This solicitation notice seeks proposals for a construction contract to correct life safety and critical deficiencies at the Oregon Caves Chateau, a National Historic Landmark. The proposed single-phase project includes installing fire suppression and detection systems, improving egress doors and accessibility, adding an elevator, replacing water supply and waste piping, upgrading the main electric service panel, and adding plywood shear walls and steel balconies to meet fire codes. The estimated price range is over $10 million, and the anticipated period of performance is from April 2020 to September 2021. The solicitation will be issued electronically on the Federal Business Opportunities website on or around October 21, 2019. The National Park Service encourages participation from small businesses, veteran-owned small businesses, small disadvantaged businesses, and women-owned small businesses.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORCA - 150025 09 80 00 - 1
FIBERBOARD WALL & CEILING TREATMENT
SECTION 09 80 00 – FIBERBOARD WALL & CEILING TREATMENT
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Fiberboard Wall and Ceiling Paneling.
1.2 RELATED REQUIREMENTS
A. Section 06 10 00 - Rough Carpentry: wood substrates and structure.
B. Section 09 21 16 - Gypsum Board: Installation and requirements for wall assemblies.
C. Section 09 90 00 - Painting and Coatings: Finish
1.3 REFERENCE STANDARDS
A. ASTM C 209 - Test Methods for Cellulosic Fiber Insulating Board.
B. ASTM C 518 - Standard Test Method for Steady-State Thermal Transmission Properties by
Means of the Heat Flow Meter Apparatus.
C. ASTM E 84 - Test Method for Surface Burning Characteristics of Building Materials.
D. UL listed, File R16381.
E. Forest Stewardship Certification (FSC): CoC Cert no. 5682.
F. ICC-ES Report ESR-1374.
1.4 SUBMITTALS
A. See Section 01 33 23 - Submittal Procedures for submittal procedures.
B. Product Data: Provide Manufacturer's data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation methods
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with not less than 10 years of documented experience.
B. Not Permitted: formaldehyde or other toxic materials. Refer to Section 01 57 19.11 for additional requirements regarding safety of materials.
ORCA - 150025 09 80 00 - 2
1.6 MOCK-UP
A. Provide mock-up of fiberboard panels at vertical and running bond patterns to illustrate finish, color, joint, and pattern for approval by Contracting Officer. Comply with requirements of
Section 01 33 23 Submittal Procedures.
B. Contracting Officer to determine location of mock up.
C. Mock up may remain as part of work upon approval by Contracting Officer. Work to remain to be protected for duration of construction.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store products in manufacturer's unopened packaging with labels intact until ready for installation.
B. Inspect the materials upon delivery to assure that specified products have been received. Report damaged material immediately to the delivering carrier and note such damage on the carrier's freight bill of lading.
C. Store materials in a dry place, indoors, on raised platform protected from weather damage
1.8 FIELD CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
B. Climatize panels to existing moisture conditions and for not less than 24 hours before installation. Comply with manufacturer’s recommendations for acclimatization.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Basis of Design: Homasote Company; www.homasote.com.
1. Product to match Historic existing panels in size, pattern, and joint condition (beveled most locations – beadboard joint behind lobby desk) per Drawings.
2. Substitutions: Not permitted.
2.2 MATERIALS
A. A. PINnacle Tackboard Panels: Class C fire-rated. Molded, recycled post-consumer paper, cellulose fiber structural panel. Physical properties as follows:
1. Thickness: 1/2 inch (13 mm).
2. Density: 26-28 pcf (416-448 kg/cu. m) tested in accordance with ASTM C 209.
3. Tensile Strength: When tested in accordance with ASTM C 209:
4. Parallel: 450-700 psi (3,100-4,830 kPa).
5. Transverse: 750-1000 psi (5.1171-6.894 kPa).
6. Hardness (Janka Ball): 230 lbs (104 kg) tested in accordance with ASTM D 1037.
7. Water Absorption by Volume: When tested in accordance with ASTM C 209:
a. 2 hour immersion: 7 percent maximum.
http://www.homasote.com/
ORCA - 150025 09 80 00 - 3
8. Expansion: 50 to 90 percent relative humidity, 0.25 % in accordance with ASTM C 209.
9. Thermal Resistance: When tested in accordance with ASTM C 209 per ASTM C 518:
a. R-value: 1.2 for 1/2 inch thick board.
10. Noise reduction coefficient (NRC): 0.20
11. Flame Spread: 76 to 200 tested in accordance with ASTM E 84, Class III or C.
12. Width: Panel width varies per location as indicated on Drawings.
13. Pattern: Pattern varies per location as indicated on Drawings.
14. Edge: Beveled edge in all locations except bead board profile to match existing behind lobby desk as shown on Drawings.
15. Finish: STN-3 and as determined by mock-up per Section 09 90 00 Painting and
Coatings.
2.3 ACCESSORIES
A. Panel Fasteners:
1. Nails, Wood Framing: Length required to penetrate wood framing, 3/4 inch minimum.
2. Screws:
a. General: 20 gauge or heavier, self-tapping drywall type steel screw.
b. Wood Framing: Coarse thread drywall type wood screw, length required to penetrate framing, 3/4 inch minimum.
c. Metal Framing: 22-25 gauge, drywall type steel screw.
B. Drywall fastener for decoupled wall installation: #10 drywall screw or laminating screw.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine substrates upon which work will be installed.
B. Verify framing member spacing complies with manufacturer’s requirements depending on substrates and installation methods.
C. If substrate preparation is responsibility of another installer, notify Contracting Officer of unsatisfactory preparation before proceeding.
D. Verify what environmental conditions are, and will continue to be maintained in accordance with manufacturer’s recommendations.
E. Fiberboard wall and ceiling panels to exactly replicate existing pattern and joints of historic
“Nu-Wood” panels to be removed at Levels B1 and 1, and the main public corridors of Levels 2 and 3. Contractor to carefully document existing nu-wood panels prior to replacement.
F. Starting work by installer is acceptance of substrate and environmental conditions.
3.2 PREPARATION
A. Follow manufacturer’s instructions by separating and allowing panels to be exposed to environmental temperature and humidity conditions for not less than 24 hours before start of installation.
ORCA - 150025 09 80 00 - 4
3.3 INSTALLATION
A. Install in accordance with manufacturer's instructions.
B. Install only clean dry panels. Do not install wet panels.
C. Wall Panel Installation: Space panel joints 1/8 inch (3 mm) apart; 1/4 inch (6 mm) space at floors, ceilings, and window and door frames. Install gypsum wallboard or other wall finish panels so that finish panel joints are staggered and do not coincide with sound barrier panel joints. Install in accordance with finish panel manufacturer’s installation recommendations.
D. Finish panels with STN-3 per mock-up and Section 09 90 00
3.4 CLEANING
A. Comply with manufacturer's recommendations for repairing damaged panels.
B. Replace panels that cannot be repaired.
3.5 PROTECTION
A. Protect installed products from subsequent construction operations.
B. Touch-up, repair, or replace damaged products before Substantial Completion.
END OF SECTION