A06_Dwgs_01_ORCA_100CD_FINAL_4_FIRE_SUPPRESSION.pdf
PDF 6 MB Posted
- Solicitation number
- 140P2019R0045
About this file
This pre-solicitation notice seeks proposals for a construction contract to correct life safety and critical deficiencies at the Oregon Caves Chateau National Historic Landmark. The National Park Service will issue a solicitation on or around October 21, 2019 seeking a single prime contractor to perform work including fire suppression and detection system installation, egress door replacements, accessibility improvements, and structural repairs. Eligible firms must have the capability to convert first floor guest rooms to full accessibility, improve public area and restroom access, install a three-story elevator, replace water supply and waste vent piping, update steam systems, replace the main electric panel, add plywood shear walls, and install balconies to meet fire code egress requirements. The estimated price range is over $10,000,000 to be completed from April 2020 through September 2021. The NAICS code is 236220 with a size standard of $36.5 million. Maximum practicable opportunities are to be provided to small businesses, veteran-owned small businesses, small disadvantaged businesses, and women-owned small businesses.
Drawings - Fire Suppression
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M M
ROOF
SPRINKLER
RELEASE
EXTERIOR
MIST
RELEASE
FIRE SUPPRESSION LEGEND
STANDARD RESPONSE PENDANT
SPRINKLER - VIKING VK102 K-5.6
STANDARD RESPONSE UPRIGHT
SPRINKLER - VIKING VK100 K-5.6
QUICK RESPONSE CONCEALED PENDANT
SPRINKLER - VIKING VK 462
QUICK RESPONSE DRY PENDANT
SPRINKLER - VIKING VK482 K-5.6
HORIZONTAL SIDEWALL SPRINKLER -
VIKING VK104 K-5.6
CONCEALED HORIZONTAL SPRINKLER -
VIKING VK481 K-5.6
QUICK RESPONSE VERTICAL SIDEWALL
SPRINKLER VIKING VK106 K-5.6
WATER MIST NOZZLE - TELESTO MIST
CURTAIN K1/K2
RISER
ATTIC SPRINKLER VIKING V-BB 200 DEG. F
TELESTO ROOF MIST NOZZLE NGW P62
FIRE HOSE CABINET
STEEL SCHEDULE 40 PIPE
CPVC PIPE
COPPER TUBE
16 18
3 5
4 6 8
10 11
17 19
CROSS MAIN BRANCH
PIPE
SPRINKLER
BEAM
FLOOR
SPRINKLER BANCH
NEW CEILING
CONCEALED SPRINKLER
CROSS MAIN THROUGH BEAM
ROOF SPRINKLER
ROOF SPRINKLER BRANCH
ROOF SPRINKLER MAIN (COPPER)ATTIC SPRINKLER AND MAIN (STEEL)
ATTIC SPACE
DRY ZONE MAIN (STEEL)
TYPICAL THRD FLOOR ROOM DRY PENDANT SPRINKLERS
THIRD LEVEL
EXTERIOR MIST MAIN (COPPER)
EXTERIOR MIST NOZZLE
DECK
COPPER MAIN SUPPLY
K1 OR K2 NOZZLE
1"THREAD COPPER
1"COPPER
LOG STRUCTURE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:3
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S.
N.A.
9/13/2019
FIRE PROTECTION
DETAILS & NOTESFS2.00
134 210
CONSTRUCTION DRAWINGS
F S
.0
B
.S
1. SPRINKLER SYSTEM TO BE BID OPTION D.
2. THE SPRINKLER SYSTEM SHALL BE ARRANGED AS
FOLLOWS:
A. WET ZONE - ALL FLOOR AREAS ON BASEMENT
LEVELS 1,2,3 AND LEVELS 1 AND 2
B. DRY ZONE – ALL FLOOR AREAS ON LEVEL 3,
THE ATTIC AND CONCEALED SPACES
C. WATER MIST EXTERIOR ZONE – AS SHOWN,
MANUAL OPERATION FROM RELEASING PANEL
AND MAIN OFFICE ONLY.
D. WATER MIST ROOF ZONE – AS SHOWN,
MANUAL OPERATION FROM RELEASING PANEL
AND MAIN OFFICE ONLY.
1. THE SYSTEM SHALL BE INSTALLED IN COMPLIANCE
WITH THE CURRENT STANDARD OF NATIONAL FIRE
PROTECTION ASSOCIATION (NFPA) #13. SYSTEM
MUST ALSO BE INSTALLED IN ACCORDANCE WITH THE
SECRETARY OF INTERIOR’S STANDARDS FOR
REHABILITATION. WHERE CONFLICT BETWEEN
STANDARDS APPEARS THE ENGINEER SHALL BE
CONTACTED FOR CONSULTATION.
2. ALL EXPOSED PIPING SHALL BE SCHEDULE 40 STEEL.
SCHEDULE 10 OR LIGHT WALL PIPE SHALL NOT BE
PERMITTED FOR ANY SIZE PIPE.
3. ALL STEEL FITTINGS SHALL BE THREADED. CUT
GROOVE FITTINGS MAY BE PERMITTED FOR 4 INCH
AND LARGER SIZE WHERE ACCESS IS ACHIEVABLE.
ROLLED GROOVE FITTINGS SHALL NOT BE
PERMITTED.
4. CPVC PIPING SHALL BE PERMITTED ON WET ZONES
AS SHOWN ON THE DRAWINGS. THE ENGINEER SHALL
BE CONTACTED IF QUESTIONS ARISE REGARDING
WHERE CPVC IS ACCEPTABLE.
5. EXTERIOR WATER MIST PIPING SHALL BE TYPE L
COPPER.
FIRE SPRINKLER GENERAL NOTES
8. ALL COMPONENTS SHALL BE COORDINATED
WITH OTHER TRADES.
9. THE EXISTING PIPE SECTIONS SHALL BE
MAINTAINED OPERATIONAL AS LONG AS
POSSIBLE. THE OBJECTIVE IS TO MAINTAIN EACH
AREA UNTIL THE NEW SYSTEM WITHIN THE
RESPECTIVE AREA IS ACTIVATED TO MAINTAIN
PROTECTION.
10. THE SYSTEM SHALL BE CONNECTED TO THE
FIRE ALARM SYSTEM AS EACH AREA IS
COMPLETED AND BECOMES OPERATIONAL.
11. DRY-PIPE SYSTEMS
1. JOINTS SHALL BE THREADED OR CUT
GROOVE. ROLLED GROOVE FITTINGS NOT
PERMITTED.
2. ALL PENDENT SPRINKLERS SHALL BE DRY
MODELS
3. ALL PIPING SHALL BE SLOPED TO MAIN
RISER OR TO CLEARLY ACCESSED
AUXILIARY LOCATIONS. LOW POINT
DRAINS SHALL BE MINIMIZED.
