A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_1_-_164.pdf

PDF 21 MB Posted

Attached to
ORCA 150025 - Correct Life Safety and Critical Def
Solicitation number
140P2019R0045
Issued by

About this file

This document contains structural calculations for a federal construction project. The National Park Service is seeking proposals to correct life safety and critical deficiencies at the Oregon Caves Chateau, a National Historic Landmark. Key work includes installing a fire suppression system, upgrading egress doors and accessibility, adding a three-story elevator, replacing plumbing and electrical systems, and structural reinforcement. Steel balconies will also be added to meet fire code. The estimated price range is over $10 million. The period of performance is from April 2020 to September 2021. Interested parties should monitor the Federal Business Opportunities website for solicitation documents expected to be released on or around October 21, 2019.

Appendix B - Structural Calculations Pages 1 - 164

View the file

Other files

File Type Posted
01 27 00-Definition of Contract Line Items_ORCA Amend 4_0004.pdf PDF
140P2019R0045 Amend 4 SOC_0004.pdf PDF
07_ContractPriceSchedule_ORCA150025_Amend 4_0004.xls XLS spreadsheet
Sol_140P2019R0045_Amd_0004.pdf PDF
09 80 00 Fiberboard Wall Ceiling Treatment_ORCA_0003.pdf PDF
Sol_140P2019R0045_Amd_0003.pdf PDF
B03_Wage_Determination_OR20200039 1-3-2020_0003.pdf PDF
140P2019R0045 Amend 3 SOC_0003.pdf PDF
Sol_140P2019R0045_Amd_0001.pdf PDF
Sol_140P2019R0045_Amd_0002.pdf PDF
00 01 10 Table of Contents_ORCA_r1_0002.pdf PDF
140P2019R0045 Amend 1 SOC.updated_0002.pdf PDF
09 80 00 Fiberboard Wall & Ceiling Treatment_0002.pdf PDF
Sign-in sheet_0002.pdf PDF
L8.03 Landscape Details - A1_0002.pdf PDF
A06_Specs_03_XAPPENDIX-C_ORCA_Chateau_Hazardous_Materials_Report.pdf PDF
A06_Specs_03_XAPPENDIX-D_ORCA_Fire_Protection_Basis_of_Design.pdf PDF
A06_Specs_03_XAPPENDIX-A_ORCA_Geotech_Report.pdf PDF
A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_165_-_330.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
B08_Solic_Contract_Price_Schedule_ORCA150025_FINAL.xls XLS spreadsheet
A06_Dwgs_01_ORCA_100CD_FINAL_0_TITLE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_3_ARCHITECTURE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_6_PLUMBING.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_8_ELECTRICAL.pdf PDF
B08_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Solic_140P2019R0045_SF_1442_&_Clauses.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-01.pdf PDF
B08_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Solic_SF24-16d.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_7_MECHANICAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_4_FIRE_SUPPRESSION.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_2_STRUCTURAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_5_FIRE_DETECTION.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-15-48.pdf PDF
B03_Wage_Determination_OR20190039_8-30-19.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-02-14.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_1_LANDSCAPE.pdf PDF
B08_Solit_PSP_Cover.rtf RTF text file
B08_Solit_PSP_Vol_II_Equals.doc DOC document
B08_Solit_PSP_Vol_II_HazMat.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Structural Calculations

Oregon Caves Chateau

Oregon Caves National Monument 20000 Caves Highway, OR

September 13, 2019

CONSTRUCTION DRAWINGS

Prepared by:

48 Colin P. Kelly Street, San Francisco, CA 94107 T 415 989 9900

F 415 989 9909 www.soha.com

Prepared for:

ARG ARCHITECTS

SOHA Job Number: 170901.00

DATE SIGNED: 9/3/2019

48 Colin P. Kelly Street San Francisco, CA 94170

Tel: (415) 989 - 9900

Fax: (415) 989 - 9909

Project: ORCA

Job No. 170901.00

Date: November 15, 2018 By: GWC

Table of Contents

Contents Page No.

Balcony Framing BF-1

Fire Escapes FX-1

Level 1 Ramp L1R-1

Raised B2 Storage B2S-1

Miscellaneous Calculations MC-1

-Cedar Rail Posts MC-2 -Balcony Railing MC-4

-Elevator Guiderail Support MC-8

-Stairs MC-11

BALCONY FRAMING

Structural Narrative

Condition Summary

The original structure had a timber framed balcony that was demolished. This project will restore this feature.

Rehabilitation

New Balcony will be steel framed with HSS 8x8 Moment Frame Beams and Columns.

They will be clad in non-structural cedar to simulate the former balcony’s aesthetic.

The structure is self-supporting for gravity loads and seismic loads. The gravity design considers 100 psf live load, 190 psf snow load + drift at upper level. The framing is log joist supporting decking. The log joists are supported by the HSS framing. Seismic Design considers snow load as a seismic mass. Foundations will be supported by design-build micro-piles at each HSS column location.

BF-1

BF-2

BF-3

BF-4

BF-5

BF-6

BF-7

BF-8

BF-9

BF-10

BF-11

BF-12

BF-13

BF-14

BF-15

BF-16

BF-17

BF-18

BF-19

BF-20

BF-21

BF-22

BF-23

BF-24

BF-25

BF-26

BF-27

BF-28

BF-29

BF-30

BF-31

BF-32

BF-33

BF-34

BF-35

BF-36

BF-37

BF-38

BF-39

BF-40

BF-41

BF-42

BF-43

BF-44

BF-45

BF-46

BF-47

BF-48

BF-49

BF-50

BF-51

BF-52

BF-53

BF-54

BF-55

BF-56

BF-57

BF-58

BF-59

BF-60

BF-61

BF-62

BF-63

BF-64

BF-65

BF-66

BF-67

BF-68

BF-69

BF-70

BF-71

BF-72

BF-73

BF-74

BF-75

BF-76

BF-77

BF-78

BF-79

BF-80

BF-81

BF-82

BF-83

BF-84

BF-85

BF-86

BF-87

BF-88

BF-89

BF-90

BF-91

BF-92

BF-93

BF-94

BF-95

BF-96

BF-97

BF-98

BF-99

BF-100

BF-101

BF-102

FIRE ESCAPES

Structural Narrative

Condition Summary

The original structure had wood-framed fire escapes from Levels 1 and 2. The existing metal-framed fire escapes have replaced the original. The existing Fire Escapes’ metal framing are to be replaced and reconfigured.

Rehabilitation

The Fire Escapes will have aluminum grating floors and 6x Alaskan Cedar cantilevered beams at 48”o.c. Dead Load, Snow Load and Ice Loading has been considered. Snow load governs over 100 psf live load. Additionally, the existing floor framing is cut and re-supported to accommodate the new 6x cantilevered beams.

The design considers the cases of full snow load on the fire escape cantilevers only and full snow load on both the roof and fire escape cantilevers.

FX-1

FX-2

FX-3

FX-4

FX-5

FX-6

FX-7

FX-8

FX-9

FX-10

FX-11

FX-12

FX-13

FX-14

FX-15

FX-16

FX-17

FX-18

FX-19

FX-20

FX-21

FX-22

FX-23

FX-24

FX-25

FX-26

FX-27

FX-28

FX-29

FX-30

FX-31

FX-32

FX-33

FX-34

FX-35

FX-36

FX-37

FX-38

FX-39

FX-40

FX-41

FX-42

FX-43

FX-44

FX-45

FX-46

FX-47

FX-48

FX-49

FX-50

FX-51

FX-52

FX-53

FX-54

FX-55

FX-56

FX-57

FX-58

FX-59

FX-60

170901.00 COVER PAGE (signed)
170901.00 CONTENTS
170901.00 01
170901.00 02
02
170901.00 02A
170901.00 02B
170901.00 02C
170901.00 02D
170901.00 03
170901.00 04
170901.00 05

File details come from the government source that posted it. Updated .