07_ContractPriceSchedule_ORCA150025_Amend 4_0004.xls

XLS spreadsheet 30 KB Posted

Attached to
ORCA 150025 - Correct Life Safety and Critical Def
Solicitation number
140P2019R0045
Issued by

About this file

This document provides details for a federal construction contract solicitation to correct life safety and critical deficiencies at the Oregon Caves Chateau. The solicitation will be issued on or about October 21, 2019 seeking responses from contractors to perform work including fire suppression and detection system installation, egress door replacements, structural deficiency corrections, and accessibility improvements. Eligible offerors must be registered in the System for Award Management. The estimated price range for the project is over $10 million and the period of performance is from April 2020 through September 2021. The solicitation will provide instructions for submitting proposals. The National Park Service is the contracting agency and the work location is the Oregon Caves National Monument and Preserve.

View the file

Other files

File Type Posted
01 27 00-Definition of Contract Line Items_ORCA Amend 4_0004.pdf PDF
140P2019R0045 Amend 4 SOC_0004.pdf PDF
Sol_140P2019R0045_Amd_0004.pdf PDF
09 80 00 Fiberboard Wall Ceiling Treatment_ORCA_0003.pdf PDF
Sol_140P2019R0045_Amd_0003.pdf PDF
B03_Wage_Determination_OR20200039 1-3-2020_0003.pdf PDF
140P2019R0045 Amend 3 SOC_0003.pdf PDF
Sol_140P2019R0045_Amd_0001.pdf PDF
Sol_140P2019R0045_Amd_0002.pdf PDF
00 01 10 Table of Contents_ORCA_r1_0002.pdf PDF
140P2019R0045 Amend 1 SOC.updated_0002.pdf PDF
09 80 00 Fiberboard Wall & Ceiling Treatment_0002.pdf PDF
Sign-in sheet_0002.pdf PDF
L8.03 Landscape Details - A1_0002.pdf PDF
A06_Specs_03_XAPPENDIX-C_ORCA_Chateau_Hazardous_Materials_Report.pdf PDF
A06_Specs_03_XAPPENDIX-D_ORCA_Fire_Protection_Basis_of_Design.pdf PDF
A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_1_-_164.pdf PDF
A06_Specs_03_XAPPENDIX-A_ORCA_Geotech_Report.pdf PDF
A06_Specs_03_XAPPENDIX-B_ORCA_STRUCT_CALCS_201900913_Pages_165_-_330.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
B08_Solic_Contract_Price_Schedule_ORCA150025_FINAL.xls XLS spreadsheet
A06_Dwgs_01_ORCA_100CD_FINAL_0_TITLE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_3_ARCHITECTURE.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_6_PLUMBING.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_8_ELECTRICAL.pdf PDF
B08_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Solic_140P2019R0045_SF_1442_&_Clauses.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-01.pdf PDF
B08_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Solic_SF24-16d.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_7_MECHANICAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_4_FIRE_SUPPRESSION.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_2_STRUCTURAL.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_5_FIRE_DETECTION.pdf PDF
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-15-48.pdf PDF
B03_Wage_Determination_OR20190039_8-30-19.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
A06_Specs_02_ORCA_100CD_FINAL_SPECS-DIV-02-14.pdf PDF
A06_Dwgs_01_ORCA_100CD_FINAL_1_LANDSCAPE.pdf PDF
B08_Solit_PSP_Cover.rtf RTF text file
B08_Solit_PSP_Vol_II_Equals.doc DOC document
B08_Solit_PSP_Vol_II_HazMat.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

CONTRACT PRICE SCHEDULE - REVISED AMENDMENT NO. 0004
SOLICITATION NUMBER: 140P2019R0045
PARK - PMIS: ORCA - 150025
DEVELOPED AREA: Oregon Caves Chateau
PROJECT TITLE: Correct Life Saftey and Critical Deficiencies at Oregon Caves Chateau
Notice: Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all Option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. Refer to Solicitation Section "H" for additional information regarding contract options.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Base Scope1Lump Sum
TOTAL BASE PRICE (Contract Line Item Number 1) ------------------------------------------------------------
2OPTION A - Balcony Reconstruction1Lump Sum
3OPTION B - Coffee Shop Lighting1Lump Sum
4OPTION C - Wainscot Paneling at Level B1 to be African Cherry veneer versus redwood1Lump Sum
5OPTION D - Mist Sprinkler System at Building Exterior1Lump Sum
6OPTION E - Replacment of plumbing piping at Basement 3.1Lump Sum
7OPTION F - Replacment high efficiency Boiler1Lump Sum
8OPTION G - Replacement of electric strip heaters at office areas with hydronic radiator1Lump Sum
9OPTION H - Replacement of electric forced air heaters remaining in B2 employee and cafeteria areas with new electric heaters1Lump Sum
10OPTION J - Full renovation of bathrooms including replacement of existing bathtub or shower pan, wall, floor, and ceiling finishes, new light fixture, and new toilet room accessories at Levels 2 and 31Lump Sum
11OPTION K - Replacement of carpeting throughout levels 2 and 31Lump Sum
12OPTION L - Replacement of all non-historic light fixtures throughout Levels 2 and 3 and at staff bedrooms at B21Lump Sum
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 2 through 12) ------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 12) -----------
All measurement and payment information is included in the project specifications, Section 012700.

&RORCA - 150025

CPS - &P

File details come from the government source that posted it. Updated .