1 – EXISTING 6 INCH WATER SERVICE FLANGED FITTING FROM RESERVOIR
2 – DOUBLE CHECK VALVE WITH SHUT OFF VALVES
3 – WET ZONE ALARM VALVE WITH SHUT OFF VALVES, FLOW ALARM SWITCH
AND MAIN DRAIN
4 – TO WET SPRINKLER ZONE
5 - DRY ZONE VALVE WITH TRIM, SHUT OFF VALVE, FLOW ALARM PRESSURE
SWITCH, MAIN DRAIN
6 – TO DRY PIPE SPRINKLER ZONE
7 – EXTERIOR MIST DELUGE VALVE WITH TRIM, MANUAL AND RELEASING
PANEL CONTROL, DRAIN
8 – TO EXTERIOR MIST ZONE
9 – ROOF DELUGE VALVE WITH TRIM, MANUAL AND RELEASING PANEL
CONTROL, DRAIN
10 – TO ROOF ZONE
11 - 4 INCH FROM FDC
12 – CHECK VALVE
13 – FDC DRAIN
14 – MANIFOLD DRAIN LINE
15 – DRAIN TO EXTERIOR
16 – EXTERIOR MIST RELEASING PANEL
17 – EXTERIOR MIST MANUAL RELEASE WITH INFORMATION SIGN
18 – ROOF SPRINKLER RELEASING PANEL
19 – ROOF SPRINKLER MANUAL RELEASE WITH INFORMATION SIGN
20- MAIN DRAIN FROM ATTIC
21 - DISCHARGE TO EXTERIOR
NOTE: ALL VALVES TO BE ELECTRONICALLY TAMPER PROTECTED EXCEPT
DRAINS THAT MAY BE LOCKED IN NORMAL PLACEMENT.
FIRE SPRINKLER MAIN MANIFOLD
MAIN SPRINKLER MANIFOLD DETAIL
TYPICAL OPEN FRAME CEILING
SPRINKLERS
TYPICAL CEILING SPRINKLERS
ATTIC DETAIL
U.S. NATIONAL PARK SERVICE OREGON
CAVE CHATEAU EXTERIOR MIST
PROTECTION
HYDRAULIC CALCULATION INFORMATION
REMOTE AREA #1 - MAIN ATTIC
OCCUPANCY CALCULATION: LIGHT HAZARD
DENSITY: 0.10 gpm/sqft for 1,500 sqft TOTAL HOSE STREAMS: 300 gpm
TOTAL HEADS FLOWING: 7
K FACTOR: 4.2
TOTAL WATER REQUIRED: 392.7 gpm TOTAL PRESSURE REQUIRED: 53.6 psi
SAFETY MARGIN - PSI: +90.9 (62%)
HYDRAULIC CALCULATION INFORMATION
REMOTE AREA #2 - SIDE ATTICS
OCCUPANCY CALCULATION: LIGHT HAZARD
DENSITY: 0.10 gpm/sqft for 1,500 sqft TOTAL HOSE STREAMS: 100 gpm
TOTAL HEADS FLOWING: 6
K FACTOR: 5.6
TOTAL WATER REQUIRED: 201.6 gpm TOTAL PRESSURE REQUIRED: 64.9 psi
SAFETY MARGIN - PSI: +78.3 (54.7%)
HYDRAULIC CALCULATION INFORMATION
REMOTE AREA #3 - ROOF MIST NOZZLES
OCCUPANCY CALCULATION: N/A
DENSITY: N/A
TOTAL HOSE STREAMS: 100 gpm
TOTAL HEADS FLOWING: ALL
K FACTOR: 0.63
TOTAL WATER REQUIRED: 129.5 gpm TOTAL PRESSURE REQUIRED: 117 psi
SAFETY MARGIN - PSI: +27.3 (18.9%)
HYDRAULIC CALCULATION INFORMATION
REMOTE AREA #4 - ROOF MIST NOZZLES
OCCUPANCY CALCULATION: N/A
DENSITY: N/A
TOTAL HOSE STREAMS: 100 gpm
TOTAL HEADS FLOWING: 30
K FACTOR: 0.94
TOTAL WATER REQUIRED: 440.45 gpm TOTAL PRESSURE REQUIRED: 96.7 psi
SAFETY MARGIN - PSI: +48.2 (33.3%)
SCALE: NO SCALE
210211
FIRE SUPPRESSION LEGEND
STANDARD RESPONSE PENDANT
SPRINKLER - VIKING VK102 K-5.6
STANDARD RESPONSE UPRIGHT
SPRINKLER - VIKING VK100 K-5.6
QUICK RESPONSE CONCEALED PENDANT
SPRINKLER - VIKING VK 462
QUICK RESPONSE DRY PENDANT
SPRINKLER - VIKING VK482 K-5.6
HORIZONTAL SIDEWALL SPRINKLER -
VIKING VK104 K-5.6
CONCEALED HORIZONTAL SPRINKLER -
VIKING VK481 K-5.6
QUICK RESPONSE VERTICAL SIDEWALL
SPRINKLER VIKING VK106 K-5.6
WATER MIST NOZZLE - TELESTO MIST
CURTAIN K1/K2
RISER
ATTIC SPRINKLER VIKING V-BB 200 DEG. F
TELESTO ROOF MIST NOZZLE NGW P62
FIRE HOSE CABINET
STEEL SCHEDULE 40 PIPE
CPVC PIPE
COPPER TUBE
NC
NB
NA
ND
SC
SB
SA
SE
CB
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
SA.1 NA.1
3.2 5.8
4.0
3.0
4.0
3.0
1.0
4.0
1.0
4.0
3.01.25
1.0 4.0
1.0
1.0
1.25
1.0
1.0
1.0
4.04.0
6" MAIN WATER SUPPLY
1.0 1.0
1.01.0
1.01.0
1.0
1.25
2.0
1.0
1.0
3.0
1.0
3.0
3.0
1.0
2.5
1.251.0
1.0
NON-ACCESSIBLE SPACE
NO A/S
1.0
1.25 1.0 1.0
2.01.5
2.0
1.0
1.0
1.25
4.0
4.0 1.5
3.0 4.0
FS2.05
3.0
3.0
3.0
1.5
4.0
MIST NOZZLE K20MIST NOZZLE K2P
1.0 1.25 2.5
1.5
3.0
4.0
MECHANICAL
B301
FHC-3-A
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:5
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S.
N.A.
9/13/2019
BASEMENT LEVEL 3 FIRE
SUPPRESSIONFS2.B3
135 210
CONSTRUCTION DRAWINGS
F S
.B
B
.S
BLDG.
TRUE
NORTH
29.6°
1. ALL PIPE ON THIS LEVEL TO BE SCHEDULE
40 STEEL EXCEPT MIST TUBE THAT SHALL
BE COPPER.
2. SEE DETAIL FS2.00/1 FOR MANIFOLD
LAYOUT
3. EXISTING 6 INCH WATER SUPPLY WITH
FLANGED FITTING FROM RESERVOIR
4. CRAWL SPACE TO BE INSULATED TO
PREVENT FREEZING
5. NEW SPRINKLERS TO BE INSTALLED
PARALLEL TO EXISTING TO MAINTAIN
PROTECTION AS LONG AS POSSIBLE
6. ELEVATOR PIT SPRINKLER WITH SHUT OFF
175°F (79°C) WITH GUARD
7. ALL MECHANICAL ROOM SPRINKLERS TO
BE 175°F (79°C) BRONZE FINISH WITH
GUARDS
8. ALL CRAWL SPACE SPRINKLERS TO BE
175°F (79°C) BRONZE FINISH WITH GUARDS
9. STAIRWAY SPRINKLERS TO BE 165°F (74°C)
CONCEALED SIDEWALL WITH WHITE FINISH
10. ALL MIST TUBE TO BE TYPE L COPPER
11. FINAL COMPONENT LOCATIONS TO BE
ENGINEER AND ARCHITECT APPROVED
12. DRAIN TO EXTERIOR BY MAIN-3 BASEMENT
ENTRANCE DOOR.
FIRE SUPRESSION GENERAL NOTES
1 EXISTING 6 INCH WATER SUPPLY WITH
FLANGED FITTING FROM RESERVOIR.
2 MAIN MANIFOLD SEE DETAIL 1-1 ON SHEET
FS2.00-P1
3 MAIN DRAIN 1.5
4 RISER 2A (WET) 4.0
5 RISER 3A (DRY) 4.0
6 RISER 5A EXTERIOR MIST 3.0
7 RISER 8A EXTERIOR ROOF 3.0
8 FIRE DEPARTMENT PUMPING LINE 4" DOWN
TO CRAWL SPACE.
9 SPRINKLER UNDER STAIR LANDING
10 UP TO LEVEL 2
11 ELEVATOR PIT SPRINKLER WITH SHUTOFF
175 DEG.F. (79 DEG.C) WITH GUARD.
12 RISER 4A EXTERIOR MIST 1.5
13 RISER 1A (WET) 4.0
14 EXPOSED EXTERIOR MIST COPPER TUBE.
FIRE SUPPRESSION
SHEET FS2.B3 SPECIFIC NOTES
NC
NB
NA
ND
SC
SB
SA
SE
CB
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
SA.1 NA.1
3.2 5.8
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0 1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.51.5
1.25 3
1.25
1.25
1.25
1.25
1.25
2.0
2.5
2.5
2.5
2.5
2.0
2.0
1.0
FHC-2B
1.0
1.01.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0 1.0
FHC-2A
1.0
1.0
1.5
1.25
1.5
1.0
1.0
1.25
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.25 1.01.0
1.25
1.0 1.5
1.5
1.5
2.0
1.0
1.25 1.5
1.0
1.0
1.5 1.25
1.0
2.5
4.0
3.03.0
2.0
1.0
1.0
1.0
1.0
RISER 7A MIST 2.5
1.01.0
1.0
MIST NOZZLE K2M
1.25 3.0
MIST NOZZLE K2L
MIST NOZZLE K2K
1.5
1.0 1.25
1.5
1.5
1.5
WINE STORAGE
B202B
STAIRS
B200
MIST NOZZLE K2N
LAUNDRY
B209B
SERVICE ENTRY
B209
CLOSET
B209A
STORAGE
B211C
STORAGE
B211
ELEVATOR
ELEV.MACHINE RM
B211B
ELECTRIC ROOM
B211A
MECHANICAL
B301
MECHANICAL
B301
CORRIDOR
B201A
MECHANICAL
B301
MECHANICAL
B301
STORAGE
B202
STORAGE
B203
CORRIDOR
B201A
STAFF LOUNGE
B204
BATHROOM
B204B-1 BATHROOM
B204B-1
STAFF BEDROOM #3
B205
STAFF BEDROOM #2
B206
STAFF BEDROOM #1
B207
MECHANICAL
B301
1.5
FIRE SUPPRESSION LEGEND
STANDARD RESPONSE PENDANT
SPRINKLER - VIKING VK102 K-5.6
STANDARD RESPONSE UPRIGHT
SPRINKLER - VIKING VK100 K-5.6
QUICK RESPONSE CONCEALED PENDANT
SPRINKLER - VIKING VK 462
QUICK RESPONSE DRY PENDANT
SPRINKLER - VIKING VK482 K-5.6
HORIZONTAL SIDEWALL SPRINKLER -
VIKING VK104 K-5.6
CONCEALED HORIZONTAL SPRINKLER -
VIKING VK481 K-5.6
QUICK RESPONSE VERTICAL SIDEWALL
SPRINKLER VIKING VK106 K-5.6
WATER MIST NOZZLE - TELESTO MIST
CURTAIN K1/K2
RISER
ATTIC SPRINKLER VIKING V-BB 200 DEG. F
TELESTO ROOF MIST NOZZLE NGW P62
FIRE HOSE CABINET
STEEL SCHEDULE 40 PIPE
CPVC PIPE
COPPER TUBE
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:5
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S.
N.A.
9/13/2019
BASEMENT LEVEL 2 FIRE
SUPPRESSIONFS2.B2
136 210
CONSTRUCTION DRAWINGS
F S
.B
B
.S
BLDG.
TRUE
NORTH
29.6°
1. ALL PIPE ON THIS LEVEL TO BE SCHEDULE 40
STEEL AS SHOWN ON PLAN
2. NEW SPRINKLERS TO BE INSTALLED PARALLEL TO
EXISTING TO MAINTAIN PROTECTION AS LONG AS
POSSIBLE
3. ALL STORAGE ROOM AND UTILITY SPACE
SPRINKLERS TO BE 165°F (74°C) BRONZE FINISH
WITH GUARDS
4. ALL LOUNGE AND BEDROOM AREA SPRINKLERS
TO BE 155°F (68°C) WITH WHITE FINISH COVER
PLATES
5. STAIRWAY SPRINKLERS TO BE 165°F (74°C)
CONCEALED SIDEWALL WITH WHITE FINISH
6. REFLECTED CEILING PLAN SHOWN FOR
SPRINKLER HEAD PLACEMENT. PIPE TO BE RUN
ABOVE DROP CEILINGS WHERE THEY ARE
LOCATED. PLACE SPRINKLERS TYPICALLY IN THE
CENTER OF TILES.
7. ALL BEAM PENETRATIONS SHALL BE APPROVED
BY THE STRUCTURAL ENGINEER.
8. ALL MIST TUBE TO BE TYPE L COPPER.
9. FINAL COMPONENT LOCATIONS TO BE ENGINEER
AND ARCHITECT APPROVED
FIRE SUPPRESSSION GENERAL NOTES
1 RISER 1A (WET) 4.0
2 RISER 4A EXTERIOR MIST 1.5
3 1.0 UP FROM LEVEL B3
4 MAIN DRAIN 1.5
5 RISER 2B (WET) 4.0
6 RISER 3B (DRY) 4.0
7 RISER 5B EXTERIOR MIST 3.0
8 RISER 8B EXTERIOR ROOF 3.0
9 RISER 2A (WET) 4.0
10 RISER 3A (DRY) 4.0
11 RISER 5A EXTERIOR MIST 3.0
12 RISER 8A EXTERIOR ROOF 3.0
13 COORDINATE FIRE RISERS WITH
PLUMBING RISERS IN CAVITY SPACE.
14 FINAL LOCATION FOR REFRIGERATOR
DRY PENDANT SPRINKLERS TO BE
FIELD ESTABLISHED. SPRINKLER
BARELS TO BE FIELD MEASURED.
FIRE SUPPRESSION
SHEET FS2.B2 SPECIFIC NOTES
NC
NB
NA
ND
SC
SB
SA
SE
CB
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
SA.1 NA.1
3.2 5.8
RISER 1B (WET 4")
1.0
1.0 2.0
2.0
1.0
2.0
1.0
2.0 1.0
1.0
1.0
1.0 2.0
1.0
2.0
1.0 3.0
2.0
1.5
1.0
1.0
2.0
1.0
2.0
1.25
2.0
1.0
1.25
1.0 1.0
1.0
1.0 1.0
1.0
1.01.0
1.25
1.01.0
1.5
1.0
1.01.01.01.01.01.25
1.0
1.0
1.0
1.5
1.5
4.0
4.0
1.01.0
4.0
FHC-1A
2.03.0
1.5
1.01.01.01.0
1.25
RISER 7A MIST
FHC-1B
1.0
4.0
4.0
1.0
1.0
1.25
1.0
1.0
1.25
4.0
1.25
1.0
1.0
1.25
1.0
2.0
1.0
1.0
1.0
1.0
1.0
MIST NOZZLE
MIST NOZZLE K2IMIST NOZZLE
K2J
MIST NOZZLE
K1F
1.0
1.0
1.0
1.0
1.0
1.5
4.0
COFFEE SHOP
B104
KITCHEN
B103
1.5
1.01.01.0
1.5
BALCONY
DINING ROOM
B102
GIFT SHOP
B101
WOMENS RESTROOM
B101A
MENS ROOM
B101B
GIFT SHOP
B101
ELEVATOR
STORAGE
B100A
FIRE SUPPRESSION LEGEND
STANDARD RESPONSE PENDANT
SPRINKLER - VIKING VK102 K-5.6
STANDARD RESPONSE UPRIGHT
SPRINKLER - VIKING VK100 K-5.6
QUICK RESPONSE CONCEALED PENDANT
SPRINKLER - VIKING VK 462
QUICK RESPONSE DRY PENDANT
SPRINKLER - VIKING VK482 K-5.6
HORIZONTAL SIDEWALL SPRINKLER -
VIKING VK104 K-5.6
CONCEALED HORIZONTAL SPRINKLER -
VIKING VK481 K-5.6
QUICK RESPONSE VERTICAL SIDEWALL
SPRINKLER VIKING VK106 K-5.6
WATER MIST NOZZLE - TELESTO MIST
CURTAIN K1/K2
RISER
ATTIC SPRINKLER VIKING V-BB 200 DEG. F
TELESTO ROOF MIST NOZZLE NGW P62
FIRE HOSE CABINET
STEEL SCHEDULE 40 PIPE
CPVC PIPE
COPPER TUBE
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:5
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S.
N.A.
9/13/2019
BASEMENT LEVEL 1 FIRE
SUPPRESSIONFS2.B1
137 210
CONSTRUCTION DRAWINGS
F S
.B
B
.S
1. UNLESS OTHERWISE NOTED ALL SPRINKLER PIPE TO BE RUN
ABOVE CEILING.
2. ALL MAINS TO BE SCHEDULE 40 STEEL
3. KITCHEN SPRINKLER PIPE TO BE EXPOSED, SCHEDULE 40 STEEL
AS SHOWN ON PLAN.
4. DINING ROOM, GIFT SHOP AND COFFEE SHOP PIPE TO BE CPVC
PLASTIC AS SHOWN ON PLAN
5. NEW SPRINKLERS TO BE INSTALLED PARALLEL TO EXISTING TO
MAINTAIN PROTECTION AS LONG AS POSSIBLE
6. ALL STORAGE ROOM, KITCHEN AND UTILITY SPACE SPRINKLERS
TO BE 165°F (74°C) BRONZE FINISH WITH GUARDS
7. ALL PUBLIC SPACE (DINING ROOM, COFFEE SHOP AND GIFT SHOP
SPRINKLERS TO BE 155°F (68°C), FLUSH PLATE CONCEALED WITH
ARCHITECT APPROVED SPECIAL FINISH COLOR COVER PLATES
8. RESTROOM SPRINKLERS TO BE 155°F (68°C), FLUSH PLATE
CONCEALED WITH ARCHITECT APPROVED WHITE FINISH COLOR
COVER PLATES
9. STAIRWAY SPRINKLERS TO BE 165°F (74°C) FLUSH PLATE
CONCEALED SIDEWALL WITH ARCHITECT APPROVED SPECIAL
FINISH COLOR.
10. REFLECTED CEILING PLAN SHOWN FOR SPRINKLER HEAD
PLACEMENT. PIPE TO BE RUN ABOVE DROP CEILINGS WHERE
THEY ARE LOCATED. PLACE SPRINKLERS TYPICALLY IN THE
CENTER OF TILES.
11. ALL BEAM PENETRATIONS SHALL BE APPROVED BY THE
STRUCTURAL ENGINEER.
12. ALL MIST TUBE TO BE TYPE L COPPER
13. FINAL LOCATIONS TO BE ENGINEER AND ARCHITECT APPROVED.
FIRE SPRINKLER NOTES x
BLDG.
TRUE
NORTH
29.6°
1 RISER 4A EXTERIOR MIST
2 RISER 1A (WET)
3 1.0 UP FROM LEVEL B3
4 1.0 UP TO LEVEL 1
5 MAIN DRAIN 1.5
6 RISER 2C (WET) 4.0
7 RISER 3C (DRY) 4.0
8 RISER 5C EXTERIOR MIST 3.0
9 RISER 8C EXTERIOR ROOF 3.0
10 RISER 2B (WET) 4.0
11 RISER 3B (DRY) 4.0
12 RISER 5B EXTERIOR MIST 3.0
13 RISER 8B EXTERIOR ROOF 3.0
14 FIRE DEPARTMENT PUMPING LINE
4" DOWN TO CRAWL SPACE.
FIRE SUPPRESSION
SHEET FS2.B1 SPECIFIC NOTES
NC
NB
NA
ND
SC
SB
SA
SE
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
SA.1 NA.1
3.2 5.8
RISER 1B (WET) 4"
FHC-1A
1.0
2.5
2.5
2.5
1.0
1.02.5
2.5
1.0 1.0
2.5
1.0
1.0
2.5
1.0
1.0
2.5
1.0
1.0
1.0
1.0
2.5
2.5
1.0
1.0
1.0
1.0
1.5
1.5
1.0
1.0
1.0
2.5
1.0
1.0
2.5
1.0
1.0
3.0
3.0
1.0 1.0
1.0
1.0
3.0
1.0
2.0
2.0 2.0
1.0
2.0
2.0
2.0
2.0
1.01.0
1.0
1.0
2.0
2.0
1.0 1.0
2.0
1.0 1.0
3"
3"
1.0
2.5
1.0
1.0
2.5
1.0
2.5
FHC-1B
1.0 3.0
4.0 3.0
1.0 1.0
2.5
2.5
1.0
1.0
2.5
1.0
2.51.0
2.51.0
2.5
1.0
2.5
1.0
2.5 1.0
1.0 2.5
1.0 2.5
1.0
2.5
1.0 2.5
1.0 2.5
1.0
1.0
2.5 1.0
2.5
1.0
2.5
1.0
2.5
1.0 2.5
2.5
K1B
K1E
RISER 7A MIST 2.5
2.5
4.0
MIST NOZZLE K2H MIST NOZZLE K2G
1.0
1.0 1.0
1.5
OFFICE #1
OFFICE #2
LOBBY
GAME ROOM
CORRIDOR
SITTING ROOM
LINEN
GUESTROOM
BATHROOM
105A
GUESTROOM
BATHROOM
103A
BATHROOM
104A
GUESTROOM
GUESTROOM
GUESTROOM
BATHROOM
102A
BATHROOM
101A
LOBBY
SITTING ROOM
FIRE SUPPRESSION LEGEND
STANDARD RESPONSE PENDANT
SPRINKLER - VIKING VK102 K-5.6
STANDARD RESPONSE UPRIGHT
SPRINKLER - VIKING VK100 K-5.6
QUICK RESPONSE CONCEALED PENDANT
SPRINKLER - VIKING VK 462
QUICK RESPONSE DRY PENDANT
SPRINKLER - VIKING VK482 K-5.6
HORIZONTAL SIDEWALL SPRINKLER -
VIKING VK104 K-5.6
CONCEALED HORIZONTAL SPRINKLER -
VIKING VK481 K-5.6
QUICK RESPONSE VERTICAL SIDEWALL
SPRINKLER VIKING VK106 K-5.6
WATER MIST NOZZLE - TELESTO MIST
CURTAIN K1/K2
RISER
ATTIC SPRINKLER VIKING V-BB 200 DEG. F
TELESTO ROOF MIST NOZZLE NGW P62
FIRE HOSE CABINET
STEEL SCHEDULE 40 PIPE
CPVC PIPE
COPPER TUBE
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:4
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S.
N.A.
9/13/2019
LEVEL 1 FIRE
SUPPRESSIONFS2.01
138 210
CONSTRUCTION DRAWINGS
F S
.0
B
.S
1. UNLESS OTHERWISE NOTED ALL SPRINKLER
PIPE TO BE RUN ABOVE CEILING. SEE DETAIL
2.00/3
2. ALL MAINS TO BE SCHEDULE 40 STEEL AS SHOWN
ON PLAN.
3. LOUNGE, OFFICE AND GUEST ROOMS PIPE TO BE
CPVC PLASTIC AS SHOWN ON PLAN.
4. NEW SPRINKLERS TO BE INSTALLED PARALLEL TO
EXISTING TO MAINTAIN PROTECTION AS LONG AS
POSSIBLE
5. ALL PUBLIC SPACE AND GUEST ROOM SPRINKLERS
TO BE 155°F (68°C), FLUSH PLATE CONCEALED
WITH ARCHITECT APPROVED SPECIAL FINISH
COLOR COVER PLATES
6. RESTROOM SPRINKLERS TO BE 155°F (68°C),
FLUSH PLATE CONCEALED WITH ARCHITECT
APPROVED WHITE FINISH COLOR COVER PLATES
7. STAIRWAY SPRINKLERS TO BE 165°F (74°C) FLUSH
PLATE CONCEALED SIDEWALL WITH ARCHITECT
APPROVED SPECIAL FINISH COLOR.
8. REFLECTED CEILING PLAN SHOWN FOR SPRINKLER
HEAD PLACEMENT. PIPE TO BE RUN ABOVE DROP
CEILINGS WHERE THEY ARE LOCATED. PLACE
SPRINKLERS TYPICALLY IN THE CENTER OF TILES.
9. ALL BEAM PENETRATIONS SHALL BE APPROVED BY
THE STRUCTURAL ENGINEER.
10. ALL MIST TUBE TO BE TYPE L COPPER
11. FINAL COMPONENT LOCATIONS TO BE ENGINEER
AND ARCHITECT APPROVED
FIRE SPRINKLER NOTES x
BLDG.
TRUE
NORTH
29.6°
1 MAIN DRAIN 1.5
2 RISER 2C (WET) 4.0
3 RISER 3C (DRY) 4.0
4 RISER 5C EXTERIOR MIST 3.0
5 RISER 8C EXTERIOR ROOF 3.0
6 RISER 1C (WET) 3.0
7 1.0 FROM LEVEL 1
8 FIRE DEPARTMENT PUMPING LINE 4"
DOWN TO CRAWL SPACE.
9 FIRE DEPARTMENT PUMPING
CONNECTION (F.D.C)
FIRE SUPPRESSION
SHEET FS2.01 SPECIFIC NOTES
NC
NB
NA
ND
SC
SB
SA
SE
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
SA.1 NA.1
3.2 5.8
EXTERIOR MIST NOZZLES
(TYP)
MIST NOZZLE K2E
FHC-2A
FHC-2B
1.2
2.5
2.5
1.2
1.0
1.0
2.5
2.5
1.0
1.0
1.0
1.0
2.5
2.5
1.0
1.0
2.5
1.0 1.0
1.0
1.0 2.5
2.5
1.0
2.51.0
1.0 1.0
1.0
2.5
1.0
1.0
2.5 2.5
2.5
2.5
RUN ALONG RAFTERS
1.0 1.0 1.0
1.25
1.0 1.0 1.0
1.01.01.25
1.0
1.01.01.251.5
1.0
2.0 2.5
2.0
2.0
1.0
1.5
1.0
2.5
1.01.0
3.0 1.0
1.0
1.0
2.5
2.5
1.0
2.5
2.5
2.5
1.0
1.0
1.0
1.0
2.5
2.5
1.0
1.0
2.5
2.5
1.0 1.0
2.5
1.0
1.0
1.0
2.5
2.5 1.0
2.5 2.5
1.0
1.0
1.0
2.5
1.0
2.5
2.5
2.5
1.0
2.5
2.5
2.5
RISER 1C (WET)3.0
3.0
2.5
2.5
MIST NOZZLE K2F
MIST NOZZLE K3D
2.5 2.5 2.5
2.5
2.5
2.5
2.5
1.0 1.5 1.0
2.0
2.0
STAIRS
BATHROOM
214A
BATHROM
204A
BATHROOM
203A
BATHROOM
201A
BATHROOM
212A
BATHROOM
210A
BATHROOM
209A
STAIRS
BATHROOM
211A
STORAGE
200C
CORRIDOR
200B
BATHROOM
206A
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
BATHROOM
209A
LOBBY
STAIRS
UP TO
FHC-3A 1"UP
1.0
FIRE SUPPRESSION LEGEND
STANDARD RESPONSE PENDANT
SPRINKLER - VIKING VK102 K-5.6
STANDARD RESPONSE UPRIGHT
SPRINKLER - VIKING VK100 K-5.6
QUICK RESPONSE CONCEALED PENDANT
SPRINKLER - VIKING VK 462
QUICK RESPONSE DRY PENDANT
SPRINKLER - VIKING VK482 K-5.6
HORIZONTAL SIDEWALL SPRINKLER -
VIKING VK104 K-5.6
CONCEALED HORIZONTAL SPRINKLER -
VIKING VK481 K-5.6
QUICK RESPONSE VERTICAL SIDEWALL
SPRINKLER VIKING VK106 K-5.6
WATER MIST NOZZLE - TELESTO MIST
CURTAIN K1/K2
RISER
ATTIC SPRINKLER VIKING V-BB 200 DEG. F
TELESTO ROOF MIST NOZZLE NGW P62
FIRE HOSE CABINET
STEEL SCHEDULE 40 PIPE
CPVC PIPE
COPPER TUBE
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:4
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S.
N.A.
9/13/2019
LEVEL 2 FIRE
SUPPRESSIONFS2.02
139 210
CONSTRUCTION DRAWINGS
F S
.0
B
.S
BLDG.
TRUE
NORTH
29.6°
1. UNLESS OTHERWISE NOTED ALL SPRINKLER
PIPE TO BE RUN ABOVE CEILING.
3. ALL MAINS TO BE SCHEDULE 40 STEEL AS
SHOWN ON PLAN
4. GUEST ROOMS PIPE TO BE CPVC PLASTIC AS
SHOWN ON PLAN.
5. NEW SPRINKLERS TO BE INSTALLED
PARALLEL TO EXISTING TO MAINTAIN
PROTECTION AS LONG AS POSSIBLE
6. ALL GUEST ROOM AND CORRIDOR
SPRINKLERS TO BE 155°F (68°C), FLUSH
PLATE CONCEALED WITH ARCHITECT
APPROVED SPECIAL FINISH COLOR COVER
PLATES
7. STAIRWAY SPRINKLERS TO BE 165°F (74°C)
FLUSH PLATE CONCEALED SIDEWALL WITH
ARCHITECT APPROVED SPECIAL FINISH
COLOR.
8. REFLECTED CEILING PLAN SHOWN FOR
SPRINKLER HEAD PLACEMENT. PIPE TO BE
RUN ABOVE DROP CEILINGS WHERE THEY
ARE LOCATED. PLACE SPRINKLERS
TYPICALLY IN THE CENTER OF TILES.
9. ALL BEAM PENETRATIONS SHALL BE
APPROVED BY THE STRUCTURAL ENGINEER.
10. FINAL COMPONENT LOCATIONS TO BE
ENGINEER AND ARCHITECT APPROVED
11. ALL MIST TUBE TO BE TYPE L COPPER
FIRE SUPRESSION NOTES
1 MAIN DRAIN 1.5
2 RISER 2C (WET) 4.0
3 RISER 3C (DRY) 4.0
4 RISER 5C EXTERIOR MIST 3.0
5 RISER 8C EXTERIOR ROOF 3.0
FIRE SUPPRESSION
SHEET FS2.02 SPECIFIC NOTES
SPRINKLER - VIKING VK102 K-5.6
STANDARD RESPONSE UPRIGHT
SPRINKLER - VIKING VK100 K-5.6
QUICK RESPONSE CONCEALED PENDANT
SPRINKLER - VIKING VK 462
QUICK RESPONSE DRY PENDANT
SPRINKLER - VIKING VK482 K-5.6
HORIZONTAL SIDEWALL SPRINKLER -
VIKING VK104 K-5.6
CONCEALED HORIZONTAL SPRINKLER -
VIKING VK481 K-5.6
QUICK RESPONSE VERTICAL SIDEWALL
SPRINKLER VIKING VK106 K-5.6
WATER MIST NOZZLE - TELESTO MIST
CURTAIN K1/K2
RISER
ATTIC SPRINKLER VIKING V-BB 200 DEG. F
TELESTO ROOF MIST NOZZLE NGW P62
FIRE HOSE CABINET
STEEL SCHEDULE 40 PIPE
CPVC PIPE
COPPER TUBE
NC
NB
NA
ND
SC
SB
SA
SE
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
SA.1 NA.1
3.2 5.8
MIST NOZZLE K2AMIST NOZZLE K2C MIST NOZZLE K2B
1.0 1.0 1.0
LINEN
300C
BATHROOM
301A
BATHROOM
309A
BATHROOM
307A
BATHROOM
305A
BATHROOM
311A
BATHROOM
312A
STAIRS
BATHROOM
303A
BATHROOM
302A
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
CORRIDOR
GUESTROOM
EAVE
EAVE
EAVE
FHC-3A
1"FROM BELOW
LINEN
300C
CORRIDOR
1"FROM
BELOW
FHC-3B
FROM ABOVE
1.0
1.0
1.0 1.0
1.0
1.25
1.25 1.5
1.0
1.0
1.0
1.0
1.25
1.52.5
1.0
2.5
1.02.0 1.25
1.25
1.25
1.0
1.0
1.0 1.0
1.0
1.0
1.25
1.0
1.5
2.5 3.0
1.01.0
1.0
1.0 1.0
3.0 3.0 3.0 3.0
1.0 1.0
1.0 1.0 1.0 1.0 1.0
1.01.01.01.0
1.0 1.0 1.0 1.0 1.0
1.0
1.0
3.0 3.0 3.0 3.0 3.0 3.0 3.0 2.5
1.0 1.0
4.0
1.0
1.0
1.0 1.0
1.0
1.25
1.251.0
1.0
1.25
1.25
1.25
2.0
2.0
2.0
1.5
1.0
1.5 1.25
1.0
1.0
1.25
1.0
1.0
1.0 1.0
1.0
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:4
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S
N.A.
9/13/2019
LEVEL 3 FIRE
SUPPRESSIONFS2.03
140 210
CONSTRUCTION DRAWINGS
F S
.0
B
.S
BLDG.
TRUE
NORTH
29.6°
1. UNLESS OTHERWISE NOTED ALL SPRINKLER PIPE
TO BE RUN ABOVE CEILING. SEE DETAIL 2.00/3
2. ALL PIPE TO BE SCHEDULE 40 STEEL
3. PITCH ALL PIPE TO DRAIN. ADD SUPPLEMENTAL
LOW POINT DRAINS WHERE NEEDED. LOW POINT
DRAINS SHALL BE ACCESSABLE.
4. NEW SPRINKLERS TO BE INSTALLED PARALLEL TO
EXISTING TO MAINTAIN PROTECTION AS LONG AS
POSSIBLE
5. ALL GUEST ROOM AND CORRIDOR SPRINKLERS TO
BE 155°F (68°C), FLUSH PLATE CONCEALED WITH
ARCHITECT APPROVED SPECIAL FINISH COLOR
COVER PLATES
6. STAIRWAY SPRINKLERS TO BE 165°F (74°C) FLUSH
PLATE CONCEALED SIDEWALL WITH ARCHITECT
APPROVED SPECIAL FINISH COLOR.
7. ALL CONCEALED AREA UPRIGHT SIDEWALL
SPRINKLERS TO BE 175°F (79°C)
8. REFLECTED CEILING PLAN SHOWN FOR SPRINKLER
HEAD PLACEMENT. PIPE TO BE RUN ABOVE DROP
CEILINGS WHERE THEY ARE LOCATED. PLACE
SPRINKLERS TYPICALLY IN THE CENTER OF TILES.
9. ALL BEAM PENETRATIONS SHALL BE APPROVED BY
THE STRUCTURAL ENGINEER.
FIRE SUPPRESSION NOTES
1 LOW POINT DRAIN
2 ACCESS DOOR
3 MAIN DRAIN 1.5
4 RISER 3C 4.0
5 RISER 5C EXTERIOR MIST 3.0
6 RISER 8C EXTERIOR ROOF 3.0
7 ROOF NOZZLE DRAIN VALVE/PORT
8 DRY ZONE INSPECTORS TEST DRAIN VALVE
9 MIST NOZZLES SUPPLIED FROM ATTIC.
10 RUN PIPE EXPOSE ABOVE DOOR FRAME
11 PLACE ALL RISERS TIGHT TO WALL TO AVOID
IMPACTING PASSAGEWAY.
12 RISER 2C (WET) 4.0
FIRE SUPPRESSION
SHEET FS2.03 SPECIFIC NOTES
SPRINKLER - VIKING VK102 K-5.6
STANDARD RESPONSE UPRIGHT
SPRINKLER - VIKING VK100 K-5.6
QUICK RESPONSE CONCEALED PENDANT
SPRINKLER - VIKING VK 462
QUICK RESPONSE DRY PENDANT
SPRINKLER - VIKING VK482 K-5.6
HORIZONTAL SIDEWALL SPRINKLER -
VIKING VK104 K-5.6
CONCEALED HORIZONTAL SPRINKLER -
VIKING VK481 K-5.6
QUICK RESPONSE VERTICAL SIDEWALL
SPRINKLER VIKING VK106 K-5.6
WATER MIST NOZZLE - TELESTO MIST
CURTAIN K1/K2
RISER
ATTIC SPRINKLER VIKING V-BB 200 DEG. F
TELESTO ROOF MIST NOZZLE NGW P62
FIRE HOSE CABINET
STEEL SCHEDULE 40 PIPE
CPVC PIPE
COPPER TUBE
CD
CC
NC
NB
NA
ND
SC
SB
SA
SE
CB
CA
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
CD.9
SA.1 NA.1
6.1
A
NC
NB
NA
ND
SC
SB
SA
SE
SD
NA.4
NB.3
SA.3
SB.8
1.1
2.9
SA.1 NA.1
3.2 5.8
EXTERIOR MIST NOZZLE K1A
EXTERIOR MIST NOZZLE K1D
TO EXTERIOR MIST NOZZLE K2A
TO EXTERIOR MIST NOZZLE K2C TO EXTERIOR MIST NOZZLE K2B
1.5
1.5
1.0 1.0 1.0
2.0
1.5
1.0
3.0
2.5
3.03.0 1.0
1.5
1.0 1.0
2.0
1.01.0 2.5
2.02.0
1.5
1.5 2.5
1.0
1.0 1.0
2.0
2.5 2.5 2.5
1.0 1.0 1.0
1.25
1.0
1.0
1.5
1.25
1.5 1.5
1.0
1.0
2.0
1.0
1.0
1.25
1.5
1.0
1.0
1.0
1.0
1.25
1.5
1.5
3 4
3.03.03.03.03.03.03.0
GUESTROOM
GUESTROOM
GUESTROOM
GUESTROOM
TELESTO ROOF MIST
NOZZLE
ROOF
PROVIDE AUXILLARY
DRAINS FOR NOZZLE
SUPPLY TO PREVENT
TRAPPED WATER AT LOW
POINTS
TELESTO ROOF NOZZLE
ROOF
AUXILLARY LOW POINT DRAIN
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:5
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S.
N.A.
9/13/2019
ATTIC LEVEL FIRE
SUPPRESSIONFS2.04
141 210
CONSTRUCTION DRAWINGS
F S
.0
B
.S
BLDG.
TRUE
NORTH
29.6°
1. ALL ATTIC, THIRD FLOOR AND ROOF PIPE TO BE
SCHEDULE 40 STEEL AS SHOWN ON PLAN
2. ALL EXTERIOR MIST PIPE TO BE TYPE K COPPER
3. PITCH ALL PIPE TO DRAIN. ARROWS INDICATE
ASSUMED DIRECTION OF DRAIN. THIS IS TO BE
FIELD VERIFIED BY CONTRACTOR AND ADDITIONAL
DRAINS PROVIDED AS NEEDED. LOW POINT DRAINS
SHALL BE ACCESSIBLE AND APPROVED BY
ENGINEER.
4. NEW SPRINKLERS TO BE INSTALLED PARALLEL TO
EXISTING TO MAINTAIN PROTECTION AS LONG AS
POSSIBLE
5. ALL SPRINKLERS TO BE 200°F (93°C) BRONZE FINISH
6. ALL BEAM PENETRATIONS SHALL BE APPROVED BY
THE STRUCTURAL ENGINEER.
7. ACCESS TO THE WING ATTICS IS NOT FULLY KNOWN
AND CANNOT BE UNTIL CEILINGS ARE REMOVED.
8. CURRENT SPRINKLER LAYOUT IS SHOWN BASED ON
EXPECTED SITUATION BUT FINAL SPRINKLER
PLACEMENT WILL NEED TO BE UNDERTAKEN IN
CONSULTATION WITH THE ENGINEER AFTER
CEILINGS HAVE BEEN REMOVED.
9. ROOF MIST NOTE: FINAL LOCATIONS TO BE FIELD
VERIFIED IN CONSULTATION WITH ENGINEER
FIRE SUPPRESSION NOTES
FS2.04
2 ROOF DETAIL 1
FS2.04
3 ROOF DETAIL 2
1 DOTTED LINES REPRESENT APPROXIMATE MIST
SPRAY PATTERN
2 SEE DETAIL FS2.04/2 (TYPICAL)
3 MOST DEMANDING CALCULATED AREA - ATTIC
AREA #1
4 MAIN DRAIN 1.5 WITH ZONE DRAIN VALVES
5 RISER 3C (DRY) 4.0
6 RISER 5C EXTERIOR MIST 3.0
7 RISER 8C EXTERIOR ROOF 3.0
8 TO THIRD FLOOR ZONE
9 LOW POINT DRAIN SEE DETAIL FS2.04/3 (TYPICAL)
10 1 INCH DOWN TO ROOF DRAIN VALVE ON LEVEL 3.
11 1 INCH DOWN TO INSPECTOR'S TEST CONNECTION
ON LEVEL 3.
FIRE SUPPRESSION
SHEET FS2.04 SPECIFIC NOTES
LEVEL 1
0"
LEVEL 2
13' - 5"
ROOF
36' - 4"
BASEMENT 1
-12' - 3"
LEVEL 3
22' - 7"
BASEMENT 2
-24' - 0"
BASEMENT 3
-36' - 0"
5 4
LEVEL 1.1
2' - 4"
BASEMENT 2.1
-22' - 9"
3.25.8
ATTIC
31' - 4"
5 45 45.8
MIST NOZZLE K2K
MIST NOZZLE K1C
MIST NOZZLE K1B
MIST NOZZLE K2G MIST NOZZLE K2H MIST NOZZLE K1E
MIST NOZZLE K1D
MIST NOZZLE K1A
MIST NOZZLE K2A
MIST NOZZLE K2C
MIST NOZZLE K2FMIST NOZZLE K2D
MIST NOZZLE K2JMIST NOZZLE K2I
MIST NOZZLE K2MMIST NOZZLE K2L
MIST NOZZLE K2PMIST NOZZLE K2O
MIST NOZZLE K1F
MIST NOZZLE K2B
MIST NOZZLE K2E
TELESTO ROOF MIST
NOZZLES
SEE FS2.04 FOR LOCATIONS
MIST NOZZLE K2N
2 2 2
0 4 84
SCALE OF FEET
SCALE I
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
138578
150025
OREGON CAVES NATIONAL MONUMENT
OREGON CAVES CHATEAU
R E
V
IT
/1
/2
:1
:5
P M
C U s e rs
\s w b ra
\D o c u m e n ts \0
-W o rk
\C lie n ts
\H P
G \P
R O
J E
C T
S \O
R C
A \R e v it \O
R C
A
F
IR
E
S U
P R
E S
S
IO
N .r v t
N.A.
B.S
N.A.
9/13/2019
EXTERIOR ELEVATION -
MIST FIRE SUPPRESSIONFS2.05
142 210
CONSTRUCTION DRAWINGS
F S
.0
B
.S
FS2.05
EXTERIOR ELEVATION - MIST FIRE
SUPPRESSION
1 SUPPLIED FROM ATTIC
2 SUPPLIED FROM SECOND FLOOR.
3 EXPOSED COPPER TUBE RUN TIGHT TO WALL AND
ABOVE WINDOWS TO MINIMIZE VISUAL IMPACT. FINAL
LOCATIONS TO BE ENGINEER AND ARCHITECT
APPROVED.
4 SUPPLIED FROM FIRST FLOOR.
5 ALL EXTERIOR TUBE TO BE TYPE L COPPER RUN ALONG
ROOF FRAMING UNDER EAVE. FINAL LOCATION TO BE
ENGINEER AND ARCHITECT APPROVED.
6 SUPPLIED FROM - 1 LEVEL.
7 SUPPLIED FROM - 2 LEVEL.
8 EXPOSED COPPER RISER. FINAL LOCATION TO BE
ENGINEER AND ARCHITECT APPROVED.
9 DECK SUPPLIED FROM - 3 LEVEL.
FIRE SUPPRESSION
SHEET FS2.05 SPECIFIC NOTES
| ORCA_150025_FIRE SUPRESSION - Sheet - FA2-00 - FIRE DETECTION DETAILS |
| ORCA_150025_FIRE SUPRESSION - Sheet - FA2-01 - LEVEL 1 FIRE DETECTION AND NOTIFICATION SYSTEM |
| ORCA_150025_FIRE SUPRESSION - Sheet - FA2-02 - LEVEL 2 FIRE DETECTION AND NOTIFICATION SYSTEM |
| ORCA_150025_FIRE SUPRESSION - Sheet - FA2-03 - LEVEL 3 FIRE DETECTION AND NOTIFICATION SYSTEM |
| ORCA_150025_FIRE SUPRESSION - Sheet - FA2-B1 - BASEMENT LEVEL 1 FIRE DETECTION AND NOTIFICATION SYSTEM |
| ORCA_150025_FIRE SUPRESSION - Sheet - FA2-B2 - BASEMENT LEVEL 2 FIRE DETECTION AND NOTIFICATION SYSTEM |
| ORCA_150025_FIRE SUPRESSION - Sheet - FA2-B3 - BASEMENT LEVEL 3 FIRE DETECTION AND NOTIFICATION SYSTEM |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-00 - FIRE PROTECTION DETAILS & NOTES |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-B3 - BASEMENT LEVEL 3 FIRE SUPPRESSION |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-B2 - BASEMENT LEVEL 2 FIRE SUPPRESSION |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-B1 - BASEMENT LEVEL 1 FIRE SUPPRESSION |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-01 - LEVEL 1 FIRE SUPPRESSION |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-02 - LEVEL 2 FIRE SUPPRESSION |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-03 - LEVEL 3 FIRE SUPPRESSION |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-04 - ATTIC LEVEL FIRE SUPPRESSION |
| ORCA_150025_FIRE SUPRESSION - Sheet - FS2-05 - EXTERIOR ELEVATION - MIST FIRE SUPPRESSION |
File details come from the government source that posted it. Updated .