A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_165_-_330.pdf

PDF 15 MB Posted

Attached to
ORCA 150025 - Correct Life Safety and Critical Def
Solicitation number
140P2019R0045
Issued by

About this file

This pre-solicitation notice is for a construction contract to correct life safety and critical deficiencies at the Oregon Caves Chateau, a National Historic Landmark. The National Park Service seeks to address fire suppression, egress and accessibility deficiencies in public areas, guest rooms, staff quarters and support spaces through installation of a fire suppression system, code compliant egress doors, and accessibility improvements including conversion of first floor guest rooms and improved access to dining facilities and restrooms. Additional work includes replacement of water, waste and steam piping, electrical systems, addition of shear walls and balconies, and construction of internal stairways. The estimated price range is over $10 million and the period of performance is from April 2020 to September 2021. The solicitation is expected to be issued on or about October 21, 2019, with responses due at a later date. The NAICS code is 236220 and businesses must be registered in SAM.gov to be eligible for award.

Appendix B - Structural Calculations Pages 165 - 330

View the file

Other files

File Type Posted
01 27 00-Definition of Contract Line Items_ORCA Amend 4_0004.pdf PDF
140P2019R0045 Amend 4 SOC_0004.pdf PDF
07_ContractPriceSchedule_ORCA150025_Amend 4_0004.xls XLS spreadsheet
Sol_140P2019R0045_Amd_0004.pdf PDF
09 80 00 Fiberboard Wall Ceiling Treatment_ORCA_0003.pdf PDF
Sol_140P2019R0045_Amd_0003.pdf PDF
B03_Wage_Determination_OR20200039 1-3-2020_0003.pdf PDF
140P2019R0045 Amend 3 SOC_0003.pdf PDF
Sol_140P2019R0045_Amd_0001.pdf PDF
Sol_140P2019R0045_Amd_0002.pdf PDF
00 01 10 Table of Contents_ORCA_r1_0002.pdf PDF
140P2019R0045 Amend 1 SOC.updated_0002.pdf PDF
09 80 00 Fiberboard Wall & Ceiling Treatment_0002.pdf PDF
Sign-in sheet_0002.pdf PDF
L8.03 Landscape Details - A1_0002.pdf PDF
A06_Specs_03_XAPPENDIX-C_ORCA_Chateau_Hazardous_Materials_Report.pdf PDF
A06_Specs_03_XAPPENDIX-D_ORCA_Fire_Protection_Basis_of_Design.pdf PDF
A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_1_-_164.pdf PDF
A06_Specs_03_XAPPENDIX-A_ORCA_Geotech_Report.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
B08_Solic_Contract_Price_Schedule_ORCA150025_FINAL.xls XLS spreadsheet
A06_Dwgs_01_ORCA_100CD_FINAL_0_TITLE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_3_ARCHITECTURE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_6_PLUMBING.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_8_ELECTRICAL.pdf PDF
B08_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Solic_140P2019R0045_SF_1442_&_Clauses.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-01.pdf PDF
B08_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Solic_SF24-16d.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_7_MECHANICAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_4_FIRE_SUPPRESSION.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_2_STRUCTURAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_5_FIRE_DETECTION.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-15-48.pdf PDF
B03_Wage_Determination_OR20190039_8-30-19.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-02-14.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_1_LANDSCAPE.pdf PDF
B08_Solit_PSP_Cover.rtf RTF text file
B08_Solit_PSP_Vol_II_Equals.doc DOC document
B08_Solit_PSP_Vol_II_HazMat.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FX-61

FX-62

FX-63

FX-64

FX-65

FX-66

FX-67

FX-68

FX-69

FX-70

FX-71

FX-72

FX-73

FX-74

FX-75

FX-76

FX-77

FX-78

FX-79

FX-80

FX-81

FX-82

FX-83

FX-84

FX-85

FX-86

FX-87

FX-88

FX-89

FX-90

FX-91

FX-92

FX-93

FX-94

FX-95

FX-96

FX-97

FX-98

FX-99

FX-100

FX-101

FX-102

FX-103

FX-104

FX-105

FX-106

FX-107

FX-108

FX-109

FX-110

FX-111

FX-112

FX-113

FX-114

FX-115

FX-116

FX-117

FX-118

FX-119

FX-120

FX-121

FX-122

FX-123

FX-124

FX-125

FX-126

FX-127

FX-128

FX-129

FX-130

FX-131

FX-132

FX-133

FX-134

FX-135

FX-136

FX-137

FX-138

FX-139

FX-140

FX-141

FX-142

FX-143

FX-144

FX-145

FX-146

FX-147

FX-148

FX-149

FX-150

FX-151

FX-152

FX-153

FX-154

FX-155

FX-156

FX-157

FX-158

FX-159

FX-160

FX-161

FX-162

FX-163

FX-164

FX-165

FX-166

FX-167

FX-168

FX-169

FX-170

FX-171

FX-172

FX-173

FX-174

FX-175

FX-176

FX-177

FX-178

48 Colin P. Kelly Street San Francisco, CA 94170

Tel: (415) 989 - 9900

Fax: (415) 989 - 9909

Project: ORCA

Job No. 170901.00

Date: November 15, 2018 By: GWC

LEVEL 1 RAMP

Structural Narrative

A new ramp is to be installed on Level 1. This consists of new wood floor framing at the upper landing and sloping portion of the ramp supported on new structural steel framing of HSS and channel sections; some existing floor framing can be kept at the ramp and lower landing. The design considers a live load of 100 psf.

L1R-1

L1R-2

L1R-3

L1R-4

L1R-5

L1R-6

L1R-7

RAISED B2 STORAGE

Condition Summary

Basement 2 has two different top of floor elevations. The top of concrete slab elevation is lower than the top of wood floor elevation. This project will raise the finished floor elevation at the storage area over the concrete slab to match the wood-framed area’s finished floor elevation.

Rehabilitation

A new wood-framed raised floor is to be built on top of the existing concrete slab to match the finished floor elevation of the existing wood-framed structure. The wood structure considers a storage live load of 250 psf.

BF-1B2S-1

BF-2B2S-2

BF-3B2S-3

BF-4B2S-4

MISCELLANEOUS

Cedar Rail Posts: The railing of the fire escapes is to be built using Alaskan (yellow) cedar. The railing posts are attached to the 6x via a through-bolted steel bracket. The design considers guardrail live loading of 200 pounds concentrated or 50 lb/ft distributed per ASCE 7-10 §4.5.1.

Balcony Railing: The balcony railing will consist of steel HSS posts welded to the HSS frame beams and clad in cedar wrapping for the appearance of wood. The design considers guardrail live loading of 200 pounds concentrated or 50 lb/ft distributed per ASCE 7-10 §4.5.1.

Elevator Guiderail Support: A new elevator is to be installed, providing access from Basement 2 to Level 1. The HSS guiderail support is designed for a preliminary lateral force per the elevator manufacturer.

Stairs: One set of new stairs is to be provided from Basement 3 to Basement 1.

Another set of new stairs is to be provided from Level 2 to Level 3. Where new openings through the existing floor are required, the existing framing is to be cut and re-supported wherever possible. The design of the stair structural elements considers a live load of 100 psf.

MC-1

MC-2

MC-3

MC-4

MC-5

MC-6

MC-7

MC-8

MC-9

MC-10

MC-11

MC-12

MC-13

MC-14

MC-15

MC-16

MC-17

MC-18

MC-19

MC-20

MC-21

MC-22

MC-23

MC-24

MC-25

MC-26

MC-27

MC-28

MC-29

MC-30

MC-31

MC-32

MC-33

MC-34

MC-35

MC-36

MC-37

File details come from the government source that posted it. Updated .