This document contains plans for an emergency spillway site at the Oglala Dam. The plans show the location of the existing dam and reservoir, underground utilities, wetlands, and two trailer homes that are to be relocated by the contractor and replaced with new manufactured homes. The limits of disturbance and construction for the emergency spillway channel are delineated. Notes specify that the contractor must relocate the two existing trailer homes and install two new manufactured homes in a location determined by the Bureau of Indian Affairs and Oglala Sioux Tribe, and refer to specification sections for requirements regarding the new manufactured homes and their installation.

The related federal contract opportunity is solicitation number 140A1623R0026 for the Oglala Dam Reconstruction Project issued by the Department of the Interior Bureau of Indian Affairs Central Office. The solicitation seeks bids for the Oglala Dam Remediation Project and lists the contract attachments in Section J.

View the file

Other files for this federal contract opportunity

Other files attached to Oglala Dam Construction, newest first.
File Type Posted
SECTION_00_41_23_-_Bid_Form_Rev6_0006.docx DOCX document
SECTION_35_20_17_-_Gate_Hydraulic_Operating_Unit_R3_0005.pdf PDF
069_SP-S-15_SERVICE_SPILLWAY_CVC_DETAILS_0005.pdf PDF
Sol_140A1623R0026_Amd_0005.pdf PDF
B08_A6_Solicitation_Questions_and_Answers_Log_Round_3_FINAL_0005.pdf PDF
SECTION_02_41_20_-_Piezometer_Abandonment_R2_0004.pdf PDF
SECTION_31_23_19_-_Dewatering_R1_0004.pdf PDF
SECTION_01_51_38_-_Diversion_and_Care_of_Water_R2_0004.pdf PDF
SECTION_03_37_23_-_Roller-Compacted_Concrete_R1_0004.pdf PDF
SECTION_00_41_23_-_Bid_Form_R4_0004.pdf PDF
E_Revised_Solicitation_SECTION_M_0004.pdf PDF
B08_A6_Solicitation_Questions_and_Answers_Log_Round_2_0004.pdf PDF
Sol_140A1623R0026_Amd_0004.pdf PDF
SECTION_01_50_00_-_Temporary_Facilities_and_Controls_R1_0004.pdf PDF
SECTION_35_20_17_-_Gate_Hydraulic_Operating_Unit_R1_0004.pdf PDF
SECTION_08_90_00_-_Louvers_and_Vents_R1_0004.pdf PDF
G-19_Dam_Mods_Materials_Distribution_Chart_0004.pdf PDF
SECTION_01_45_00_-_Quality_Control_R1_0004.pdf PDF
SECTION_03_40_00_-_Precast_Concrete_R2_0004.pdf PDF
SECTION_03_34_13_-_Controlled_Low_Strength_Material_R1_0004.pdf PDF
SECTION_33_05_24_-_Welded_Steel_Pipe___Fittings_R1_0004.pdf PDF
SECTION_01_20_00_-_Price_and_Payment_Procedures_Rev_2_0004.pdf PDF
OW-S-01_Outlet_Works_Diversion_Intake_Structure_0004.pdf PDF
SECTION_31_56_23_-_Soil-Cement-Bentonite_Cutoff_Wall_R2_0004.pdf PDF
SECTION_03_30_00_-_Cast_in_Place_Concrete_R3_0004.pdf PDF
EM-C-11_Embankment_Details_0004.pdf PDF
SECTION_03_40_00_-_Precast_Concrete_R1_0003.pdf PDF
SECTION_02_41_20_-_Piezometer_Abandonment_R1_0003.pdf PDF
SECTION_01_51_38_-_Diversion_and_Care_of_Water_R1_0003.pdf PDF
SECTION_03_34_13_-_Controlled_Low_Strength_Material_R1_0003.pdf PDF
SECTION_02_41_13_-_Selective_Site_Demolition_R1_0003.pdf PDF
Preliminary_RCC_Mix_Design_Report_0003.pdf PDF
Sol_140A1623R0026_Amd_0003.pdf PDF
SECTION_03_30_00_-_Cast_in_Place_Concrete_R2_0003.pdf PDF
SECTION_31_23_13_-_Subgrade_Preparation_R1_0003.pdf PDF
SECTION_13_60_00_-_Manufactured_Home_Installation_R2_0003.pdf PDF
SECTION_03_37_23_-_Roller-Compacted_Concrete_R1_0003.pdf PDF
Sol_140A1623R0026_Amd_0002.pdf PDF
Oglala_Dam_GDR_Final_0002.pdf PDF
Sol_140A1623R0026_Amd_0001.pdf PDF
B08_A8_SF-25_Performance_Bond_Form.pdf PDF
B08_A7_SF-24_Bid_Bond_Form.pdf PDF
B08_A1_Pricing_Schedule.pdf PDF
B08_A6_Solicitation_Questions_and_Answers_Log.xlsx XLSX spreadsheet
Sol_140A1623R0026.pdf PDF
B08_A3_Plans_and_Drawings.pdf PDF
B08_A9_SF-25A_Payment_Bond_Form.pdf PDF
B08_A5_DOL_Wage_Determination.pdf PDF
B08_A4_Investing_in_America_Brand_Guide.pdf PDF
B08_A2_SOW_and_Technical_Specifications.pdf PDF
Show all 50

Oglala Dam Construction has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACCESS ROAD

EMERGENCY SPILLWAY

OGLALA RESERVOIR

(DEWATERED)

SEWAGE TREATMENT POND

(CURRENTLY NON-OPERATIONAL)

X

X

X X

X

EXISTING OGLALA NEIGHBORHOOD

UNDERGROUND ELECTRIC

OVERHEAD ELECTRIC

WATER LINE

EXISTING EMBANKMENT

RIGHT EMERGENCY

SPILLWAY BERM,

SHEET ES-C-02

LEFT EMERGENCY

SPILLWAY BERM,

SHEET ES-C-03

TRAILER HOME

TO BE DEMOLISHED

NOTE 1

EMERGENCY SPILLWAY CHANNEL

WHITE CLAY CREEK

DISCHARGE

CHANNEL

OGLALA DAM

ESR 5+00

ESR 10+00

ESR 15+00

ESR 20+00ESR 25+00ESR 30+00

ESR 35+00ESR 40+00

U/ E

U/E

U/ E

U/E U/E

WTR

WTR

WTR

W

TR

W

TR

RESERVOIR

MNWS EL 2996.4

DELINEATED WETLANDS, TYP

APPROXIMATE LIMITS OF

EMERGENCY SPILLWAY CHANNEL

LIMITS OF

DISTURBANCE

TRAILER HOME

TO BE DEMOLISHED

NOTE 1

ESR 0+00

ESR 45+00

"NO TRESSPASSING" SIGN

MOUNTED TO PRESSURE-TREATED

POST, SHEET SP-S-18

"NO GUARDRAIL AHEAD" SIGN

MOUNTED TO PRESSURE-TREATED

POST, SHEET SP-S-18

SEWAGE TREATMENT POND

(CURRENTLY NON-OPERATIONAL)

P16 P17 P18

P19

P20

P10

P11 P12

P14

P9

P15

P13

ES

L

5+

ES

L

+0

ESL 0+00

ESL 14+00

EMBANKMENT

DISCHARGE

CHANNEL

SERVICE

SPILLWAY

EMERGENCY SPILLWAY

SITE ACCESS ROAD

\\geiconsulta B:\Working\BUREAU OF INDIAN AFFAIRS\2200324 Oglala Dam Remediation Design\00_CAD\Design\Sheets\008_G-08_EMERGENCY SPILLWAY SITE PLAN.dwg - 6/13/2023

Bureau of Indian Affairs Great Plains Region

Safety of Dams Branch

4601 DTC BOULEVARD

SUITE 325

DENVER, CO 80237

(303)662-0100

Consultants

NO DATE ISSUE/REVISION APP

0 3/10/2023 ISSUED FOR BID CMM

1 6/13/2023 AMENDMENT 4: CHANGES

FOR BIDDER QUESTIONS CMM

SHEET NAME SHEET NO.Oglala Dam Remediation Project

Spillway and Outlet Works Rehabilitation

Pine Ridge Indian Reservation, Oglala Lakota County, South Dakota

If this scale bar does not measure 1" then drawing is not original scale.

Attention:

0 1"

Designed:

Checked:

Drawn:

P.E. No:

GEI Project

Approved: SHEET NO.

EMERGENCY SPILLWAY

SITE PLAN

ISSUED FOR BID

P. EGGERS

M. WALKER

B. MARTIN

C. MASCHING

15919

G-08

2200324

SCALE: 1" = 200'

PLAN

EMERGENCY SPILLWAY SITE PLAN

KEY MAP

NOTES:

1. TWO EXISTING TRAILER HOMES CURRENTLY WITHIN

EMERGENCY SPILLWAY CHANNEL ARE TO BE

RELOCATED BY CONTRACTOR AND REPLACED WITH

TWO NEW MANUFACTURED HOMES IN A LOCATION

DETERMINED BY BIA AND THE OGLALA SIOUX TRIBE.

REFER TO SPECIFICATION XX XX XX FOR ADDITIONAL

INFORMATION REGARDING NEW MANUFACTURED

HOMES AND INSTALLATION REQUIREMENTS.

2. SEE SHEET G-09 FOR LIMITS OF DISTURBANCE

COORDINATES.

Sheets and Views
G-08 EMERGENCY SPILLWAY SITE PLAN

File details come from the government source that posted it. Updated .