A06_Dwgs_01_ORCA_100CD_FINAL_0_TITLE.pdf
PDF 11 MB Posted
- Solicitation number
- 140P2019R0045
About this file
This is a pre-solicitation notice for a construction contract to Correct Life Safety and Critical Deficiencies at Oregon Caves Chateau. The National Park Service seeks to address structural deficiencies, fire suppression and detection systems, egress and accessibility issues, and replacement of water supply, waste, electrical and HVAC systems. Work includes installation of code-compliant egress doors and fire detection/suppression, conversion of first floor guest rooms to accessible standards, and addition of a three-story elevator and steel-framed balconies. The project will be conducted in a single phase with an estimated price over $10 million and performance period from April 2020 to September 2021. Responses are due on an unspecified future date to be provided in solicitation documents issued on or about October 21, 2019.
Drawings - Title
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TITLE OF DRAWING
LOCATION WITHIN PARK
NAME OF PARK
COUNTYREGION STATE
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
QUALITY DESIGN CERTIFICATION
Prepared in Accordance with Design Development (Title I)
OR
Variance from Design Development (Title I) Approved by Superintendent on
OR
Construction Drawings Not Preceded by Design Development (Title I)
Project Manager
Drawing No.
Date
DRAWING NO.
OF
138578
OREGON CAVES NATIONAL MONUMENT
OREGONJOSEPHINE
OREGON CAVES CHATEAU
A/E FIRMS
PRIME:
ARCHITECTURAL RESOURCES GROUP
PORTLAND, OREGON
LANDSCAPE ARCHITECT:
RHAA
MILL VALLEY, CALIFORNIA
STRUCTURAL ENGINEER:
SOHA ENGINEERS
SAN FRANCISCO, CALIFORNIA
FIRE PROTECTION:
HERITAGE PROTECTION GROUP
MIDDLEBURY, VERMONT
MECHANICAL ELECTRICAL AND PLUMBING:
INTEGRAL GROUP
SEATTLE, WASHINGTON
R E
V
IT
Date
PACIFIC WEST
PMIS/PKG. NO.
SHEET
150025
/1
/2
:5
:0
A
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
CORRECT LIFE SAFETY AND CRITICAL
DEFICIENCIES
1 211
K E
CONSTRUCTION DRAWINGS
Mark Sheet REVISION Date Initial
PMIS 150025
UP
DNUP
UP
UP
UP
CD
CC NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
AE3.00
18' - 0
18' - 0
18' - 0"
18' - 0"
17' - 4" 15' - 0" 17' - 0"
60' - 0" 60
14' - 4"
18' - 4"
9' - 4"
10' - 8"
7' - 4"
13' - 8"
4' - 8"
9"
9"
17' - 3
9"
7'
3"
8'
9"
36' - 0 " 36' - 0"
9"
5"
9"
3.2 5.8
49' - 4"
FIREPLACE
OFFICE #1
OFFICE #2
WOMEM'S
RESTROOM
BATHROOM
105A
GUEST ROOM
CLOSET
105B
STORAGE
B112
GUEST ROOM
GUEST ROOM
GUEST ROOM
BATHROOM
104A
BATHROOM
103A
CLOSET
104B
CLOSET
103B
GUEST ROOM
BATHROOM
B121
CLOSET
B122 CLOSET
B123
BATHROOM
B124
STORAGE
B125
CORRIDOR
GAME ROOM
LOBBY
SITTING ROOM
22.47°22.47°
105-2
104-1
111-2
110-3
101-1
102-2
102A-1
104-2
103-1
102-1
104A-1
108-3 107-1108-2108-1
109-4
109-5
109-1
110-1
109-3
109-2
109-6
105-1
B100-1
110-2
111-1
109-1
107-2
0 4 84
SCALE OF FEET
ISCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:0
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EXISTING CONDITIONS
FLOOR PLAN - LEVEL 1AE2.01
15 211
CONSTRUCTION DRAWINGS
A E
.0
K
E
AE2.01
1 EXISTING FLOOR PLAN - LEVEL 1
(FOR REFERENCE ONLY - CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD)
BLDG.
TRUE
NORTH
29.6°
DN
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1
NA.1
6.1
3.2 5.8
18' - 0
18' - 0
18' - 0"
18' - 0"
17' - 4" 15' - 0" 17' - 0"
60' - 0"
14' - 4"
18' - 4"
9' - 4"
10' - 8"
7' - 4"
13' - 8"
4' - 8"
9"
9"
17' - 3
9"
7'
3"
8'
9"
36' - 0 " 36' - 0"
5"
9"
49' - 4"
CLOSET
215A
STAIRS
CLOSET
214B
BATHROOM
214A
CLOSET
204B
CLOSET
203B
BATHROOM
204A
BATHROOM
203A
CLOSET
206B
BATHROOM
206A CLOSET
205B
BATHROOM
205A
BATHROOM
201A
CLOSET
201B CLOSET
202B
CLOSET
211B BATHROOM
212A
CLOSET
212B
CLOSET
210B
CLOSET
209B
BATHROOM
210A
GUEST ROOM
BATHROOM
209A
GUEST ROOM
202BATHROOM
202A
GUEST ROOM
CORRIDOR
200B
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
CORRIDOR
200A
STAIRS
BATHROOM
211A
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
STORAGE
200C
GUEST ROOM
LINEN ROOM
CHIMNEY
22.47° 22.47°
205-2
206-1209-1
204-1
205-1
215-1
214-2
214A-1
201-1
202-2
202A-1
204A-1
204-2
202-1214-1
211-1
211A-1
210-1
211-2
210-2
203-1
207-1208-1
212-1
200-1
7'
0 4 84
SCALE OF FEET
ISCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:0
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EXISTING CONDITIONS
FLOOR PLAN - LEVEL 2AE2.02
16 211
CONSTRUCTION DRAWINGS
A E
.0
K
E
AE2.02
1 EXISTING FLOOR PLAN - LEVEL 2
(FOR REFERENCE ONLY - CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD)
BLDG.
TRUE
DN
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
AE3.00
3.2 5.8
18' - 0
18' - 0
18' - 0"
18' - 0"
17' - 4" 15' - 0" 17' - 0"
60' - 0" 60
14' - 4"
18' - 4"
9' - 4"
10' - 8"
7' - 4"
13' - 8"
4' - 8"
9"
9"
17' - 3
9"
7'
3"
8'
9"
36' - 0
36' - 0"
5"
9"
49' - 4"
LINEN RM
300C
SHOWER RM
312B
GUEST ROOM
CLOSET
301B
BATHROOM
301A
RESTROOM
310A
CLOSET
310B
GUEST ROOM
GUEST ROOM
BATHROOM
305A
GUEST ROOM
GUEST ROOM
GUEST ROOM
RESTROOM
312A
CLOSET
306A
GUEST ROOM
BATHROOM
304A
BATHROOM
302A
GUEST ROOM
GUEST ROOM
BATHROOM
303A
BATHROOM
309A
GUEST ROOM
GUEST ROOM
BATHROOM
307A
CORRIDOR
STORAGE
300A
STORAGE
300B
STORAGE
305B
BATHROOM
311A
STORAGE
311B
CHIMNEY
22.47° 22.47°
312-1 304-1
312A-1
311A-1
304A-1
305A-1
307-1 306-1308-1309-1310-1
303-1301-1 302-1
311-1 305-1
7'
0 4 84
SCALE OF FEET
ISCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:1
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EXISTING CONDITIONS
FLOOR PLAN - LEVEL 3AE2.03
17 211
CONSTRUCTION DRAWINGS
A E
.0
K
E
AE2.03
1 EXISTING FLOOR PLAN - LEVEL 3
(FOR REFERENCE ONLY - CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD)
BLDG.
TRUE
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
AE3.00
3.2 5.8
(E) CHIMNEY
NC
NB
NA
ND
SC
SB
SA
SE
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
SA.1 NA.1
3.2 5.8
0 4 84
SCALE OF FEET
ISCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:1
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EXISTING CONDITIONS
FLOOR PLAN - ROOFAE2.04
18 211
CONSTRUCTION DRAWINGS
A E
.0
K
E
AE2.04
1 EXISTING FLOOR PLAN - ROOF
(FOR REFERENCE ONLY)
BLDG.
TRUE
UP
UP
UP
DN
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
AE3.00
KITCHEN
B103
WALK-IN REFRIG.
B103A
COFFEE SHOP
B104
DINING ROOM
B102
GIFT SHOP
B101
STAIRS
B100
3.2 5.8
18' - 0
18' - 0
18' - 0"
18' - 0"
17' - 4" 15' - 0" 17' - 0"
60' - 0" 60
14' - 4"
18' - 4"
9' - 4"
10' - 8"
7' - 4"
13' - 8"
4' - 8"
9"
9"
17' - 3
9"
7'
3"
8'
9"
36' - 0 " 36' - 0"
9"
5"
9"
49' - 4"
CHIMNEY
MEN'S RESTROOM
B105
22.47° 22.47°
B103-2
B103-1
B102-2 B102-3B102-1
B101-2
B101-3
B101-1
B104-2
B104-1
B101-4
B103-3
B101-1
B104-1
B102-1
B103-1
0 4 84
SCALE OF FEET
ISCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:2
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EXISTING CONDITIONS
FLOOR PLAN -
BASEMENT 1AE2.B1
14 211
CONSTRUCTION DRAWINGS
A E
.B
K
E
AE2.B1
1 EXISTING FLOOR PLAN - BASEMENT 1
(FOR REFERENCE ONLY - CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD)
BLDG.
TRUE
DN
UP
UP
UP
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
AE3.00
3.2 5.8
18' - 0
18' - 0
18' - 0"
18' - 0"
17' - 4" 15' - 0" 17' - 0"
60' - 0" 60
14' - 4"
18' - 4"
9' - 4"
10' - 8"
7' - 4"
13' - 8"
4' - 8"
9"
9"
17' - 3
9"
7'
3"
8'
9"
36' - 0 " 36' - 0"
5"
9"
49' - 4"
UP
LAUNDRY
B209
STAFF DINING
B208
LAUNDRY
B209B
RESTROOM
B210A
STORAGE
B211
CHIMNEY
REFG UNIT
STORAGE
B203
STORAGE
B210
DUMB-
WAITER
CORRIDOR
B201
STAIRS
B200
STORAGE
B201A
STAFF BEDROOM #1
B207
CLOSET
B207A
BATHROOM
B203A
STAFF BEDROOM #3
B205
STAFF BEDROOM #2
B206
CLOSET
B206A
CLOSET
B205A
STAFF LOUNGE
B204
WINE STOR
B202B
STORAGE
B202
22.47° 22.47°
B208-4B208-2
B209B-1
B209-1
B208-1 B208-3
B207-1
B207-2
B206-1
7'
B209-1
0 4 84
SCALE OF FEET
ISCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:2
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EXISTING CONDITIONS
FLOOR PLAN -
BASEMENT 2AE2.B2
13 211
CONSTRUCTION DRAWINGS
A E
.B
K
E
AE2.B2
1 EXISTING FLOOR PLAN - BASEMENT 2
(FOR REFERENCE ONLY - CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD)
BLDG.
TRUE
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
18' - 0
18' - 0
18' - 0"
18' - 0"
60' - 0" 60
14' - 4"
18' - 4"
9' - 4"
10' - 8"
7' - 4"
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
AE3.00
13' - 8"
4' - 8"
9"
9"
17' - 3
9"
7'
3"
8'
9"
36' - 0 " 36' - 0"
5"
9"
MECHANICAL ROOM
B301
3.2 5.8
17' - 4" 15' - 0" 17' - 0"
49' - 4"
WORKSHOP
B302
UP
22.47° 22.47°
CRAWL SPACE
B301-1
7'
B301-2
0 4 84
SCALE OF FEET
ISCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:2
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EXISTING CONDITIONS
FLOOR PLAN -
BASEMENT 3AE2.B3
12 211
CONSTRUCTION DRAWINGS
A E
.B
K
E
AE2.B3
1 EXISTING FLOOR PLAN - BASEMENT 3
(FOR REFERENCE ONLY - CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD)
BLDG.
TRUE
LEVEL 1
0"
LEVEL 2
13' - 5"
ROOF
36' - 4"
BASEMENT 1
-12' - 3"
LEVEL 3
22' - 7"
BASEMENT 2
-24' - 0"
BASEMENT 3
-36' - 0"
5 4
LEVEL 1.1
2' - 4"
BASEMENT 2.1
-22' - 9"
3.25.8
ATTIC
31' - 4"
B208-4 B208-2
B103-2
B209B-1B209-1
B208-1B208-3B207-1
B207-2B206-1
105-2
104-1
205-2 206-1 209-1
204-1
205-1 210-1
211-2
210-2207-1 208-1
B102-2B102-3 B102-1
108-3107-1 108-2 108-1 109-4109-5109-6
B101-2B101-3 B101-1
105-1
B103-3
307-1306-1 308-1 309-1 310-1
305-1
B301-1
B103-1
311-1
B205-1
107-2
B102-1
B301-2
(E) FAN
OPENING
TO REMAIN
0 4 84
SCALE OF FEET
ISCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:2
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EXISTING CONDITIONS
EXTERIOR ELEVATIONAE3.00
19 211
CONSTRUCTION DRAWINGS
A E
.0
K
E
AE3.00
1 EXISTING EXTERIOR ELEVATION - WEST
(FOR REFERENCE ONLY)
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:3
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
DRAWING INDEX
T1.01 2 211
CONSTRUCTION DRAWINGS
T .0
K
E
SHEET
SUB
SHEET TITLE OF SHEET
1 - COVER SHEET
2 T1.01 DRAWING INDEX
3 T1.02 ABBREVIATIONS, SYMBOLS, GENERAL NOTES, & PROJECT DATA
4 T1.03 CODE ANALYSIS
5 T1.04 EGRESS PLAN - SITE
6 T1.05 CODE PLANS & SIGNAGE
7 T1.06 CODE PLANS & SIGNAGE
8 T1.07 SPECIALTIES - RAMP AND STAIR REQUIREMENTS
9 T1.08 SPECIALTIES - CLEARANCE LIMITS
10 T1.09 SPECIALTIES - MOUNTING HEIGHTS
11 T1.10 SPECIALTIES - SIGNAGE
12 AE2.B3 EXISTING CONDITIONS FLOOR PLAN - BASEMENT 3
13 AE2.B2 EXISTING CONDITIONS FLOOR PLAN - BASEMENT 2
14 AE2.B1 EXISTING CONDITIONS FLOOR PLAN - BASEMENT 1
15 AE2.01 EXISTING CONDITIONS FLOOR PLAN - LEVEL 1
16 AE2.02 EXISTING CONDITIONS FLOOR PLAN - LEVEL 2
17 AE2.03 EXISTING CONDITIONS FLOOR PLAN - LEVEL 3
18 AE2.04 EXISTING CONDITIONS FLOOR PLAN - ROOF
19 AE3.00 EXISTING CONDITIONS EXTERIOR ELEVATION
GENERAL
SHEE
T
SUB
SHEET TITLE OF SHEET
163 P4.01 ENLARGED PLUMBING FLOOR PLAN - LOWER - BASEMENT 2
164 P4.02 ENLARGED PLUMBING FLOOR PLAN - UPPER - BASEMENT 2
165 P5.01 PLUMBING RISER DIAGRAM
166 P6.01 PLUMBING DETAILS
167 P6.02 PLUMBING DETAILS
168 P7.01 PLUMBING SCHEDULES
169 M0.01 MECHANICAL COVER SHEET
170 M1.B3 MECHANICAL DEMO FLOOR PLAN - BASEMENT 3
171 M1.B2 MECHANICAL DEMO FLOOR PLAN - BASEMENT 2
172 M1.B1 MECHANICAL DEMO FLOOR PLAN - BASEMENT 1
173 M1.01 MECHANICAL DEMO FLOOR PLAN - LEVEL 1
174 M1.02 MECHANICAL DEMO FLOOR PLAN - LEVEL 2
175 M1.03 MECHANICAL DEMO FLOOR PLAN - LEVEL 3
176 M2.B3 MECHANICAL FLOOR PLAN - BASEMENT 3
177 M2.B2 MECHANICAL FLOOR PLAN - BASEMENT 2
178 M2.B1 MECHANICAL FLOOR PLAN - BASEMENT 1
179 M2.01 MECHANICAL FLOOR PLAN - LEVEL 1
180 M2.02 MECHANICAL FLOOR PLAN - LEVEL 2
181 M2.03 MECHANICAL FLOOR PLAN - LEVEL 3
182 M3.01 ENLARGED KITCHEN PLAN
183 M3.02 ENLARGED MECHANICAL ROOM FLOOR PLAN
184 M4.01 MECHANICAL SECTIONS
185 M5.01 HYDRONIC DIAGRAM
186 M6.01 MECHANICAL DETAILS
187 M6.02 MECHANICAL DETAILS
188 M7.01 MECHANICAL SCHEDULES
189 E0.01 ELECTRICAL LEGEND
190 E0.02 PANEL SCHEDULES
191 E0.03 PANEL SCHEDULES
192 E0.04 PANEL SCHEDULES
193 E0.05 PANEL SCHEDULES
194 E0.06 PANEL SCHEDULES
195 E0.07 ELECTRICAL SCHEDULES
196 E0.08 ELECTRICAL SCHEMATIC DIAGRAMS
197 E1.B3 ELECTRICAL DEMO FLOOR PLAN - BASEMENT 3
198 E1.B2 ELECTRICAL DEMO FLOOR PLAN - BASEMENT 2
199 E1.B1 ELECTRICAL DEMO FLOOR PLAN - BASEMENT 1
200 E1.01 ELECTRICAL DEMO FLOOR PLAN - LEVEL 1
201 E1.02 ELECTRICAL DEMO FLOOR PLAN - LEVEL 2
202 E1.03 ELECTRICAL DEMO FLOOR PLAN - LEVEL 3
203 E2.00 ELECTRICAL SITE PLAN
204 E2.B3 FLOOR PLAN - BASEMENT 3
205 E2.B2 FLOOR PLAN - BASEMENT 2
206 E2.B1 FLOOR PLAN - BASEMENT 1
207 E2.01 FLOOR PLAN - LEVEL 1
208 E2.02 FLOOR PLAN - LEVEL 2
209 E2.03 FLOOR PLAN - LEVEL 3
210 E6.01 ELECTRICAL CALCULATIONS
211 E7.01 TECHNOLOGY FLOOR PLAN LEVEL 1 & BASEMENT 2
SHEE
T
SUB
SHEET TITLE OF SHEET
106 A5.31 INTERIOR ELEVATIONS - LEVEL 2
107 A5.32 INTERIOR ELEVATIONS - LEVEL 2 & 3
108 A5.33 INTERIOR ELEVATIONS - LEVEL 3
109 A5.34 INTERIOR ELEVATIONS - LEVEL 3
110 A5.35 INTERIOR ELEVATIONS - LEVEL 3
111 A5.36 INTERIOR ELEVATIONS - LEVEL 3
112 A5.37 INTERIOR ELEVATIONS - LEVEL 3
113 A6.B2 CEILING PLAN - BASEMENT 2
114 A6.B1 CEILING PLAN - BASEMENT 1
115 A6.01 CEILING PLAN - LEVEL 1
116 A6.02 CEILING PLAN - LEVEL 2
117 A6.03 CEILING PLAN - LEVEL 3
118 A8.00 ASSEMBLY TYPES
119 A8.01 TYPICAL EXTERIOR DETAILS
120 A8.02 DOOR AND WINDOW DETAILS
121 A8.03 DOOR AND WINDOW DETAILS
122 A8.04 DOOR AND WINDOW MODIFICATION DETAILS
123 A8.05 LOUVER DETAILS
124 A8.06 EXTERIOR DETAILS - FIRE ESCAPE
125 A8.07 EXTERIOR DETAILS - FIRE ESCAPE
126 A8.08 EXTERIOR DETAILS - BALCONY
127 A8.10 INTERIOR DETAILS - LOBBY DESK
128 A8.11 INTERIOR DETAILS - STAIRS, RAMPS, CUSTOM LIGHTING
129 A8.12 INTERIOR DETAILS
130 A9.01 INTERIOR FINISH SCHEDULE
131 A9.10 DOOR SCHEDULE - EXISTING
132 A9.11 DOOR SCHEDULE - NEW / RELOCATED
133 A9.12 WINDOW SCHEDULE
134 FS2.00 FIRE PROTECTION DETAILS & NOTES
135 FS2.B3 BASEMENT LEVEL 3 - FIRE SUPPRESSION
136 FS2.B2 BASEMENT LEVEL 2 - FIRE SUPPRESSION
137 FS2.B1 BASEMENT LEVEL 1 - FIRE SUPPRESSION
138 FS2.01 LEVEL 1 - FIRE SUPPRESSION
139 FS2.02 LEVEL 2 - FIRE SUPPRESSION
140 FS2.03 LEVEL 3 - FIRE SUPPRESSION
141 FS2.04 ATTIC FIRE SUPPRESSION
142 FS2.05 EXTERIOR ELEVATION - MIST FIRE SUPPRESSION
143 FA2.00 FIRE DETECTION DETAILS
144 FA2.B3 BASEMENT LEVEL 3 - FIRE DETECTION AND NOTIFICATION SYSTEM
145 FA2.B2 BASEMENT LEVEL 2 - FIRE DETECTION AND NOTIFICATION SYSTEM
146 FA2.B1 BASEMENT LEVEL 1 - FIRE DETECTION AND NOTIFICATION SYSTEM
147 FA2.01 LEVEL 1 - FIRE DETECTION AND NOTIFICATION SYSTEM
148 FA2.02 LEVEL 2 - FIRE DETECTION AND NOTIFICATION SYSTEM
149 FA2.03 LEVEL 3 - FIRE DETECTION AND NOTIFICATION SYSTEM
150 P0.01 PLUMBING COVER SHEET
151 P1.B3 PLUMBING DEMO FLOOR PLAN - BASEMENT 3
152 P1.B2 PLUMBING DEMO FLOOR PLAN - BASEMENT 2
153 P1.B1 PLUMBING DEMO FLOOR PLAN - BASEMENT 1
154 P1.01 PLUMBING DEMO FLOOR PLAN - LEVEL 1
155 P1.02 PLUMBING DEMO FLOOR PLAN - LEVEL 2
156 P1.03 PLUMBING DEMO FLOOR PLAN - LEVEL 3
157 P2.B3 PLUMBING FLOOR PLAN - BASEMENT 3
158 P2.B2 PLUMBING FLOOR PLAN - BASEMENT 2
159 P2.B1 PLUMBING FLOOR PLAN - BASEMENT 1
160 P2.01 PLUMBING FLOOR PLAN - LEVEL 1
161 P2.02 PLUMBING FLOOR PLAN - LEVEL 2
162 P2.03 PLUMBING FLOOR PLAN - LEVEL 3
SHEE
T
SUB
SHEET TITLE OF SHEET
47 S3.01 BALCONY HSS FRAME ELEVATIONS
48 S3.02 BALCONY HSS FRAME ELEVATIONS
49 S3.10 WALL FRAMING ELEVATION AT FIRE ESCAPES
50 S3.11 SECTIONS AT ELEVATOR
51 S3.12 SITE WALLS AND STAIRS
52 S4.01 BALCONY FRAMING DETAILS - 1
53 S4.02 BALCONY FRAMING DETAILS - 2
54 S4.03 BALCONY FRAMING DETAILS - 3
55 S4.04 BALCONY FOUNDATION DETAILS
56 S4.05 FIRE ESCAPE FRAMING DETAILS - 1
57 S4.06 FIRE ESCAPE FRAMING DETAILS - 2
58 S4.07 WOOD FRAMING DETAILS
59 S4.08 BALCONY GUARDRAIL DETAILS
60 S4.10 EXISTING TIMBER BEAM TO COLUMN CONN. REINFORCEMENT
61 S4.11 SECTIONS AT NEW INTERIOR RAMP
62 S4.12 ELEVATOR PIT & GUIDE RAIL SUPPORT FRAMING DETAILS
63 S4.13 STAIR FRAMING DETAILS
64 S4.14 ELEVATOR FRAMING DETAILS
65 A1.B3 DEMO FLOOR PLAN - BASEMENT 3
66 A1.B2 DEMO FLOOR PLAN - BASEMENT 2
67 A1.B1 DEMO FLOOR PLAN - BASEMENT 1
68 A1.01 DEMO FLOOR PLAN - LEVEL 1
69 A1.02 DEMO FLOOR PLAN - LEVEL 2
70 A1.03 DEMO FLOOR PLAN - LEVEL 3
71 A1.30 DEMO EXTERIOR ELEVATION
72 A2.B3 FLOOR PLAN - BASEMENT 3
73 A2.B2 FLOOR PLAN - BASEMENT 2
74 A2.B1 FLOOR PLAN - BASEMENT 1
75 A2.01 FLOOR PLAN - LEVEL 1
76 A2.02 FLOOR PLAN - LEVEL 2
77 A2.03 FLOOR PLAN - LEVEL 3
78 A2.04 FLOOR PLAN - ATTIC
79 A3.01 EXTERIOR ELEVATION
80 A3.02 EXTERIOR ELEVATION
81 A4.01 BUILDING SECTIONS
82 A4.10 WALL SECTIONS
83 A5.01 NEW BASEMENT STAIRS - ENLARGED PLANS
84 A5.02 NEW BASEMENT STAIRS - SECTIONS
85 A5.03 EGRESS STAIRS (LEVEL 2-3) - PLANS & SECTIONS
86 A5.04 INTERIOR RAMPS - ENLARGED PLANS
87 A5.05 ELEVATOR - ENLARGED PLANS & SECTIONS
88 A5.06 FIRE ESCAPE 1 - ENLARGED PLANS & SECTIONS
89 A5.07 FIRE ESCAPE 1 - SECTIONS
90 A5.08 FIRE ESCAPE 2 - ENLARGED PLANS & SECTIONS
91 A5.09 FIRE ESCAPE 2 - SECTIONS
92 A5.10 FIRE ESCAPE 3 - ENLARGED PLAN & SECTIONS
93 A5.15 ENLARGED PLANS - BATHROOMS
94 A5.16 ENLARGED PLANS - BATHROOMS
95 A5.20 INTERIOR ELEVATIONS - BASEMENT 1 & 2
96 A5.21 INTERIOR ELEVATIONS - BASEMENT 1
97 A5.22 INTERIOR ELEVATIONS - BASEMENT 1
98 A5.23 INTERIOR ELEVATIONS - LEVEL 1
99 A5.24 INTERIOR ELEVATIONS - LEVEL 1
100 A5.25 INTERIOR ELEVATIONS - LEVEL 1
101 A5.26 INTERIOR ELEVATIONS - LEVEL 1
102 A5.27 INTERIOR ELEVATIONS - LEVEL 1
103 A5.28 INTERIOR ELEVATIONS - LEVEL 2
104 A5.29 INTERIOR ELEVATIONS - LEVEL 2
105 A5.30 INTERIOR ELEVATIONS - LEVEL 2
SHEE
T
SUB
SHEET TITLE OF SHEET
20 L0.01 CONSTRUCTION STAGING AND ACCESS PLAN
21 L1.01 SITE DEMOLITION PLAN
22 L2.01 SITE CONSTRUCTION PLAN
23 L3.01 LAYOUT AND GRADING PLAN
24 L8.01 SITE DETAILS
25 L8.02 SITE DETAILS
26 L8.03 SITE DETAILS
27 L8.04 SITE DETAILS
28 L8.05 SITE DETAILS
29 S1.01 STRUCTURAL GENERAL NOTES
30 S1.10 TYPICAL WOOD DETAILS
31 S1.11 TYPICAL WOOD DETAILS
32 S1.20 TYPICAL CONCRETE DETAILS
33 S2.B3 BASEMENT 3 AND FOUNDATION PLAN
34 S2.B2 BASEMENT 2 FRAMING PLAN
35 S2.B2.A BASEMENT 2 WALL SHEATHING PLAN
36 S2.B1 BASEMENT 1 FRAMING PLAN
37 S2.B1.A BASEMENT 1 WALL SHEATHING PLAN
38 S2.01 LEVEL 1 FRAMING PLAN
39 S2.01.A LEVEL 1 WALL SHEATHING PLAN
40 S2.02 LEVEL 2 FRAMING PLAN
41 S2.02.A LEVEL 2 WALL SHEATING PLAN
42 S2.03 LEVEL 3 FRAMING PLAN
43 S2.03.A LEVEL 3 WALL SHEATING PLAN
44 S2.04 ATTIC FRAMING PLAN
45 S2.05 ROOF FRAMING PLAN
46 S2.10 STAIRS FRAMING PLANS - B3 TO B1 AND L2 TO L3
CORRECT LIFE SAFETY AND
CRITICAL DEFICIENCIES
LANDSCAPE
STRUCTURAL
PLUMBING (CONTINUED)
MECHANICAL
ELECTRICAL
ARCHITECTURAL (CONTINUED)
ARCHITECTURAL
FIRE SUPPRESSION SYSTEM
FIRE DETECTION AND NOTIFICATION SYSTEM
PLUMBING
STRUCTURAL (CONTINUED)
& AND
ANGLE
@ AT
CENTERLINE
Ø DIAMETER/ ROUND
PROPERTY LINE OR
PLATE
SF SQUARE FEET
1R1S 1 ROD, 1 SHELF
ACOUS ACOUSTICAL
ACT ACOUSTIC
CEILING TILE
AD AREA DRAIN
ADD'L ADDITIONAL
ADJ ADJUSTABLE/ ADJACENT
AFF ABOVE FINISHED FLOOR
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASB ASBESTOS
ASPH ASPHALT
ATT ATTACH
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BUR BUILT-UP ROOFING
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CLG CEILING
CLKG CAULKING
CLO CLOSET
CLR CLEAR
CMU CONCRETE
MASONRY UNIT
CNTR COUNTER
CO CLEANOUT
COL COLUMN
COMP COMPOSITION
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTG CENTER
CTSK COUNTERSINK
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DETER DETERIORATED
DF DRINKING FOUNTAIN
OR DOUGLAS FIR
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DTL DETAIL
DWG DRAWING
DWR DRAWER
E EAST
(E) EXISTING
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
EP ELECTRICAL PANEL
EQ EQUAL
EQPT EQUIPMENT
EWC ELECTRICAL
WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXPO EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FB FUSE BOX
FBR BD FIBER BOARD
FBRGL FIBERGLASS
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FE CABINET
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLASH FLASHING
FLUOR FLUORESCENT
FND FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FABRIC PANEL
FPRF FIREPROOF
FRP FIBERGLASS
REINFORCED PANEL
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FURR FURRING
FUT FUTURE
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GL GLASS
GLB GLUE LAM BEAM
GND GROUND
GR GRADE
GSM GALVANIZED
SHEET METAL
GYP GYPSUM
HB HOSE BIB
HC HOLLOW CORE
HDR HEADER
HDWD HARDWOOD
HDWE HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HGT HEIGHT
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JC JANITOR CLOSET
JT JOINT
KIT KITCHEN
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LB POUND
LKR LOCKER
LN LINOLEUM
LT LIGHT
MTRL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MC MEDICINE CABINET
MDF MEDIUM DENSITY
FIBERBOARD
MDO MEDIUM DENSITY
OVERLAY
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MOD MODIFICATION
MTD MOUNTED
MUL MULLION
N NORTH
(N) NEW
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OBS OBSCURE
OC ON CENTER
OCC OCCUPANCY OR
OCCUPANT(S)
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED,
CONTRACTOR
INSTALLED
OFOI OWNER FURNISHED,
OWNER INSTALLED
OFF OFFICE
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND
BOARD
PARA PARALLEL
PERP PERPENDICULAR
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PRCST PRECAST
PT PAINT
PTD PAPER TOWEL
DISPENSER
PTD/R COMBINATION
PAPER TOWEL
DISPENSER/
RECEPTACLE
PTN PARTITION
PTR PAPER TOWEL
RECEPTACLE
QT QUARRY TILE
R RISER
RAD RADIUS
RB RUBBER BASE
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REFG REFRIGERATOR
REHAB REHABILITATE
REINF REINFORCED
REP REPAIR
REQ REQUIRED
RESIL RESILIENT
RES RESTORE
RF REFINISH
RGTR REGISTER
FL ROOF LEADER
RM ROOM
RO ROUGH OPENING
RR RESTROOMS
RWD REDWOOD
RWL RAIN WATER
LEADER
S SOUTH
SALV SALVAGE
SASM SELF-ADHESIVE
SHEET MEMBRANE
SC SOLID CORE
SCD SEAT COVER
DISPENSER
SCHED SCHEDULE
SD SOAP DISPENSER
SECT SECTION
SH SHELF
SHR SHOWER
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SLD SEE LANDSCAPE
DRAWINGS
SLR SEALER
SMD SEE MECHANICAL
DRAWINGS
SND SANITARY NAPKIN
DISPENSER
SNR SANITARY NAPKIN
RECEPTACLE
SPD SEE PLUMBING
DRAWINGS
SPEC SPECIFICATION
SQ SQUARE
SSD SEE STRUCTURAL
DRAWINGS
SSK SERVICE SINK
SST STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
STN STAIN
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYM SYMMETRICAL
T TREAD
TB TOWEL BAR
TCA TILE COUNCIL OF
AMERICA
TEL TELEPHONE
TER TERRAZZO
T&G TONGUE &
GROOVE
THK THICK
TO TOP OF
TOC TOP OF CURB
TOP TOP OF PAVING
TOW TOP OF WALL
TPD TOILET PAPER
DISPENSER
TR TRASH RECEPTACLE
TRD TREAD
TV TELEVISION
TYP TYPICAL
UNF UNFINISHED
UON UNLESS OTHERWISE
NOTED
UR URINAL
VCT VINYL
COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VTR VENT THROUGH ROOF
VW VINYL WALLCOVERING
W WEST
W/ WITH
WC WATER CLOSET
WCV WALLCOVERING
WD WOOD
WO WHERE OCCURS
W/O WITHOUT
WP WATERPROOF
WRB WATER RESISTANT
BARRIER
WSCT WAINSCOT
WT WEIGHT
ABBREVIATIONS
1. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF VARIATIONS OR DISCREPENCIES. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATIONS OR
DISCREPENCIES ARE RESOLVED BY THE CONTRACTING OFFICER.
2. ALL CONSTRUCTION AND INSTALLATION WORK SHOWN ON DRAWINGS SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE CODES AND ORDINANCES. USE METHODS AS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF ALL PREVAILING LAWS AND
CODES.
3. DO NOT SCALE DRAWINGS: USE DIMENSIONS SHOWN. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT
(E) CONDITIONS ARE TO FACE OF (E) FINISH. U.O.N. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N. DIMENSIONS OF
(E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE STATE'S REPRESENTATIVE FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
4. SAFETY MEASURES: AT ALL TIMES THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONDITIONS AT THE JOB SITE, INCLUDING SAFETY OF PEOPLE AND PROPERTY. CONTRACTING OFFICER SITE VISITS ARE NOT INTENDED TO REVIEW THE
ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES.
5. INSTALL MANUFACTURED MATERIALS AND EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS, UNLESS
OTHERWISE INSTRUCTED.
6. ALL WASTE AND REFUSE CAUSED IN CONNECTION WITH THE WORK SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF BY THE CONTRACTOR. THE PREMISES SHALL BE LEFT CLEAR AND CLEAN TO THE SATISFACTION OF THE CONTRACTING OFFICER.
7. APPLICATION OF FINISH: SURFACES PREVIOUSLY PREPARED OR INSTALLED BY ANOTHER TRADE SHALL BE INSPECTED CAREFULLY BY THE CONTRACTOR BEFORE APPLYING SUBSEQUENT MATERIALS OR FINISHES. IF SURFACES ARE NOT ACCEPTABLE, THE CONTRACTING OFFICER SHALL BE NOTIFIED IMMEDIATELY IN ORDER THAT CORRECTIONS MAY BE MADE. APPLICATIONS OF FINISHES WILL BE CONSTRUED AS ACCEPTANCE OF RESPONSIBILITY BY THE SUBCONTRACTOR FOR THE BASE UPON WHICH IT IS
APPLIED.
8. INSTALL ALL WORK PLUMB, LEVEL AND STRAIGHT, OR AS REQUIRED TO ALIGN WITH (E) ADJACENT SURFACES.
9. CONTRACTOR SHALL DESIGN AND INSTALL SHORING AS REQUIRED TO PERFORM WORK. RESPONSIBILITY FOR ENGINEERING, CONSTRUCTION, AND SAFETY OF THE SHORING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
10. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLEMENTARY. CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE DRAWINGS, SPECIFICATIONS, NOTES AND DETAILS SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER AND RESOLVED BEFORE PROCEEDING WITH WORK.
11. DETAILS SHOWN SHALL BE INCORPORATED INTO THE PROJECT AT ALL APPROPRIATE LOCATIONS WHETHER SPECIFICALLY CALLED
OUT OR NOT.
12. THE CONTRACTOR MUST SUBMIT IN WRITING ANY REQUESTS FOR MODIFICATIONS TO THE PLANS AND SPECIFICATIONS. SHOP DRAWINGS SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW DO NOT CONSTITUTE "IN WRITING" UNLESS IT IS CLEARLY NOTED ON THE SUBMITTAL THAT SPECIFIC CHANGES ARE BEING REQUESTED WITH THE PHRASE "REQUESTED CHANGE".
13. THROUGHOUT THE CONSTRUCTION DOCUMENTS, ITEMS THAT ARE EXISTING ARE INDICATED AS "EXISTING" OR "(E)", ITEMS WITHOUT THIS INDICATION ARE NEW CONSTRUCTION. WHERE REQUIRED FOR PURPOSES OF CLARITY, SOME ITEMS MAY BE
INDICATED AS "NEW OR "(N)".
GENERAL NOTES
1. ARCHITECTURAL RESOURCES GROUP ASSUMES NO RESPONSIBILITY FOR THE MANAGEMENT OF HAZARDOUS MATERIALS THAT MAY
BE ON THIS SITE.
2. HAZARDOUS MATERIALS ARE KNOWN TO BE LOCATED ON THIS SITE. AN INVESTIGATION FOR HAZARDOUS MATERIALS HAS BEEN PERFORMED BY VISTA ENVIRONMENTAL CONSULTING. THE RESULTING REPORT, DATED DECEMBER 27, 2017, IS AVAILABLE UPON
REQUEST FROM THE NATIONAL PARK SERVICE.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSURING THAT PERSONNEL WITHIN THE WORK AREA ARE PROTECTED FROM EXPOSURE TO ANY HAZARDOUS MATERIALS ENCOUNTERED. IF MATERIALS ARE DISCOVERED THAT MAY BE HAZARDOUS. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER AND CEASE WORK UNTIL CONDITIONS CAN BE MAINTAINED IN
COMPLIANCE WITH ALL APPLICABLE REGULATIONS.
HAZARDOUS MATERIALS
DETAIL NUMBERING
THE NUMBERING SYSTEM
USED FOR DETAILS ON
THE DRAWINGS IS AS
SHOWN IN THE
FOLLOWING DIAGRAM.
WHEN MORE THAN ONE
BLOCK IS USED FOR A SINGLE
DETAIL, THE NUMBER OF THE
LOWEST NUMBERED BLOCK IS
USED, THUS NUMBERS ARE
ALWAYS IN THE SAME
LOCATION ON THE SHEET.
PROJECT DATA
PROJECT DESCRIPTION:
THE PROJECT WILL CORRECT CRITICAL CODE AND LIFE SAFETY DEFICIENCIES OF THE OREGON CAVES CHATEAU, A NATIONAL HISTORIC LANDMARK (NHL), TO IMPROVE EMERGENCY EGRESS, FIRE PROTECTION, AND ACCESSIBILITY.
COMPLETED IN 1934, THE ARCHITECTURALLY COMPLEX NHL HAS SIGNIFICANT BARRIERS TO ACCESSIBILITY DUE TO ITS HILLSIDE LOCATION. THE WORK SHALL BE CONDUCTED IN ONE PHASE AND INCLUDES THE FOLLOWING:
STRUCTURAL: FLOOR JOIST REPLACEMENT, ADDING LATERAL FORCE RESISTANCE THROUGH ADDITION OF PLYWOOD SHEAR WALLS ON ALL EXTERIOR WALLS, AND INSTALLATION OF PLYWOOD SHEAR PANELS TO INTERIOR WALLS.
ACCESSIBILITY: CONVERSION OF 1ST FLOOR GUEST ROOMS TO BE FULLY ACCESSIBLE (SIGNAGE, DOOR WIDENING, CLOSETS AND LAVATORIES) AND IMPROVE ACCESS DINING FACILITIES AND RESTROOMS. IMPROVE ACCESSIBILITY IN THE UPPER LEVEL LODGING AND THE LOWER LEVEL EMPLOYEE AREAS. INSTALL A THREE STORY FULL-SIZE ELEVATOR
BETWEEN THE 1ST FLOOR, 1ST BASEMENT, AND 2ND BASEMENT.
EGRESS: RECONSTRUCTION OF THE HISTORIC FIRE ESCAPES, NEW INTERNAL STAIRWAYS WITH FIRE RATED-DOORS BETWEEN 3RD/2ND FLOORS AND ANOTHER BETWEEN B1/B2/B3 FLOORS, UPGRADES TO EGRESS ROUTES AND DOORS.
FIRE SUPRESSION AND DETECTION: INSTALLATION OF FIRE DETECTION/SUPPRESSION SYSTEM AND OF CODE
COMPLIANCE EGRESS DOORS.
MECHANICAL, ELECTRICAL, AND PLUMBING UPGRADES: REPLACEMENT OF WATER SUPPLY PIPING, WASTE VENT LINE PIPING, TOILETS, AND FAUCETS. REPLACEMENT OF STEAM PIPING, TRAPS, AND RADIATORS. REPLACEMENT OF MAIN
ELECTRIC SERVICE ENTRANCE PANEL.
OPTIONAL: RECONSTRUCTION OF THE HISTORIC BALCONIES, NEW LIGHTING AT COFFEE SHOP, NEW WAINSCOT
PANELING AT LEVEL B1, MIST SPRINKLER SYSTEM AT BUILDING EXTERIOR.
BID OPTIONS ARE AS FOLLOWS:
OPTION A: WEST BALCONY RECONSTRUCTION UTILIZING WOOD AND STEEL AS SHOWN ON ARCHITECTURAL AND
STRUCTURAL DRAWINGS.
OPTION B: REPLACEMENT OF EXISTING LINEAR STRIP FLUORESCENT LIGHTS WITH NEW LIGHTING AS SHOWN ON
ELECTRICAL AND ARCHITECTURAL DRAWINGS.
OPTION C: UTLIZE AN AFRICAN CHERRY VENEER WOOD PANEL TO MATCH EXISTING BEING REMOVED IN LIEU OF THE REDWOOD WAINSCOT PANELING CURRENTLY SHOWN IN THE ARCHITECTURAL DRAWINGS AT BASEMENT 1 AND MAIN
STAIR LANDING TO BASEMENT 1. (DEDUCTIVE BID).
OPTION D: INSTALLATION OF MIST SPRINKLER SYSTEM AS SHOWN ON FIRE SUPPRESSION DRAWINGS.
OPTION E: REPLACEMENT OF ALL PLUMBING PIPING AT BASEMENT 3 AS NOTED ON PLUMBING DRAWINGS.
OPTION F: REPLACEMENT OF EXISTING BOILER WITH HIGH EFFICIENCY BOILER AS NOTED ON MECHANICAL DRAWINGS.
OPTION G: REPLACEMENT OF ELECTRIC STRIP HEATERS AT OFFICE AREAS WITH HYDRONIC HEATERS AS NOTED ON
MECHANICAL DRAWINGS.
OPTION H: REPLACEMENT OF EXISTING ELECTRIC FORCED AIR HEATERS REMAINING ON BASEMENT 2 STAFF BEDROOMS, LOUNGE, AND DINING AREAS WITH NEW ELECTRIC HEATERS AS NOTED ON MECHANICAL DRAWINGS.
OPTION I: REPLACEMENT OF ALL NON-HISTORIC LIGHT FIXTURES (MAINLY "GLOBE" STYLE), THROUGHTOUT LEVELS 2 AND 3 AND AT STAFF BEDROOMS AT BASEMENT 2. CONTRACTOR TO WALK SITE WITH CONTRACTING OFFICER TO DETERMINE
WHAT FIXTURES ARE TO REMAIN.
OPTION J: FULL RENOVATION OF REMAINING GUEST BATHROOMS THROUGHOUT LEVELS 2 AND 3 INCLUDING REPLACEMENT OF EXISTING BATHTUB OR SHOWER PAN; NEW WALL AND FLOOR FINISHES; NEW LIGHT FIXTURES; AND
NEW TOILET ACCESSORIES.
OPTION K: REPLACEMENT OF EXISTING CARPETING THROUGHOUT LEVES 2 AND 3. PUBLIC HALLWAYS AND STAIRWAYS
TO HAVE CPT-1. GUESTROOMS TO HAVE CPT-2.
SYMBOL LEGEND
1.2
202B
228B
NAME
ELEVATION
EXITING CONSTRUCTION TO
BE REMOVED
DOOR NUMBER
WINDOW NUMBER
KEY NOTE
ROOM NAME & NUMBER
GRID LINE
SECTION
SYMBOL
VIEW TITLE
LEVEL
ELEVATION
A101
INTERIOR ELEVATION
OR PHOTO LOCATION
DETAIL
SYMBOL
REVISION
SYMBOL
NEW CONSTRUCTION
ALIGN
SURFACES
EXISTING CONSTRUCTION TO
REMAIN
A101
SCALE:
1 VIEW NAME
A101
A101
1t WALL TYPE
ROOM NAME
?02-12
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:3
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
ABBREVIATIONS,
SYMBOLS, GENERAL
NOTES, & PROJECT DATAT1.02
3 211
CONSTRUCTION DRAWINGS
T .0
K
E
APPLICABLE CODES:
THE SECRETARY OF THE INTERIOR STANDARDS FOR THE TREATMENT
OF HISTORIC PROPERTIES, GUIDELINES FOR REHABILITATION
2015 INTERNATIONAL EXISTING BUILDING CODE
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL PLUMBING CODE
2014 NEC NATIONAL ELECTRICAL CODE
IESNA 10TH EDITION ILLUMINATING ENGINEERS SOCIETY OF NORTH
AMERICA
2014 NFPA 70 NATIONAL ELECTRICAL CODE (NEC)
NFPA NATIONAL FIRE CODES, INLCUDING ANNEXES (EXCEPT NFPA
5000) EFFECTIVE 1-11-2016
ACCESSIBILITY REQUIREMENTS ARE GOVERNED BY:
2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS FOR
BUILDINGS AND FACILITIES.
ELEVATORS ARE GOVERNED BY:
2011 OREGON ELEVATOR SPECIALTY CODE
CLASSIFICATION OF WORK (IEBC, CHAPTER 5)
WORK ON THIS PROJECT IS AN ALTERATION – LEVEL 3 BECAUSE THE
WORK AREA WILL EXCEED 50% OF THE BUILDING
THE BUILDING IS A HISTORIC BUILDING AND THEREFORE CHAPTER 12
OF THE IEBC APPLIES.
ADDITIONS TO THE BUILDING (EXTERIOR BALCONIES) WILL FALL UNDER
CHAPTER 11 OF THE IEBC.
OCCUPANCY GROUPS (IBC, CHAPTER 3)
GROUP DESCRIPTION
R-1 HOTEL (PRIMARY OCCUPANCY)
1ST FLOOR: LOBBY/SITTING/GAME ROOM
A-2 1ST BASEMENT: DINING/ COFFEE SHOP
2ND BASEMENT: STAFF DINING ROOM
B OFFICES & REGISTRATION
M GIFT SHOP
R-2 EMPLOYEE DORMITORY
S-1 STORAGE AREAS
ALL USES ARE EXISTING AND HAVE MINIMALLY CHANGED SINCE THE
BUILDING WAS CONSTRUCTED AND ARE NON-SEPARATED USES.
INCIDENTAL USE SEPARATION (IBC CHAPTER 5, TABLE 509)
THE BUILDING IS EQUIPPED THROUGHT WITH AN AUTOMATIC
SPRINKLER SYSTEM THEREFORE 1-HOUR SEPARATION IS NOT
REQUIRED.
SEPARATION WALLS ARE, HOWEVER, REQUIRED TO:
1. RESIST SMOKE AND EXTEND FROM FLOOR TO BOTTOM OF
SHEATHING ABOVE
2. DOORS MUST BE:
• SELF-CLOSING OR AUTOMATIC CLOSING UPON DETECTION OF
SMOKE
• HAVE NO AIR TRANSFER OPENINGS
• UNDERCUT MUST CONFORM TO NFPA
3. NO WALL PENETRATIONS UNLESS PROTECTED BY A SMOKE
DAMPER
SPECIAL DETAILED REQUIREMENTS ON USE AND OCCUPANCY
(IBC, CHAPTER 4)
SECTION 420 APPLIES AND REQUIRES ALL R-1 & R-2 SLEEPING UNITS
MUST BE SEPARATED FROM EACH OTHER AND OTHER USES BY FIRE
PARTITIONS AND HORIZONTAL ASSEMBLIES
1. FIRE PARTITIONS BETWEEN SLEEPING UNITS AND SEPARATING
SLEEPING UNITS FROM OTHER USES– 1/2 HOUR (708.3, EXCEPTION
2.) EXISTING GUEST ROOM WALLS AND DOORS ARE NON-
CONFORMING.
2. FIRE PARTITIONS BETWEEN SLEEPING UNITS AND CORRIDORS – 1/2
HOUR (708.3, EXCEPTION 1.) EXISTING GUEST ROOM WALLS AND
DOORS ARE NON-CONFORMING.
3. FIRE BLOCKING IS NOT REQUIRED ABOVE ALL FIRE PARTITIONS
BECAUSE A FIRE SPRINKLER SYSTEM IS PRESENT (708.4,
EXCEPTION 6.)
4. HORIZONTAL ASSEMBLIES – 1/2 HOUR (711.2.4.3, EXCEPTION.)
EXISTING GUEST ROOM CEILINGS ARE NON-CONFORMING.
ONE LAYER OF 5/8" TYPE "X" GYPSUM BOARD TO BE ADDED TO GUEST
ROOM PARITION WALLS BETWEEN ROOMS, BETWEEN CORRIDORS AND
AT GUEST ROOM CEILINGS TO PROVIDE 1/2 HOUR RATING.
ROOM OR AREA SEPARATION
ROOMS WITH BOILERS WHERE THE
LARGEST PIECE OF EQUIPMENT IS
OVER 15 PSI AND 10 HORSEPOWER
REFRIGERANT MACHINERY ROOM
LAUNDRY ROOM > 100 SF
WASTE / LINEN COLLECTION > 100 SF
1 HOUR OR PROVIDE
AUTOMATIC FIRE-SPRINKLER
SYSTEM
CONSTRUCTION TYPE: (IBC CHAPTER 6)
V-B (EXISTING HISTORIC CONSTRUCTION)
BUILDING HEIGHT AND AREA: (IBC CHAPTER 5)
PROPOSED
AREA
3RD BASEMENT 1,381 -- 1,381
2ND BASEMENT 5,663 655 6,318
1ST BASEMENT 5,663 655 6,318
1ST FLOOR 5,663 655 6,318
2ND FLOOR 5,475 -- 5,475
3RD FLOOR 3,246 -- 3,246
TOTAL 27,091 1,965 29,056
EXISTING
AREA
TOTAL
(SF)
ALLOWABLE
(SF)
10,500 PER
FLOOR MAX
PER
CALCULATION
BELOW
21,000 TOTAL
MAX
NOTE: THREE OF THE SIX LEVELS ARE BELOW THE ENTRY LEVEL.
PER THE IBC, THE GRADE PLANE IS “A REFERENCE PLANE
REPRESENTING THE AVERAGE OF FINISHED GROUND LEVEL ADJOINING
THE BUILDING AT EXTERIOR WALLS, THE REFERENCE PLANE SHALL BE
ESTABLISHED BY THE LOWEST POINTS WITHIN THE AREA BETWEEN
THE BUILDING AND THE LOT LINE OR, WHERE THE LOT LINE IS MORE
THAN 6 FEET (1829 MM) FROM THE BUILDING, BETWEEN THE BUILDING
AND A POINT 6 FEET FROM THE BUILDING.”
PER THE IBC, A STORY ABOVE GRADE PLANE IS “ANY STORY HAVING
ITS FINISHED FLOOR SURFACE ENTIRELY ABOVE THE GRADE PLANE,
OR IN WHICH THE SURFACE OF THE FLOOR NEXT ABOVE IS:
1. MORE THAN 6 FEET (1829 MM) ABOVE GRADE PLANE; OR
2. MORE THAN 12 FEET ABOVE THE FINISHED GROUND LEVEL AT ANY
POINT.
ALTHOUGH THE THREE BASEMENT LEVELS OF THIS BUILDING ARE
PARTIALLY BELOW GROUND, THE GRADE AROUND THE BUILDING
DROPS STEEPLY ON THE WEST SIDE. THE LOWEST LEVEL OF THE
BUILDING IS A “STORY” BECAUSE THE FLOOR ABOVE IS MORE THAN 12
FEET ABOVE THE GRADE AT THE WEST SIDE. THEREFORE ALL LEVELS,
INCLUDING THOSE REFERRED TO AS BASEMENTS, ARE STORIES FOR
CODE PURPOSES.
ALLOWABLE BUILDING AREA CALCULATION (IBC CHAPTER 5)
BASIC BUILDING AREA (IBC TABLE 506.2)
At = FOR A OCCUPANCY = 6,000 ,FOR R OCCUPANCY = 7,000, FOR
M OCCUPANCY = 9,000
SINCE OCCUPANCIES ARE NOT SEPARATED, THEN THE MOST
RESTRICTIVE APPLIES, THEREFORE AT = 6,000
AREA MODIFICATIONS (IBC SECTION 506)
Aa = At + [(At)(If)] + [(At)(Is)] (IBC Equation 5-1)
If = [(F/P) – 25](W/30) (IBC Equation 5-2)
If = (355/355) – 25](30/30) = 0.75
Is = 0 because sprinklers used in lieu of 1 hour protection
Aa = 6,000 + (6,000)(0.75) + (6,000)(0) = 10,500 allowable area per floor
TOTAL BUILDING ALLOWABLE AREA
Aa x 2 for two stories 10,500 x 2 = 21,000 sf total allowable area
TOTAL BUILDING AREA IS 29,056 SQ. FT. THEREFORE BUILDING AREA IS
NON-CONFORMING. HOWEVER, PER SECTION 1203.2 OF THE
INTERNATIONAL EXISTING BUILDING CODE, A HISTORIC BUILDING IS
DEEMED TO BE IN COMPLIANCE IF PROVIDED WITH AN AUTOMATIC
FIRE-EXTINGUISHING SYSTEM.
ALLOWABLE BUILDING AREA CALCULATION (IBC CHAPTER 5)
ALLOWABLE HEIGHT (IBC TABLE 504.3)
60 FEET, 2 STORY (MORE STRINGENT REQUIREMENT FOR A-2
OCCUPANCY WITH FULLY AUTOMATIC SPRINKLERY SYSTEM)
EXITING BUILDING HEIGHT IS 52’-4” AND 6 STORIES. HEIGHT IS
CONORMING, BUT NUMBER OF STORIES IS NON-CONFORMING.
HOWEVER, PER SECTION 1203.2 OF THE INTERNATIONAL EXISTING
BUILDING CODE, A HISTORIC BUILDING IS DEEMED TO BE IN
COMPLIANCE IF PROVIDED WITH AN AUTOMATIC FIRE-SPRINKLER
SYSTEM.
GENERAL FIRE RESISTIVE REQUIREMENTS (IBC TABLE 601)
ALL BUILDING ELEMENTS (WALLS, STRUCTURE, FLOORS, ROOFS, ETC)
HAVE A 0 HOUR FIRE RESISTIVE RATING FOR TYPE VB CONSTRUCTION.
FIRE RESISTIVE REQUIREMENTS FOR EXTERIOR WALLS (IBC TABLE 602)
THE OREGON CAVES CHATEAU IS GREATER THAN 30'-0" AWAY FROM
ANY OTHER STRUCTURE ON THE SITE, THEREFORE THE EXTERIOR
WALLS ARE NOT REQUIRED TO HAVE A FIRE-RESISTIVE RATING.
MAXIMUM COMMON PATH OF EGRESS TRAVEL (IBC TABEL 1006.2.1):
75 FEET WITH APPROVED SPRINKLERY SYSTEM. SEE CODE PLANS.
EXIT ACCESS TRAVEL DISTANCE (IBC TABLE 1017.2):
250 FEET WITH APPROVED SPRINKLER SYSTEM. SEE CODE PLANS.
INTERNATIONAL EXISTING BUILDING CODE
SUMMARY OF PERTINENT SECTIONS SPECIFIC TO THIS PROJECT
CHAPTER 12 - HISTORIC BUILDINGS
1203.9 STAIRWAY RAILINGS. GRAND STAIRWAYS SHALL BE ACCEPTED WITHOUT COMPLYING WITH THE HANDRAIL AND GUARD REQUIREMENTS. EXISTING HANDRAILS AND GUARDS AT ALL STAIRWAYS SHALL BE PERMITTED TO
REMAIN, PROVIDED THEY ARE NOT STRUCTURALLY DANGEROUS.
HISTORIC MAIN GRAND STAIRWAY RAILINGS TO REMAIN AS-IS.
CHAPTER 8 ALTERATIONS – LEVEL 2
805.5.1 CORRIDOR DOORS. CORRIDOR DOORS IN THE WORK AREA SHALL NOT BE CONSTRUCTED OF HOLLOW CORE WOOD AND SHALL NOT CONTAIN LOUVERS. ALL DWELLING UNIT OR SLEEPING UNIT CORRIDOR DOORS IN WORK AREAS IN BUILDINGS OF GROUPS R-1, R-2, AND I-1 SHALL BE AT LEAST 1 3/8-INCH SOLID CORE WOOD OR APPROVED EQUIVALENT….. ALL DWELLING UNIT OR SLEEPING UNIT CORRIDOR DOORS IN WORK AREAS IN BUILDINGS OF GROUPS R-1, R-2, AND I-1 SHALL BE EQUIPPED WITH APPROVED DOOR CLOSERS. ALL REPLACEMENT DOORS SHALL BE 1-3/4-INCH SOLID BONDED WOOD CORE OR APPROVED EQUIVALENT, UNLESS THE EXISTING FRAME WILL
ACCOMMODATE ONLY A 1-3/8” INCH DOOR.
EXCEPTIONS:
1. CORRIDOR DOORS WITHIN A DWELLING UNIT OR SLEEPING UNIT.
2. EXISTING DOORS MEETING THE REQUIREMENTS OF GUIDELINES ON FIRE RATINGS OF ARCHAIC MATERIALS AND ASSEMBLIES (IEBC RESOURCE A) FOR A RATING OF 15 MINUTES OR MORE SHALL BE ACCEPTED AS MEETING THE
PROVISIONS OF THIS REQUIREMENT.
3. EXISTING DOORS IN BUILDINGS PROTECTED THROUGHOUT WITH AN APPROVED AUTOMATIC SPRINKLER SYSTEM SHALL BE REQUIRED ONLY TO RESIST SMOKE, BE REASONABLY TIGHT FITTING, AND SHALL NOT CONTAIN
LOUVERS.
4. IN GROUP HOMES WITH A MAXIMUM OF 15 OCCUPANTS AND THAT ARE PROTECTED WITH AN APPROVED
AUTOMATIC DETECTION SYSTEM, CLOSING DEVICES MAY BE OMITTED.
5. DOOR ASSEMBLIES HAVING A FIRE PROTECTION RATING OF AT LEAST 20 MINUTES.
THE PROJECT IS PROVIDING A 20-MINUTE FIRE-RESISTANT COATING ON HISTORIC WOOD DOORS THOUGH IT IS NOT
REQUIRED PER EXCEPTION 3 ABOVE. SMOKE SEALS ARE PROVIDED AT ALL CORRIDOR DOORS.
805.9 HANDRAILS.
805.9.1 MINIMUM REQUIREMENTS. EVERY REQUIRED EXIT STAIRWAY THAT IS PART OF THE MEANS OF EGRESS AND THAT HAS THREE OR MORE RISERS AND IS NOT PROVIDED WITH AT LEAST ONE HANDRAIL, OR IN WHICH THE EXISTING HANDRAILS ARE JUDGED TO BE IN DANGER OF COLLAPSING, SHALL BE PROVIDED WITH HANDRAILS FOR THE FULL LENGTH OF THE STAIRWAY ON AT LEAST ONE SIDE. ALL EXIT STAIRWAYS WITH A REQUIRED EGRESS
WIDTH OF MORE THAN 66 INCHES SHALL HAVE HANDRAILS ON BOTH SIDES.
HISTORIC MAIN STAIR GUARDRAIL IS AT 33.5" AFF AND PERFORMS AS THE HANDRAIL FOR THE MAIN STAIR.
2015 INTERNATIONAL FIRE CODE
SUMMARY OF PERTINENT SECTIONS SPECIFIC TO THIS PROJECT
CHAPTER 11 – CONSTRUCTION REQUIREMENTS FOR EXISTING BUILDINGS
1103.4 VERTICAL OPENINGS. INTERIOR VERTICAL OPENINGS, INCLUDING BUT NOT LIMITED TO STAIRWAYS, ELEVATOR HOISTWAYS, SERVICE AND UTILITY SHAFTS, THAT CONNECT TWO ORE MORE STORIES OF A BUILDING, SHALL BE
ENCLOSED OR PROTECTED AS SPECIFIED IN 1103.4.1 THROUGH 1103.4.10.
1103.4.2 THREE TO FIVE STORIES. IN OTHER THAN GROUP I-2 AND I-3 OCCUPANICES, INTERIOR VERTICAL OPENINGS CONNECTING THREE TO FIVE STORIES SHALL BE PROTECTED BY EITHER 1-HOUR FIRE RESISTANCE-RATED CONSTRUCTION OR AN AUTOMATIC SPRINKLER SYSTEM SHALL BE INSTALLED THROUGHOUT THE BUILDING IN
ACCORDANCE WITH SECTION 903.3.1 OR 903.3.2.
HISTORIC MAIN STAIR CONNECTS 3 LEVELS AT ORCA BUT AN FIRE SPRINKLER SYSTEM IS INSTALLED THROUGHOUT SO IT IS PERMITTED TO BE OPEN. THE EXISTING WOOD BEAM THAT DROPS DOWN AT THE FRONT OF THE STAIRS
ALSO ACTS AS A SMOKE CURTAIN.
1104.6 GUARDS. GUARDS COMPLYING WITH THIS SECTION SHALL BE PROVIDED AT THE OPEN SIDES OF MEANS OF EGRESS THAT ARE MORE THAN 30 INCHES ABOVE THE FLOOR OR GRADE BELOW. [PROJECT CONFORMS]
1104.6.1 HEIGHT OF GUARDS. GUARDS SHALL FORM A PROTECTIVE BARRIER NOT LESS THAN 42 INCHES HIGH.
EXCEPTIONS:
1. EXISTING GUARDS ON THE OPEN SIDE OF EXIT ACCESS AND EXIT STAIRWAYS AND RAMPS SHALL NOT BE LESS
THAN 30 INCHES HIGH.
HISTORIC RAILING IS 33 ½” HIGH AT MAIN STAIR AND EXISTING RAMP AND IS ALLOWED PER EXCEPTION ABOVE
1104.6.2 OPENING LIMITATIONS. OPEN GUARDS SHALL HAVE BALUSTERS OR ORNAMENTAL PATTERNS SUCH THAT A 6-INCH-DIAMETER SPHERE CANNOT PASS THROUGH ANY OPENING UP TO A HEIGHT OF 34 INCHES.
HISTORIC RAILING CONFORMS TO THIS REQUIREMENT. AN EXCEPTION IS ALSO ALLOWED FOR NON-CONFORMING
RAILS BY THE AHJ.
1104.7 SIZE OF DOORS. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL BE SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 28 INCHES. WHERE THIS SECTION REQUIRES A MINIMUM CLEAR WIDTH OF 28 INCHES AND A DOOR OPENING INCLUDES TWO DOOR LEAVES WITHOUT A
MULLION, ONLE LEAF SHALL PROVIDE A CLEAR OPENING WIDTH OF 28 INCHES.
HISTORIC EXTERIOR DOORS PROVIDE A MINIMUM CLEARANCE OF 28" PER THE DOOR SCHEDULE - AND ARE
PERMITTED TO REMAIN.
1104.10 STAIR DIMENSIONS FOR EXISTING STAIRWAYS. EXISTING STAIRWAYS IN BUILDINGS SHALL BE PERMITTED TO REMAIN IF THE RISE DOES NOT EXCEED 8 ¼ INCHES AND RUN IS NOT LESS THAN 9 INCHES. EXISTING STAIRWAYS
CAN BE REBUILT.
HISTORIC MAIN STAIR MEETS THIS REQUIREMENT.
FIRE ESCAPE CODE ANALYSIS
SUMMARY OF PERTINENT CODE SECTIONS SPECIFIC TO THE NEW FIRE ESCAPES
2015 INTERNATIONAL EXISTING BUILDING CODE
805.3.1.2.1 FIRE ESCAPE ACCESS AND DETAILS.
FIRE ESCAPES SHALL COMPLY WITH ALL OF THE FOLLOWING REQUIREMENTS:
1. OCCUPANTS SHALL HAVE UNOBSTRUCTED ACCESS TO THE FIRE ESCAPE WITHOUT HAVING TO PASS THROUGH A
ROOM SUBJECT TO LOCKING.
2. ACCESS TO A NEW FIRE ESCAPE SHALL BE THROUGH A DOOR, EXCEPT THAT WINDOWS SHALL BE PERMITTED TO PROVIDE ACCESS FROM SINGLE DWELLING UNITS OR SLEEPING UNITS IN GROUP R-1, R-2, AND I-1 OCCUPANCIES OR TO PROVIDE ACCESS FROM SPACES HAVING A MAXIMUM OCCUPANT LOAD OF 10 IN OTHER OCCUPANCY CLASSIFICATIONS.
[PROJECT COMPLIES]
805.3.1.2.2 CONSTRUCTION
THE FIRE ESCAPE SHALL BE DESIGNED TO SUPPORT A LIVE LOAD OF 100 POUNDS PER SQUARE FOOT AND SHALL BE CONSTRUCTED OF STEEL OR OTHER APPROVED NONCOMBUSTIBLE MATERIALS. FIRE ESCAPES CONSTRUCTED OF WOOD NOT LESS THAN NOMINAL 2INCHES THICK ARE PERMITTED ON BUILDINGS OF TYPE V CONSTRUCTION. WALKWAYS AND RAILINGS LOCATED OVER OR SUPPORTED BY COMBUSTIBLE ROOFS IN BUILDINGS OF TYPE III AND IV
CONSTRUCTION ARE PERMITTED TO BE OF WOOD NOT LESS THAN NOMINAL 2 INCHES THICK.
PROJECT IS TYPE VB CONSTRUCTION THEREFORE WOOD IS ALLOWED. FIRE ESCAPES ARE CONSTRUCTED OF WOOD
WITH NON-SLIP BAR GRATING FLOOR SURFACE AND TREADS.
805.3.1.2.3 DIMENSIONS.
STAIRWAYS SHALL BE AT LEAST 22 INCHES WIDE WITH RISERS NOT MORE THAN, AND TREADS NOT LESS THAN, 8 INCHES. LANDING AT THE FOOT OF STAIRWAYS SHALL BE NOT LESS THAN 40 INCHES WIDE BY 36 INCHES LONG AND
LOCATED NOT MORE THAN 8 INCHES BELOW THE DOOR.
PROJECT COMPLIES - CURRENT FIRE ESCAPES ARE 24” WIDE WITH 8” RISERS AND 8” TREADS. HANDRAIL PROVIDED ON
ONE SIDE REDUCES THE CLEAR WIDTH TO 22-1/2".
2015 INTERNATIONAL FIRE CODE
1104.16 FIRE ESCAPE STAIRWAYS
FIRE ESCAPE STAIRWAYS SHALL COMPLY WITH SECTIONS 1104.16.1 THROUGH 1104.16.7 [LISTED BELOW].
1104.16.1 EXISTING MEANS OF EGRESS
FIRE ESCAPE STAIRWAYS SHALL BE PERMITTED IN EXISTING BUILDINGS BUT SHALL NOT CONSTITUTE MORE THAN 50
PERCENT OF THE REQUIRED EXIT CAPACITY.
PROJECT TOTAL OCCUPANT LOAD IS 597 OCCUPANTS. 261 OCCUPANTS EXIT BY FIRE ESCAPE WHICH IS LESS THAN 50%
PER EGRESS PLANS ON T1.05.
1104.16.2 PROTECTION OF OPENINGS
OPENINGS WITHIN 10 FEET OF FIRE ESCAPE STAIRWAYS SHALL BE PROTECTED BY OPENING PROTECTIVES HAVING A
MINIMUM ¾-HOUR FIRE PROTECTION RATING.
EXCEPTION: IN BUILDINGS EQUIPPED THROUGHOUT WITH AN APPROVED AUTOMATIC SPRINKLER SYSTEM, OPENING
PROTECTION IS NOT REQUIRED.
PROJECT IS EQUIPPED THROUGHOUT WITH AN APPROVED AUTOMATIC SPRINKLER SYSTEM THEREFORE FIRE
PROTECTION RATING IS NOT REQUIRED.
1104.16.4 ACCESS.
ACCESS TO A FIRE ESCAPE STAIRWAY FROM A CORRIDOR SHALL NOT BE THROUGH AN INTERVENING ROOM. ACCESS TO A FIRE ESCAPE STAIRWAY SHALL BE FROM A DOOR OR WINDOW MEETING THE CRITERIA OF SECTION 1005.1. ACCESS TO A FIRE ESCAPE STAIRWAY SHALL BE DIRECTLY TO A BALCONY, LANDING OR PLATFORM. THESES SHALL NOT BE HIGHER THAN THE FLOOR OR WINDOW SILL LEVEL AND NOT LOWER THAN 8 INCHES BELOW THE FLOOR LEVEL OR 18” BELOW THE
WINDOW SILL.
PROJECT COMPLIES – FIRE ESCAPES ARE SHOWN AT FLOOR LEVEL AND ARE NOT ACCESSED THROUGH INTERVENING
SPACES.
1104.16.5 MATERIALS AND STRENGTH.
COMPONENTS OF FIRE ESCAPE STAIRWAYS SHALL BE CONSTRUCTED OF NONCOMBUSTIBLE MATERIALS. [IEBC ALLOWS WOOD COMPONENTS IF TYPE V CONSTRUCTION – DETAILS SHOW A MIX OF STEEL AND WOOD TO KEEP THE APPEARANCE AS HISTORICALLY SENSITIVE AS FEASIBLE WHILE MEETING THE STRUCTURAL LOADING REQUIREMENTS. THIS WAS REVIEWED WITH SHPO SINCE THERE WERE A LOT OF CONCERNS ABOUT THE VISUAL IMPACT OF THE FIRE ESCAPES – I’VE ALSO ATTACHED AN HISTORIC PHOTO OF THE CHATEAU WITH FIRE ESCAPES THAT WERE ADDED THERE SHORTLY AFTER IT WAS BUILT.] FIRE ESCAPE STAIRWAYS AND BALCONIES SHALL SUPPORT THE DEAD LOAD PLUS A LIVE LOAD OF NOT LESS THAN 100 POUNDS PER SQUARE FOOT. FIRE ESCAPE STAIRWAYS AND BALCONIES SHALL BE PROVIDED WITH
A TOP AND INTERMEDIATE HANDRAIL ON EACH SIDE
PROPOSED FIRE ESCAPES HAVE A TOP AND INTERMEDIATE WOOD HANDRAIL. SINCE THE FIRE ESCAPE UTILIZE A 4” DIAMETER TOP RAIL TO MEET THE HISTORIC AESTHETIC, AN ADDITIONAL 2” DIAMETER HANDRAIL IS PROVIDED ON ONE
SIDE IOF THE STAIR TO MEET THE GRASPABILITY REQUIREMENTS.
1104.16.5.1 EXAMINATION. FIRE ESCAPE STAIRWAYS AND BALCONIES SHALL BE EXAMINED FOR STRUCTURAL ADEQUACY AND SAFETY IN ACCORDANCE WITH 1104.16.5 BY A REGISTERED DESIGN PROFESSIONAL OR OTHERS ACCEPTABLE TO THE FIRE CODE OFFICIAL EVERY 5 YEARS, OR AS REQUIRED BY THE FIRE CODE OFFICIAL. AN INSPECTION REPORT
SHALL BE SUBMITTED TO THE FIRE CODE OFFICIAL AFTER SUCH EXAMINATION.
FOR INFORMATION ONLY. NPS TO COORDIANATE THESE REQUIREMENTS INTERNALLY AND WITH THE FUTURE
CONCESSIONAIRE.
1104.16.6 TERMINATION
THE LOWEST BALCONY SHALL NOT BE MORE THAN 18 FEET FROM THE GROUND. FIRE ESCAPE STAIRWAYS SHALL EXTEND TO THE GROUND OR BE PROVIDED WITH COUNTERBALANCED STAIRS REACHING THE GROUND.
PROJECT COMPLIES. THE TALLEST FIRE ESCAPE (#3) IS 17'-4" TO THE GROUND.
1104.10.1 DIMENSIONS FOR REPLACEMENT STAIRS. THE REPLACEMENT OF AN EXISTING
STAIRWAY IN A STRUCTURE SHALL NOT BE REQUIRED TO COMPLY WITH THE NEW
STAIRWAY REQUIREMENTS OF SECTION 1009 WHERE THE EXISTING SPACE AND
CONSTRUCTION WILL NOT ALLOW A REDUCTION IN PITCH OR SLOPE.
REPLACEMENT STAIR FROM BASEMENT 1 TO BASEMENT 3 HAS A HEAD HEIGHT
CLEARANCE ISSUE DUE TO EXISTING STRUCTURE AS SHOWN IN SECTION 1/ A5.02 AT THE
BASEMENT 1 LEVEL. A 6'-5" HEAD HEIGHT CLEARANCE IS PROVIDED.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:3
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
CC
KG
9/13/019
CODE ANALYSIS
T1.03 4 211
CONSTRUCTION DRAWINGS
T .0
C
C
T
W
W
T P P P
3993 3994
UP
UP
UP
ORCA
CHATEAU
ORCA
CHALET
CAVE ENTRANCE
ACCESS ROAD
UPPER POND
LOWER POND
PARKING
CAVE CREEK TRAIL
ACCESS ROAD
BASEMENT 1
EGRESS PATH
BASEMENT 2
EGRESS PATH
LEVEL 2 / FIRE ESCAPE 3
EGRESS PATH CONVERGES
WITH LEVEL 1 PATH.
LEVEL 2 / FIRE ESCAPE 1
EGRESS PATH CONVERGES
WITH LEVEL 1 EGRESS
BASEMENT 1/ FIRE ESCAPE 2
EGRESS PATH (UNDER
BALCONY) CONVERGES WITH
BASEMENT 3 EGRESS PATH
ACCESSIBLE
PARKING STALLS
BASEMENT 3 EGRESS DOOR
(UNDER BALCONY)
MAIN ENTRY / LEVEL 1
EGRESS AND
ACCESSIBLITY PATH
BASEMENT 3 EGRESS PATH
0 16 3216
SCALE OF FEET
LSCALE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:0
:3
P
M B
IM
/O
R C
A /O
R C
A
A
R C
H
IT
E C
T U
R A
L -C e n tr a l.
rv t
ARG
KE
KG
9/13/019
EGRESS PLAN - SITE
T1.04 5 211
CONSTRUCTION DRAWINGS
T .0
K
E
B
LD
G
TR
U
N O
R
TH
UP
UP
UP
UP
UP
CD
NC
NB
NA
ND
SC
SB
SA
SE
CA
SD
NA.4
NB.3
SA.3
SB.8
CD.9
SA.1 NA.1
3.2 5.8
39 '-6"
BOILER: 1,143 SF
1143/300 = 4 OCC
TOTAL FLOOR
OCCUPANT LOAD: 4
01-04
FIRE ESCAPE #2
CD
NA
ND
SA
SE
CA
3.2 5.8
114'-0"
STAFF DORMS: 644 SF
644/50 = 13 OCC
STORAGE: 855 SF
855/300 = 3 OCC
STORAGE/BOH: 1,651 SF
1651/300 = 6 OCC
LAUNDRY: 254 SF
254/300 = 1 OCC
STAFF DINING: 459 SF
459/15 = 31 OCC
KITCHEN: 251 SF
241/200 = 2 OCC
TOTAL FLOOR
OCCUPANT LOAD: 100
ELEV
BALCONY: 655 SF
655/15 = 44
1' - 0"
01-02
01-03
18" MIN
TY
P
36" M
IN
C
LE
A R
01-06
01-04
01-04
01-08
01-09
01-10
01-05
01-11
FIRE ESCAPE #2
UP
DN
01-06
01-04
01-06
COMMON PATH OF
TRAVEL IS 68'-5" (LESS
THAN THE MAX. 75-0"
CD
NA
ND
SA
SE
CA
3.2 5.8
9 82
61'-0"
DINING: 1,655 SF
1655/15 = 110 OCC
GIFT SHOP: 569 SF
569/60 = 10 OCC
KITCHEN/BOH: 1,633 SF
1633/200 = 9 OCC
COFFEE SHOP:
45 OCC (FIXED SEATS)
FIRE ESCAPE #2
TOTAL FLOOR
OCCUPANT LOAD: 218
ELEV
BALCONY: 655 SF
655/15 = 44
77' - 1" DIAGONAL
EXIT DOORS IN DINING ARE 61'-8
APART WHICH IS GREATER
THAN 1/3 OF THE DIAGONAL OF
THE ROOM. EXISTING DOOR
LEAF IS 3'-0" WIDE
01-04
01-04
01-04
01-12
01-13
01-11
DN
DN
01-10
01-10
01-07
01-07
12" MIN.
62'-0"
01-04
01-06
01-06
01-04
01-06
CODE PLAN LEGEND
PATH OF EGRESS TRAVEL /
TRAVEL DISTANCE
100 '-0"
EXIT / NUMBER OF
OCCUPANTS DISCHARGED
ACCESSIBLE ROUTE -
30" WIDE
R-1
OCCUPANCY GROUPS
A-2B
MR-2 S-1
1 HR WALL SEPARATION (1/2 HOUR
AT GUEST ROOM CORRIDORS)
CODE PLAN GENERAL NOTES
1. WIDTH OF EGRESS COMPONENTS IS AS FOLLOWS: OCCUPANT LOAD MULTIPLIED
BY .3 FOR NEW STAIRS; OCCUPANT LOAD MULTIPLIED BY .2 FOR ALL OTHER
COMPONENTS.
2. PER 2015 IBC, TABLE 509 "INCIDENTAL USES", THE LAUNDRY ROOM DOES NOT
REQUIRE A 1-HOUR FIRE SEPARATION IF EQUIPPED WITH A FIRE SPRINKLER SYSTEM.
3. PER 2015 IBC, SECTION 303.3 "ASSEMBLY GROUP A-2", COMMERCIAL KITCHENS THAT
ARE ASSOCIATED WITH THE CAFE AND DINING AREAS ARE THE SAME OCCUPANCY
AND DO NOT REQUIRE A FIRE SEPARATION.
4. REFER TO T1.03 FOR ADDITIONAL CODE ANALYSIS.
5. REFER TO T1.10 FOR ADDITIONAL SIGNAGE REQUIREMENTS.
6. FINAL LOCATION OF EXIT SIGNS TO BE APPROVED BY FIRE MARSHAL.
7. DOOR KNOCKERS TO BE PROVIDED AT ACCESSIBLE GUEST ROOMS ON LEVEL 1.
8. COMMON PATH OF EGRESS TRAVEL IS 75'-0" MAX.
9. EXIT ACCESS TRAVEL DISTANCE IS 250'-0" MAX.
ILLUMINATED EXIT SIGN -
SEE ELECTRICAL
ACCESSIBLE EXIT
5'-0" DIA. ACCESIBLE TURNING RADIUS
TITLE OF SHEETSUB SHEET…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .