This pre-solicitation notice is for a construction contract to correct life safety and critical deficiencies at the Oregon Caves Chateau, a National Historic Landmark. The National Park Service seeks to address fire suppression, egress and accessibility deficiencies in public areas, guest rooms, staff quarters and support spaces through installation of a fire suppression system, code compliant egress doors, and accessibility improvements including conversion of first floor guest rooms and improved access to dining facilities and restrooms. Additional work includes replacement of water, waste and steam piping, electrical systems, addition of shear walls and balconies, and construction of internal stairways. The estimated price range is over $10 million and the period of performance is from April 2020 to September 2021. The solicitation is expected to be issued on or about October 21, 2019, with responses due at a later date. The NAICS code is 236220 and businesses must be registered in SAM.gov to be eligible for award.
Appendix B - Structural Calculations Pages 165 - 330
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FX-61
FX-62
FX-63
FX-64
FX-65
FX-66
FX-67
FX-68
FX-69
FX-70
FX-71
FX-72
FX-73
FX-74
FX-75
FX-76
FX-77
FX-78
FX-79
FX-80
FX-81
FX-82
FX-83
FX-84
FX-85
FX-86
FX-87
FX-88
FX-89
FX-90
FX-91
FX-92
FX-93
FX-94
FX-95
FX-96
FX-97
FX-98
FX-99
FX-100
FX-101
FX-102
FX-103
FX-104
FX-105
FX-106
FX-107
FX-108
FX-109
FX-110
FX-111
FX-112
FX-113
FX-114
FX-115
FX-116
FX-117
FX-118
FX-119
FX-120
FX-121
FX-122
FX-123
FX-124
FX-125
FX-126
FX-127
FX-128
FX-129
FX-130
FX-131
FX-132
FX-133
FX-134
FX-135
FX-136
FX-137
FX-138
FX-139
FX-140
FX-141
FX-142
FX-143
FX-144
FX-145
FX-146
FX-147
FX-148
FX-149
FX-150
FX-151
FX-152
FX-153
FX-154
FX-155
FX-156
FX-157
FX-158
FX-159
FX-160
FX-161
FX-162
FX-163
FX-164
FX-165
FX-166
FX-167
FX-168
FX-169
FX-170
FX-171
FX-172
FX-173
FX-174
FX-175
FX-176
FX-177
FX-178
48 Colin P. Kelly Street San Francisco, CA 94170
Tel: (415) 989 - 9900
Fax: (415) 989 - 9909
Project: ORCA
Job No. 170901.00
Date: November 15, 2018 By: GWC
LEVEL 1 RAMP
Structural Narrative
A new ramp is to be installed on Level 1. This consists of new wood floor framing at the upper landing and sloping portion of the ramp supported on new structural steel framing of HSS and channel sections; some existing floor framing can be kept at the ramp and lower landing. The design considers a live load of 100 psf.
L1R-1
L1R-2
L1R-3
L1R-4
L1R-5
L1R-6
L1R-7
RAISED B2 STORAGE
Condition Summary
Basement 2 has two different top of floor elevations. The top of concrete slab elevation is lower than the top of wood floor elevation. This project will raise the finished floor elevation at the storage area over the concrete slab to match the wood-framed area’s finished floor elevation.
Rehabilitation
A new wood-framed raised floor is to be built on top of the existing concrete slab to match the finished floor elevation of the existing wood-framed structure. The wood structure considers a storage live load of 250 psf.
BF-1B2S-1
BF-2B2S-2
BF-3B2S-3
BF-4B2S-4
MISCELLANEOUS
Cedar Rail Posts: The railing of the fire escapes is to be built using Alaskan (yellow) cedar. The railing posts are attached to the 6x via a through-bolted steel bracket. The design considers guardrail live loading of 200 pounds concentrated or 50 lb/ft distributed per ASCE 7-10 §4.5.1.
Balcony Railing: The balcony railing will consist of steel HSS posts welded to the HSS frame beams and clad in cedar wrapping for the appearance of wood. The design considers guardrail live loading of 200 pounds concentrated or 50 lb/ft distributed per ASCE 7-10 §4.5.1.
Elevator Guiderail Support: A new elevator is to be installed, providing access from Basement 2 to Level 1. The HSS guiderail support is designed for a preliminary lateral force per the elevator manufacturer.
Stairs: One set of new stairs is to be provided from Basement 3 to Basement 1.
Another set of new stairs is to be provided from Level 2 to Level 3. Where new openings through the existing floor are required, the existing framing is to be cut and re-supported wherever possible. The design of the stair structural elements considers a live load of 100 psf.
MC-1
MC-2
MC-3
MC-4
MC-5
MC-6
MC-7
MC-8
MC-9
MC-10
MC-11
MC-12
MC-13
MC-14
MC-15
MC-16
MC-17
MC-18
MC-19
MC-20
MC-21
MC-22
MC-23
MC-24
MC-25
MC-26
MC-27
MC-28
MC-29
MC-30
MC-31
MC-32
MC-33
MC-34
MC-35
MC-36
MC-37
File details come from the government source that posted it. Updated .