENT PIPING.

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

DNUP

UP

UP

UP

UP

UP

UP

UP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

OFFICE #1

OFFICE #2

LOBBY

GAME ROOM

CORRIDOR

SITTING ROOM

LINEN

GUEST ROOM

BATHROOM

105A

GUEST ROOM

BATHROOM

103A BATHROOM

104A

GUEST ROOM

103GUEST ROOM

GUEST ROOM

BATHROOM

102A

CLOSET

101B

BATHROOM

101A

3" V UP

EXISTING

WC-2

WC-2

WC-2

WC-2

HB-1

HB-1

BT-1

LV-1

LV-1

LV-1

SH-1

LV-1BT-1

SH-1

LV-1

SH-1

WC-2

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :5

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING FLOOR PLAN -

LEVEL 1P2.01

160 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P2.01

1 PLUMBING FLOOR PLAN - LEVEL 1

GENERAL NOTES

A. RECONFIGURE ALL DWV, CW, & HW TO ACCOMMODATE

NEW CONFIGURATION. COORDINATE WITH

ARCHITECTURAL WORK.

B. REPLACE ALL EXISTING DWV, CW, HW PIPING THAT IS

EXPOSED DURING REMOVAL & REPLACEMENT OF INDOOR

FINISHES, INSULATE ALL NEW PIPING PER

SPECIFICATIONS. CORDINATE WITH ARCHITECTURAL.

C. INSTALL NEW FIXTURES PER SCHEDULE. COORDINATE

WITH ARCHITECTURAL FOR EXACT LOCATIONS AND

INTERFACE WITH FINISHES.

D. PROVIDE ALL NEW COPPER PIPING FOR FIXTURES. SEE

DEMOLITION PLANS FOR SIZE AND QUANTITIES OF PIPE.

REPLACE PIPING LIKE FOR LIKE UNLESS OTHERWISE

INDICATED IN BID DOCUMENTS.

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

DN

DN

DN

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

STAIRS

BATHROOM

214A

BATHROOM

204A

BATHROOM

203A

BATHROOM

201A

BATHROOM

212A

BATHROOM

210A

GUEST ROOM

BATHROOM

209A

GUEST ROOM

BATHROOM

202A

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

CORRIDOR

200A

STAIRS

BATHROOM

211A

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

STORAGE

200C

CORRIDOR

200B

GUEST ROOM

GUEST ROOM

STAIRS

BATHROOM

205A

CLOSET

212B

CLOSET

211B

CLOSET

210B

CLOSET

209B

CLOSET

215A

CLOSET

214B

CLOSET

202B

CLOSET

201B

CLOSET

203B

CLOSET

206B

CLOSET

204B

BATHROOM

206A

WC-2

WC-2

WC-2

WC-2

WC-2

WC-2

SH-2

LV-2

SH-2

LV-1

SH-2

LV-1

LV-2

BT-2

LV-2

SH-3

LV-2

SH-2

LV-2

LV-1

SH-2

LV-2

WC-2

WC-2

SH-2

SH-2

SH-2

LV-2

LV-1

SH-2

EXISTING 3"

VENT UP

MS-1

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :5

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING FLOOR PLAN -

LEVEL 2P2.02

161 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P2.02

1 PLUMBING FLOOR PLAN - LEVEL 2

GENERAL NOTES

A. RECONFIGURE ALL DWV, CW, & HW TO ACCOMMODATE

NEW CONFIGURATION. COORDINATE WITH

ARCHITECTURAL WORK.

B. REPLACE ALL EXISTING DWV, CW, HW PIPING THAT IS

EXPOSED DURING REMOVAL & REPLACEMENT OF INDOOR

FINISHES, INSULATE ALL NEW PIPING PER

SPECIFICATIONS. COORDINATE WITH ARCHITECTURAL.

C. INSTALL NEW FIXTURES PER SCHEDULE. COORDINATE

WITH ARCHITECTURAL FOR EXACT LOCATIONS AND

INTERFACE WITH FINISHES.

D. PROVIDE ALL NEW COPPER PIPING FOR FIXTURES. SEE

DEMOLITION PLANS FOR SIZE AND QUANTITIES OF PIPE.

REPLACE PIPING LIKE FOR LIKE UNLESS OTHERWISE

INDICATED IN BID DOCUMENTS.

E. BID OPTION J: NEW BATHTUBS OR SHOWER PANS AT ALL

GUEST ROOM BATHROOMS

BLDG.

TRUE

NORTH

.6

SHEET NOTES

1. REPLACE LAVATORIES AT GUEST ROOMS

2. CONNECT MOP SINK TO NEAREST EXISTING DCW, DHW,

SAN, AND VENT PIPING.

3. REINSTALL SALVAGED HISTORIC LAVATORY FROM

SECOND FLOOR GUEST ROOMS. PROVIDE NEW FAUCET

AND HANDLES TOTAL OF (2) LOCATIONS.

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

3.2 5.8

LINEN RM.

300C

SHOWER RM.

312B

GUEST ROOM

CLOSET

301B

BATHROOM

301A

TOILET RM

310A

CLOSET

310B

GUEST ROOM

BATHROOM

309A

BATHROOM

307A

GUEST ROOM

GUEST ROOM

BATHROOM

305A

BATHROOM

311A

GUEST ROOM

GUEST ROOM

GUEST ROOM

TOILET RM

312A

GUEST ROOM

GUEST ROOM

STAIRS

BATHROOM

304A

BATHROOM

302A

CORRIDOR

GUEST ROOM

GUEST ROOM

BATHROOM

303A

EAVES

300B

EAVES

305B

EAVES

311B

EAVES

300A

WC-2

WC-2

WC-2

WC-2

WC-2

WC-2

WC-2

SH-4

LV-1

LV-2

SH-5

LV-2

WC-2

SH-4

LV-2

SH-2

SH-2

LV-2

LV-2

LV-2

SH-2SH-2

LV-2

SH-5

LV-2

LV-1

SH-4

LV-2

EXISTING 4" VENT

UP THROUGH ROOF

0 4 84

SCALE OF FEET

SCALE I

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :0

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING FLOOR PLAN -

LEVEL 3P2.03

162 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P2.03

1 PLUMBING FLOOR PLAN - LEVEL 3

GENERAL NOTES

A. RECONFIGURE ALL DWV, CW, & HW TO ACCOMMODATE NEW

CONFIGURATION. COORDINATE WITH ARCHITECTURAL WORK.

B. REPLACE ALL EXISTING DWV, CW, HW PIPING THAT IS EXPOSED

DURING REMOVAL & REPLACEMENT OF INDOOR FINISHES,

INSULATE ALL NEW PIPING PER SPECIFICATIONS. COORDINATE

WITH ARCHITECTURAL.

C. INSTALL NEW FIXTURES PER SCHEDULE. COORDINATE WITH

ARCHITECTURAL FOR EXACT LOCATIOINS AND INTERFACE WITH

FINISHES.

D. PROVIDE ALL NEW COPPER PIPING FOR FIXTURES. SEE

DEMOLITION PLANS FOR SIZE AND QUANTITIES OF PIPE. REPLACE

PIPING LIKE FOR LIKE UNLESS OTHERWISE INDICATED IN BID

DOCUMENTS.

E. REPALCE LAVATORIES AT GUEST ROOMS 302, 304, 309, 310, AND

312.

F. REMOVE AND REINSTALL LAVATORIES IN GUEST ROOMS AS

REQUIRED DUE TO NEW FINISHES. SEE ARCHITECTURAL.

SHEET NOTES

1. REINSTALL SALVAGED HISTORIC LAVATORY FROM FIRST

FLOOR GUEST ROOMS. PROVIDE NEW FACET AND

HANDLES. TOTAL OF (5) LOCATIONS.

2. THERE WAS NOT PREVIOUSLY A SINK IN THIS LOCATION.

PROVIDE NEW DWV, DCW & DHW TO ACCOMMODATE NEW

SINK. CONNECT TO EXISTING ADJACENT WC AND TUB

PLUMBING.

3. BID OPTION J: NEW BATHTUB OR SHOWER PANS AT ALL

GUEST ROOM BATHROOMS.

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

6 7 8

NC

NB.3

6.1

STAFF LOUNGE

B204

BATHROOM

B204A

BATHROOM

B204B

STAFF DINING

B208

FD-1 FD-1

2" SAN

4" SAN

2" V 2" V

2" V2" V

4" SAN

3" V UP

4" SAN

FROM ABOVE

2" V2" V

2" SAN

4" SAN 4" SAN

2" SAN

2" SAN

6 7 8

NC

NB.3

6.15.8

STAFF LOUNGE

B204

BATHROOM

B204A

BATHROOM

B204B

STAFF DINING

B208

WC-2

LAV-1

SH-1

LAV-1

SH-1

WC-2

1 1/2" HW DN

1 1/2" CW DN

1 1/2" CW DN

1 1/2" HW DN

1" CW

1" CW

1/2" CW

1/2" HW

1/2" HW

1/2" CW

SCALE H

0 2 42

SCALE OF FEET

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :4

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

ENLARGED PLUMBING

PLANS

P4.01 163 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P4.01

1 PLUMBING ENLARGED FLOOR PLAN IN CRAWLSPACE - BASEMENT 2 - WASTE AND VENT

P4.01

2 PLUMBING ENLARGED FLOOR PLAN - BASEMENT 2 - DOMESTIC COLD AND HOT WATER PIPING

BLDG.

TRUE

NORTH

.6

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

7 8

NC

NB

NB.3

MEN'S

RESTROOM

B101B

WOMEN'S

RESTROOM

B101A

LAV-1 LAV-1 LAV-1

UR-1

WC-1 WC-1

WC-1WC-1WC-1

1" HW

1 1/4" CW

3/4" HW

1 1/4" CW

1" HW DN

1 1/2" CW DN

1 1/2" CW

1" CW

LAV-1LAV-1 LAV-1

WC-1

1" CW

3/4" HW

3/4" CW

7 8

NC

NB

NB.3

FD-1

FD-1

4" V UP

4" SAN

2" WCO 2" WCO

2" WCO

2" WCO

2" V ABOVE

CEILING

3" SAN

4" SAN

1 1/2" V

1 1/2" V

2" V ABOVE

CEILING

3" SAN 2" V UP TO

CEILING

2" V UP TO

CEILING

3" V DN

2" SAN DN

W/CO

2" SAN DN

W/CO

4" SAN DN

2" V UP

(TYP. 6)

SCALE H

0 2 42

SCALE OF FEET

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :4

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

ENLARGED PLUMBING

PLANSP4.02

164 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P4.02

2 PLUMBING ENLARGED FLOOR PLAN - BASEMENT 1 - DOMESTIC COLD AND HOT WATER PIPING

P4.02

1 PLUMBING ENLARGED FLOOR PLAN - BASEMENT 1 - WASTE AND VENT

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

3" SAN

3" V UP/DN

4" V UP

3" V

3" SAN

3" SAN

3" SAN

4" SAN

4" SAN

1.5" V

1" V

1 1/2" CW DN

1 1/2" HW DN

1 1/2" CW DN

3"V UP

2"SAN

2"

SAN

4"

SAN

1 1/2" HW

1 1/2" CW

1 1/2" HW

1 1/2" CW

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :5

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

Checker

09/13/19

PLUMBING RISER DIGRAM

P5.01 165 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P5.01

1 BASEMENT 1 RESTROOM DRAIN, WASTE & VENT

P5.01

2 BASEMENT 1 RESTROOM DOMESTIC HOT & COLD WATER

P5.01

3 BASEMENT 2 DRAIN, WASTE & VENT

P5.01

4 BASEMENT 2 RESTROOM DOMESTIC HOT & COLD WATER

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

1/2" x 1 1/4" HEX HEAD CAP

SCREWS & CHANNEL NUTS

PIPE CLAMP

CLEVIS HANGER

18 GAUGE GALVANIZED SHIELD,

WRAP COMPLETELY AROUND PIPE,

1/2" MIN. EXTENDED BEYOND EACH

SIDE OF HANGER

ADJUSTABLE HINGE

1/2" x 1 1/4" HEX HEAD

CAP SCREWS &

CHANNEL NUTS

ALL THREAD

ROD (TYP.)

CHANNEL

TRANSVERSE

BRACE

PIPE SLEEVE

(TYP.)

CLEVIS HANGER

(TYP.)

ADJUSTABLE

HINGE

INSULATION

PROTECTION SHIELD

WITH "LOC" TABS (TYP.

FOR PIPE WITH

INSULATION AT EACH

SUPPORT)

ADJUSTABLE HALF HINGE

ALL THREADED (TYP.)

PIPE (WITH

INSULATION)

ALL THREAD ROD (TYP.)

PIPE SLEEVE (TYP.)

CLEVIS HANGER (TYP.)

PIPE (WITHOUT INSULATION)

INSULATION PROTECTION

SHIELD WITH "LOC" TABS

PIPE (WITH INSULATION)

ROD STIFFENER (TYP.)

CHANNEL

LONGITUDINAL

BRACE

CHANNEL

TRANSVERSE

BRACE

1/2" x 1 1/4" HEX HEAD

CAP SCREWS &

CHANNEL NUTS2

CHANNEL

SQUARE

WASHER

(TYP.)

CHANNEL

LONGITUDINAL

BRACE

SQUARE NUT (TYP.)

PIPE CLAMP, SIZE

ACCORDING TO PIPE SIZE

WITH OR WITHOUT

INSULATION (TYP.)

HEX NUT (TYP.)

ALL THREAD

ROD (TYP.)

ROD STIFFENER

(TYP.)

SLOTTED HEX HEAD MACHINE

SCREW (TYP.)

1/2" x 1 1/4" HEX HEAD CAP

SCREWS & CHANNEL

NUTS (TYP.)

ADJUSTABLE HINGE - 45°

MAX (TYP. OF 2)

CHANNEL

TRANSVERSE

BRACE

BEAM SPAN

NOTES:

1. COMPLY WITH CALIFORNIA BUILDING CODE SECTION 1632A, ADOPTED EDITION.

2. BRACE ALL PIPING AND EQUIPMENT TRANSVERSELY AND LONGITUDINALLY ACCORDING

TO SMACNA GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL AND AND PLUMBING

PIPING SYSTEMS.

3. ALL PIPE SUPPORTS SHALL BE PIPING TECHNOLOGY & PRODUCTS, INC. OR APPROVED

EQUAL.

4. PROVIDE TRANSVERSE SEISMIC BRACING AT 20'-0" MAXIMUM AND AT EVERY CHANGE OF

DIRECTION.

5. PROVIDE LONGITUDINAL SEISMIC BRACING AT 40'-0" O.C. MAXIMUM, MINIMUM OF 2

REQUIRED.

6. REFER TO 2/P6.03 FOR ATTACHMENT TO DECK CONTINUATION.

SHEET NOTES:

1. INSTALL ROD STIFFENER WHEN LENGTH EXCEEDS THE SCHEDULE LENGTH:

ROD STIFFENERS ARE REQUIRED ONLY ON HANGER AND TRAPEZE ASSEMBLIES

THAT HAVE SEISMIC BRACING ATTACHED AT OR WITHIN 4" OF THE ROD. A MINIMUM

OF TWO ROD STIFFENERS MUST BE INSTALLED.

2.PROVIDE COPPER HANGERS AND/OR CLAMPS FOR BARE COPPER PIPING OR EPOXY

COATED CLEVIS HANGER AND/OR CLAMPS FOR NON-METALLIC SEPARATION

BETWEEN DISIMILAR METALS.

3.REFER TO PIPING TECHNOLOGY & PRODUCTS INC. FOR CHANNEL TYPE AND LOAD

RATING BASED ON BEAM SPAN FOR UNIFORM AND CONCENTRATED LOADING.

4.REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

25"

MAX. ROD LENGTH

WITHOUT ROD

STIFFENER

19"3/8" 1/2"

ROD SIZE

18" 13"

MAX. SPACING

BETWEEN ROD

STIFFENERS

37" 31"5/8"

3/4" 28" 23"

43"7/8" 33"

60" 50"1"

1-1/4" 43" 38"

ROD STIFFENER

(TYP.)

ROD STIFFENER (TYP.)1

NONHARDENING RESILIENT

SEALANT, BOTH SIDES (TYP.).

USE META CAULK 1000 BY

RECTOSEAL IF FIRE RATING IS

REQUIRED.

FIRE RATED WALL

GALVANIZED STEEL PIPE

SLEEVE

GALVANIZED STEEL PIPE

SLEEVE

NONHARDENING RESILIENT

SEALANT, BOTH SIDES (TYP.). USE

META CAULK 1000 BY RECTOSEAL IF

FIRE RATING IS REQUIRED.

FIRE STOPPING MATERIAL

WITH SAME FIRE RATING AS

WALL

PIPE INSULATION

FIRE RATED WALL

PIPE

PIPE

NOTES:

1. INSTALL FIRE STOPPING MATERIAL PER MANUFACTURER'S

DETAIL.

2. REFER TO ARCHITECTURAL DRAWING FOR WALL FIRE RATING.

NONHARDENING

RESILIENT SEALANT,

(SEALED TOP & BOTTOM

TYP.). USE META CAULK

1000 BY RECTOSEAL IF

FIRE RATING IS REQUIRED.

PIPE INSULATION

NONHARDENING RESILIENT

SEALANT, (SEALED TOP &

BOTTOM TYP.). USE META

CAULK 1000 BY RECTOSEAL IF

FIRE RATING IS REQUIRED.

NEOPRENE PAD

STEEL SHIM (OPTIONAL)

CONCRETE FLOOR

FIBROUS MATERIAL PACKING

ALL AROUND

PIPE PIPE

STEEL PIPE RISER CLAMP

BOLT WITH NUTS

STEEL SHIM (OPTIONAL)

NEOPRENE PAD

CONCRETE FLOOR

FINISHED FLOOR

STEEL PIPE RISER

CLAMP

WELD PIPE TO SUPPORT

BOLT WITH NUTS

PIPE

NOTES:

1. REFER TO SPECIFICATIONS FOR INSULATED PIPE RISER

SUPPORTS.

2. COORDINATE RISER CLAMP ORIENTATION TO BE WITHIN WALL

CAVITY.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :5

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

IG

JHW

09/13/19

PLUMBING DETAILS

P6.01 166 211

CONSTRUCTION DOCUMENTS

P .0

IG

P6.01

1 TYPICAL SINGLE AND TRAPEZE PIPE SUPPORT

P6.01

2 PIPE PENETRATION THRU FIRE-RATED WALL

P6.01

3 PIPE PENETRATION THUR FLOOR

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

NOTES:

1. HOT DIP GALVANIZE RESTRAINT FITTING

PIPE RISER

ELBOW RESTRAINT FITTING @ STACK BASE

HOLDRITE OR EQUAL

ELBOW

METAL COVER

HAND HOLE

CLEANOUT PLUG

SCREW

SANITARY OR

STORM PIPE

Y-BRANCH

AFF

WALL

FOR WALL CONSTRUCTION

REFER TO ARCHITECTURAL

DRAWINGS

CAST IRON CLEANOUT TEE

MAY EXTEND AS

WASTE OR VENT

45° BEND

SANITARY OR

STORM PIPE

FLOW

WYE

SCORIATED CAST

IRON COVER

FLUSH TO GRADE

PROVIDE 36"X18" CONCRETE

PAD IN ASPHALT/DIRT

PAVING

DO NOT ATTACH

CLEANOUT HOUSING TO

FERRULE

FOR PAVING OTHER

THAN CONCRETE

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:2 :0

A

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING DETAILS

P6.02 167 211

CONSTRUCTION DOCUMENTS

P .0

A

G

P6.02

1 PIPE ELBOW AND RISER SUPPORT

P6.02

2 WALL CLEANOUT

P6.02

3 GRADE CLEANOUT

This document has been digitally signed and sealed by

John H. Weale, PE using a Digital Signature.

Printed copies of this document are not considered signed and sealed and

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OFOREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

138578

150025

R E

V

IT

/1

/2

:1 :4

P

M C

U s e rs

\k p a y n e \D o c u m e n ts

\O R

C A

M

E P

-C e n tr a l_ k p a y n e U

S W

O A

K .r v t

BG

AG

JHW

09/13/19

PLUMBING SCHEDULES

P7.01 168 211

CONSTRUCTION DOCUMENTS

P .0

A

G

7 PROVIDE COMBINATION CHECK VALVE AND DIVERTER VALVE, WEIL 2616.

6 EMERGENCY POWER REQUIRED.

5 PLUMBING TO PROVIDE STARTER MOTOR AND ELECTRICAL CONTRACTOR TO INSTALL.

4 REFER TO CIVIL DRAWINGS FOR LOCATION AND INVERT ELEVATION OF THE INLET PIPE TO SANITARY DRAIN ON LEVEL P1

3 PROVIDE BRONZE IMPELLER.

2 PROVIDE FLOATS, WEIL 8234 OR EQUAL, AND CONTROL PANEL W/ ALARM OUTPUTS TO BMS SYSTEM, WEIL 8165 OR EQUAL.

1 PROVIDE EXPLOSION PROOF MOTOR

NOTES:

SP-1

SUBMERSIBLE

PUMP

BELL & GOSSETT -

ELEVATOR SUMP PIT

BELOW BASEMENT LEVEL 2

ELEVATOR SUMP WATER 20 25 3600 1.50 115/1/60 - 1-7

GPM HEAD... RPM HP (V/Ph/HZ) (LBS.)

PLAN

MARK

DESCRIPTION MANUFACTURER MODEL LOCATION SERVICE FLUID

PUMP ELECTRIC

GROSS

WEIGHT

NOTES

SUMP PUMP SCHEDULE

WHA WATER HAMMER ARRESTER ZURN 1250XL - LEAD-FREE, NSF/ANSI STANDARD 372, COPPER BODY, PRE-CHARGED AND SEALED.

WCO WALL CLEANOUT ZURN Z1446 - CAST IRON CLEANOUT TEE, BRONZE PLUG, STAINLESS STEEL COVER.

TG-1 TRAP GUARD PROVENT TG33 - FLEXIBLE ELASTOMERIC PVC

HB-1 NON-FREEZE WALL HYDRANT ZURN Z1300 6-1/2" SQ. NON-FREEZE, INTEGRAL VACUUM BREAKER

GCO GRADE CLEANOUT ZURN Z1400 7 1/4" CAST IRON BODY, HEAVY DUTY CAST IRON TOP, BRONZE PLUG.

FD-1 FLOOR DRAIN (GENERAL PURPOSE) ZURN Z415B 5" DIA. CHROME PLATED BRONZE TOP, CAST IRON BODY

FCO FLOOR CLEANOUT ZURN Z1400 7 1/4"

CAST IRON BODY, HEAVY DUTY NICKEL BRONZE TOP, ANCHOR FLANGE, BRONZE

PLUG.

CO CLEANOUT BOOT ZURN Z1445 - CAST IRON CLEANOUT TEE, BRONZE PLUG.

BCO BASE CLEANOUT ZURN Z1446 -

CLEANOUT WITH ROUND WALL ACCESS COVER. CAST IRON BODY. COORDINATE

FINISH WITH ARCHITECT.

TAG FIXTURE MANUFACTURER MODEL TYPE REMARKS

PLUMBING DRAIN, CLEANOUT, AND SPECIALTY SCHEDULE

MS-1 MOP SINK FLORESTONE PRODUCTS CO MODEL 92 (SIZE 24"X24"X12") 2.2 GPM NO 3" 2" 3/4" 3/4"

PROVIDE SPEAKMAN FAUCET MODEL: COMMANDER

SC-5812 WITH INTEGRAL STOPS, CAST BRASS NOZZLE

WITH 3/4" HOSE THREADED AND PAIL HOOK, BRASS

VACUUM BREAKER, BRASS TOP BRACE ASSEMBLY WITH

WALL FLANGE AND MOUNTING SCREWS.

FD-1 FLOOR DRAIN ZURN

Z451, SHALLOW TRAP CAST IRON

BODY BRONZE TOP HEELPROOF

GRATE, TYPE B STRAINER

N/A N/A 2" 1-1/2" - -

CAST IRON BODY WITH BRONZE TOP - HEEL PROOF

GRATE MAXIMUM 1/4" GRATE OPENING

HB-1 HOSE BIBB ZURN

Z1315 THROUGH WALL FREEZEPROOF

HOSEBIBB

N/A N/A - - 3/4" - ALL BRONZE FREEZEPROOF WALL HYDRANT WITH KEY

DF-1 DRINKING FOUNTAIN ELKAY

DRKR14C. COUNTERTOP

NON-REFRIGERATED, NON-FILTERED.

N/A NO 2" 1-1/2" 1/2" -

STAINLESS STEEL COUNTERTOP. COORDINATE WITH

ARCHITECTURAL FOR CABINET INSTALLATION.

UR-1 WALL MOUNT URINAL AMERICAN STANDARD

WASHBROOK FLOWISE WALL MOUNT

URINAL

.125 GPF YES 2" 1-1/2" 1" - HIGH EFFICIENCY FLUSH VALVE W/SENSOR

WC-2

WATER CLOSET (FLUSH TANK,

FLOOR MOUNT)

AMERICAN STANDARD

CADET FLOWISE FLOOR MOUNT

TOILET. 16.5" HIGH. COLOR WHITE

ONLY

1.1 GPF YES 4" 2" 1" -

HIGH EFFICIENCY PRESSURE ASSIST.

ELONGATED BOWL WITH CLOSED FRONT SEAT. PROVIDE

TANK WITH TANK COVER LOCKING DEVICE (4142.901).

WC-1

WATER CLOSET (FLUSH VALVE,

FLOOR MOUNT)

AMERICAN STANDARD

MADERA FLOWISE 16.5" HIGH. FLOOR

MOUNT TOILET. COLOR WHITE ONLY.

FLUSHOMETER AUTOMATIC FLUSH

VALVE. MODEL 2857.128

1.1 GPF YES 4" 2" 1" -

HIGH EFFICIENCY FLUSH VALVE W/SENSOR

ELONGATED BOWL WITH OPEN FRONT SEAT.

SK-1 LAUNDRY SINK FIAT

FLTD II. MOLDED-STONE. DEEP

DOUBLE LAUNDRY SINK

TOP MOUNT GOOSENECK WITH TWO

HANDLES 8" O.C.

1.0 GPM YES 3" 1-1/2" 1/2" 1/2" PROVIDE 1.0 GPM AERATOR.

SH-6

BATHTUB/ WAND SHOWER

(CONTROLS ONLY)

AMERICAN STANDARD

AMERICAN STANDARD DIVERTER

VALVE TRIMKIT T064430.002; DIVERTER

VALVE R422; BRASS ELBOW CHROME

8888068.002

1.4 YES - - 3/4" 3/4"

3-FUNCTION HAND SHOWER WITH PAUSE FEATURE

1660766.002; 59" METAL SHOWER HOSE 8888035.002; 36"

STANDARD SLIDE BAR 1660236.002

SH-5 SHOWER (CONTROLS ONLY) AMERICAN STANDARD

AMERICAN STANDARD ESTATE

PRESSURE BALANCE SHOWER FITTING

T722.507.002; R111.000 VALVE

1.75 GPM YES - - 3/4" 3/4" WATER SAVING 3-FUNCTION SHOWERHEAD.

SH-4 BATH (CONTROLS ONLY) AMERICAN STANDARD

AMERICAN STANDARD ESTATE

PRESSURE BALANCE BATH FITTING

T722.508.002; R111.000 VALVE

1.75 GPM YES - - 3/4" 3/4"

NO SHOWERHEAD, BATH FAUCET ONLY; CAP SHOWER

OUTLET BEHIND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .