A06_Dwgs_01_ORCA_100CD_FINAL_7_MECHANICAL.pdf
PDF 7 MB Posted
- Solicitation number
- 140P2019R0045
About this file
This pre-solicitation notice announces a forthcoming solicitation for construction services to correct life safety and critical deficiencies at the Oregon Caves Chateau National Historic Landmark. The National Park Service seeks to address fire suppression, egress, accessibility, and structural deficiencies through a single prime contract with an estimated value over $10 million and period of performance from April 2020 to September 2021. Work includes installing fire suppression and detection systems, upgrading egress doors and accessibility in public and guest areas, adding an elevator, replacing water and waste lines, upgrading the main electric panel, and seismic upgrades. The solicitation will be issued electronically on FedBizOpps on or about October 21, 2019. Small businesses are encouraged to inquire about subcontracting opportunities.
Drawings - Mechanical
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
ACU AIR CONDITIONING UNIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AL ACOUSTIC LINING
ARCH ARCHITECT/ARCHITECTURAL
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING AND AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AW ACID WASTE
BLDG BUILDING
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOS BOTTOM OF STEEL
BRD BAROMETRIC RELIEF DAMPER
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CDW CONDENSER WATER
CFM CUBIC FEET PER MINUTE
CHW CHILLED WATER
CLG CEILING
CBC CALIFORNIA BUILDING CODE
CH CHILLER
CI CAST IRON
CT COOLING TOWER
CU COPPER
CL CENTERLINE
COL COLUMN
CONC CONCRETE
CONT CONTINUATION
CW COLD WATER
DB DRY BULB
DH DEHUMIDIFIER
DIM DIMENSION
DIA DIAMETER
DN DOWN
DWG DRAWING
(E) EXISTING
(ER) EXISTING TO BE RELOCATED
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EDR EQUIVALENT DIRECT RADIATION
EL ELEVATION
ELEC ELECTRICAL
ET EXPANSION TANK
EW EMERGENCY EYEWASH
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
(F) FUTURE
FCU FAN COIL UNIT
FD FIRE DAMPER
FFE FINISHED FLOOR ELEVATION
FLR FLOOR
FM FLOW METER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FPM FEET PER MINUTE
FS FLOW SWITCH
FSD COMBINATION FIRE SMOKE DAMPER WITH ACCESS
FT FEET
GPM GALLONS PER MINUTE
GR GRADE
GV GRAVITY VENTILATOR
HC HEATING COIL
HHW HEATING HOT WATER
HORIZ HORIZONTAL
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HW HOT WATER
HX HEAT EXCHANGER
I POUNDS PER SQUARE INCH
ID INSIDE DIAMETER
IN. INCHES
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
LB POUND WEIGHT
LAV LAVATORY
MAX MAXIMUM
MFR MANUFACTURER
MIN MINIMUM
(N) NEW
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NG NATURAL GAS
NO NORMALLY OPEN
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OPNG OPENING
OS OUTSIDE AIR
P PUMP
PNG OPENING
POC POINT OF CONNECTION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA PSI - ABSOLUTE
PSIG PSI - GAUGE
PVC POLYVINYL CHLORIDE
QTY QUANTITY
(R) REMOVE
RA RETURN AIR
RAH RECIRC AIR HANDLER
RC REHEAT COIL
RD ROOF DRAIN
REF ROOF EXHAUST FAN
SA SUPPLY AIR / SOUND ATTENUATOR
SC SCRUBBER
SCFM STANDARD CUBIC FEET PER MINUTE
SCHD SCHEDULE
SD SMOKE DETECTOR
SF SUPPLY FAN
SIM SIMILAR
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SMEF SMOKE EXHAUST FAN
SPEC(S) SPECIFICATION(S)
SS STAINLESS STEEL
ST SOUND ATTENUATOR TRAP
STD(S) STANDARD(S)
TA TRANSFER AIR
TE TEMPERATURE ELEMENT
TEMP TEMPERATURE
TI TEMPERATURE INDICATOR
TOS TOP OF STEEL
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VOLTS
VAV VARIABLE AIR VOLUME
VB VACUUM BREAK
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
VVR VARIABLE VOLUME UNIT WITH REHEAT
W WIDTH
W/O WITHOUT
WB WET BULB
WC WATER CLOSET
WH WATER HEATER
WLD WELDED
WT WEIGHT
GENERAL NOTES
1. ALL REQUIREMENTS IN THE BOOK OF SPECIFICATIONS ARE PART OF THIS CONTRACT. REFER TO THE SPECIFICATIONS FOR INFORMATION NOT SHOWN ON THE DRAWINGS.
2. ALL MECHANICAL EQUIPMENT, FIXED OR FLEXIBLY MOUNTED, SHALL BE BRACED OR ANCHORED.
3. CONTRACTORS SHALL VISIT SITE AND BE FULLY AWARE OF ALL CONDITIONS PRIOR TO SUBMITTING PROPOSAL.
4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED FEES, PERMITS AND INSPECTIONS.
5. COORDINATE ALL WORK WITH THE ARCHITECTURAL, STRUCTURAL DRAWINGS AND DRAWINGS OF OTHER TRADES. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL WORK, STRUCTURAL MEMBERS AND WORK OF OTHER TRADES. NO ITEM SUCH AS PIPE, DUCT, ETC., SHALL BE IN CONTACT WITH ANY EQUIPMENT. ANY ERRORS, OMISSIONS, DISCREPANCIES, DEFICIENCIES, OR CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER PRIOR TO PROCEEDING WITH
ANY AFFECTED WORK.
6. COORDINATE ALL CUTTING AND PATCHING WITH THE GENERAL CONTRACTOR. SUB CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR HIS WORK. OBTAIN WRITTEN PERMISSION FROM THE CONTRACTING OFFICER BEFORE PROCEEDING WITH ANY CUTTING OR ALTERATION OF STRUCTURAL MEMBERS.
7. CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIALS, EQUIPMENT AND LABOR NECESSARY TO ENSURE THE INSTALLATION OF COMPLETE AND FULLY FUNCTIONING
SYSTEMS.
8. RESTORE ALL DAMAGE RESULTING FROM YOUR WORK AND LEAVE PREMISES IN CLEAN CONDITION WHEN FINISHED WITH WORK.
9. CONNECT ALL EQUIPMENT FURNISHED UNDER OTHER TRADES AS SHOWN OR AS REQUIRED.
10. NOTIFY CONTRACTING OFFICER A MINIMUM OF 48 HOURS IN ADVANCE (UNLESS NOTED OTHERWISE IN SPECIFICATIONS) BEFORE ANY SYSTEM SHUTDOWN. COORDINATE ALL
SHUTDOWNS WITH THE CONTRACTING OFFICER.
11. PROVIDE A MINIMUM TWO SETS OF "AS-BUILT" FULL SIZE DRAWINGS AND TWO BOUND SETS OF ALL OPERATION MANUALS, DIAGRAMS, SERVICE CONTRACTS, GUARANTEES, ETC., ONE SET SHALL BE DELIVERED TO THE CONTRACTING OFFICER AND ONE SET TO THE BUILDING OPERATIONS DEPARTMENT.
12. PROVIDE AND COORDINATE WITH THE CONTRACTING OFFICER THE INSTALLATION OF ACCESS PANELS AS REQUIRED FOR MAINTENANCE AND INSPECTION OF ALL EQUIPMENT AND DEVICES. MINIMIZE NUMBER & LOCATION OF ACCESS PANELS BY POSITIONING PANELS TO ALLOW ACCESS TO MULTIPLE DEVICES. MECHANICAL LAYOUT SHALL ALSO BE DONE TO MINIMIZE ACCESS PANELS. NOTE THAT DRAWINGS SHOW LOCATIONS OF ALL EXPECTED PANELS.
13. SUBMIT FOR APPROVAL MANUFACTURER’S SUBMITTAL DATA ON ALL MATERIALS, EQUIPMENT, AND DEVICES PER SPECIFICATIONS.
14. EACH SYSTEM OF PIPING AND DUCTWORK SHALL BE CLEANED OF ALL FOREIGN MATERIAL AND BURRS AND ROUGH SPOTS PRIOR TO BEING PLACED IN SERVICE AND BEFORE OPERATIONAL TESTS ARE PERFORMED. ALL EXPOSED DUCTING SHALL BE CLEANED OF VISABLE FOULING, HANDPRINTS, STICKERS, PRODUCTION LABLES, AND SIMILAR.
15. EACH SYSTEM OF PIPING AND DUCTWORK SHALL BE PRESSURE TESTED IN ACCORDANCE WITH RECOGNIZED INDUSTRY STANDARDS.
16. GENERAL CONTRACTOR SHALL RETAIN INDEPENDENT TESTING AGENCY FOR TESTING AND BALANCING AIR AND HYDRONIC SYSTEMS. BALANCE AIR FLOW AT ALL OPENINGS TO AIR QUANTITIES INDICATED. BALANCE WATER FLOW AT ALL EQUIPMENT TO GPM INDICATED. AGENCY SHALL BE MEMBER OF AABC. SUBMIT FINAL BALANCE REPORT FOR
REVIEW.
17. DURING ENTIRE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL MAINTAIN ADEQUATE FIRE EXTINGUISHERS AT THE SITE, READY FOR USE IN CASE OF FIRE.
18. CONTRACTOR SHALL PROTECT THE PUBLIC FROM INJURY DURING THE PROCESS OF WORK BY POSTING WARNING SIGNS AND INSTALLING GUARD LIGHTS AND BARRICADES.
19. ALL DUCTS, PIPES AND EQUIPMENT SHALL BE CONCEALED ABOVE CEILING, UNLESS OTHERWISE NOTED.
20. CONNECTION BETWEEN COPPER AND IRON OR STEEL PIPE SHALL BE MADE WITH DIELECTRIC ISOLATING UNIONS OR WATERWAYS.
21. SLOPE ALL RUNOUTS TO EQUIPMENT AND RISERS, UP IN THE DIRECTION OF FLOW.
22. PROVIDE A VALVED DRAIN AT THE LOW POINT IN EACH PIPING SYSTEM. PROVIDE AIR VENT AT EACH HIGH POINT IN THE PIPING SYSTEM. COORDINATE ACCESS PANEL LOCATIONS, IF REQUIRED, PRIOR TO SUBMISSION OF HYDRONIC SHOP DRAWINGS FOR APPROVAL.
23. ALL VALVES AND OTHER PIPING SYSTEM SPECIALTIES SHALL BE FULL LINE SIZES, UNLESS OTHERWISE INDICATED. VALVES AND OTHER PIPING SYSTEM SPECIALTIES SHALL
BE FULL LINE SIZES, UNLESS OTHERWISE INDICATED.
24. PROVIDE REMOTE EXTENDED LUBRICATING FITTINGS FOR ALL SYSTEMS SO THAT LUBRICATION CAN BE ACCOMPLISHED WITHOUT OPENING PLENUM DOORS OR EQUIPMENT
ACCESS PANELS.
25. INSTALL ALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE ABOVE FINISHED FLOOR. PROVIDE AND INSTALL ALL NECESSARY OFFSETS TO MAINTAIN MINIMUM 7" CLEARANCE
ABOVE FINISHED CEILING WHERE POSSIBLE.
26. SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION.
27. EXISTING DUCT OR PIPE SUPPORTS SHALL NOT BE REUSED WITHOUT THE APPROVAL OF STRUCTURAL ENGINEER.
28. ALL PIPE ELEVATIONS ARE BOP (BOTTOM OF PIPE) UNLESS NOTED OTHERWISE.
29. WHERE PIPES AND DUCTS PENETRATE WALL, SEAL OPENINGS TO PREVENT AIR TRANSFER BETWEEN SPACES. USE FIRE RATED SEALANTS ON ALL FIRE SEPARATION
PENETRATIONS, INCLUDING FLOORS.
30. REFER TO ARCHITECTURAL FOR HISTORIC TREATMENT PROCEDURES FOR REMOVAL AND INSTALLATION OF NEW WORK.
31. WE'VE ADDED THE VARIOUS BID OPTIONS TO COORDINATE WITH OUR SPECS AND CONTRACT PRICE SCHEDULE. PLEASE PROVIDE ENOUGH INFORMATION FOR THESE BID
ITEMS TO PROVIDE AN APPROPRIATE DOLLAR AMOUNT (IF NOT DONE SO ALREADY).
M6.02
DETAIL DESIGNATION
SHEET NUMBER
A-12ø-120
A-24x24-120
EQUIPMENT TYPE
NECK SIZE (RECT.)
CFM
EQUIPMENT TYPE
NECK SIZE (RECT.)
CFM
CH
EQUIPMENT TYPE
EQUIPMENT NUMBER
REVISION CLOUD AND DELTA
POINT OF DISCONNECTION
T
POINT OF CONNECTION
TEMPERATURE SENSOR
SYMBOLS AND ANNOTATION
20"x12" EA (L)
DUCT FREE AREA DIMENSIONS
DUCT SYSTEM
LINING TYPE (IF APPLICABLE)
EQUIPMENT (PLAN)
PUMP
EXHAUST FAN
AIR TERMINAL
TAG
CPF EXPANSION TANK
HHWS HEATING WATER SUPPLY
HHWR HEATING WATER RETURN
CON CONDENSATE
STM STEAM
PIPE DROP
PIPE RISE
PIPE BRANCH RISE
PIPE BRANCH DROP
PIPE BRANCH TEE
PIPE TEE RISE
PIPE TEE DROP
CAPPED PIPE
PIPE LINE DESIGNATIONS
PIPE
ROOM SENSORS (PLAN)
PUMP
HYDRONIC EQUIPMENT (DIAGRAMS)
BOILER
RADIANT
PLANT EQUIPMENT
ZONE COMPONENTS
PIPE GUIDE
PIPE ANCHOR
APPROXIMATE SCOPE OF DEMO ACTIVITY
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:0
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG / JC
BG
09/13/19
MECHANICAL COVER SHEET
M0.01 169 211
CONSTRUCTION DOCUMENTS
M .0
A
G
J C jweale JHW Elec Stamp
K.Gillard Snapshot
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
MECHANICAL
B301
STAIRS
B300
(E)B
EXISTING BOILER
TO REMAIN
2 3
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:3
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG / JC
BG
09/13/19
MECHANICAL DEMO FLOOR
PLAN - BASEMENT 3M1.B3
170 211
CONSTRUCTION DOCUMENTS
M .B
A
G
J C
M1.B3
1 MECHANICAL DEMO FLOOR PLAN - BASEMENT 3
BLDG.
TRUE
NORTH
.6
SHEET NOTES
1. DEMO STEAM AND CONDENSATE PIPING ONLY, FLUE TO REMAIN.
2. DEMO EXISTING STEAM CONDENSATE PUMP.
3. BID OPTION F: REPLACE EXISTING BOILER WITH CONDENSING
BOILER. PIPE PER MANUFACTURER'S RECOMMENDATION FOR
PRIMARY ONLY, VARIABLE FLOW SYSTEM.
jweale JHW Elec Stamp jweale Image
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
STORAGE
B211
LAUNDRY
B209B
RESTROOM
B210A
SERVICE ENTRY
B209
STAFF DINING
B208
ACCESSIBLE
STAFF BEDROOM
#3
B205
STAFF BEDROOM
#2
B206
STAFF BEDROOM
#1
B207
STAFF LOUNGE
B204
BATHROOM
B203A
STORAGE
B203
CORRIDOR
B201
WINE STOR
B202B
STORAGE
B202
STAIRS
B200
ELEV MACHINE
B211B
ELEC RM
B211A
CLOSET
B209A
STORAGE
B202A
CLOSET
B205A
CLOSET
B207A
CLOSET
B206A
3 2
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:3
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG / JC
BG
09/13/19
MECHANICAL DEMO FLOOR
PLAN - BASEMENT 2M1.B2
171 211
CONSTRUCTION DOCUMENTS
M .B
A
G
J C
M1.B2
1 MECHANICAL DEMO FLOOR PLAN - BASEMENT 2
BLDG.
TRUE
NORTH
.6
SHEET NOTES
1. DEMO STEAM AND CONDENSATE PIPING ONLY EXPOSED AT
CEILING (HATCH AREA).
2. ALL RADIATORS TO BE REUSED. REMOVE CAREFULLY TO AVOID
DAMAGE TO UNIT AND THREADED INLET/OUTLET CONNECTIONS.
LABEL WITH RADIATOR LOCATION AND NAME AND STORE DRY,
PROTECTED FROM WEATHER, FOR REFURBISHMENT AND REUSE.
3. REMOVE BRANCH STEAM PIPING EXPOSED BY CEILING AND WALL
FINISH REMOVAL IN THESE AREAS. PATH OF PIPING CONCEALED
BY FINISHES IS APPROXIMATE; TRACE FROM RADIATOR.
4. DEMO STEAM AND CONDENSATE PIPING (HATCH AREA).
5. BID OPTION H: REMOVE EXISTING ELECTRIC WATER HEATERS
WITHIN AREA.
jweale JHW Elec Stamp jweale Image
UP
UP
UP
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
COFFEE SHOP
B104
KITCHEN
B103
WALK-IN REFRIG.
B103A
DINING ROOM
B102
STORAGE
B100A
GIFT SHOP
B101
STAIRS
B100
REMOVE
3 3
2 2
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:2
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG / JC
BG
09/13/19
MECHANICAL DEMO FLOOR
PLAN - BASEMENT 1M1.B1
172 211
CONSTRUCTION DOCUMENTS
M .B
A
G
J C
M1.B1
1 MECHANICAL DEMO FLOOR PLAN - BASEMENT 1
BLDG.
TRUE
NORTH
.6
SHEET NOTES
1. REMOVE EXHISTING EXHUAST FAN.
2. ALL RADIATORS TO BE REUSED. REMOVE CAREFULLY TO AVOID
DAMAGE TO UNIT AND THREADED INLET/OUTLET CONNECTIONS.
LABEL WITH RADIATOR LOCATION AND NAME AND STORE DRY,
PROTECTED FROM WEATHER, FOR REFURBISHMENT AND REUSE.
3. REMOVE BRANCH STEAM PIPING EXPOSED BY CEILING AND WALL
FINISH REMOVAL IN THESE AREAS. PATH OF PIPING CONCEALED
BY FINISHES IS APPROXIMATE; TRACE FROM RADIATOR.
4. DEMO STEAM AND CONDENSATE PIPING (HATCH AREA).
5. BID OPTION H: REMOVE EXISTING ELECTRIC HEATER.
jweale JHW Elec Stamp jweale Image
DNUP
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
OFFICE #1
OFFICE #2
LOBBY
GAME ROOM
CORRIDOR
SITTING ROOM
LINEN
GUEST ROOM
BATHROOM
105A
GUEST ROOM
BATHROOM
103A BATHROOM
104A
GUEST ROOM
GUEST ROOM
GUEST ROOM
BATHROOM
102A
CLOSET
101B
BATHROOM
101A
REMOVE AND RELOCATE
TO BATHROOM 202A PER
DRAWINGS
RELOCATED
SEE NEW PLAN
1 2 3
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:1
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG / JC
BG
09/13/19
MECHANICAL DEMO FLOOR
PLAN - LEVEL 1M1.01
173 211
CONSTRUCTION DOCUMENTS
M .0
A
G
J C
M1.01
1 MECHANICAL DEMO FLOOR PLAN - LEVEL 1
SHEET NOTES
1. REMOVE ELECTRIC BASEBOARD HEATER.
2. ALL RADIATORS TO BE REUSED. REMOVE CAREFULLY TO AVOID
DAMAGE TO UNIT AND THREADED INLET/OUTLET CONNECTIONS.
LABEL WITH RADIATOR LOCATION AND NAME AND STORE DRY,
PROTECTED FROM WEATHER, FOR REFURBISHMENT AND REUSE.
3. REMOVE BRANCH STEAM PIPING EXPOSED BY CEILING AND WALL
FINISH REMOVAL IN THESE AREAS. PATH OF PIPING CONCEALED
BY FINISHES IS APPROXIMATE; TRACE FROM RADIATOR.
4. DEMO STEAM AND CONDENSATE PIPING (HATCH AREA).
5. BID OPTION G: REMOVE TWO EXISTING ELECTRIC BASEBOARD
HEATERS.
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
DN
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
STAIRS
BATHROOM
214A
BATHROOM
204A
BATHROOM
203A
BATHROOM
201A
BATHROOM
212A
BATHROOM
210A
GUEST ROOM
BATHROOM
209A
GUEST ROOM
202BATHROOM
202A
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
CORRIDOR
200A
STAIRS
BATHROOM
211A
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
STORAGE
200C
CORRIDOR
200B
GUEST ROOM
GUEST ROOM
BATHROOM
205A
CLOSET
212B
CLOSET
211B
CLOSET
210B
CLOSET
209B
CLOSET
215A
CLOSET
214B
CLOSET
202B
CLOSET
201B
CLOSET
203B
CLOSET
206B
CLOSET
204B
4 4
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:1
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG / JC
BG
09/13/19
MECHANICAL DEMO FLOOR
PLAN - LEVEL 2M1.02
174 211
CONSTRUCTION DOCUMENTS
M .0
A
G
J C
M1.02
1 MECHANICAL DEMO FLOOR PLAN - LEVEL 2
SHEET NOTES
1. REMOVE ELECTRIC BASEBOARD HEATER.
2. ALL RADIATORS TO BE REUSED. REMOVE CAREFULLY TO AVOID
DAMAGE TO UNIT AND THREADED INLET/OUTLET CONNECTIONS.
LABEL WITH RADIATOR LOCATION AND NAME AND STORE DRY,
PROTECTED FROM WEATHER, FOR REFURBISHMENT AND REUSE.
3. REMOVE BRANCH STEAM PIPING EXPOSED BY CEILING AND WALL
FINISH REMOVAL IN THESE AREAS. PATH OF PIPING CONCEALED
BY FINISHES IS APPROXIMATE; TRACE FROM RADIATOR.
4. DEMO STEAM AND CONDENSATE PIPING (HATCH AREA).
5. BID OPTION G: REMOVE TWO EXISTING ELECTRIC BASEBOARD
HEATERS.
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
LINEN RM.
300C
SHOWER RM.
312B
GUEST ROOM
CLOSET
301B
BATHROOM
301A
TOILET RM
310A
CLOSET
310B
GUEST ROOM
BATHROOM
309A
BATHROOM
307A
GUEST ROOM
GUEST ROOM
BATHROOM
305A
BATHROOM
311A
GUEST ROOM
GUEST ROOM
GUEST ROOM
TOILET RM
312A
GUEST ROOM
GUEST ROOM
BATHROOM
304A
BATHROOM
302A
CORRIDOR
GUEST ROOM
GUEST ROOM
BATHROOM
303A
EAVES
300B
EAVES
305BEAVES
311B
EAVES
300A
3 3
2 2 2 2
4 4
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:2
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG / JC
BG
09/13/19
MECHANICAL DEMO FLOOR
PLAN - LEVEL 3M1.03
175 211
CONSTRUCTION DOCUMENTS
M .0
A
G
J C
M1.03
1 MECHANICAL DEMO FLOOR PLAN - LEVEL 3
SHEET NOTES
1. NOT USED.
2. ALL RADIATORS TO BE REUSED. REMOVE CAREFULLY TO AVOID
DAMAGE TO UNIT AND THREADED INLET/OUTLET CONNECTIONS.
LABEL WITH RADIATOR LOCATION AND NAME AND STORE DRY,
PROTECTED FROM WEATHER, FOR REFURBISHMENT AND REUSE.
3. REMOVE BRANCH STEAM PIPING EXPOSED BY CEILING AND WALL
FINISH REMOVAL IN THESE AREAS. PATH OF PIPING CONCEALED
BY FINISHES IS APPROXIMATE; TRACE FROM RADIATOR.
4. DEMO STEAM AND CONDENSATE PIPING (HATCH AREA).
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
MECHANICAL
B301
STAIRS
B300
(E)B
P
P
ET
2 1/2" HHWR UP
2 1/2" HHWS UP
3/4" HHWR
P
P
3" HHWS
3" HHWS
PIPING TIGHT TO STRUCTURE;
MINIMUM 7'8" FROM FINISHED
FLOOR TO BOTTOM OF PIPE
M3.02
3/4" HHWR
3/4" HHWS
3/4" HHWS
3/4" HHWR UP
3/4" HHWS UP
3/4" HHWR UP
3/4" HHWS UP
1" HHWS UP
1" HHWR UP
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:3
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL FLOOR PLAN -
BASEMENT 3M2.B3
176 211
CONSTRUCTION DOCUMENTS
M .B
A
G
M2.B3
1 MECHANICAL FLOOR PLAN - BASEMENT 3
GENERAL NOTES
A. ALL NEW HOT WATER PIPING TO HAVE 1.5" INSULATION.
B. FOLLOW STEAM ROUTING WHERE FEASIBLE. REFER TO
STRUCTURAL DETAILS IF STRUCTURAL MEMBER
PENETRATIONS MUST BE ADDED.
C. ALL EXISTING STEAM PIPING EXPOSED OR EXPOSED BY
FINISH REMOVAL SHALL BE REPLACED WITH HW PIPING
INSULATED WITH 1.5" FIBERGLASS. (TYP ALL FLOORS)
SHEET NOTES
1. INSTALL 1.5" DIAMETER PIPE THROUGH DOOR, OPEN
TO OUTDOORS, FLUSH WITH BOTTOM JAMB, WITH
RODENT SCREEN TO SERVE AS PROPANE AIR VENT.
PIPE IS INSTALLED IN DOOR ITSELF, UNATTACHED TO
FRAME AND WILL NOT INTERFERE WITH DOOR
OPERATION.
2. PLACE RISER SHUTOFF VALVE HERE.
3. BID OPTION F: REPLACE EXISTING BOILER WITH
CONDENSING BOILER OF EQUILALENT OUTPUT
CAPACITY. PIPE PER MANUFACTURER'S
RECOMMENDATION FOR PRIMARY ONLY SYSTEM.
REMOVE PUMPS 3 AND 4.
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
STORAGE
B211
LAUNDRY
B209B
RESTROOM
B210A
SERVICE ENTRY
B209
STAFF DINING
B208
ACCESSIBLE
STAFF BEDROOM
#3
B205
STAFF BEDROOM
#2
B206
STAFF BEDROOM
#1
B207
STAFF LOUNGE
B204
STORAGE
B203
CORRIDOR
B201
WINE STOR
B202B
STORAGE
B202
STAIRS
B200
ELEV MACHINE
B211B
ELEC RM
B211A
CLOSET
B209A
STORAGE
B202A
CLOSET
B205A
CLOSET
B207A
CLOSET
B206A
EF
EF
B2.3
(E)R
B2.2
(E)R
2" HHWS
INSTALL EXHUAST FANS IN
BATHROOM CEILING; ACCESS IS
THROUGH FAN FACE GRILL.
6"x6" EA
6"x6" EA
2 1/2" HHWS DN
2 1/2" HHWR DN
2" HHWR
2" HHWS
2" HHWR
1" HHWS
2" HHWR
1" HHWS
1" HHWR
BATHROOM
B204A
BATHROOM
B204B
1" HHWS UP
1" HHWR UP
1" HHWS UP
1" HHWR UP
1" HHWR UP
1" HHWS UP
1" HHWR UP
1" HHWS UP
1" HHWS UP
1" HHWS UP
1" HHWR UP
1" HHWR UP
1" HHWS UP
1" HHWR UP
1" HHWS UP
1" HHWR UP
2" HHWS
2" HHWR
2" HHWS
1 1/2" HHWR
1" HHWS DN 1" HHWR DN
3/4" HHWR DN
3/4" HHWR DN
3/4" HHWS DN
3/4" HHWS DN
1" HHWS UP
1" HHWR UP
1" HHWS UP
1" HHWS UP
1" HHWR UP
EF
EF
BIRDSCREEN OVER
EXHAUST OPENING
10"ø EA 10"ø EA
FD
FD
14"x10". 12" ABOVE
FINISHED FLOOR
TYPE B GRILLE BOTH
SIDES OF WALL
10"x10". 8' ABOVE
FINISHED FLOOR
TYPE B GRILLE
FD10"x10"
24"x10" EA24"x10" EA
DUCT THROUGH
FIRE WALL
TIGHT TO
STRUCTURE ABOVE
TIGHT TO
STRUCTURE ABOVE
TYPE B GRILLE
HANG DUCT FROM
OVERHANG ABOVE
2' MIN FROM WALL
3 3
DISTRIBUTION PIPING TO BE A
MINIMUM OF 7'8" OFF THE
FINISHED FLOOR
M6.02
M6.02
M6.02
M6.02
M6.01
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:2
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL FLOOR PLAN -
BASEMENT 2M2.B2
177 211
CONSTRUCTION DOCUMENTS
M .B
A
G
M2.B2
1 MECHANICAL FLOOR PLAN - BASEMENT 2
GENERAL NOTES
A. ALL EXISTING RADIATORS TO BE CLEANED AND
REHABILITATED: REMOVED, TANK CLEANED, REPAIRED AS
REQUIRED, REFINISHED TO ORIGINAL FINISH
APPEARANCE, AND REINSTALLED IN ORIGINAL LOCATION
UNLESS NOTED OTHERWISE. ALL NEW HOT WATER PIPING
TO HAVE 1.5" INSULATION.
B. FOLLOW STEAM ROUTING WHERE FEASIBLE. REFER TO
STRUCTURAL DETAILS IF STRUCTURAL MEMBER
PENETRATIONS MUST BE ADDED.
C. ALL EXISTING STEAM PIPING EXPOSED OR EXPOSED BY
FINISH REMOVAL SHALL BE REPLACED WITH HW PIPING
INSULATED WITH 1.5" FIBERGLASS. (TYP ALL FLOORS)
D. EXPOSED PIPING BELOW 7' FROM FINISHED FLOOR SHALL
HAVE INSULATION CLAD WITH ALUMINUM FOR DAMAGE
RESISTANCE.
SHEET NOTES
1. REMOVE EXTERIOR INTAKE HOOD. REPLACE WITH 3'x5'
LOUVER. SHIFT INTAKE FAN AND BACKDRAFT SEGMENT
FULLY INDOORS AND PROVIDE PLENUM CONNECTION TO
NEW LOUVER. INCLUDE INSECT SCREEN ON LOUVER AND
BACKDRAFT DAMPERS.
2. MINIMUM 24 GAUGE UNBROKEN STEEL DUCT.
3. PLACE RISER SHUTOFF VALVE HERE.
4. BID OPTION H: PROVIDE AND INSTALL NEW HEAVY DUTY
WALL MOUNTED ELECTRIC HEATER, TRANE UHWA021A2AT
OR EQUIVALENT. REPLACE EXISTING ELECTRIC HEATER.
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
UP
UP
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
COFFEE SHOP
B104
KITCHEN
B103
WALK-IN REFRIG.
B103A
DINING ROOM
B102
MEN'S
RESTROOM
B101B
WOMEN'S
RESTROOM
B101A
STORAGE
B100A
GIFT SHOP
B101
STAIRS
B100
10"x6" UP
6"x6" EA6"x6" EA
6"x6" EA6"x6" EA 4
EF
B1.3
(E)R
B1.2
(E)R B1.1
(E)R
B1.5
(E)R
A - 12"x12" -
A - 12"x12" -
12"x6" EA12"x6" EA 16"x6" EA16"x6" EA
16"x6" UP
12"x6" EA12"x6" EA
KEF
3/4" HHWR
3/4" HHWS
3/4" TYPICAL
RADIATOR
BRANCH
B1.4
(N)R
M4.01
M4.01
(E) KITCHEN HOOD
1" HHWS UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP
1" HHWS UP
1" HHWR DN
1" HHWS DN 1" HHWS UP/DN
1" HHWR UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
1/2" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
PLACE FAN ON EXISTING
EQUIPMENT PLATFORM,
CONNECT TO EXISTING
KITCHEN HOOD EXHUAST
1" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
M6.01
24"x24" EA24"x24" EA
M6.01
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:1
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL FLOOR PLAN -
BASEMENT 1M2.B1
178 211
CONSTRUCTION DOCUMENTS
M .B
A
G
M2.B1
1 MECHANICAL FLOOR PLAN - BASEMENT 1
GENERAL NOTES
A. ALL EXISTING RADIATORS TO BE CLEANED AND
REHABILITATED: REMOVED, TANK CLEANED, REPAIRED AS
REQUIRED, REFINISHED TO ORIGINAL FINISH
APPEARANCE, AND RESINSTALLED IN ORIGINAL LOCATION
UNLESS NOTED OTHERWISE. ALL NEW HOT WATER PIPING
TO HAVE 1.5" INSULATION.
B. FOLLOW STEAM ROUTING WHERE FEASIBLE. REFER TO
STRUCTURAL DETAILS IF STRUCTURAL MEMBER
PENETRATIONS MUST BE ADDED.
C. ALL EXISTING STEAM PIPING EXPOSED OR EXPOSED BY
FINISH REMOVAL SHALL BE REPLACED WITH HW PIPING
INSULATED WITH 1.5" FIBERGLASS. (TYP ALL FLOORS)
D. EXPOSED PIPING BELOW 7' FROM FINISHED FLOOR SHALL
HAVE INSUALTION CLAD WITH ALUMINUM FOR DAMAGE
RESISTANCE
E. ALL PIPING TO BE CONCEALED IN WALL ASSEMBLIES. ANY
PIPING UNABLE TO BE CONCEALED DUE TO
CONSTRUCTABILITY ISSUES SHALL BE REVIEWED WITH
CONTRACTING OFFICER.
SHEET NOTES
1. DUCTING LOCATED ABOVE BATHROOM CEILING.
2. PROVIDE 12"X12" TRANSFER GRILLES THROUGH DOOR
(TYP 2).
3. RADIATOR RUNOUT PIPING ROUTED UNDER FLOOR;
FOLLOW PATH OF PREVIOUS STEAM PIPING; SEE
STRUCTURAL FOR GUIDELINES WHERE NEW
PENETRATIONS ARE REQUIRED.
4. ALL STEAM PIPING EXPOSED OR EXPOSED BY FINISH
REMOVAL SHALL BE REPLACED WITH EQUIVALENT SIZED
STEAM PIPE INSULATED WITH 1.5" FIBERGLASS.(TYP ALL
FLOOR)
5. RADATOR CONNECTIONS RUN UNDER FLOOR.
6. BID OPTION H: PROVIDE AND INSTALL NEW HEAVY DUTY
WALL MOUNTED ELECTRIC HEATER TRANE UHEC031A0C0
OR EQUIVALENT. REPLACE EXISTING ELECTRIC HEATER.
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
DNUP
UP
UP
UP
UP
UP
UP
UP
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1
NA.1
6.1
3.2 5.8
OFFICE #1
OFFICE #2
LOBBY
GAME ROOM
CORRIDOR
SITTING ROOM
LINEN
GUEST ROOM
BATHROOM
105A
GUEST ROOM
BATHROOM
103A BATHROOM
104A
GUEST ROOM
GUEST ROOM
GUEST ROOM
BATHROOM
102A
CLOSET
101B
BATHROOM
101A
01.9
(E)R
01.4
(E)R
01.5
(E)R
01.3
(E)R
01.2
(E)R
01.1
(E)R
01.6
(E)R
01.7
(E)R
01.8
(E)R
01.10
(E)R
01.11
(E)R
01.12
(E)R
01.13
(E)R
01.16
(E)R
PIPES UP TO
3RD FLOOR
6"x16" EA6"x16" EA
1" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
3/4" HHWR UP/DN
3/4" HHWR UP/DN
1" HHWS UP/DN
1" HHWR UP/DN
1" HHWS UP/DN
1" HHWS UP/DN
1" HHWS DN
1" HHWR DN
1" HHWS UP/DN
1" HHWS DN
1" HHWR DN1" HHWS DN
1" HHWR DN
1" HHWR UP
1" HHWS UP
1" HHWR UP
1" HHWS UP
1" HHWS UP/DN
1" HHWR UP/DN
3/4" HHWS UP
3/4" HHWR UP
1" HHWR UP/DN
1" HHWR UP/DN
CONCEALED UP TO
APPROX 12" BELOW
CEILING. TYP 2.
01.14
(E)R
3/4" (CONCEALED UNDER FLOOR;
TYP RADIATOR BRANCH)
24"x18" L
1" HHWR UP/DN
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:4
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG / JC
BG
09/13/19
MECHANICAL FLOOR PLAN -
LEVEL 1M2.01
179 211
CONSTRUCTION DOCUMENTS
M .0
A
G
J C
M2.01
1 MECHANICAL FLOOR PLAN - LEVEL 1
GENERAL NOTES
A. ALL EXISTING RADIATORS TO BE CLEANED AND
REHABILITATED: REMOVED, TANK CLEANED, REPAIRED AS
REQUIRED, REFINISHED TO ORIGINAL FINISH
APPEARANCE, AND REINSTALLED IN ORIGINAL LOCATION
UNLESS NOTED OTHERWISE. ALL NEW HOT WATER PIPING
TO HAVE 1.5" INSULATION.
B. FOLLOW STEAM ROUTING WHERE FEASIBLE. REFER TO
STRUCTURAL DETAILS IF STRUCTURAL MEMBER
PENETRATIONS MUST BE ADDED.
C. ALL EXISTING SHALL BE REPLACED WITH HW PIPING
INSULATED WITH 1.5" FIBERGLASS. (TYP ALL FLOORS)
D. EXPOSED PIPING BELOW 7' FROM FINISHED FLOOR SHALL
HAVE INSULATION CLAD WITH ALUMINUM FOR DAMAGE
RESISTANCE.
SHEET NOTES
1. DUCTS EXHAUST THROUGH NEW 12"x19" LOUVER WITH
BACK DRAFT DAMPER; SEE ARCHITECTURAL FOR DETAILS
AND LOCATION IN EXTERIOR FACADE.
2. RADIATOR RUNOUT PIPING ROUTED UNDER FLOOR;
FOLLOW PATH OF PREVIOUS STEAM PIPING; SEE
STRUCTURAL FOR GUIDELINES WHERE NEW
PENETRATIONS ARE REQUIRED.
3. BID OPTION G: PROVIDE AND INSTALL NEW HYDRONIC
RADIATORS: (A)R/01.15 AND (A)R/01.16.
4. PIPES TO RUN INSIDE WALL OR PROVIDED SOFFITED
CAVITY.
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
DN
DN
DN
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
STAIRS
BATHROOM
214A
BATHROOM
204A
BATHROOM
203A
BATHROOM
201A
BATHROOM
212A
BATHROOM
210A
GUEST ROOM
BATHROOM
209A
GUEST ROOM
202BATHROOM
202A
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
CORRIDOR
200A
STAIRS
BATHROOM
211A
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
STORAGE
200C
CORRIDOR
200B
GUEST ROOM
GUEST ROOM
STAIRS
BATHROOM
205A
CLOSET
212B
CLOSET
211B
CLOSET
210B
CLOSET
209B
CLOSET
215A
CLOSET
214B
CLOSET
202B
CLOSET
201B
CLOSET
203B
CLOSET
206B
CLOSET
204B
BATHROOM
206A
02.4
(E)R
02.3
(E)R
02.2
(E)R
02.1
(E)R
02.6
(E)R
02.5
(E)R
02.19
(E)R
02.7
(E)R
02.8
(E)R
02.11
(E)R
02.12
(E)R
02.13
(E)R
02.14
(E)R
02.15
(E)R
02.16
(E)R
02.17
(E)R 02.18
(E)R
02.10
(E)R
02.9
(E)R
EF
EF
4"x4" EA4"x4" EA
3/4" HHWR UP/DN
M4.01
M4.01
3/4" HHWS UP
3/4" HHWR UP
1" HHWS DN
1" HHWR DN
1" HHWR DN
1" HHWR DN
1" HHWS DN
3/4" HHWR UP
3/4" HHWS UP
1" HHWS UP
3/4" HHWS UP
1" HHWR DN
1" HHWS DN
1" HHWS DN
1" HHWS DN
1" HHWR DN
1" HHWS DN
1" HHWR DN3/4" HHWS UP
3/4" HHWR UP
1" HHWS DN
1" HHWR DN
1" HHWS DN
1" HHWR DN
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
M4.01
M4.01
L
L
BRANCH PIPING BELOW
FLOOR (TYP)
4"x4" EA4"x4" EA
3/4" HHWR UP
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:5
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL FLOOR PLAN -
LEVEL 2M2.02
180 211
CONSTRUCTION DOCUMENTS
M .0
A
G
M2.02
1 MECHANICAL FLOOR PLAN - LEVEL 2
GENERAL NOTES
A. ALL EXISTING RADIATORS TO BE CLEANED AND
REHABILITATED: REMOVED, TANK CLEANED, REPAIRED AS
REQUIRED, REFINISHED TO ORIGINAL FINISH
APPEARANCE, AND REINSTALLED IN ORIGINAL LOCATION
UNLESS NOTED OTHERWISE. ALL NEW HOT WATER PIPING
TO HAVE 1.5" INSULATION.
B. FOLLOW STEAM ROUTING WHERE FEASIBLE. REFER TO
STRUCTURAL DETAILS IF STRUCTURAL MEMBER
PENETRATIONS MUST BE ADDED.
C. ALL EXISTING STEAM PIPING EXPOSED OR EXPOSED BY
FINISH REMOVAL SHALL BE REPLACED WITH HW PIPING
INSULATED WITH 1.5" FIBERGLASS. (TYP ALL FLOORS)
D. EXPOSED PIPING BELOW 7' FROM FINISHED FLOOR SHALL
HAVE INSULATION CLAD WITH ALUMINUM FOR DAMAGE
RESISTANCE.
SHEET NOTES
1. RUN DUCT IN SOFFIT.
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
3.2 5.8
LINEN RM.
300C
SHOWER RM.
312B
GUEST ROOM
CLOSET
301B
BATHROOM
301A
TOILET RM
310A
CLOSET
310B
GUEST ROOM
BATHROOM
309A
BATHROOM
307A
GUEST ROOM
GUEST ROOM
BATHROOM
305A
BATHROOM
311A
GUEST ROOM
GUEST ROOM
GUEST ROOM
TOILET RM
312A
GUEST ROOM
GUEST ROOM
STAIRS
BATHROOM
304A
BATHROOM
302A
CORRIDOR
GUEST ROOM
GUEST ROOM
BATHROOM
303A
EAVES
300B
EAVES
305BEAVES
311B
EAVES
300A
03.1
(E)R
03.2
(E)R
03.3
(E)R
03.4
(E)R
03.5
(E)R
03.6
(E)R
03.7
(E)R
03.8
(E)R
03.9
(E)R
03.10
(E)R
03.11
(E)R
03.12
(E)R
1 2
3/4" HHWR DN
3/4" HHWS DN
3/4" HHWR DN
3/4" HHWS DN 3/4" HHWS DN
3/4" HHWR DN
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS DN
3/4" HHWR DN 3/4" HHWR DN
3/4" HHWS DN
3/4" HHWS DN
3/4" HHWR DN
BRANCH PIPING BELOW
FLOOR (TYP)
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:0
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL FLOOR PLAN -
LEVEL 3M2.03
181 211
CONSTRUCTION DOCUMENTS
M .0
A
G
M2.03
1 MECHANICAL FLOOR PLAN - LEVEL 3
GENERAL NOTES
A. ALL EXISTING RADIATORS TO BE CLEANED AND
REHABILITATED: REMOVED, TANK CLEANED, REPAIRED AS
REQUIRED, REFINISHED TO ORIGINAL FINISH
APPEARANCE, AND REINSTALLED IN ORIGINAL LOCATION
UNLESS NOTED OTHERWISE. ALL NEW HOT WATER PIPING
TO HAVE 1.5" INSULATION.
B. FOLLOW STEAM ROUTING WHERE FEASIBLE. REFER TO
STRUCTURAL DETAILS IF STRUCTURAL MEMBER
PENETRATIONS MUST BE ADDED.
C. ALL EXISTING STEAM PIPING EXPOSED OR EXPOSED BY
FINISH REMOVAL SHALL BE REPLACED WITH HW PIPING
INSULATED WITH 1.5" FIBERGLASS. (TYP ALL FLOORS)
D. EXPOSED PIPING BELOW 7' FROM FINISHED FLOOR SHALL
HAVE INSULATION CLAD WITH ALUMINUM FOR DAMAGE
RESISTANCE.
SHEET NOTES
1. ALL STEAM PIPING EXPOSED OR EXPOSED BY FINISH
REMOVAL SHALL BE REPLACED WITH EQUIVALENT SIZED
STEAM PIPE INSULATED WITH 1.5" FIBERGLASS.(TYP ALL
FLOOR)
2. RADATOR CONNECTIONS RUN UNDER FLOOR.
BLDG.
TRUE
NORTH
.6 jweale JHW Elec Stamp jweale Image
CD
SE
SD
1.1 2.9
CD.9
3.2
KITCHEN
B103
WALK-IN REFRIG.
B103A
KEF
EXISTING WELDED
STAINLESS
DUCTING AND
HOOD TO REMAIN
MIN 5' TO
BUILDING
24"x24" EA24"x24" EA
SCALE H
0 2 42
SCALE OF FEET
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:3
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
ENLARGED KITCHEN PLAN
M3.01 182 211
CONSTRUCTION DOCUMENTS
M .0
A
G
M3.01
1 MECHANICAL FLOOR PLAN - BASEMENT 1 BLDG.
T R
U E
N O
R T H
29.6°
SHEET NOTES
1. BIRDSCREEN EXHUAST EXIT
jweale JHW Elec Stamp jweale Image
CD
CC
SC
SB
SD
SB.8
2.9
CD.9
3.2
MECHANICAL
B301
(E)B
P
P
ET
2 1/2" HHWR UP
2 1/2" HHWS UP
2" HHWR
M4.01
M4.01
P
P
3" HHWR
3" HHWS
PIPING TIGHT TO STRCUTURE;
MINIMUM 7'8" FROM FINISHED
FLOOR TO BOTTOM OF PIPE
STRAINER
STRAINER
M6.02
M6.02
M6.01
M6.01
SCALE H
0 2 42
SCALE OF FEET
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:0
:4
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
ENLARGED MECHANICAL
ROOM FLOOR PLAN
M3.02 183 211
CONSTRUCTION DOCUMENTS
M .0
A
G
M3.02
1 MECHANICAL FLOOR PLAN - BASEMENT 3
BLDG.
T R
U E
N O
R T H
29.6° jweale JHW Elec Stamp jweale Image
BASEMENT 2
-24' - 0"
BASEMENT 2
-24' - 0"
BASEMENT 3
-36' - 0"
BASEMENT 3
-36' - 0"
M4.01
MECHANICAL
B301
B
P
P
P
BASEMENT 2
-24' - 0"
BASEMENT 2
-24' - 0"
BASEMENT 3
-36' - 0"
BASEMENT 3
-36' - 0"
M4.01
MECHANICAL
B301
B
P
P
P
SCALE H
0 2 42
SCALE OF FEET
LEVEL 1
0' - 0"
LEVEL 1
0' - 0"
BASEMENT 1
-12' - 3"
BASEMENT 1
-12' - 3"
LEVEL 1.1
2' - 4"
LEVEL 1.1
2' - 4"
M4.01
10"x6" EA10"x6" EA 16"x6" EA16"x6" EA
16"x6" EA16"x6" EA
EF
L
LEVEL 1
0' - 0"
LEVEL 1
0' - 0"
BASEMENT 1
-12' - 3"
BASEMENT 1
-12' - 3"
M4.01
12"x6" EA12"x6" EA
6"x6" EA6"x6" EA
6"x6" EA6"x6" EA
CDCD.9
LEVEL 2
13' - 5"
LEVEL 2
13' - 5"
LEVEL 3
22' - 7"
LEVEL 3
22' - 7"
CDCC.9CD.1
M4.01
GUEST ROOM
BATHROOM
206A
EF
4"x4" EA4"x4" EA
LEVEL 2
13' - 5"
LEVEL 2
13' - 5"
LEVEL 3
22' - 7"
LEVEL 3
22' - 7"
M4.01
L
LEVEL 2
13' - 5"
LEVEL 2
13' - 5"
LEVEL 3
22' - 7"
LEVEL 3
22' - 7"
GUEST ROOM
M4.01
4"x4" EA4"x4" EA
L
LEVEL 2
13' - 5"
LEVEL 3
22' - 7"
LEVEL 2
13' - 5"
LEVEL 2
13' - 5"
LEVEL 3
22' - 7"
LEVEL 3
22' - 7"
LEVEL 2
13' - 5"
LEVEL 3
22' - 7"
M4.01
L
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:1
:5
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL SECTIONS
M4.01 184 210
CONSTRUCTION DOCUMENTS
M .0
A
G
3/8" = 1'-0"
MECHANICAL ROOM SECTION 1
3/8" = 1'-0"
MECHANICAL ROOM SECTION 2
1/4" = 1'-0"
RESTROOM SECTION 1
1/4" = 1'-0"
RESTROOM SECTION 2
1/4" = 1'-0"
GUEST 206 SECTION 1
1/4" = 1'-0"
GUEST 206 EXHUAST SECTION 2
1/4" = 1'-0"
GUEST 205 EXHUAST SECTION 1
1/4" = 1'-0"
GUEST 205 EXHAUST SECTION 2
jweale JHW Elec Stamp jweale Image
BASEMENT 2
BASEMENT 1
LEVEL 1
LEVEL 2
LEVEL 3
BASEMENT 3
BOILER (E)
E(R)
01.9
E(R)
02.11
E(R)
B1.3
E(R)
01.10
E(R)
02.12
E(R)
03.7
E(R)
01.11
E(R)
02.13
E(R)
01.16
E(R)
02.14
E(R)
01.13
E(R)
02.16
E(R)
02.15
E(R)
01.12
E(R)
02.18
E(R)
02.17
E(R)
01.14
E(R)
03.8
RISER 1
RISER 2
E(R)
01.8
E(R)
02.10
E(R)
02.09
E(R)
01.7
E(R)
B1.2
E(R)
02.8
E(R)
02.7
E(R)
01.6
E(R)
B1.2
E(R)
03.5
E(R)
03.6
E(R)
03.4
E(R)
03.3
E(R)
03.2
E(R)
01.5
E(R)
02.6
E(R)
02.5
E(R)
03.1
E(R)
01.4
E(R)
01.3
E(R)
02.4
E(R)
02.3
E(R)
01.2
E(R)
02.2
E(R)
02.1
E(R)
01.1
E(R)
B1.5
E(R)
02.19
E(R)
03.12
RISER 4 RISER 5 RISER 6 RISER 7 RISER 8RISER 8RISER 9RISER 10RISER 11RISER 12RISER 13RISER 14RISER 15RISER 16RISER 17
E(R)
B2.3
E(R)
B2.2
E(R)
B2.1
1" HWS/R 3/4" HWS/R 3/4" HWS/R 1" HWS/R 3/4" HWS/R 3/4" HWS/R 1" HWS/R 1" HWS/R 1" HWS/R 1" HWS/R 1" HWS/R 1" HWS/R 1" HWS/R 1" HWS/R 1" HWS/R
3/4" HWS/R
3/4" HWS/R 3/4" HWS/R 3/4" HWS/R
E(R)
03.9
E(R)
03.10
E(R)
03.11
3/4" HWR
3/4" HWS/R 3/4" HWS/R 3/4" HWS/R 3/4" HWS/R 3/4" HWS/R 3/4" HWS/R
3/4" HWS/R
P
3"
3"
3"
P
RETURN LINE FOLLOWS
SUPPLY PATHS SHOWN
RISER 3
R
B1.4
P
P
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:1
:5
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
HYDRONIC DIAGRAM
M5.01 185 211
CONSTRUCTION DOCUMENTS
M .0
A
G
SHEET NOTES
1. PROVIDE SHUTOFF VALVE ON SUPPLY AND RETURN
LEG OF RISER.
jweale JHW Elec Stamp jweale Image
T
EXHAUST FAN W/ TYPE B2 BASE (BASIS OF
DESIGN: GREENHECK). BASE IS A RIGID,
ONE-PIECE STRUCTURAL STEEL BASE.
BASE FEATURES INTEGRAL OUTDOOR
RATED SPRING MOUNTS.
ROOF LEVEL
SPRING VIBRATION RAILS WITH EARTHQUAKE
RESTRAINTS.
EXHAUST AIR
EXHAUST AIR DUCT. CONNECT TO FAN
WITH FLEXIBLE CONNECTOR
NOTES:
1. PROVIDE WELDED STAINLESS STEEL DUCTWORK. SLOPE ANY REQUIRED HORIZONTAL
SECTIONS OF DUCTWORK AT 2% SLOPE TO THE HOOD.
2. PER NFPA 96, PROVIDE, PIPE, AND INSTALL 1 - 2 GALLON ALUMINUM OR STAINLESS STEEL
GREASE CATCH CONTAINER.
EXTEND OUT FROM BUILDING
5 FEET PER FIRE CODE
MINIMUM 2'
GREASE CATCH CONTAINER PIPED
TO FAN DRAIN.
FLANGES AND FLEX CONNECTION
304 STAINLESS 2x2x1/4 ANGLE IRON; 4" LENGTH
EACH SIDE OF GREASE CONTAINER; FASTEN DOWN
ONLY TO HOLD CONTAINER IN PLACE
1/2" x 1 1/4" HEX HEAD CAP SCREWS
& CHANNEL NUTS
PIPE CLAMP
CLEVIS HANGER
18 GAUGE x 12" LONG
GALVANIZED SHIELD ALL AROUND
PIPE
ADJUSTABLE HINGE
1/2" x 1 1/4" HEX HEAD
CAP SCREWS &
CHANNEL NUTS
ALL THREADED
ROD (TYP.)
CHANNEL TRANSVERSE
BRACE
PIPE SLEEVE (TYP.)
CLEVIS HANGER (TYP.)
ADJUSTABLE
HINGE
INSULATION PROTECTION SHIELD WITH
"LOC" TABS (TYP. FOR PIPE WITH
INSULATION AT EACH SUPPORT)
ADJUSTABLE HALF HINGE
ALL THREADED ROD (TYP.)
PIPE (WITH
INSULATION)
ROD STIFFENER (TYP.)
ALL THREADED ROD (TYP.)
PIPE SLEEVE (TYP.)
CLEVIS HANGER (TYP.)
PIPE (WITHOUT INSULATION)
INSULATION PROTECTION
SHIELD WITH "LOC" TABS
PIPE (WITH INSULATION)
ROD STIFFENER (TYP.)
CHANNEL
LONGITUDINAL BRACE
ROD STIFFENER (TYP.)
CHANNEL
TRANSVERSE
BRACE
1/2" x 1 1/4" HEX HEAD
CAP SCREWS &
CHANNEL NUTS
1/2
ROD SIZE,
IN.
3/81/2 UP TO 2
MAX. PIPE
SIZE, IN.
MAX. ROD
LENGTH, IN.
NOTES:
1. COMPLY WITH 2015 IBC.
2. BRACE ALL PIPING AND EQUIPMENT TRANSVERSELY AND LONGITUDINALLY ACCORDING TO
SMACNA GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL AND PIPING SYSTEMS.
3. ALL PIPE SUPPORTS SHALL BE PIPING TECHNOLOGY & PRODUCTS, INC. OR EQUAL.
4. PROVIDE TRANSVERSE SEISMIC BRACING AT 20'-0" MAXIMUM AND AT EVERY CHANGE OF
DIRECTION.
5. PROVIDE LONGITUDINAL SEISMIC BRACING AT 40'-0" O.C. MAXIMUM, MINIMUM OF 2 REQUIRED.
6. REFER TO RELEVANT ATTACHMENT DETAILS AND STRUCTURAL FOR CONTINUATION.
SHEET NOTES:
1. INSTALL ROD STIFFENER WHEN LEGNTH EXCEEDS THE SCHEDULE LENGTH
2.PROVIDE NONETALLIC SEPARATION BETWEEN UNINSULATED COPPER PIPING AND METAL
SUPPORTS. PLASTIC COATED OR FELT LINED CLEVIS HANGER. PLASTIC COATED PIPE
CLAMP.
3.SPACE PIPE HANGERS AND SUPPORTS PER MECHANICAL SPECIFICATION.
MINIMUM 1/4" STICKY-BACK
FELT OR RIBBED NEOPRENE
BETWEEN
HANGERS/CLAMPS AND PIPE MINIMUM 1/4" STICKY-BACK FELT OR
RIBBED NEOPRENE BETWEEN
HANGERS/CLAMPS AND PIPE
1/2
ROD SIZE,
IN.
3/81/2 UP TO 2
MAX. PIPE
SIZE, IN.
MAX. ROD
LENGTH, IN.
CHANNEL
SQUARE WASHER (TYP.)
CHANNEL LONGITUDINAL BRACE
SQUARE NUT (TYP.)
PIPE CLAMP, SIZE ACCORDING TO
PIPE SIZE AND WITH OR WITHOUT
INSULATION (TYP.)
HEX NUT (TYP.)
ALL THREADED
ROD (TYP.)
ROD STIFFENER
(TYP.)
SLOTTED HEX
HEAD MACHINE
SCREW (TYP.)
1/2" x 1 1/4" HEX HEAD CAP
SCREWS & CHANNEL
NUTS (TYP.)
ADJUSTABLE HINGE - 45° MAX
(TYP. OF 2)
CHANNEL
TRANSVERSE BRACE
NOTES:
1. COMPLY WITH 2015 IBC
2. BRACE ALL PIPING AND EQUIPMENT TRANSVERSELY AND LONGITUDINALLY ACCORDING TO SMACNA GUIDELINES
FOR SEISMIC RESTRAINTS OF MECHANICAL AND PIPING SYSTEMS.
3. ALL PIPE SUPPORTS SHALL BE PIPING TECHNOLOGY & PRODUCTS, INC. OR EQUAL.
4. PROVIDE TRANSVERSE SEISMIC BRACING AT 20'-0" MAXIMUM AND AT EVERY CHANGE OF DIRECTION.
5. PROVIDE LONGITUDINAL SEISMIC BRACING AT 40'-0" O.C. MAXIMUM, MINIMUM OF 2 REQUIRED.
6. REFER TO RELEVANT ATTACHMENT DETAILS AND STRUCTURAL FOR CONTINUATION.
TRAPEZE CHANNEL ASSEMBLY.
BASIS OF DESIGN: ANVIL 45 CHANNEL
ASSEMBLY
SHEET NOTES:
1. INSTALL ROD STIFFENER WHEN LEGNTH EXCEEDS THE SCHEDULE LENGTH
2.SPACE PIPE HANGERS AND SUPPORTS PER MECHANICAL SPECIFICATION.
AIR BLEED (TYP.)
REMOTE TEMPERATURE
BULB SENSOR
FRONT VIEWSIDE VIEW
NOTES
1. BASIS OF DESIGN CONTROL VALVE IS DANFOSS RA2000. WITH TAMPER RESISTANT THERMOSTATIC ACTUATOR AND REMOTE T SENSOR WITH CAPILLARY TUBE.
2. ADD AIR BLEED VALVE TO EACH RADIATOR AT TOP. BLEED VALVE MUST REQUIRE TOOL TO ACTUATE (SCREWDRIVER OR KEY).
3. EXISTING RADIATORS TO BE CLEANED AND REHABILITATED: REMOVE, FLUSH, TANK DIP, REPAIR AS REQUIRED (INCLUDING MACHINING OF VALVE CONNECTIONS
AS REQUIRED), REFINISH TO ORIGINAL APPEARANCE, AND REINSTALL. RADIATORS THAT FAIL PRESSURE TEST TO BE REPLACED WITH NEW REPLICA RADIATORS OF SAME HEIGHT AND SECTION COUNT, BURNHAM SLEDERIZED 19-4 OR EQUIVALENT; PROVIDE LINE ITEM COST
4. 4. SUBMIT REMOTE TEMPERATURE LOCATIONS FOR APPROVAL PRIOR TO MOUNTING; LOCATIONS TO BE ON WALL, NOT COVERED BY WINDOW DRAPES AND
AWAY FROM DRAFTS.
5. BRING PIPE UP AT RADIATOR; EXPOSED HORITZONTAL PIPE RUNS WILL REQUIRE FABRICATION AND INSTALLATION OF PHYSICAL PROTECTION FROM DAMAGE
(CUSTOM FABRICATED STEEL CAGE).
THERMOSTATIC
CONTROL VALVE
CAPILLARY
TUBE
LOCK SHIELD VALVE
FLOOR DRAIN
AUTOMATIC AIR
VENT
PRESSURE GAUGE
SOV (TYP.)
PRE-CHARGING
AIR CONNECTION
EXPANSION TANK
FINISHED SURFACE
P
ET
SHEET NOTES:
1. CONNECT TO SIDE OF MAIN (AVOID TOP OR
BOTTOM CONNECTION TO PREVENT AIR OR
DEBRIS FROM ENTERING PIPE TO EXPANSION
TANK)
2. DRAIN VALVE REQUIRED TO PROPERLY
PRECHARGE TANK
3. TANK CONNECTIONS MAY VARY DEPENDING ON
TANK SIZE & MODEL
P
PRESSURE REDUCING
VALVE
CW MAKE-UP
S.P.D. FOR CONTINUATION
TO CLOSED LOOP SYSTEM
1. REFER TO SPECIFICATIONS FOR ISOLATION
VALVE TYPE.
2. PRESSURE RELIEF VALVE TO BE SET TO
8OPSI.
3. PROVIDE AND INSTALL TEKMAR 256 SINGLE
BOILER CONTROLLER. INCLUDING
OUTDOOR AIR TEMPERATURE SENSOR.
4. CONNECT SUPPLY TO TOP FRONT
CONNECTION ONLY; RETURN MAY CONNECT
FRONT OR REAR. INCLUDE 1" SYSTEM
BLOW-OFF (DRAIN) VALVE IN LOWEST PART
OF RETURN PIPING CLOSE TO BOILER.
5. REPLACE EXISTING LOW VOLTAGE WIRING
TO ON/OFF SWITCH IN OFFICE 110/111 TO
ENABLE BOILER SYSTEM. PROVIDE RELAY
CONTROL PANEL TO INTERLOCK PUMPS P1,
P2, P3, AND P4 TO ENABLING OF BOILER
SYSTEM
NOTE:
BOILER
DRAIN
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:1
:0
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL DETAILS
M6.01 186 211
CONSTRUCTION DOCUMENTS
M .0
A
G
M6.01
2 EXHAUST FAN MOUNTING DETAIL
M6.01
6 TYPICAL SINGLE AND TRAPEZE PIPE SUPPORT DETAIL
M6.01
1 TYPICAL SINGLE AND TRAPEZE PIPE SUPPORT DETAIL
M6.01
3 RADIATOR DETAIL
M6.01
4 EXPANSION TANK AND AIR SEPARATION PIPING DETAIL
M6.01
5 BOILER PIPING DETAIL
jweale JHW Elec Stamp jweale Image
NONHARDENING RESILIENT
SEALANT, BOTH SIDES (TYP.).
USE META CAULK 1000 BY
RECTOSEAL IF FIRE RATING IS
REQUIRED.
FIRE RATED WALL
GALVANIZED STEEL PIPE
SLEEVE
GALVANIZED STEEL PIPE
SLEEVE
NONHARDENING RESILIENT
SEALANT, BOTH SIDES (TYP.). USE
META CAULK 1000 BY RECTOSEAL IF
FIRE RATING IS REQUIRED.
FIRE STOPPING MATERIAL
WITH SAME FIRE RATING AS
WALL
PIPE INSULATION
FIRE RATED WALL
PIPE
PIPE
NOTES:
1. INSTALL FIRE STOPPING MATERIAL PER MANUFACTURER'S
DETAIL.
2. REFER TO ARCHITECTURAL DRAWING FOR WALL FIRE RATING.
GROUT BELOW PLATE
PLATE COVERING ENTIRE
PUMP MOUNTING SURFACE
BEVEL EDGES
1/4"
4"x4"x1/4" TS OR
4" SCH 40 PIPE
8"x8"x1/4" PLATE
1/2" HILTI KWIK BOLTS
MIN. 4" EMBEDMENT
3/8" W/ MAXIMUM EMBEDMENT
INTO PUMP BODY PER
MANUFACTURER'S
RECOMMENDATIONS
NOTES
P
MOTOR
PUMP
CHECK VALVE
MIN. 5 STRAIGHT
PIPE DIAMETERS
PRESSURE GAGE
SHUTOFF VALVE (TYP.)
MAXIMUM 60" AFF
3/4" DRAIN VALVE
STRAINER W/ BLOW-OFF
VALVE LOCATED UPSTREAM
OF PUMPS.
FLEX CONNECTOR,
DUAL SPHERE NEOPRENE FLEX
CONNECTORS, (MASON SELEFLEX OR
EQUAL), (TYP)
FABRICATED STEEL SUPPORTS
WELDED OR FASTENED TO RIGID
PIPE SECTIONS, (TYP 2 PER PUMP)
A QUALIFIED PROFESSIONAL ENGINEER SHALL SIGN AND SEAL DESIGN
CALCULATIONS AND SEISMIC RESTRAINT DETAILS PER LOCAL CODES.
THIS DETAIL IS PROVIDED FOR INFORMATION ONLY.
PUMP SHALL BE SUPPORTED PER MANUFACTURER'S REQUIREMENTS.
1.
2.
TEST PORT
(TYP.2)
FLOOR
SLEEVE
FASTENERS (TYP.)
FIRE-RATED
SEPARATION,
S.A.D.
STEEL GRILLE, SEE
MECHANICAL FLOOR PLANS
FOR MODEL AND SIZE.
FIRE
DAMPER
BREAKAWAY
CONNECTION
(TYP.)
1/4" THERMAL
INSULATING
BLANKET
SEE NOTE 2
NOTE:
1. THE OPENING IN THE WALL SHALL BE LARGER THAN THE DAMPER SLEEVE ASSEMBLY TO
PERMIT INSTALLATION AND EXPANSION. THE OPENING SHALL BE A MAXIMUM OF 1"
LARGER THAN THE OVERALL SIZE OF THE DAMPER/SLEEVE ASSEMBLY.
2. DAMPER SLEEVE SHALL NOT EXCEED MORE THAN 6" BEYOND THE FIRE WALL OR
PARTITION UNLESS DAMPER IS EQUIPPED WITH INSTALLED ACCESS DOOR.
3. MOUNTING ANGLES SHALL BE A MINIMUM OF 1 1/2 x 1 1/2 x 20 GAUGE STEEL.
4. INSTALL PER MANUFACTURER'S UL APPROVED GUIDELINES.
SEE MECHANICAL PLANS
FOR DUCT SIZE
MOUNTING ANGLE
SEE NOTE 3
AIR FLOW
FLEX CONNECTION
(TYPICAL)
AIR FLOWCABINET FAN
PROVIDE MFR'S SAFETY GUARD ON
INLET WHERE SHOWN UNDUCTED (SEE
PLANS)
TO STRUCTURE ABOVE
3/8" ALL THREAD ROD
(TYP. OF 4)
DUCT WORK (WHERE OCCURS)
DUCT WORK
STRUCTURAL & BOLTED
ATTACHMENT TO CABINET FAN
SPRING VIBRATION ISOLATOR
1" MIN. STATIC DEFLECTION
(TYP. 4)
DETAIL ALSO APPLIES TO CONCEALED FAN COIL UNITS, SMD FOR LOCATIONS.1.
NOTES:
CABINET FAN
EXHAUST GRILLE
CEILNG
CEILING MOUNTED
EXHAUST FAN
ADJUSTABLE HANGER BAR FOR
MOUNTING FAN TO CEILING
FRAMING (TYP. BOTH SIDES)
METAL STUD (TYP)
GYPBOARD (TYP)
SEE PLANS FOR DUCT SIZES
FLEXIBLE DUCT
CONNECTOR, 12" MAX
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:1
:0
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL DETAILS
M6.02 187 211
CONSTRUCTION DOCUMENTS
M .0
A
G
M6.02
1 PIPE PENETRATION THRU FIRE-RATED WALL
M6.02
2 INLINE PUMP PIPING & SUPPORT DETAIL
M6.02
3 GRILL ACCESS FIRE DAMPER
M6.02
4 CABINET FAN HANING DETAIL
M6.02
5 CEILING MOUNTED EXHAUST FAN
jweale JHW Elec Stamp jweale Image
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OFOREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
138578
150025
R E
V
IT
/1
/2
:3
:4
P M
C U s e rs
\j c h a m b lis s \D o c u m e n ts
\O R
C A
M E
P -C e n tr a l_ jo e c h a m b lis s .r v t
JHW
AG
BG
09/13/19
MECHANICAL SCHEDULES
M7.01 188 211
CONSTRUCTION DOCUMENTS
M .0
A
G
MECHANICAL - BOILER REPIPE TO HOT WATER CONFIGURATION SCHEDULE
TYPE
EQUIPMENT
NUMBER MANUFACTURER MODEL LOCATION SERVICE TYPE NOTES
B 1 WEIL-MCLAIN 880 B3 HEAT STEAM-WATER FIELD CONVERTIBLE 1,2,3,4,5
MECHANICAL - EXHAUST FAN SCHEDULE
TYPE
EQUIPMENT
NUMBER MANUFACTURER MODEL LOCATION SERVICE TYPE
FAN MOTOR ELECTRICAL
EMERG.
PWR.
[Y/N]
OPERATING
WEIGHT NOTESAIR FLOW
WHEEL
ESP TSP
SPEED
[RPM]
MIN. STATIC
EFFICIENCY
SOUND
POWER
[dB] HP
VFD
Y/N VOLT PH HZTYPE
MIN. DIA.
[IN]
KEF 1 GREENHECK USF-322-BI LOADING HOOD EXHAUST UTILITY 7800 CFM - 2' - 8" 1.80 in-wg 1.80 in-wg 1438 50 82 5 hp No 240 V 1 60 Hz No 395.00 lbf 1
EF 2 PANASONIC FV 08VKS3 RESTROOM B204A CEILING 70 CFM 0' - 6" 0.30 in-wg 0.30 in-wg 1125 0.4 SONES 0 hp No 120 V 1 60 Hz No 15.00 lbf
EF 3 PANASONIC FV 08VKS3 RESTROOM B204B CEILING 70 CFM 0' - 6" 0.30 in-wg 0.30 in-wg 1125 0.4 SONES 0 hp No 120 V 1 60 Hz No 15.00 lbf
EF 4 GREENHECK SQ-98-VG RESTROOM B101A B101B INLINE 490 CFM - 1' - 0" 1.50 in-wg 1.50 in-wg 2159 - 62 0.25 hp No 120 V 1 60 Hz No 46.00 lbf 2
EF 5 PANASONIC FV 08VKS3 RESTROOM 206A CEILING 70 CFM 0' - 6" 0.30 in-wg 0.30 in-wg 1125 0.4 SONES 0 hp Yes 120 V 1 60 Hz No 15.00 lbf
EF 6 PANASONIC FV 08VKS3 RESTROOM 205A CEILING 70 CFM 0' - 6" 0.30 in-wg 0.30 in-wg 1125 0.4 SONES 0 hp Yes 120 V 1 60 Hz No 15.00 lbf
EF 7 GREENHECK SQ-90-D STORAGE B211 ELEVATOR MACHINE ROOM INLINE 510 CFM - 1' - 0" 0.25 in-wg 0.50 in-wg 1550 - 71 0.1 hp No 120 V 1 60 Hz No 50.00 lbf 2
EF 8 GREENHECK SQ-80-D LAUNDRY LAUNDRY INLINE 150 CFM - 1' - 0" 0.26 in-wg 0.50 in-wg 1550 - 71 0.08 hp No 120 V 1 60 Hz No 46.00 lbf 2
MECHANICAL - PUMP SCHEDULE
TYPE
EQUIPMENT
NUMBER MANUFACTURER MODEL LOCATION SERVICE TYPE FLUID
PUMP MOTOR ELECTRICAL
OPERATING
WEIGHT NOTESFLOW HEAD SPEED
MIN. STATIC EFF.
VFD
[Y/N] HP VOLT
PHAS
E
FREQUE
NCY
EMERG. PWR.
(Y/N)
P 1 BELL & GOSSETT ECOCIRC XL 70-145 BASEMENT 3 HOT WATER CIRCULATOR WATER 52 GPM 46.60 ftH2O 3450 NA Y 2.0 208 V 1 60 Hz Yes 38.00 lb 1,2,3
P 2 BELL & GOSSETT ECOCIRC XL 70-145 BASEMENT 3 HOT WATER CIRCULATOR WATER 52 GPM 46.60 ftH2O 3450 NA Y 2.0 208 V 1 60 Hz Yes 38.00 lb 1,2,3
P 3 BELL & GOSSETT E90-2AB BASEMENT 3 HOT WATER CIRCULATOR WATER 38 GPM 28.00 ftH2O 1800 NA N 1.0 120 V 1 60 Hz Yes 48.00 lb 1,3,4
P 4 BELL & GOSSETT E90-2AB BASEMENT 3 HOT WATER CIRCULATOR WATER 38 GPM 28.00 ftH2O 1800 NA N 1.0 120 V 1 60 Hz Yes 48.00 lb 1,3,4
1. MOUNT INLINE PER MANUFACTURER ORIENTATION REQUIREMENTS AS PART OF PIPE.
2. PROVIDE INTEGRATED AND REMOTE PRESSURE SENSOR. INSTALL REMOTE DELTA PRESSURE SENSOR AT BOTTOM OF RISER TO R2.1 WIRED TO PUMP CONTROL INPUT; SET TO MAINTAIN CONSTANT PRESSURE OF 15 FT WG.
3. CONNECT ENABLE INPUT TO RELAY INTERLOCKED TO OPERATE BY BOILER CONTROLLER SYSTEM PUMP OUTPUT.
4. PROVIDE WITH ECM MOTOR OPTION; AT BALANCE, ADJUST SPEED TO FLOW IN PARALLEL OPERATION; PROVIDE RELAY AND WIRE TO BOILER CONTROLLER TO OPERATE AS SYSTEM PUMP
(E) MECHANICAL - RADIATOR SCHEDULE
TYPE
EQUIPMENT
NUMBER SECTIONS HEIGHT
HEATING CAPACITY
(BTU/HR) FLOW(GPM)
NOTE
S
R 01.1 30 3' - 0" 13617 1.8 1,2,3
R 01.2 30 1' - 8" 13617 1.8 1,2,3
R 01.3 30 1' - 8" 13617 1.8 1,2,3
R 01.4 30 1' - 8" 13617 1.8 1,2,3
R 01.5 30 1' - 8" 13617 1.8 1,2,3
R 01.6 30 1' - 8" 13617 1.8 1,2,3
R 01.7 42 1' - 8" 19064 2.5 1,2,3
R 01.8 20 1' - 8" 9078 1.2 1,2,3
R 01.9 11 3' - 0" 9350 1.2 1,2,3
R 01.10 6 3' - 0" 5100 0.7 1,2,3
R 01.11 13 3' - 0" 11050 1.5 1,2,3
R 01.12 9 3' - 0" 7650 1.0 1,2
R 01.13 13 3' - 0" 11050 1.5 1,2,3
R 01.14 8 3' - 0" 6800 0.9 1,2,3
R 01.15 5 1' - 8" 2270 0.3 4
R 01.16 7 3' - 0" 3177 0.4 1,2,3
R 02.1 13 3' - 0" 13500 1.5 1,2,3
R 02.2 9 3' - 0" 7650 0.4 1,2,3
R 02.3 9 3' - 0" 4085 0.5 1,2,3
R 02.4 12 3' - 0" 10200 1.4 1,2,3
R 02.5 6 3' - 0" 5100 0.7 1,2
R 02.6 12 3' - 0" 10200 1.4 1,2,3
R 02.7 6 3' - 0" 5100 0.7 1,2,3
R 02.8 7 3' - 0" 5950 0.8 1,2,3
R 02.9 7 3' - 0" 5950 0.8 1,2,3
R 02.10 6 3' - 0" 5100 0.7 1,2,3
R 02.11 12 3' - 0" 10200 1.4 1,2,3
R 02.12 6 3' - 0" 5100 0.7 1,2,3
R 02.13 12 3' - 0" 10200 1.4 1,2,3
R 02.14 9 3' - 0" 4085 0.5 1,2,3
R 02.15 9 3' - 0" 7650 1.0 1,2,3
R 02.16 12 3' - 0" 10200 0.5 1,2,3
R 02.17 7 3' - 0" 3177 0.4 1,2,3
R 02.18 8 3' - 0" 6800 0.9 1,2,3
R 02.19 9 3' - 0" 7650 1.0 1,2,3
R 03.1 9 3' - 0" 7650 1.0 1,2,3
R 03.2 7 3' - 0" 5950 0.8 1,2,3
R 03.3 6 3' - 0" 5100 0.7 1,2,3
R 03.4 6 3' - 0" 5100 0.7 1,2,3
R 03.5 6 3' - 0" 5100 0.7 1,2,3
R 03.6 7 3' - 0" 5950 0.8 1,2,3
R 03.7 10 3' - 0" 8500 1.1 1,2,3
R 03.8 10 3' - 0" 8500 1.1 1,2,3
R 03.9 8 3' - 0" 6800 0.9 1,2,3
R 03.10 7 3' - 0" 5950 0.8 1,2,3
R 03.11 8 3' - 0" 6800 0.9 1,2,3
R 03.12 10 3' - 0" 8500 1.1 1,2,3
R B1.1 30 1' - 8" 13617 1.8 1,2,3
R B1.2 42 1' - 8" 19064 2.5 1,2,3
R B1.3 42 1' - 8" 19064 2.5 1,2,3
R B1.5 26 3' - 0" 22100 2.9 1,2,3
R B2.2 30 1' - 8" 13617 2.8 1,2,3
R B2.3 14 1' - 8" 11348 0.8 1,2,3
R B2.4 14 3' - 0" 12750 0.5 1,2,3
1. PROVIDE AND INSTALL NEW THERMOSTATIC CONTROL VALVE WITH REMOTE SENSOR. SEE DETAIL.
2. BASIS OF DESIGN CONTROL VALVE IS DANFOSS RA2000. WITH THERMOSTATIC ACTUATOR, 3/4" SIZE (TYP)
3. ADD 1/2" AIR BLEED VALVE TO EACH RADIATOR AT TOP.
4. EXISTING RADIATORS TO BE CLEANED AND REHABILITATED: REMOVE, FLUSH, TANK DIP, REPAIR AS REQUIRED (INCLUDING MACHINING
OF VALVE CONNECTIONS AS REQUIRED), REFINISH TO ORIGINAL APPEARANCE, AND REINSTALL. IF RADIATOR CANNOT BE
REFURBISHED; PROVIDE EQUIVALENT SIZE REPLICA PER SPECS.
5. REMOVE AND STORE RADIATOR FOR FUTURE USE BY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .