A06_Dwgs_01_ORCA_100CD_FINAL_3_ARCHITECTURE.pdf

PDF 35 MB Posted

Attached to
ORCA 150025 - Correct Life Safety and Critical Def
Solicitation number
140P2019R0045
Issued by

About this file

This pre-solicitation notice announces an upcoming solicitation to correct life safety and critical deficiencies at the Oregon Caves Chateau National Historic Landmark. The work includes fire suppression and detection systems, code compliant egress doors and accessibility improvements, structural deficiencies, replacement of water supply and waste vent piping, steam piping and radiators, the main electric service panel, and addition of plywood shear panels and steel-framed balconies. The estimated price range is over $10 million, with an estimated performance period of April 2020 through September 2021. The solicitation is expected to be issued on or about October 21, 2019. Small businesses, veteran-owned small businesses, small disadvantaged businesses, and women-owned small businesses are encouraged to participate as either prime contractors or subcontractors.

Drawings - Architecture

View the file

Other files

File Type Posted
01 27 00-Definition of Contract Line Items_ORCA Amend 4_0004.pdf PDF
140P2019R0045 Amend 4 SOC_0004.pdf PDF
07_ContractPriceSchedule_ORCA150025_Amend 4_0004.xls XLS spreadsheet
Sol_140P2019R0045_Amd_0004.pdf PDF
09 80 00 Fiberboard Wall Ceiling Treatment_ORCA_0003.pdf PDF
Sol_140P2019R0045_Amd_0003.pdf PDF
B03_Wage_Determination_OR20200039 1-3-2020_0003.pdf PDF
140P2019R0045 Amend 3 SOC_0003.pdf PDF
Sol_140P2019R0045_Amd_0001.pdf PDF
Sol_140P2019R0045_Amd_0002.pdf PDF
00 01 10 Table of Contents_ORCA_r1_0002.pdf PDF
140P2019R0045 Amend 1 SOC.updated_0002.pdf PDF
09 80 00 Fiberboard Wall & Ceiling Treatment_0002.pdf PDF
Sign-in sheet_0002.pdf PDF
L8.03 Landscape Details - A1_0002.pdf PDF
A06_Specs_03_XAPPENDIX-C_ORCA_Chateau_Hazardous_Materials_Report.pdf PDF
A06_Specs_03_XAPPENDIX-D_ORCA_Fire_Protection_Basis_of_Design.pdf PDF
A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_1_-_164.pdf PDF
A06_Specs_03_XAPPENDIX-A_ORCA_Geotech_Report.pdf PDF
A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_165_-_330.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
B08_Solic_Contract_Price_Schedule_ORCA150025_FINAL.xls XLS spreadsheet
A06_Dwgs_01_ORCA_100CD_FINAL_0_TITLE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_6_PLUMBING.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_8_ELECTRICAL.pdf PDF
B08_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Solic_140P2019R0045_SF_1442_&_Clauses.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-01.pdf PDF
B08_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Solic_SF24-16d.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_7_MECHANICAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_4_FIRE_SUPPRESSION.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_2_STRUCTURAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_5_FIRE_DETECTION.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-15-48.pdf PDF
B03_Wage_Determination_OR20190039_8-30-19.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-02-14.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_1_LANDSCAPE.pdf PDF
B08_Solit_PSP_Cover.rtf RTF text file
B08_Solit_PSP_Vol_II_Equals.doc DOC document
B08_Solit_PSP_Vol_II_HazMat.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

18' - 0

18' - 0

18' - 0"

18' - 0"

02-65

02-02

MECHANICAL

B301

3.2 5.8

17' - 4" 15' - 0" 17' - 0"

7'

3"

8'

9"

9"

5"

9"

9"

36' - 0

36' - 0"

49' - 4"

60' - 0"

14' - 4"

13' - 8"

4' - 8"

9' - 4"

10' - 8"

7' - 4"

9"

UP

TYP

02-10

02-1102-11

02-30

22.47° 22.47°

CRAWL SPACE

02-38

02-46

02-49

02-50

B301-2

02-67

02-68

DEMOLITION PLAN GENERAL NOTES

1. SEE PROJECT GENERAL NOTES, ON SHEET T1.02.

2. PROTECT AREAS OUTSIDE AREA OF WORK FROM DAMAGE

DURING CONSTRUCTION. PROTECTION REQUIREMENTS

INCLUDE THE INSTALLATION OF PHYSICAL BARRIERS TO

RESTRICT ACCESS TO, AND PREVENT DAMAGE FROM,

CONSTRUCTION ACTIVITIES RELATED TO THIS WORK.

PROTECTION SHALL BE OF REQUIRED SIZE AND THICKNESS

TO WITHSTAND IMPACT FROM FALLING DEBRIS, ROLLING

EQUIPMENT, AND DELIVERY OF MATERIALS. BARRIER

MATERIALS ARE TO BE INSTALLED WITHOUT ATTACHMENT

DIRECTLY TO ADJACENT HISTORIC BUILDINGS, SURFACES,

OR SITE WORK. PROTECT EXISTING SITE IMPROVEMENTS,

APPURTENANCES, AND LANDSCAPING. COVER AND PROTECT

FURNITURE, FURNISHINGS, SUPPLIES, AND EQUIPMENT THAT

HAVE NOT BEEN REMOVED. PROVIDE TEMPORARY WEATHER

PROTECTION TO ENSURE THAT NO WATER LEAKAGE OR

DAMAGE OCCURS TO STRUCTURE OR INTERIOR AREAS OF

EXISTING BUILDING.

3. REFERENCE STRUCTURAL, MECHANICAL, ELECTRICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL AREAS OF

DEMOLITION.

4. LAYOUT ON SITE & COORDINATE ALL (N) OPENINGS WITH

PARTITION LAYOUT AND HAVE CONTRACTING OFFICER

REVIEW LAYOUT PRIOR TO CUTTING.

5. REMOVE AND REINSTALL ALL (E) HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS FOR

REINSTALLATION IN THE SAME LOCATION.

6. REMOVE ALL NU-WOOD FIBERBOARD WALL AND CEILING

PANELS THROUGHOUT THE CHATEAU FOR REPLACEMENT

WITH NEW FIBERBOARD PANELS.

7. ALL [REAL] WOOD BASE, TRIM, WAINSCOT, AND PANELING ON

PARTITIONS TO BE REMOVED SHALL BE SALVAGED FOR

REINSTALLATION. THE LEVEL 1 AND BASEMENT 1 PUBLIC

AREAS SHALL HAVE THE WOOD PANELS REMOVED AND

CATALOGUED TO BE REINSTALLED IN THE EXACT SAME

LOCATION.

8. REMOVE ALL FLOOR FINISH ASSEMBLIES AT LEVEL 1

INCLUSIVE OF FASTENERS, PADDING, ETC. TO EXPOSE WOOD

SUBFLOOR.

9. ALL BATHROOM ACCESSORIES AT DEMOLISHED ROOMS TO

BE SALVAGED TO OWNER. CERAMIC SOAP DISHES TO BE

REINSTALLED PER INTERIOR ELEVATIONS.

10. REMOVE ALL FIRE HOSE CABINETS.

11. REMOVE ALL (E) TOILETS. SPD FOR REPLACEMENT.

12. REMOVE ALL (E) PEDESTAL SINKS AT LEVEL 1 GUEST ROOMS

TO BE REINSTALLED AT LEVEL 3 GUESTROOMS NOTED.

13. REMOVE AND REPLACE TILE AS REQUIRED AT GUESTROOM

SHOWER/BATH CONTROL WALL ON LEVELS 2 AND 3 FOR

INSTALLATION OF NEW CONTROLS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

REMOVE PORTION OF (E) WALL.

COORDINATE DEMOLITION WITH SCOPE

OF (N) WORK, AS DEFINED IN

DOCUMENTS

REMOVE (E) DOOR, FRAME,

AND HARDWARE

DEMOLITION PLAN LEGEND

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION E: REPLACEMENT OF ALL PLUMBING PIPING AT BASEMENT 3 AS NOTED ON

PLUMBING DRAWINGS.

OPTION F: REPLACEMENT OF EXISTING BOILER WITH HIGH EFFICIENCY BOILER AS NOTED

ON MECHANICAL DRAWINGS.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:0

:1

P

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

DEMO FLOOR PLAN -

BASEMENT 3A1.B3

65 211

CONSTRUCTION DRAWINGS

A .B

K

E

A1.B3

1 DEMO FLOOR PLAN - BASEMENT 3

02-02 REMOVE (E) STAIRS, LANDINGS, AND ASSOCIATED RAILINGS.

02-10 REMOVE AND SALVAGE (E) SHELVING AND/OR CABINETRY.

02-11 REMOVE (E) PARTITION.

02-30 REMOVE (E) STEP

02-38 ENLARGE (E) OPENING IN CONCRETE WALL FOR LOWERED

DOOR OPENING. COORDINATED WITH DOOR SCHEDULE.

02-46 (E) ACCESS HATCH - ENLARGE (E) 19 X 16" OPENING TO 24X36"

TO PROVIDE LARGER ACCESS TO CRAWL SPACE.

02-49 REMOVE AND SALVAGE (E) GENERATOR.

02-50 REMOVE (E) GENERATOR ENCLOSURE AND CONCRETE PAD.

02-65 REMOVE (E) STAIR ENCLOSURE INCLUSIVE OF EXTERIOR

WALLS, ROOF, STAIRS, RAILINGS, AND FLOORINGS.

02-67 REMOVE (E) WOOD FLOORING AS REQ'D FOR INSTALLATION OF

FIRE-RATED PARTITION. SEE FLOOR PLANS.

02-68 REMOVE (E) WOOD FLOORING AS REQ'D FOR NEW CONC

COLUMN AND FOOTING. SSD.

DEMOLITION KEY NOTES

BLDG.

TRUE

NORTH

29.6°

UP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

5' - 9

7' - 4"

1' - 0"

02-01

02-02

02-02

4'

02-05

02-06

TYP

02-07

02-09

TYP

02-10

TYP

02-10

TYP

02-10

TYP

02-10

3' - 10"

2' - 0"

02-02

02-15

3.2 5.8

49' - 4"

17' - 4" 15' - 0" 17' - 0"

18' - 0"

18' - 0"

36' - 0"

5"

36' - 0

18' - 0

18' - 0

9"

9"

60' - 0"

14' - 4"

13' - 8"

4' - 8"

9' - 4"

10' - 8"

7' - 4"

9"

7'

3"

8'

9"

9"

7'

9"

10"

02-20

OPTION A

STORAGE

B211

LAUNDRY

B209B

RESTROOM

B210A

SERVICE ENTRY

B209

STAFF DINING

B208

ACCESSIBLE STAFF

BEDROOM #3

B205

STAFF BEDROOM #2

B206

STAFF BEDROOM #1

B207

STAFF LOUNGE

B204

BATHROOM

B203A

STORAGE

B203

WINE STOR

B202B

STORAGE

B202

STAIRS

B200

CLOSET

B207A

CLOSET

B206A

CHIMNEY

REFG UNIT

DUMB-

WAITER

22.47° 22.47°

02-32

STAFF KITCHEN

B208B

02-15

02-12

02-10

02-09

02-04

02-12

02-47

02-47

02-47

02-65

02-15

02-12

02-5402-54 02-5402-54

02-1202-1202-12

02-5402-54

02-54

02-5402-54

02-5402-54

02-5402-54

02-14

02-64

02-32

B209-1

02-0802-66

02-66

02-53

02-08

02-08

02-66

02-19

DEMOLITION PLAN GENERAL NOTES

1. SEE PROJECT GENERAL NOTES, ON SHEET T1.02.

2. PROTECT AREAS OUTSIDE AREA OF WORK FROM DAMAGE

DURING CONSTRUCTION. PROTECTION REQUIREMENTS

INCLUDE THE INSTALLATION OF PHYSICAL BARRIERS TO

RESTRICT ACCESS TO, AND PREVENT DAMAGE FROM,

CONSTRUCTION ACTIVITIES RELATED TO THIS WORK.

PROTECTION SHALL BE OF REQUIRED SIZE AND THICKNESS

TO WITHSTAND IMPACT FROM FALLING DEBRIS, ROLLING

EQUIPMENT, AND DELIVERY OF MATERIALS. BARRIER

MATERIALS ARE TO BE INSTALLED WITHOUT ATTACHMENT

DIRECTLY TO ADJACENT HISTORIC BUILDINGS, SURFACES,

OR SITE WORK. PROTECT EXISTING SITE IMPROVEMENTS,

APPURTENANCES, AND LANDSCAPING. COVER AND PROTECT

FURNITURE, FURNISHINGS, SUPPLIES, AND EQUIPMENT THAT

HAVE NOT BEEN REMOVED. PROVIDE TEMPORARY WEATHER

PROTECTION TO ENSURE THAT NO WATER LEAKAGE OR

DAMAGE OCCURS TO STRUCTURE OR INTERIOR AREAS OF

EXISTING BUILDING.

3. REFERENCE STRUCTURAL, MECHANICAL, ELECTRICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL AREAS OF

DEMOLITION.

4. LAYOUT ON SITE & COORDINATE ALL (N) OPENINGS WITH

PARTITION LAYOUT AND HAVE CONTRACTING OFFICER

REVIEW LAYOUT PRIOR TO CUTTING.

5. REMOVE AND REINSTALL ALL (E) HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS FOR

REINSTALLATION IN THE SAME LOCATION.

6. REMOVE ALL NU-WOOD FIBERBOARD WALL AND CEILING

PANELS THROUGHOUT THE CHATEAU FOR REPLACEMENT

WITH NEW FIBERBOARD PANELS.

7. ALL [REAL] WOOD BASE, TRIM, WAINSCOT, AND PANELING ON

PARTITIONS TO BE REMOVED SHALL BE SALVAGED FOR

REINSTALLATION. THE LEVEL 1 AND BASEMENT 1 PUBLIC

AREAS SHALL HAVE THE WOOD PANELS REMOVED AND

CATALOGUED TO BE REINSTALLED IN THE EXACT SAME

LOCATION.

8. REMOVE ALL FLOOR FINISH ASSEMBLIES AT LEVEL 1

INCLUSIVE OF FASTENERS, PADDING, ETC. TO EXPOSE WOOD

SUBFLOOR.

9. ALL BATHROOM ACCESSORIES AT DEMOLISHED ROOMS TO

BE SALVAGED TO OWNER. CERAMIC SOAP DISHES TO BE

REINSTALLED PER INTERIOR ELEVATIONS.

10. REMOVE ALL FIRE HOSE CABINETS.

11. REMOVE ALL (E) TOILETS. SPD FOR REPLACEMENT.

12. REMOVE ALL (E) PEDESTAL SINKS AT LEVEL 1 GUEST ROOMS

TO BE REINSTALLED AT LEVEL 3 GUESTROOMS NOTED.

13. REMOVE AND REPLACE TILE AS REQUIRED AT GUESTROOM

SHOWER/BATH CONTROL WALL ON LEVELS 2 AND 3 FOR

INSTALLATION OF NEW CONTROLS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

REMOVE PORTION OF (E) WALL.

COORDINATE DEMOLITION WITH SCOPE

OF (N) WORK, AS DEFINED IN

DOCUMENTS

REMOVE (E) DOOR, FRAME,

AND HARDWARE

DEMOLITION PLAN LEGEND

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION A: WEST BALCONY RECONSTRUCTION UTILIZING WOOD AND STEEL AS SHOWN

ON ARCHITECTURAL AND STRUCTURAL DRAWINGS.

OPTION H: REPLACEMENT OF EXISTING ELECTRIC FORCED AIR HEATERS REMAINING ON

BASEMENT 2 STAFF BEDROOMS, LOUNGE, AND DINING AREAS WITH NEW ELECTRIC

HEATERS AS NOTED ON MECHANICAL DRAWINGS.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:0

:1

P

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

DEMO FLOOR PLAN -

BASEMENT 2A1.B2

66 211

CONSTRUCTION DRAWINGS

A .B

K

E

A1.B2

1 DEMO FLOOR PLAN - PHASE 1 - BASEMENT 2

02-01 REMOVE (E) FIRE ESCAPE, PLATFORMS, AND ASSOCIATED

STRUCTURAL ELEMENTS.

02-02 REMOVE (E) STAIRS, LANDINGS, AND ASSOCIATED RAILINGS.

02-04 REMOVE (E) KITCHEN AIR INTAKE VENT AND HOOD

02-05 REMOVE (E) CONCRETE SLAB FOR NEW ELEVATOR PIT.

02-06 REMOVE (E) FLOORING AND FRAMING AS REQ'D FOR ELEVATOR,

STAIRS, OR RAMP. SSD AND FLOOR PLANS TO COORDINATE.

02-07 REMOVE AND SALVAGE (E) REFG UNITS.

02-08 REMOVE AND SALVAGE (E) DOOR, FRAME, AND ASSOCIATED

HARDWARE.

02-09 REMOVE (E) RAMP AND ASSOCIATED RAILINGS.

02-10 REMOVE AND SALVAGE (E) SHELVING AND/OR CABINETRY.

02-12 REMOVE AND SALVAGE (E) PLUMBING FIXTURE. SPD FOR

ADDITIONAL SALVAGE OR REINSTALL REQUIREMENTS.

02-14 REMOVE AND SALVAGE (E) WOOD WINDOW FOR REPLACEMENT.

02-15 REMOVE AND SALVAGE (E) EQUIPMENT.

02-19 REMOVE (E) FIBERBOARD WALL PANELS

02-20 REMOVE (E) DUMBWAITER DOOR.

02-32 REMOVE AND REINSTALL (E) HISTORIC HOUSE PHONE SAME

LOCATION.

02-47 REMOVE (E) BASEBAORD HEATER. SMD.

02-53 PROTECT (E) COUNTER/CASEWORK DURING CONSTRUCTION

02-54 REMOVE (E) CEILING

02-64 REMOVE (E) FLOOR FINISH ASSEMBLY DOWN TO WD

SUBLFOOR(HATCHED AREA). SEE ROOM FINISH SCHEDULE.

02-65 REMOVE (E) STAIR ENCLOSURE INCLUSIVE OF EXTERIOR WALLS,

ROOF, STAIRS, RAILINGS, AND FLOORINGS.

02-66 MODIFY (E) OPENING FOR NEW DOOR AS REQ'D. COORDINATE

WITH DOOR SCHEDULE.

DEMOLITION KEY NOTES

BLDG.

TRUE

NORTH

COORDINATE WITH DOOR SCHEDULE

UP

UP

UP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

02-06 02-06

02-02

TYP

02-12

02-24

02-12

02-24

02-02

02-02

02-13

02-56

1' - 0" 7' - 4"

5' - 9

10"

3.2 5.8

COFFEE SHOP

B104

KITCHEN

B103

WALK-IN REFRIG.

B103A

DINING ROOM

B102

GIFT SHOP

B101

STAIRS

B100

02-02

OPTION A

02-20

5' - 0" 1' - 0"

02-08

02-43

36' - 0"

18' - 0"

18' - 0"

5"

36' - 0

18' - 0

18' - 0

9"

9"

8'

9"

9"

60' - 0"

14' - 4"

13' - 8"

4' - 8"

9' - 4"

10' - 8"

7' - 4"

9"

49' - 4"

17' - 4" 15' - 0" 17' - 0"

7'

9"

02-26

TYP

02-27

22.47° 22.47°

CHIMNEY

02-55

02-41

02-40

02-42

02-4302-43

02-4402-44

02-44

02-4802-48

B103-1

B104-1

B101-1

B102-1

ABOVE

02-6402-64

02-21

02-21

02-21

02-22

DEMOLITION PLAN GENERAL NOTES

1. SEE PROJECT GENERAL NOTES, ON SHEET T1.02.

2. PROTECT AREAS OUTSIDE AREA OF WORK FROM DAMAGE

DURING CONSTRUCTION. PROTECTION REQUIREMENTS

INCLUDE THE INSTALLATION OF PHYSICAL BARRIERS TO

RESTRICT ACCESS TO, AND PREVENT DAMAGE FROM,

CONSTRUCTION ACTIVITIES RELATED TO THIS WORK.

PROTECTION SHALL BE OF REQUIRED SIZE AND THICKNESS

TO WITHSTAND IMPACT FROM FALLING DEBRIS, ROLLING

EQUIPMENT, AND DELIVERY OF MATERIALS. BARRIER

MATERIALS ARE TO BE INSTALLED WITHOUT ATTACHMENT

DIRECTLY TO ADJACENT HISTORIC BUILDINGS, SURFACES,

OR SITE WORK. PROTECT EXISTING SITE IMPROVEMENTS,

APPURTENANCES, AND LANDSCAPING. COVER AND PROTECT

FURNITURE, FURNISHINGS, SUPPLIES, AND EQUIPMENT THAT

HAVE NOT BEEN REMOVED. PROVIDE TEMPORARY WEATHER

PROTECTION TO ENSURE THAT NO WATER LEAKAGE OR

DAMAGE OCCURS TO STRUCTURE OR INTERIOR AREAS OF

EXISTING BUILDING.

3. REFERENCE STRUCTURAL, MECHANICAL, ELECTRICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL AREAS OF

DEMOLITION.

4. LAYOUT ON SITE & COORDINATE ALL (N) OPENINGS WITH

PARTITION LAYOUT AND HAVE CONTRACTING OFFICER

REVIEW LAYOUT PRIOR TO CUTTING.

5. REMOVE AND REINSTALL ALL (E) HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS FOR

REINSTALLATION IN THE SAME LOCATION.

6. REMOVE ALL NU-WOOD FIBERBOARD WALL AND CEILING

PANELS THROUGHOUT THE CHATEAU FOR REPLACEMENT

WITH NEW FIBERBOARD PANELS.

7. ALL [REAL] WOOD BASE, TRIM, WAINSCOT, AND PANELING ON

PARTITIONS TO BE REMOVED SHALL BE SALVAGED FOR

REINSTALLATION. THE LEVEL 1 AND BASEMENT 1 PUBLIC

AREAS SHALL HAVE THE WOOD PANELS REMOVED AND

CATALOGUED TO BE REINSTALLED IN THE EXACT SAME

LOCATION.

8. REMOVE ALL FLOOR FINISH ASSEMBLIES AT LEVEL 1

INCLUSIVE OF FASTENERS, PADDING, ETC. TO EXPOSE WOOD

SUBFLOOR.

9. ALL BATHROOM ACCESSORIES AT DEMOLISHED ROOMS TO

BE SALVAGED TO OWNER. CERAMIC SOAP DISHES TO BE

REINSTALLED PER INTERIOR ELEVATIONS.

10. REMOVE ALL FIRE HOSE CABINETS.

11. REMOVE ALL (E) TOILETS. SPD FOR REPLACEMENT.

12. REMOVE ALL (E) PEDESTAL SINKS AT LEVEL 1 GUEST ROOMS

TO BE REINSTALLED AT LEVEL 3 GUESTROOMS NOTED.

13. REMOVE AND REPLACE TILE AS REQUIRED AT GUESTROOM

SHOWER/BATH CONTROL WALL ON LEVELS 2 AND 3 FOR

INSTALLATION OF NEW CONTROLS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

REMOVE PORTION OF (E) WALL.

COORDINATE DEMOLITION WITH SCOPE

OF (N) WORK, AS DEFINED IN

DOCUMENTS

REMOVE (E) DOOR, FRAME,

AND HARDWARE

DEMOLITION PLAN LEGEND

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION A: WEST BALCONY RECONSTRUCTION UTILIZING WOOD AND STEEL AS SHOWN

ON ARCHITECTURAL AND STRUCTURAL DRAWINGS.

OPTION C: UTLIZE AN AFRICAN CHERRY VENEER WOOD PANEL TO MATCH EXISTING

BEING REMOVED IN LIEU OF THE REDWOOD WAINSCOT PANELING CURRENTLY SHOWN IN

THE ARCHITECTURAL DRAWINGS AT BASEMENT 1 AND MAIN STAIR LANDING TO

BASEMENT 1. (DEDUCTIVE BID).

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:0

:0

P

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

DEMO FLOOR PLAN -

BASEMENT 1A1.B1

67 211

CONSTRUCTION DRAWINGS

A .B

K

E

A1.B1

1 DEMO FLOOR PLAN - BASEMENT 1

02-02 REMOVE (E) STAIRS, LANDINGS, AND ASSOCIATED RAILINGS.

02-06 REMOVE (E) FLOORING AND FRAMING AS REQ'D FOR ELEVATOR, STAIRS,

OR RAMP. SSD AND FLOOR PLANS TO COORDINATE.

02-08 REMOVE AND SALVAGE (E) DOOR, FRAME, AND ASSOCIATED HARDWARE.

02-12 REMOVE AND SALVAGE (E) PLUMBING FIXTURE. SPD FOR ADDITIONAL

SALVAGE OR REINSTALL REQUIREMENTS.

02-13 REMOVE (E) RADIATOR.

02-20 REMOVE (E) DUMBWAITER DOOR.

02-21 REMOVE (E) FIBERBOARD WALL AND CEILING PANELS (ENTIRE ROOM

AND ASSOCIATED CLOSETS AS APPLICABLE)

02-22

02-24 REMOVE (E) PARTITION. REINSTALL WOOD PANELING. SEE GENERAL

NOTE 7.

02-26 REMOVE AND SALVAGE (E) WINDOW. PREPARE FOR INSTALLATION OF

NEW WINDOW AND DOOR.

02-27 REMOVE AND SALVAGE (E) FIXED SEATING.

02-40 REMOVE (E) FIRE SPRINKLER RISER. SEE FIRE SUPPRESSION DRAWINGS.

02-41 REMOVE (E) ELECTRICAL PANEL. SED.

02-42 REMOVE AND SALVAGE (E) CASEWORK.

02-43 REMOVE (E) WD SCREEN.

02-44 REMOVE (E) CASEWORK.

02-48 REMOVE AND REINSTALL (E) WOOD PANELING IN THE EXACT SAME

LOCATION (ENTIRE ROOM).

02-55 SEE MECHANICAL FOR MODIFICATIONS TO (E) KITCHEN HOOD AND

EXHAUST.

02-56 REMOVE AND SALVAGE (E) WINDOW. PARTIALLY REMOVE PARTITION AS

REQ'D FOR INSTALLATION OF NEW DOOR. COORDINATE WITH DOOR

SCHEDULE.

02-64 REMOVE (E) FLOOR FINISH ASSEMBLY DOWN TO WD

SUBLFOOR(HATCHED AREA). SEE ROOM FINISH SCHEDULE.

DEMOLITION KEY NOTES

BLDG.

TRUE

DNUP

UP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

02-06

02-06

02-08

TYP

02-12

TYP

02-12

02-08

02-08

02-12

02-06

02-56

02-01 02-02

02-02

02-16

3.2 5.8

OPTION A

FIREPLACE

OFFICE #1

OFFICE #2

LOBBY

GAME ROOM

CORRIDOR

SITTING ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

02-08

02-13

TYP

02-12

02-08

17' - 4" 15' - 0" 17' - 0"

49' - 4"

36' - 0

18' - 0

18' - 0

9"

9"

36' - 0"

18' - 0"

18' - 0"

5"

7'

3"

8'

9"

9"

60' - 0"

14' - 4"

13' - 8"

4' - 8"

9' - 4"

10' - 8"

7' - 4"

9"

7'

9"

22.47° 22.47°

02-32

02-34

02-37

02-33

02-47

02-47

02-47

02-47

02-51

02-13

02-12

02-57

02-5802-58

02-59

02-31

02-01

02-52

02-18

02-12

02-0802-08

02-08

02-08

02-0802-08

02-0802-08

107-2

109-1

02-08

02-17

02-12

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-66

DEMOLITION PLAN GENERAL NOTES

1. SEE PROJECT GENERAL NOTES, ON SHEET T1.02.

2. PROTECT AREAS OUTSIDE AREA OF WORK FROM DAMAGE

DURING CONSTRUCTION. PROTECTION REQUIREMENTS

INCLUDE THE INSTALLATION OF PHYSICAL BARRIERS TO

RESTRICT ACCESS TO, AND PREVENT DAMAGE FROM,

CONSTRUCTION ACTIVITIES RELATED TO THIS WORK.

PROTECTION SHALL BE OF REQUIRED SIZE AND THICKNESS

TO WITHSTAND IMPACT FROM FALLING DEBRIS, ROLLING

EQUIPMENT, AND DELIVERY OF MATERIALS. BARRIER

MATERIALS ARE TO BE INSTALLED WITHOUT ATTACHMENT

DIRECTLY TO ADJACENT HISTORIC BUILDINGS, SURFACES,

OR SITE WORK. PROTECT EXISTING SITE IMPROVEMENTS,

APPURTENANCES, AND LANDSCAPING. COVER AND PROTECT

FURNITURE, FURNISHINGS, SUPPLIES, AND EQUIPMENT THAT

HAVE NOT BEEN REMOVED. PROVIDE TEMPORARY WEATHER

PROTECTION TO ENSURE THAT NO WATER LEAKAGE OR

DAMAGE OCCURS TO STRUCTURE OR INTERIOR AREAS OF

EXISTING BUILDING.

3. REFERENCE STRUCTURAL, MECHANICAL, ELECTRICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL AREAS OF

DEMOLITION.

4. LAYOUT ON SITE & COORDINATE ALL (N) OPENINGS WITH

PARTITION LAYOUT AND HAVE CONTRACTING OFFICER

REVIEW LAYOUT PRIOR TO CUTTING.

5. REMOVE AND REINSTALL ALL (E) HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS FOR

REINSTALLATION IN THE SAME LOCATION.

6. REMOVE ALL NU-WOOD FIBERBOARD WALL AND CEILING

PANELS THROUGHOUT THE CHATEAU FOR REPLACEMENT

WITH NEW FIBERBOARD PANELS.

7. ALL [REAL] WOOD BASE, TRIM, WAINSCOT, AND PANELING ON

PARTITIONS TO BE REMOVED SHALL BE SALVAGED FOR

REINSTALLATION. THE LEVEL 1 AND BASEMENT 1 PUBLIC

AREAS SHALL HAVE THE WOOD PANELS REMOVED AND

CATALOGUED TO BE REINSTALLED IN THE EXACT SAME

LOCATION.

8. REMOVE ALL FLOOR FINISH ASSEMBLIES AT LEVEL 1

INCLUSIVE OF FASTENERS, PADDING, ETC. TO EXPOSE WOOD

SUBFLOOR.

9. ALL BATHROOM ACCESSORIES AT DEMOLISHED ROOMS TO

BE SALVAGED TO OWNER. CERAMIC SOAP DISHES TO BE

REINSTALLED PER INTERIOR ELEVATIONS.

10. REMOVE ALL FIRE HOSE CABINETS.

11. REMOVE ALL (E) TOILETS. SPD FOR REPLACEMENT.

12. REMOVE ALL (E) PEDESTAL SINKS AT LEVEL 1 GUEST ROOMS

TO BE REINSTALLED AT LEVEL 3 GUESTROOMS NOTED.

13. REMOVE AND REPLACE TILE AS REQUIRED AT GUESTROOM

SHOWER/BATH CONTROL WALL ON LEVELS 2 AND 3 FOR

INSTALLATION OF NEW CONTROLS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

REMOVE PORTION OF (E) WALL.

COORDINATE DEMOLITION WITH SCOPE

OF (N) WORK, AS DEFINED IN

DOCUMENTS

REMOVE (E) DOOR, FRAME,

AND HARDWARE

DEMOLITION PLAN LEGEND

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION A: WEST BALCONY RECONSTRUCTION UTILIZING WOOD AND STEEL AS SHOWN

ON ARCHITECTURAL AND STRUCTURAL DRAWINGS.

OPTION G: REPLACEMENT OF ELECTRIC STRIP HEATERS AT OFFICE AREAS WITH

HYDRONIC HEATERS AS NOTED ON MECHANICAL DRAWINGS.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:5

:3

A

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

DEMO FLOOR PLAN -

LEVEL 1A1.01

68 211

CONSTRUCTION DRAWINGS

A .0

K

E

A1.01

1 DEMO FLOOR PLAN - LEVEL 1

02-01 REMOVE (E) FIRE ESCAPE, PLATFORMS, AND ASSOCIATED STRUCTURAL

ELEMENTS.

02-02 REMOVE (E) STAIRS, LANDINGS, AND ASSOCIATED RAILINGS.

02-06 REMOVE (E) FLOORING AND FRAMING AS REQ'D FOR ELEVATOR, STAIRS, OR

RAMP. SSD AND FLOOR PLANS TO COORDINATE.

02-08 REMOVE AND SALVAGE (E) DOOR, FRAME, AND ASSOCIATED HARDWARE.

02-12 REMOVE AND SALVAGE (E) PLUMBING FIXTURE. SPD FOR ADDITIONAL SALVAGE

OR REINSTALL REQUIREMENTS.

02-13 REMOVE (E) RADIATOR.

02-16 REMOVE (E) ENTRY ACCESS STAIRS AND/OR LANDING. SEE LANDSCAPE.

02-17 REMOVE (E) LAVATORY

02-18 REMOVE (E) PARTITION AS REQ'D FOR NEW DOOR OR OPENING.

02-21 REMOVE (E) FIBERBOARD WALL AND CEILING PANELS (ENTIRE ROOM AND

ASSOCIATED CLOSETS AS APPLICABLE)

02-31 REMOVE AND REINSTALL (E) HISTORIC NIGHT WATCHMAN STATION IN THE SAME

LOCATION.

02-32 REMOVE AND REINSTALL (E) HISTORIC HOUSE PHONE SAME LOCATION.

02-33 REMOVE AND REINSTALL (E) INFORMATION PLAQUE IN THE SAME LOCATION.

02-34 REMOVE AND REINSTALL (E) GUARDRAIL. SEE FLOOR PLANS FOR

MODIFICATIONS.

02-37 REMOVE AND REINSTALL (E) BENCH. SEE FLOOR PLAN FOR MODIFICATIONS.

02-47 REMOVE (E) BASEBAORD HEATER. SMD.

02-51 REMOVE AND SALVAGE (E) SAFE TO OWNER.

02-52 REMOVE (E) PLATFORM AND ASSOCIATED RAILINGS.

02-56 REMOVE AND SALVAGE (E) WINDOW. PARTIALLY REMOVE PARTITION AS REQ'D

FOR INSTALLATION OF NEW DOOR. COORDINATE WITH DOOR SCHEDULE.

02-57 REMOVE (E) STAIRS. SLAVAGE WOOD TREADS AND RISERS FOR

REINSTALLATION IN THE SAME LOCATION.

02-58 REMOVE AND REINSTALL (E) LOBBY DESK AND CASEWORK. SEE FLOOR PLANS

FOR MODIFIED LAYOUT.

02-59 RELOCATE (E) WINDOW 111-1. SEE FLOOR PLANS.

02-66 MODIFY (E) OPENING FOR NEW DOOR AS REQ'D. COORDINATE WITH DOOR

SCHEDULE.

DEMOLITION KEY NOTES

BLDG.

TRUE

DN

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

02-01

3.2 5.8

STAIRS

BATHROOM

214A

BATHROOM

204A

BATHROOM

203A

BATHROOM

201A

BATHROOM

212A

BATHROOM

210A

GUEST ROOM

BATHROOM

209A

GUEST ROOM

202BATHROOM

202A

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

CORRIDOR

200A

STAIRS

BATHROOM

211A

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

STORAGE

200C

CORRIDOR

200B

GUEST ROOM

GUEST ROOM

CLOSET

212B

CLOSET

211B

CLOSET

210B

CLOSET

209B

CLOSET

215A

CLOSET

214B

CLOSET

202B

CLOSET

201B

CLOSET

203B

CLOSET

206B

CLOSET

204B

CHIMNEY

49' - 4"

17' - 4" 15' - 0" 17' - 0"

36' - 0"

18' - 0"

18' - 0"

5"

36' - 0

18' - 0

18' - 0

9"

9"

60' - 0"

14' - 4"

13' - 8"

4' - 8"

9' - 4"

10' - 8"

7' - 4"

9"

7'

3"

8'

9"

9"

7'

9"

02-0802-08

02-2802-28

22.47° 22.47°

02-3002-30

02-12

02-45

02-45

02-45

02-45

02-45 02-12

02-62

02-61

TYP

02-64

02-47

02-08

02-32

02-01

02-69

02-17

02-17

02-17

02-17

02-21

02-21

02-21

02-21

02-21

02-21

02-21 02-21 02-21 02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-32

DEMOLITION PLAN GENERAL NOTES

1. SEE PROJECT GENERAL NOTES, ON SHEET T1.02.

2. PROTECT AREAS OUTSIDE AREA OF WORK FROM DAMAGE

DURING CONSTRUCTION. PROTECTION REQUIREMENTS

INCLUDE THE INSTALLATION OF PHYSICAL BARRIERS TO

RESTRICT ACCESS TO, AND PREVENT DAMAGE FROM,

CONSTRUCTION ACTIVITIES RELATED TO THIS WORK.

PROTECTION SHALL BE OF REQUIRED SIZE AND THICKNESS

TO WITHSTAND IMPACT FROM FALLING DEBRIS, ROLLING

EQUIPMENT, AND DELIVERY OF MATERIALS. BARRIER

MATERIALS ARE TO BE INSTALLED WITHOUT ATTACHMENT

DIRECTLY TO ADJACENT HISTORIC BUILDINGS, SURFACES,

OR SITE WORK. PROTECT EXISTING SITE IMPROVEMENTS,

APPURTENANCES, AND LANDSCAPING. COVER AND PROTECT

FURNITURE, FURNISHINGS, SUPPLIES, AND EQUIPMENT THAT

HAVE NOT BEEN REMOVED. PROVIDE TEMPORARY WEATHER

PROTECTION TO ENSURE THAT NO WATER LEAKAGE OR

DAMAGE OCCURS TO STRUCTURE OR INTERIOR AREAS OF

EXISTING BUILDING.

3. REFERENCE STRUCTURAL, MECHANICAL, ELECTRICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL AREAS OF

DEMOLITION.

4. LAYOUT ON SITE & COORDINATE ALL (N) OPENINGS WITH

PARTITION LAYOUT AND HAVE CONTRACTING OFFICER

REVIEW LAYOUT PRIOR TO CUTTING.

5. REMOVE AND REINSTALL ALL (E) HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS FOR

REINSTALLATION IN THE SAME LOCATION.

6. REMOVE ALL NU-WOOD FIBERBOARD WALL AND CEILING

PANELS THROUGHOUT THE CHATEAU FOR REPLACEMENT

WITH NEW FIBERBOARD PANELS.

7. ALL [REAL] WOOD BASE, TRIM, WAINSCOT, AND PANELING ON

PARTITIONS TO BE REMOVED SHALL BE SALVAGED FOR

REINSTALLATION. THE LEVEL 1 AND BASEMENT 1 PUBLIC

AREAS SHALL HAVE THE WOOD PANELS REMOVED AND

CATALOGUED TO BE REINSTALLED IN THE EXACT SAME

LOCATION.

8. REMOVE ALL FLOOR FINISH ASSEMBLIES AT LEVEL 1

INCLUSIVE OF FASTENERS, PADDING, ETC. TO EXPOSE WOOD

SUBFLOOR.

9. ALL BATHROOM ACCESSORIES AT DEMOLISHED ROOMS TO

BE SALVAGED TO OWNER. CERAMIC SOAP DISHES TO BE

REINSTALLED PER INTERIOR ELEVATIONS.

10. REMOVE ALL FIRE HOSE CABINETS.

11. REMOVE ALL (E) TOILETS. SPD FOR REPLACEMENT.

12. REMOVE ALL (E) PEDESTAL SINKS AT LEVEL 1 GUEST ROOMS

TO BE REINSTALLED AT LEVEL 3 GUESTROOMS NOTED.

13. REMOVE AND REPLACE TILE AS REQUIRED AT GUESTROOM

SHOWER/BATH CONTROL WALL ON LEVELS 2 AND 3 FOR

INSTALLATION OF NEW CONTROLS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

REMOVE PORTION OF (E) WALL.

COORDINATE DEMOLITION WITH SCOPE

OF (N) WORK, AS DEFINED IN

DOCUMENTS

REMOVE (E) DOOR, FRAME,

AND HARDWARE

DEMOLITION PLAN LEGEND

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION J: FULL RENOVATION OF REMAINING GUEST BATHROOMS THROUGHOUT LEVELS

2 AND 3 INCLUDING REPLACEMENT OF EXISTING BATHTUB OR SHOWER PAN;

REPLACEMENT OF EXISTING FINISHES; REPLACEMENT OF EXISTING LIGHT FIXTURE(S);

AND NEW TOILET ACCESSORIES; AS SPECIFIED AND SHOWN FOR OTHER RENOVATED

GUEST BATHROOMS.

OPTION K: REPLACEMENT OF EXISTING CARPETING THROUGHOUT LEVES 2 AND 3.

PUBLIC HALLWAYS AND STAIRWAYS TO HAVE CPT-1. GUESTROOMS TO HAVE CPT-2.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:5

:3

A

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

DEMO FLOOR PLAN -

LEVEL 2A1.02

69 211

CONSTRUCTION DRAWINGS

A .0

K

E

A1.02

1 DEMO FLOOR PLAN - LEVEL 2

02-01 REMOVE (E) FIRE ESCAPE, PLATFORMS, AND ASSOCIATED

STRUCTURAL ELEMENTS.

02-08 REMOVE AND SALVAGE (E) DOOR, FRAME, AND ASSOCIATED

HARDWARE.

02-12 REMOVE AND SALVAGE (E) PLUMBING FIXTURE. SPD FOR

ADDITIONAL SALVAGE OR REINSTALL REQUIREMENTS.

02-17 REMOVE (E) LAVATORY

02-21 REMOVE (E) FIBERBOARD WALL AND CEILING PANELS

(ENTIRE ROOM AND ASSOCIATED CLOSETS AS APPLICABLE)

02-28 REMOVE WALL AS REQ'D FOR NEW DOOR OPENING WITH

LOWER THRESHOLD. COORDINATE WITH DOOR SCHEDULE.

02-30 REMOVE (E) STEP

02-32 REMOVE AND REINSTALL (E) HISTORIC HOUSE PHONE SAME

LOCATION.

02-45 REMOVE AND REINSTALL (E) COURNER GUARDS IN THE

SAME LOCATION.

02-47 REMOVE (E) BASEBAORD HEATER. SMD.

02-61 REMOVE AND REINSTALL DOOR AND FRAME AS 205A-1. SEE

DOOR SCHEDULE.

02-62 REMOVE AND REINSTALL DOOR AND FRAME AS 206A-1. SEE

DOOR SCHEDULE.

02-64 REMOVE (E) FLOOR FINISH ASSEMBLY DOWN TO WD

SUBLFOOR(HATCHED AREA). SEE ROOM FINISH SCHEDULE.

02-69 REMOVE (E) WALL FINISHES IN ROOM. SALVAGE WAINSCOT,

BASE BOARD, AND CHAIR RAIL FOR REINSTALLATION IN THE

SAME LOCATION.

DEMOLITION KEY NOTES

BLDG.

TRUE

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

TYP

02-11

02-06

02-0302-03

02-08

3.2 5.8

49' - 4"

17' - 4" 15' - 0" 17' - 0"

36' - 0

18' - 0

18' - 0

9"

9"

60' - 0"

14' - 4"

13' - 8"

4' - 8"

9' - 4"

10' - 8"

7' - 4"

9"

7'

3"

8'

9"

9"

36' - 0"

18' - 0"

18' - 0"

5"

7'

9"

LINEN RM.

300C

SHOWER RM.

312B

GUEST ROOM

CLOSET

301B

BATHROOM

301A

TOILET RM

310A

CLOSET

310B

GUEST ROOM

BATHROOM

309A

BATHROOM

307A

GUEST ROOM

GUEST ROOM

BATHROOM

305A

BATHROOM

311A

GUEST ROOM

GUEST ROOM

GUEST ROOM

TOILET RM

312A

GUEST ROOM

GUEST ROOM

BATHROOM

304A

BATHROOM

302A

CORRIDOR

GUEST ROOM

GUEST ROOM

BATHROOM

303A

EAVES

300B

EAVES

305B

EAVES

311B

EAVES

300A

CHIMNEY

02-18

22.47° 22.47°

02-45

02-45

02-32

02-31

02-4502-4502-45

02-08

02-64

02-6402-64

02-64 02-64

02-64

02-32

02-31

02-01

02-64

02-64

02-01

02-17

02-17

02-17

02-17

02-17

02-21

02-21

02-21

02-21

02-21

02-21

02-21 02-21 02-21

02-21 02-21

02-2102-21 02-21

02-21

02-21

DEMOLITION PLAN GENERAL NOTES

1. SEE PROJECT GENERAL NOTES, ON SHEET T1.02.

2. PROTECT AREAS OUTSIDE AREA OF WORK FROM DAMAGE

DURING CONSTRUCTION. PROTECTION REQUIREMENTS

INCLUDE THE INSTALLATION OF PHYSICAL BARRIERS TO

RESTRICT ACCESS TO, AND PREVENT DAMAGE FROM,

CONSTRUCTION ACTIVITIES RELATED TO THIS WORK.

PROTECTION SHALL BE OF REQUIRED SIZE AND THICKNESS

TO WITHSTAND IMPACT FROM FALLING DEBRIS, ROLLING

EQUIPMENT, AND DELIVERY OF MATERIALS. BARRIER

MATERIALS ARE TO BE INSTALLED WITHOUT ATTACHMENT

DIRECTLY TO ADJACENT HISTORIC BUILDINGS, SURFACES,

OR SITE WORK. PROTECT EXISTING SITE IMPROVEMENTS,

APPURTENANCES, AND LANDSCAPING. COVER AND PROTECT

FURNITURE, FURNISHINGS, SUPPLIES, AND EQUIPMENT THAT

HAVE NOT BEEN REMOVED. PROVIDE TEMPORARY WEATHER

PROTECTION TO ENSURE THAT NO WATER LEAKAGE OR

DAMAGE OCCURS TO STRUCTURE OR INTERIOR AREAS OF

EXISTING BUILDING.

3. REFERENCE STRUCTURAL, MECHANICAL, ELECTRICAL, AND

PLUMBING DRAWINGS FOR ADDITIONAL AREAS OF

DEMOLITION.

4. LAYOUT ON SITE & COORDINATE ALL (N) OPENINGS WITH

PARTITION LAYOUT AND HAVE CONTRACTING OFFICER

REVIEW LAYOUT PRIOR TO CUTTING.

5. REMOVE AND REINSTALL ALL (E) HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS FOR

REINSTALLATION IN THE SAME LOCATION.

6. REMOVE ALL NU-WOOD FIBERBOARD WALL AND CEILING

PANELS THROUGHOUT THE CHATEAU FOR REPLACEMENT

WITH NEW FIBERBOARD PANELS.

7. ALL [REAL] WOOD BASE, TRIM, WAINSCOT, AND PANELING ON

PARTITIONS TO BE REMOVED SHALL BE SALVAGED FOR

REINSTALLATION. THE LEVEL 1 AND BASEMENT 1 PUBLIC

AREAS SHALL HAVE THE WOOD PANELS REMOVED AND

CATALOGUED TO BE REINSTALLED IN THE EXACT SAME

LOCATION.

8. REMOVE ALL FLOOR FINISH ASSEMBLIES AT LEVEL 1

INCLUSIVE OF FASTENERS, PADDING, ETC. TO EXPOSE WOOD

SUBFLOOR.

9. ALL BATHROOM ACCESSORIES AT DEMOLISHED ROOMS TO

BE SALVAGED TO OWNER. CERAMIC SOAP DISHES TO BE

REINSTALLED PER INTERIOR ELEVATIONS.

10. REMOVE ALL FIRE HOSE CABINETS.

11. REMOVE ALL (E) TOILETS. SPD FOR REPLACEMENT.

12. REMOVE ALL (E) PEDESTAL SINKS AT LEVEL 1 GUEST ROOMS

TO BE REINSTALLED AT LEVEL 3 GUESTROOMS NOTED.

13. REMOVE AND REPLACE TILE AS REQUIRED AT GUESTROOM

SHOWER/BATH CONTROL WALL ON LEVELS 2 AND 3 FOR

INSTALLATION OF NEW CONTROLS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

REMOVE PORTION OF (E) WALL.

COORDINATE DEMOLITION WITH SCOPE

OF (N) WORK, AS DEFINED IN

DOCUMENTS

REMOVE (E) DOOR, FRAME,

AND HARDWARE

DEMOLITION PLAN LEGEND

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION J: FULL RENOVATION OF REMAINING GUEST BATHROOMS THROUGHOUT LEVELS

2 AND 3 INCLUDING REPLACEMENT OF EXISTING BATHTUB OR SHOWER PAN;

REPLACEMENT OF EXISTING FINISHES; REPLACEMENT OF EXISTING LIGHT FIXTURE(S);

AND NEW TOILET ACCESSORIES; AS SPECIFIED AND SHOWN FOR OTHER RENOVATED

GUEST BATHROOMS.

OPTION K: REPLACEMENT OF EXISTING CARPETING THROUGHOUT LEVES 2 AND 3.

PUBLIC HALLWAYS AND STAIRWAYS TO HAVE CPT-1. GUESTROOMS TO HAVE CPT-2.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:5

:3

A

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

DEMO FLOOR PLAN -

LEVEL 3A1.03

70 211

CONSTRUCTION DRAWINGS

A .0

K

E

A1.03

1 DEMO FLOOR PLAN - LEVEL 3

02-01 REMOVE (E) FIRE ESCAPE, PLATFORMS, AND ASSOCIATED

STRUCTURAL ELEMENTS.

02-03 REMOVE (E) EGRESS DOOR INSERT. PREPARE FRAME FOR NEW

WINDOW SASH TO MATCH ADJACENT (E) SASH.

02-06 REMOVE (E) FLOORING AND FRAMING AS REQ'D FOR ELEVATOR,

STAIRS, OR RAMP. SSD AND FLOOR PLANS TO COORDINATE.

02-08 REMOVE AND SALVAGE (E) DOOR, FRAME, AND ASSOCIATED

HARDWARE.

02-11 REMOVE (E) PARTITION.

02-17 REMOVE (E) LAVATORY

02-18 REMOVE (E) PARTITION AS REQ'D FOR NEW DOOR OR OPENING.

02-21 REMOVE (E) FIBERBOARD WALL AND CEILING PANELS (ENTIRE

ROOM AND ASSOCIATED CLOSETS AS APPLICABLE)

02-31 REMOVE AND REINSTALL (E) HISTORIC NIGHT WATCHMAN

STATION IN THE SAME LOCATION.

02-32 REMOVE AND REINSTALL (E) HISTORIC HOUSE PHONE SAME

LOCATION.

02-45 REMOVE AND REINSTALL (E) COURNER GUARDS IN THE SAME

LOCATION.

02-64 REMOVE (E) FLOOR FINISH ASSEMBLY DOWN TO WD

SUBLFOOR(HATCHED AREA). SEE ROOM FINISH SCHEDULE.

DEMOLITION KEY NOTES

BLDG.

TRUE

LEVEL 1

0"

LEVEL 2

13' - 5"

ROOF

36' - 4"

BASEMENT 1

-12' - 3"

LEVEL 3

22' - 7"

BASEMENT 2

-24' - 0"

BASEMENT 3

-36' - 0"

5 4

LEVEL 1.1

2' - 4"

BASEMENT 2.1

-22' - 9"

02-02

02-01

02-65

02-01

02-0102-01

02-03 02-03

02-02

02-01

02-02

02-56

02-56

3.25.8

OPTION A

02-56

ATTIC

31' - 4"

02-38

02-50

02-49

02-04

02-65

02-14

02-52

02-66

02-08

02-08

02-08 02-08

0 4 84

SCALE OF FEET

ISCALE

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:5

:4

A

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

DEMO EXTERIOR

ELEVATIONA1.30

71 211

CONSTRUCTION DRAWINGS

A .3

K

E

A1.30

1 DEMO EXTERIOR ELEVATION - WEST - PHASE 1

02-52 REMOVE (E) PLATFORM AND ASSOCIATED RAILINGS.

02-56 REMOVE AND SALVAGE (E) WINDOW. PARTIALLY REMOVE PARTITION

AS REQ'D FOR INSTALLATION OF NEW DOOR. COORDINATE WITH

DOOR SCHEDULE.

02-65 REMOVE (E) STAIR ENCLOSURE INCLUSIVE OF EXTERIOR WALLS,

ROOF, STAIRS, RAILINGS, AND FLOORINGS.

02-66 MODIFY (E) OPENING FOR NEW DOOR AS REQ'D. COORDINATE WITH

DOOR SCHEDULE.

02-08 REMOVE AND SALVAGE (E) DOOR, FRAME, AND ASSOCIATED

HARDWARE.

02-14 REMOVE AND SALVAGE (E) WOOD WINDOW FOR REPLACEMENT.

02-38 ENLARGE (E) OPENING IN CONCRETE WALL FOR LOWERED DOOR

OPENING. COORDINATED WITH DOOR SCHEDULE.

02-49 REMOVE AND SALVAGE (E) GENERATOR.

02-50 REMOVE (E) GENERATOR ENCLOSURE AND CONCRETE PAD.

02-01 REMOVE (E) FIRE ESCAPE, PLATFORMS, AND ASSOCIATED

STRUCTURAL ELEMENTS.

02-02 REMOVE (E) STAIRS, LANDINGS, AND ASSOCIATED RAILINGS.

02-03 REMOVE (E) EGRESS DOOR INSERT. PREPARE FRAME FOR NEW

WINDOW SASH TO MATCH ADJACENT (E) SASH.

02-04 REMOVE (E) KITCHEN AIR INTAKE VENT AND HOOD

DEMOLITION KEY NOTES

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

A3.01

MECHANICAL

B301

STAIRS

B300

B301-1

B301-2

A5.01

A4.10

A4.10

A4.10

3.2 5.8

A4.01

A4.01

A4.01

A4.01

OPTION A

TYP

06-02

UP

CRAWL SPACE

14-01

03-02 03-02

B300-1

02-46

TYP

05-06

08-18

06-61

UP

03-11

03-10

A3.01

06-62

FLOOR PLAN GENERAL NOTES

1. SEE T1.02 FOR PROJECT GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. SEE T1.07 FOR TYPICAL STAIR AND RAMP REQUIREMENTS.

3. SEE T1.08 FOR ACCESSIBILITY CLEARANCE REQUIREMENTS.

4. SEE EXISTING CONDITIONS PLANS FOR GRID DIMENSIONS.

5. WHERE (N) WORK REQUIRES INFILL AND/OR REPAIR TO (E)

FINISHES, THOSE PATCHES AND (N) WALLS SHALL MATCH

THE EXISTING ADJACENT HISTORIC FINISH IN KIND, TEXTURE,

AND COLOR.

6. PATCH ALL CEILING AND WALL HOLES DUE TO REMOVAL OF

FIXTURES.

7. SEE REFLECTED CEILING PLANS (STARTING ON SHEET A6.B2)

FOR CEILING SCOPE OF WORK.

8. ALL INTERIOR EXISTING WALLS ARE TYPE C AND ALL NEW

WALLS ARE TYPE A, PER SHEET A8.00 UNLESS OTHERWISE

NOTED.

9. ALL EXTERIOR WOOD FRAMED WALLS ARE TYPE AA PER

SHEET A8.00 UNLESS OTHERWISE NOTED.

10. REINSTALL ALL EXISTING HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS IN THE

SAME LOCATION.

11. MODIFY ALL (E) WINDOW AND DOOR FRAMES TO

ACCOMMODATE NEW WALL ASSEMBLY. SEE SHEET A8.04

12. PROVIDE OVERFLOW DRAIN AT ALL EXISTING BATHTUBS TO

REMAIN. SEE PLUMBING DRAWINGS.

13. SEE SHEET A8.12 FOR TYPICAL FLOOR TRANSITIONS.

14. NEW TOILETS THROUGHOUT. SPD.

15. INSTALL NEW TILE TO MATCH EXISTING (ALIGNING JOINTS)

AT GUESTROOM SHOWER/BATH CONTROLS WALL ON LEVELS

2 AND 3.

16. ACOUSTIC SEALANT TO BE UTIIZED AT ALL WALL JOINTS FOR

GUESTROOMS, BATHROOMS, AND RESTROOMS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

(N) WALL. SEE FLOOR PLAN FOR WALL

TYPE

(N) DOOR. SEE DOOR SCHEDULE FOR

ADDITIONAL INFO

FLOOR PLAN LEGEND

(N) WALL PANELING ON (E) WALL

1-HOUR RATING - AT (N) WALL

1-HOUR RATING - AT (E) WALL

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION E: REPLACEMENT OF ALL PLUMBING PIPING AT BASEMENT 3 AS NOTED ON

PLUMBING DRAWINGS.

OPTION F: REPLACEMENT OF EXISTING BOILER WITH HIGH EFFICIENCY BOILER AS NOTED

ON MECHANICAL DRAWINGS.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:0

:3

P

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

FLOOR PLAN -

BASEMENT 3A2.B3

72 211

CONSTRUCTION DRAWINGS

A .B

K

E

A2.B3

1 FLOOR PLAN - BASEMENT 3

PLAN KEY NOTES

02-46 (E) ACCESS HATCH - ENLARGE (E) 19 X 16" OPENING TO

24X36" TO PROVIDE LARGER ACCESS TO CRAWL SPACE.

03-02 CONCRETE LANDING. SEE LANDSCAPE.

03-10 CONCRETE STAIRS ON GRADE. SSD. CONTRACTOR TO

VERIFY EXISTING GRADE ELEVATIONS TO COORDINATE

FINAL LOCATION OF STAIRS.

03-11 CONCRETE SLAB ON GRADE. SSD.

05-06 EXPOSED STEEL SUPPORT, PAINT EX-PT-2, SSD.

06-02 BALCONY STEEL SUPPORT CLAD IN WOOD. SSD

06-61 USE WOOD EPOXY TO PATCH HOLE IN WINDOW FRAME

WHERE (E) CONDUIT TO GENERATOR HAS BEEN

REMOVED, SAND SMOOTH AND PAINT ENTIRE FRAME,

EX-PT-1.

08-18 PROVIDE 24X36 ACCESS DOOR AND FRAME AT

ENLARGED OPENING

14-01 LINE OF ELEVATOR PIT ABOVE.

BLDG.

TRUE

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

A3.01

STORAGE

B211

LAUNDRY

B209B

RESTROOM

B210A

SERVICE ENTRY

B209

STAFF DINING

B208

ACCESSIBLE STAFF

BEDROOM #3

B205

STAFF BEDROOM #2

B206

STAFF BEDROOM #1

B207

STAFF LOUNGE

B204

STORAGE

B203

CORRIDOR

B201

WINE STOR

B202B

STORAGE

B202

STAIRS

B200

ELEV MACHINE

B211B

ELEC RM

B211A

CLOSET

B209A

STORAGE

B202A

BALCONY

CLOSET

B205A

CLOSET

B207A

CLOSET

B206A

(E) CHIMNEY

B -1

B -1

B204-1

B202-1 B203-1

B211-1

B209A-1

B211A-1

B211B-1

A5.01

A5.05

A5.08

A4.10

A4.10

A4.10

3.2 5.8

A4.01

A4.01

A4.01

A4.01

CORRIDOR

B201A

OPTION A

C

LR

3' - 1"

TYP

06-02

15' - 7"

1'

0" 4'

9"

1'

6"

5' - 0"

4' - 3"

UP

16' - 6"

3' - 8 1/2"

ALIGN

3' - 7

A5.04

B201-1

27-01

06-3906-39

STAFF KITCHEN

B208B

A1A1

ELEV

A1

A1

A1A1

A1

C1

TYP

B B

-1

A5.04

B210-1

B209-1

B1

B

A5.15

2'

6"

1' - 6" MIN

9' - 3"

1R1S

B205A-1

B206-1

B207-1

B204-2

B204A-1

B204B-1

B211C-1

27-01

1' - 5 3/4"

STORAGE

B211C

B -2

B200-2

B205-1

B205-1

B209-2

5' - 0

TYP

05-0608-01

2' - 0"

4' - 7"

A1

UP

B202A-1

B202B-1

B203-2

B210A-1

11-02

11-03

A

23-05

C1

06-63

C1

06-6306-6306-63

DN

08-06

B206A-1

4'

0"

1' - 0"

1'

0"

06-57

CLR

3' - 6

A1

A

06-01

A

10-04

E

E

05-12 9 3/4"

6"

10-22

A5.20

07-1207-12

8'-0"

AFF

8'-0"

AFF

21-01

A3.01

8' - 0

1/4" VIF

06-78

FLOOR PLAN GENERAL NOTES

1. SEE T1.02 FOR PROJECT GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. SEE T1.07 FOR TYPICAL STAIR AND RAMP REQUIREMENTS.

3. SEE T1.08 FOR ACCESSIBILITY CLEARANCE REQUIREMENTS.

4. SEE EXISTING CONDITIONS PLANS FOR GRID DIMENSIONS.

5. WHERE (N) WORK REQUIRES INFILL AND/OR REPAIR TO (E)

FINISHES, THOSE PATCHES AND (N) WALLS SHALL MATCH

THE EXISTING ADJACENT HISTORIC FINISH IN KIND, TEXTURE,

AND COLOR.

6. PATCH ALL CEILING AND WALL HOLES DUE TO REMOVAL OF

FIXTURES.

7. SEE REFLECTED CEILING PLANS (STARTING ON SHEET A6.B2)

FOR CEILING SCOPE OF WORK.

8. ALL INTERIOR EXISTING WALLS ARE TYPE C AND ALL NEW

WALLS ARE TYPE A, PER SHEET A8.00 UNLESS OTHERWISE

NOTED.

9. ALL EXTERIOR WOOD FRAMED WALLS ARE TYPE AA PER

SHEET A8.00 UNLESS OTHERWISE NOTED.

10. REINSTALL ALL EXISTING HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS IN THE

SAME LOCATION.

11. MODIFY ALL (E) WINDOW AND DOOR FRAMES TO

ACCOMMODATE NEW WALL ASSEMBLY. SEE SHEET A8.04

12. PROVIDE OVERFLOW DRAIN AT ALL EXISTING BATHTUBS TO

REMAIN. SEE PLUMBING DRAWINGS.

13. SEE SHEET A8.12 FOR TYPICAL FLOOR TRANSITIONS.

14. NEW TOILETS THROUGHOUT. SPD.

15. INSTALL NEW TILE TO MATCH EXISTING (ALIGNING JOINTS)

AT GUESTROOM SHOWER/BATH CONTROLS WALL ON LEVELS

2 AND 3.

16. ACOUSTIC SEALANT TO BE UTIIZED AT ALL WALL JOINTS FOR

GUESTROOMS, BATHROOMS, AND RESTROOMS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

(N) WALL. SEE FLOOR PLAN FOR WALL

TYPE

(N) DOOR. SEE DOOR SCHEDULE FOR

ADDITIONAL INFO

FLOOR PLAN LEGEND

(N) WALL PANELING ON (E) WALL

1-HOUR RATING - AT (N) WALL

1-HOUR RATING - AT (E) WALL

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION A: WEST BALCONY RECONSTRUCTION UTILIZING WOOD AND STEEL AS SHOWN

ON ARCHITECTURAL AND STRUCTURAL DRAWINGS.

OPTION H: REPLACEMENT OF EXISTING ELECTRIC FORCED AIR HEATERS REMAINING ON

BASEMENT 2 STAFF BEDROOMS, LOUNGE, AND DINING AREAS WITH NEW ELECTRIC

HEATERS AS NOTED ON MECHANICAL DRAWINGS.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:0

:2

P

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

FLOOR PLAN -

BASEMENT 2A2.B2

73 211

CONSTRUCTION DRAWINGS

A .B

K

E

A2.B2

1 FLOOR PLAN - BASEMENT 2

PLAN KEY NOTES

05-06 EXPOSED STEEL SUPPORT, PAINT EX-PT-2, SSD.

05-12 4" DIAMETER METAL BOLLARD, PAINT EX-PT-1

06-01 WOOD GUARDRAIL.

06-02 BALCONY STEEL SUPPORT CLAD IN WOOD. SSD

06-39 RAISE FLOOR TO ALIGN WITH BASEMENT 2.1 LEVEL. 2X10

@ 16" 0.C.

06-57 ROD AND SHELF TO HAVE SUPPORT POINTS STARTING AT

42" AND ON 6" INTERVALS UP TO 60"

06-63 (E) COUNTER, CASEWORK AND/OR SHELVING TO REMAIN.

06-78 NEW 1.5" THICK MAPLE BUTCHERBLOCK COUNTERTOP ON

(E) BASE CASEWORK. PROVIDE 1/2" LIP AT SIDES AND

FRONT.

07-12 1/2" SMOKE-SOUND SEALANT, UL TYP AS FIRE STOP AT

WALL TO MASONRY CONNECTION

08-01 REMOVE AND REPLACE (E) VENT HOOD WITH LOUVERS.

SEE DETAILS 10,11, AND 12 ON A8.05

08-06 WD WINDOW TO MATCH (E). SEE WINDOW SCHEDULE.

10-04 SEMI-RECESSED FIRE HOSE CABINET. SEE DETAIL 2/A8.12

10-22 SURFACE MOUNTED FIRE HOSE CABINET.

11-02 (E) CLOTHES WASHER LOCATION

11-03 (E) CLOTHES DRYERS LOCATION

21-01 FIRE RISER. SEE FIRE SUPPRESSION.

23-05 LINE OF (E) KITCHEN HOOD

27-01 REINSTALLED HISTORIC HOUSE PHONE.

BLDG.

TRUE

UP

UP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1

A5.22

A5.21

A5.21

A5.21

A5.20

A3.01

COFFEE SHOP

B104

KITCHEN

B103

WALK-IN REFRIG.

B103A

DINING ROOM

B102 MEN'S RESTROOM

B101B

WOMEN'S RESTROOM

B101A

STORAGE

B100A

BALCONY

GIFT SHOP

B101

STAIRS

B100

B101B-1

B101A-1

B102-2

CHIMNEY

A5.05

A5.01

B100A-1

A5.16

A5.08

A4.10

A4.10

A4.10

3.2 5.8

A4.01

A4.01

A4.01

DUMB-

WAITER

ELEV

23-01

OPTION A

TYP

06-02

A5.22

A5.20

B104-3

B104-1

B101-1

TYP

09-08

B104-2

B102-4

B102-3

B103A-1

B103-1

B103-2B

B103-2A

B102-1

RR VEST.

B101C

06-11

B102-5

09-12

B101-2

09-12

B101-3

TYP

06-50

TYP

06-50

DN

A5.2219

A5.22 11

TYP

05-06

B103B-1

06-01

23-04

23-01

06-6306-6306-63

R

R

10-04

D1

09-25

09-25

09-25

22-16

01-1801-1801-18

10-04

(E) LANDING

TO REMAIN

FLOOR PLAN GENERAL NOTES

1. SEE T1.02 FOR PROJECT GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. SEE T1.07 FOR TYPICAL STAIR AND RAMP REQUIREMENTS.

3. SEE T1.08 FOR ACCESSIBILITY CLEARANCE REQUIREMENTS.

4. SEE EXISTING CONDITIONS PLANS FOR GRID DIMENSIONS.

5. WHERE (N) WORK REQUIRES INFILL AND/OR REPAIR TO (E)

FINISHES, THOSE PATCHES AND (N) WALLS SHALL MATCH

THE EXISTING ADJACENT HISTORIC FINISH IN KIND, TEXTURE,

AND COLOR.

6. PATCH ALL CEILING AND WALL HOLES DUE TO REMOVAL OF

FIXTURES.

7. SEE REFLECTED CEILING PLANS (STARTING ON SHEET A6.B2)

FOR CEILING SCOPE OF WORK.

8. ALL INTERIOR EXISTING WALLS ARE TYPE C AND ALL NEW

WALLS ARE TYPE A, PER SHEET A8.00 UNLESS OTHERWISE

NOTED.

9. ALL EXTERIOR WOOD FRAMED WALLS ARE TYPE AA PER

SHEET A8.00 UNLESS OTHERWISE NOTED.

10. REINSTALL ALL EXISTING HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS IN THE

SAME LOCATION.

11. MODIFY ALL (E) WINDOW AND DOOR FRAMES TO

ACCOMMODATE NEW WALL ASSEMBLY. SEE SHEET A8.04

12. PROVIDE OVERFLOW DRAIN AT ALL EXISTING BATHTUBS TO

REMAIN. SEE PLUMBING DRAWINGS.

13. SEE SHEET A8.12 FOR TYPICAL FLOOR TRANSITIONS.

14. NEW TOILETS THROUGHOUT. SPD.

15. INSTALL NEW TILE TO MATCH EXISTING (ALIGNING JOINTS)

AT GUESTROOM SHOWER/BATH CONTROLS WALL ON LEVELS

2 AND 3.

16. ACOUSTIC SEALANT TO BE UTIIZED AT ALL WALL JOINTS FOR

GUESTROOMS, BATHROOMS, AND RESTROOMS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

(N) WALL. SEE FLOOR PLAN FOR WALL

TYPE

(N) DOOR. SEE DOOR SCHEDULE FOR

ADDITIONAL INFO

FLOOR PLAN LEGEND

(N) WALL PANELING ON (E) WALL

1-HOUR RATING - AT (N) WALL

1-HOUR RATING - AT (E) WALL

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION A: WEST BALCONY RECONSTRUCTION UTILIZING WOOD AND STEEL AS SHOWN

ON ARCHITECTURAL AND STRUCTURAL DRAWINGS.

OPTION C: UTLIZE AN AFRICAN CHERRY VENEER WOOD PANEL TO MATCH EXISTING

BEING REMOVED IN LIEU OF THE REDWOOD WAINSCOT PANELING CURRENTLY SHOWN IN

THE ARCHITECTURAL DRAWINGS AT BASEMENT 1 AND MAIN STAIR LANDING TO

BASEMENT 1. (DEDUCTIVE BID).

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:0

:1

P

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

FLOOR PLAN -

BASEMENT 1A2.B1

74 211

CONSTRUCTION DRAWINGS

A .B

K

E

A2.B1

1 FLOOR PLAN - BASEMENT 1

PLAN KEY NOTES

01-18 ALL EQUIPMENT/SINKS/COUNTERS IN KITCHEN ARE (E)

UNLESS NOTED OTHERWISE. SEE MECH. FOR

MODIFICATIONS TO EXHAUST SYSTEM.

05-06 EXPOSED STEEL SUPPORT, PAINT EX-PT-2, SSD.

06-01 WOOD GUARDRAIL.

06-02 BALCONY STEEL SUPPORT CLAD IN WOOD. SSD

06-11 REINSTALLED OR (N) WOOD PANELING AS REQ'D - MATCH

(E) PATTERN, FINISH, WD SPECIES, AND TYPE.

06-50 REINSTALLED WOOD PANELING.

06-63 (E) COUNTER, CASEWORK AND/OR SHELVING TO REMAIN.

09-08 PATCH ALL WALL HOLES TO MATCH ADJACENT MATERIAL,

TEXTURE, AND FINISH.

09-12 PATCH FLOORING TO MATCH ADJACENT (E) FLOORING AS

REQ'D. SMOOTH TRANSITION BETWEEN NEW AND (E).

09-25 MODIFY EXISTING FURRING WALL DEPTH AS REQUIRED TO

COMPLETELY CONCEAL PIPING. SEE FIRE SUPPRESSION

AND MECHANICAL DRAWINGS.

10-04 SEMI-RECESSED FIRE HOSE CABINET. SEE DETAIL 2/A8.12

22-16 MOP SINK WITH UTILITY SHELF AND MOP/BROOM HOLDER

MOUNTED SO TOP OF SHELF IS 5'-0" AFF. SEE PLUMBING.

23-01 MODIFIED KITCHEN EXHAUST. SMD.

23-04 (N) RADIATOR TO MATCH (E). SMD

BLDG.

TRUE

NORTH

29.6°

NOTE: FUTURE PATIO

PROJECT TO PROVIDE

LANDINGS AT B104-1 AND

B101-1

DNUP

UP

UP

UP

UP

UP

UP

UP

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

A3.02

A3.02

A5.27

A5.26

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1

NA.1

6.1

A5.20

15A5.27

A3.01

OFFICE #1

OFFICE #2

LOBBY

A5.27

GAME ROOM

CORRIDOR

SITTING ROOM

LINEN

GUEST ROOM

BATHROOM

105A

GUEST ROOM

BATHROOM

103A BATHROOM

104A

GUEST ROOM

GUEST ROOM

GUEST ROOM

BATHROOM

102A

CLOSET

101B

BATHROOM

101A

BALCONY

ELEV

102A-1

102-1

101-1

101A-1

103-1

103A-1

104A-1

104-1

105-1

105A-1

108-1

A5.26

A5.24

A5.24

A5.24

A5.27 12

A5.24

A5.05

A5.16

A5.16

A5.06

A4.10

A4.10

A4.10

3.2 5.8

A5.16

A5.04

A5.16

A4.01

A4.01

A4.01

A4.01

(E) FIREPLACE

OPTION A

TYP

06-02 06-02 00-02

109-1

32-02

08-09

27-02

27-01

101B-1

08-17

C1

C1

C1

C1

C1

B1

C1

A1

C1

D

TYP

A1

C1

08-11

106-1

106-2

-1

107-2

111-1

A5.23

A5.26

A5.23

A8.10

100-1

102-2

06-64

06-64

C1

32-02

R 2' - 6"

1'

6"

10-1310-13

CLOSET

102B

102B-1

A

10-04

08-09

21-01

21-01

21-01

06-26

TYP

06-26

10-04

FLOOR PLAN GENERAL NOTES

1. SEE T1.02 FOR PROJECT GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. SEE T1.07 FOR TYPICAL STAIR AND RAMP REQUIREMENTS.

3. SEE T1.08 FOR ACCESSIBILITY CLEARANCE REQUIREMENTS.

4. SEE EXISTING CONDITIONS PLANS FOR GRID DIMENSIONS.

5. WHERE (N) WORK REQUIRES INFILL AND/OR REPAIR TO (E)

FINISHES, THOSE PATCHES AND (N) WALLS SHALL MATCH

THE EXISTING ADJACENT HISTORIC FINISH IN KIND, TEXTURE,

AND COLOR.

6. PATCH ALL CEILING AND WALL HOLES DUE TO REMOVAL OF

FIXTURES.

7. SEE REFLECTED CEILING PLANS (STARTING ON SHEET A6.B2)

FOR CEILING SCOPE OF WORK.

8. ALL INTERIOR EXISTING WALLS ARE TYPE C AND ALL NEW

WALLS ARE TYPE A, PER SHEET A8.00 UNLESS OTHERWISE

NOTED.

9. ALL EXTERIOR WOOD FRAMED WALLS ARE TYPE AA PER

SHEET A8.00 UNLESS OTHERWISE NOTED.

10. REINSTALL ALL EXISTING HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS IN THE

SAME LOCATION.

11. MODIFY ALL (E) WINDOW AND DOOR FRAMES TO

ACCOMMODATE NEW WALL ASSEMBLY. SEE SHEET A8.04

12. PROVIDE OVERFLOW DRAIN AT ALL EXISTING BATHTUBS TO

REMAIN. SEE PLUMBING DRAWINGS.

13. SEE SHEET A8.12 FOR TYPICAL FLOOR TRANSITIONS.

14. NEW TOILETS THROUGHOUT. SPD.

15. INSTALL NEW TILE TO MATCH EXISTING (ALIGNING JOINTS)

AT GUESTROOM SHOWER/BATH CONTROLS WALL ON LEVELS

2 AND 3.

16. ACOUSTIC SEALANT TO BE UTIIZED AT ALL WALL JOINTS FOR

GUESTROOMS, BATHROOMS, AND RESTROOMS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

(N) WALL. SEE FLOOR PLAN FOR WALL

TYPE

(N) DOOR. SEE DOOR SCHEDULE FOR

ADDITIONAL INFO

FLOOR PLAN LEGEND

(N) WALL PANELING ON (E) WALL

1-HOUR RATING - AT (N) WALL

1-HOUR RATING - AT (E) WALL

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION A: WEST BALCONY RECONSTRUCTION UTILIZING WOOD AND STEEL AS SHOWN

ON ARCHITECTURAL AND STRUCTURAL DRAWINGS.

OPTION G: REPLACEMENT OF ELECTRIC STRIP HEATERS AT OFFICE AREAS WITH

HYDRONIC HEATERS AS NOTED ON MECHANICAL DRAWINGS.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:0

:4

P

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

FLOOR PLAN - LEVEL 1

A2.01 75 211

CONSTRUCTION DRAWINGS

A .0

K

E

A2.01

1 FLOOR PLAN - LEVEL 1

PLAN KEY NOTES

00-02 LINE OF FIRE ESCAPE ABOVE

06-02 BALCONY STEEL SUPPORT CLAD IN WOOD. SSD

06-26 WALL MOUNTED WD HANDRAIL INSTALLED AT 36" AFF

06-64 WOOD FIRE ESCAPE WITH ALUM BAR GRATING FLOOR

SYSTEM

08-09 RECESSED DOOR OPERATOR. REFER TO DOOR

SCHED.

08-11 EXTERIOR EXHAUST LOUVER. SMD.

08-17 BOLLARD WITH DOOR OPERATOR.

10-04 SEMI-RECESSED FIRE HOSE CABINET. SEE DETAIL

2/A8.12

10-13 ROD AND SHELF TO HAVE SUPPORT POINTS STARTING

AT 42" AND ON 6" INTERVALS UP TO 60"

21-01 FIRE RISER. SEE FIRE SUPPRESSION.

27-01 REINSTALLED HISTORIC HOUSE PHONE.

27-02 REINSTALLED HISTORIC NIGHT WATCHMAN STATION.

32-02 (N) ENTRY PORCH, STAIRS AND RAMP. SEE

LANDSCAPE.

BLDG.

TRUE

DN

DN

DN

CD

CC

NC

NB

NA

ND

SC

SB

SA

SE

CB

CA

SD

A3.02

A3.02

NA.4

NB.3

SA.3

SB.8

1.1

2.9

CD.9

SA.1 NA.1

6.1A1.30

A3.01

CLOSET

215A

STAIRS

CLOSET

214B

BATHROOM

214A

CLOSET

204B

CLOSET

203B

BATHROOM

204A

BATHROOM

203A

BATHROOM

201A

CLOSET

201B

CLOSET

202B

CLOSET

211B

BATHROOM

212A

CLOSET

212B

CLOSET

210B

CLOSET

209B

BATHROOM

210A

BATHROOM

209A

BATHROOM

202A

CORRIDOR

200A

STAIRS

BATHROOM

211A

STORAGE

200C

CORRIDOR

200B

BATHROOM

206A

CLOSET

206B

BATHROOM

205A

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

CHIMNEY

A5.29

A5.30

A5.29

A5.30

A5.30

A5.31

A5.31

A5.31

A5.31

A5.31

A5.32

A5.29

A5.2916

A5.29

19 9

A5.28

A5.28

A5.28

A5.28

3.2 5.8

A4.01

A4.01

A4.01

A4.01

27-02

27-01

27-01

10-04

208-1

209-1 207-1

209A-1

215-1

212-1

212A-1

212B-1

211B-1

210B-1

209B-1

200C-1 201-1

201A-1214-3

215-2

215A-1

214A-1

214B-1

211A-1

211-1

210-1

210A-1

-2

202-1

202-2

203-1

203A-1

203B-1

204A-1

204B-1

204-1

202B-1

201B-1

202A-1

214-2

200B-2 200A-2

A5.10

09-03

A5.16

206A-1

205A-1A5.16

A5.03

-2

205-1

206B-1

200D-1

A5.2816

6A5.32

06-47

06-47 06-47

06-47

217-1

A5.06

200A-1200B-1

216-1

STAIRS

A1

C1

B1

C1

B

C1

C1

C1C1

C1

C1

C1

C1

C1

C1

C1

C1 C1

C1

C1

C1

C1

A5.32

A5.32

06-64

09-03

06-64

06-47

21-01

21-01

C1

1' - 3

22-07

22-07

JAN. CL.

200D

22-16

22-07

22-07

10-04

FLOOR PLAN GENERAL NOTES

1. SEE T1.02 FOR PROJECT GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. SEE T1.07 FOR TYPICAL STAIR AND RAMP REQUIREMENTS.

3. SEE T1.08 FOR ACCESSIBILITY CLEARANCE REQUIREMENTS.

4. SEE EXISTING CONDITIONS PLANS FOR GRID DIMENSIONS.

5. WHERE (N) WORK REQUIRES INFILL AND/OR REPAIR TO (E)

FINISHES, THOSE PATCHES AND (N) WALLS SHALL MATCH

THE EXISTING ADJACENT HISTORIC FINISH IN KIND, TEXTURE,

AND COLOR.

6. PATCH ALL CEILING AND WALL HOLES DUE TO REMOVAL OF

FIXTURES.

7. SEE REFLECTED CEILING PLANS (STARTING ON SHEET A6.B2)

FOR CEILING SCOPE OF WORK.

8. ALL INTERIOR EXISTING WALLS ARE TYPE C AND ALL NEW

WALLS ARE TYPE A, PER SHEET A8.00 UNLESS OTHERWISE

NOTED.

9. ALL EXTERIOR WOOD FRAMED WALLS ARE TYPE AA PER

SHEET A8.00 UNLESS OTHERWISE NOTED.

10. REINSTALL ALL EXISTING HOUSE PHONES, NIGHT

WATCHMAN STATIONS, AND FIRE EXTINGUISHERS IN THE

SAME LOCATION.

11. MODIFY ALL (E) WINDOW AND DOOR FRAMES TO

ACCOMMODATE NEW WALL ASSEMBLY. SEE SHEET A8.04

12. PROVIDE OVERFLOW DRAIN AT ALL EXISTING BATHTUBS TO

REMAIN. SEE PLUMBING DRAWINGS.

13. SEE SHEET A8.12 FOR TYPICAL FLOOR TRANSITIONS.

14. NEW TOILETS THROUGHOUT. SPD.

15. INSTALL NEW TILE TO MATCH EXISTING (ALIGNING JOINTS)

AT GUESTROOM SHOWER/BATH CONTROLS WALL ON LEVELS

2 AND 3.

16. ACOUSTIC SEALANT TO BE UTIIZED AT ALL WALL JOINTS FOR

GUESTROOMS, BATHROOMS, AND RESTROOMS.

(E) WALL ASSEMBLY TO REMAIN

(E) DOOR TO REMAIN. SEE DOOR

SCHEDULE FOR ADDITIONAL INFO

(N) WALL. SEE FLOOR PLAN FOR WALL

TYPE

(N) DOOR. SEE DOOR SCHEDULE FOR

ADDITIONAL INFO

FLOOR PLAN LEGEND

(N) WALL PANELING ON (E) WALL

1-HOUR RATING - AT (N) WALL

1-HOUR RATING - AT (E) WALL

0 4 84

SCALE OF FEET

ISCALE

BID OPTIONS:

OPTION J: FULL RENOVATION OF REMAINING GUEST BATHROOMS THROUGHOUT LEVELS

2 AND 3 INCLUDING REPLACEMENT OF EXISTING BATHTUB OR SHOWER PAN;

REPLACEMENT OF EXISTING FINISHES; REPLACEMENT OF EXISTING LIGHT FIXTURE(S);

AND NEW TOILET ACCESSORIES; AS SPECIFIED AND SHOWN FOR OTHER RENOVATED

GUEST BATHROOMS.

OPTION K: REPLACEMENT OF EXISTING CARPETING THROUGHOUT LEVES 2 AND 3.

PUBLIC HALLWAYS AND STAIRWAYS TO HAVE CPT-1. GUESTROOMS TO HAVE CPT-2.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG. NO.

SHEET

OF

138578

150025

OREGON CAVES NATIONAL MONUMENT

OREGON CAVES CHATEAU

R E

V

IT

/1

/2

:0

:5

P

M B

IM

/O

R C

A /O

R C

A

A

R C

H

IT

E C

T U

R A

L -C e n tr a l.

rv t

ARG

KE

KG

9/13/2019

FLOOR PLAN - LEVEL 2

A2.02 76 211

CONSTRUCTION DRAWINGS

A .0

K

E

A2.02

1 FLOOR PLAN - LEVEL 2

PLAN KEY NOTES

06-47 REINSTALLED CORNER GUARD.

06-64 WOOD FIRE ESCAPE WITH ALUM BAR GRATING FLOOR

SYSTEM

09-03 PATCH CARPETING AS REQ'D, MATCH ADJACENT

CARPETING.

10-04 SEMI-RECESSED FIRE HOSE CABINET. SEE DETAIL

2/A8.12

21-01 FIRE RISER. SEE FIRE SUPPRESSION.

22-07 (N) LAV. SEE PLUMBING.

22-16 MOP SINK WITH UTILITY SHELF AND MOP/BROOM

HOLDER MOUNTED SO TOP OF SHELF IS 5'-0" AFF. SEE

PLUMBI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .