SECTION_03_40_00_-_Precast_Concrete_R2_0004.pdf

PDF 127 KB Posted

Attached to
Oglala Dam Construction Federal contract opportunity
Solicitation number
140A1623R0026
Issued by
Department of the Interior Bureau of Indian Affairs Central Office

About this file

This technical specification covers precast concrete requirements for the Oglala Dam Remediation Project solicited by the Bureau of Indian Affairs under solicitation number 140A1623R0026. Key precast concrete elements required include a prefabricated control building, precast manholes for toe drains, an optional precast diversion intake structure, and a precast concrete mat for toe drain weir boxes. The specification defines material standards, design submittal requirements, quality control procedures, manufacturing qualifications, installation and storage requirements. Approved precast concrete manufacturers include Divine Concrete and Vaughn Concrete Products, with others acceptable if approved.

View the file

Other files for this federal contract opportunity

Other files attached to Oglala Dam Construction, newest first.
File Type Posted
SECTION_00_41_23_-_Bid_Form_Rev6_0006.docx DOCX document
SECTION_01_20_00_-_Price_and_Payment_Procedures_Rev3_0006.docx DOCX document
Sol_140A1623R0026_Amd_0006.pdf PDF
SECTION_35_20_17_-_Gate_Hydraulic_Operating_Unit_R3_0005.pdf PDF
069_SP-S-15_SERVICE_SPILLWAY_CVC_DETAILS_0005.pdf PDF
Sol_140A1623R0026_Amd_0005.pdf PDF
SECTION_00_41_23_-_Bid_Form_R5_0005.pdf PDF
067_SP-S-14_SERVICE_SPILLWAY_STILLING_BASIN_DETAILS_0005.pdf PDF
SECTION_02_41_20_-_Piezometer_Abandonment_R2_0004.pdf PDF
SECTION_31_23_19_-_Dewatering_R1_0004.pdf PDF
SECTION_01_51_38_-_Diversion_and_Care_of_Water_R2_0004.pdf PDF
SECTION_03_37_23_-_Roller-Compacted_Concrete_R1_0004.pdf PDF
SECTION_00_41_23_-_Bid_Form_R4_0004.pdf PDF
E_Revised_Solicitation_SECTION_M_0004.pdf PDF
B08_A6_Solicitation_Questions_and_Answers_Log_Round_2_0004.pdf PDF
Sol_140A1623R0026_Amd_0004.pdf PDF
SECTION_01_50_00_-_Temporary_Facilities_and_Controls_R1_0004.pdf PDF
SECTION_35_20_17_-_Gate_Hydraulic_Operating_Unit_R1_0004.pdf PDF
SECTION_08_90_00_-_Louvers_and_Vents_R1_0004.pdf PDF
G-19_Dam_Mods_Materials_Distribution_Chart_0004.pdf PDF
SECTION_01_45_00_-_Quality_Control_R1_0004.pdf PDF
SECTION_03_34_13_-_Controlled_Low_Strength_Material_R1_0004.pdf PDF
SECTION_33_05_24_-_Welded_Steel_Pipe___Fittings_R1_0004.pdf PDF
SECTION_01_11_00_-_Summary_of_Work_R2_0004.pdf PDF
G-23_Structural_Standard_Notes_0004.pdf PDF
SECTION_31_56_13_-_Deep_Mix_Method_(DMM)_Walls_R2_0004.pdf PDF
SECTION_03_40_00_-_Precast_Concrete_R1_0003.pdf PDF
SECTION_02_41_20_-_Piezometer_Abandonment_R1_0003.pdf PDF
SECTION_01_51_38_-_Diversion_and_Care_of_Water_R1_0003.pdf PDF
SECTION_03_34_13_-_Controlled_Low_Strength_Material_R1_0003.pdf PDF
SECTION_02_41_13_-_Selective_Site_Demolition_R1_0003.pdf PDF
Preliminary_RCC_Mix_Design_Report_0003.pdf PDF
Sol_140A1623R0026_Amd_0003.pdf PDF
SECTION_31_23_13_-_Subgrade_Preparation_R1_0003.pdf PDF
SECTION_13_60_00_-_Manufactured_Home_Installation_R2_0003.pdf PDF
SECTION_03_37_23_-_Roller-Compacted_Concrete_R1_0003.pdf PDF
Oglala_As-Built_Drawings_0003.pdf PDF
SECTION_00_41_23_-_Bid_Form_R3_0003.pdf PDF
SECTION_01_20_00_-_Price_and_Payment_Procedures_Rev_1_0003.pdf PDF
Oglala_Dam_GDR_Final_0002.pdf PDF
Sol_140A1623R0026_Amd_0001.pdf PDF
B08_A8_SF-25_Performance_Bond_Form.pdf PDF
B08_A7_SF-24_Bid_Bond_Form.pdf PDF
B08_A1_Pricing_Schedule.pdf PDF
B08_A6_Solicitation_Questions_and_Answers_Log.xlsx XLSX spreadsheet
Sol_140A1623R0026.pdf PDF
B08_A9_SF-25A_Payment_Bond_Form.pdf PDF
B08_A5_DOL_Wage_Determination.pdf PDF
B08_A4_Investing_in_America_Brand_Guide.pdf PDF
B08_A2_SOW_and_Technical_Specifications.pdf PDF
Show all 50

Oglala Dam Construction has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUREAU OF INDIAN AFFAIRS OGLALA DAM SPILLWAY AND OUTLET WORKS

OGLALA DAM SPILLWAY AND OUTLET WORKS SECTION 03 40 00

JUNE 2023 PRECAST CONCRETE

FOR BID REV 2 PAGE 1 OF 4

SECTION 03 40 00

PRECAST CONCRETE

GENERAL

1.01 SCOPE OF WORK

A. This Section specifies the requirements for precast concrete, including the following:

Prefabricated concrete control building, complete with all appurtenances.

Precast manholes for toe drains.

Diversion Intake Structure at CONTRACTOR’s option.

Precast concrete mat for toe drain weir boxes.

1.02 REFERENCES

A. American Concrete Institute (ACI)

ACI 117 Standard Specifications for Tolerances for Concrete Construction and Materials

ACI 301 Specifications for Structural Concrete

B. ASTM International (ASTM)

ASTM A48 Standard Specification for Gray Iron Castings

ASTM C150 Standard Specification for Portland Cement

ASTM C478 Standard Specification for Precast Reinforced Concrete Manhole Sections

ASTM C595 Standard Specification for Blended Hydraulic Cements

ASTM C857 Minimum Structural Design Loading for Underground Precast Concrete Utility Structures

ASTM C858 Standard Specification for Underground Precast Concrete Utility Structures

ASTM C923 Resilient Connections Between Reinforced Concrete Manhole Structures, Pipes, and Laterals

ASTM C990 Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants

C. AASHTO Standard Specifications

BUREAU OF INDIAN AFFAIRS SECTION 03 40 00

FOR BID REV 2 PAGE 2 OF 4

1.03 SUBMITTALS

A. Shop Drawings

Shop Drawings shall include unit dimensions, section details, finishes, reinforcement, connection details, lifting and erection inserts, other embedded items, the alignment of pipe blockouts, proposed methods of anchoring used to secure adjacent concrete sections, and layout diagrams identifying installation locations and identification marks.

Product Data: Manufacturer’s literature, specifications, and load tables for materials to be used in precast Work.

B. Administrative

Design Data:

a. Complete design computations of each precast concrete unit, including the axial forces and diaphragm forces due to lateral loads and of the connections and anchorage systems. Computations shall be signed and sealed by a licensed Professional Engineer. Professional Engineer’s seal shall be clearly legible, including jurisdiction of registration, registration number, and name on seal.

b. Certification by Professional Engineer that design of precast concrete units was performed in accordance with performance and design criteria stated in the Contract Documents, and that design complies with Laws and Regulations.

C. Quality Control

Certificates:

a. Manufacturer’s certification of compliance with Professional Engineer’s design.

b. CONTRACTOR’s certification off source of supply for construction materials.

Manufacturer’s Instructions:

a. Instructions and recommendations for handling, storing, protecting the products furnished.

b. Installation instructions for the products furnished, including setting drawings, templates, and directions and tolerances for installing anchorage systems.

Source Quality Control Submittals:

a. Laboratory test results, evaluation reports, and other data as required for the source quality control tests and inspections required to demonstrate compliance with the Contract Documents for the following materials:

1) Concrete materials, cylinders, and mix design tests.

2) Certified copies of mill reports covering chemical and physical properties of miscellaneous metal materials.

FOR BID REV 2 PAGE 3 OF 4

Supplier Reports:

a. Submit written report of results of each visit to site by Supplier’s service personnel, including purpose and time of visit, tasks performed, and results obtained. Submit within two days of completion of visit to the Site.

Qualifications Statements: Submit qualifications for the following:

a. Manufacturer, when requested by BIA Representative.

b. Professional Engineer.

c. Installer.

d. Welders’ certifications.

1.04 QUALITY CONTROL

A. Manufacturer shall have a minimum of 5 years of experience in the manufacture of similar structures.

B. Professional Engineer shall be a licensed Professional Engineer and have a minimum of 5 years of experience in the design of similar structures.

C. Installer shall have a minimum of 5 years of experience installing similar structures.

D. Welder shall be a certified welder for the types of welds required for proposed connection types.

1.05 QUALITY ASSURANCE

A. After installation, CONTRACTOR shall demonstrate to the BIA Representative that the structures have been properly installed, level, with tight joints, at the correct elevations and orientations, and that backfill has been placed in accordance with the Specifications.

1.06 PRODUCT DELIVERY, HANDLING, AND STORAGE

A. Lift and support units only at designated lifting and supporting points.

B. Transport units in a manner that will not result in overstressing or damage during delivery, handling, and storage of units.

C. Provide storage location where units will be protected from vehicular traffic and other potential sources of damage. Units should be stored on concrete slab, wood or visqueen. Do not place units directly on earth during storage.

D. Place stored units so that identification marks are discernible.

1.07 MANUFACTURERS

A. Precast Concrete

Divine Concrete, 104 Highway 18, Colome, SD 57317.

FOR BID REV 2 PAGE 4 OF 4

Vaughn Concrete Products, 2671 So. Greeley HWY, Cheyenne, WY 82007.

Oldcastle Infrastructure.

Or approved equal.

1.08 TOE DRAIN WEIR BOX PRECAST MAT

Work shall be performed in accordance with ACI 301.

Reinforced, precast concrete mat shall be a minimum of 6 inches thick and constructed to the dimensions shown on the Drawings.

Reinforcement shall consist of 4x4 - W2.9xW2.9 WWF.

Minimum concrete compressive strength (f’c) shall be 4,000 psi.

PRODUCTS

2.01 PRECAST

A. Concrete and reinforcement used in the construction of structures shall conform to the requirements of Section 03 30 00 – Cast-in-Place Concrete.

B. Cast wall pipes and holes for pipe penetrations at the elevations and sizes indicated on the Drawings and also as required for CONTRACTOR-designed hydraulic line alignments, and as coordinated with the AGENCY for future equipment.

C. Joint Sealer for the precast sections shall be flexible material such as CONSEAL or approved equal.

EXECUTION

3.01 WORKMANSHIP

A. The precast concrete structures shall be installed on the top of the non-overflow section as shown on the drawings and in conformance with the manufacturer’s written instruction.

B. Tolerances shall be in accordance with ACI 117.

END OF SECTION