067_SP-S-14_SERVICE_SPILLWAY_STILLING_BASIN_DETAILS_0005.pdf
PDF 506 KB Posted
- Attached to
- Oglala Dam Construction
- Solicitation number
- 140A1623R0026
About this file
This document package includes construction drawings and specifications for rehabilitation work at Oglala Dam, as well as the related federal contract opportunity solicitation. The drawings show construction details for rehabilitation of the dam's service spillway stilling basin, including reinforced concrete placement details, dowel placements, and baffle block configurations. The solicitation is from the Department of the Interior Bureau of Indian Affairs seeking offers for the Oglala Dam Rehabilitation Project, as described in Section J. Offerors are to remediate the dam to address safety issues. The winning contractor will be responsible for execution of spillway and outlet works rehabilitation in accordance with the specifications and drawings provided.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4" C
LR
TY
P
3" CLR
TYP
8"1' -0
" C
LR
TY
P
#8 @ 9"
EW, T&B
RCC LIFTS
BELOW
9" TYPE 1 WS
#7x24" PLAIN DOWEL
@ 12" CENTERED ON JOINT
GREASE END OF DOWEL
FOR SECOND PLACEMENT
CONTRACTION JOINT
4" CLR
TYP
#8 @ 9"
EW, T&B
#8 @ 6"
EW
#8 @ 6"
EW
#4 @ 6" TOS
RCC LIFTS
BELOW
6"10'-0"
5' -0
3' -2
#8 @ 9"
EW, T&B
RCC LIFTS
BELOW
#6 U BARS @ 6" EF
6-#4
@ 6" TOW
6-#8 @ 6"
EW, T&B
#6 ON 5'-0" x 5'-0" GRID
4" C
LR
TY
P
6"
CLR
TYP
3'-2"8"
LTE TOP, TYP
6"
2"
TYP
6"
0"
6" C
LR
TY
P
3' -2
BA
FF
LE
3'-10" MAX
BAFFLE
#6 U BAR @ 6" EF
6" CLR
TYP
4 - #8 @ 6" EF
6 - #8 @ 6" EF
\\geiconsulta B:\Working\BUREAU OF INDIAN AFFAIRS\2200324 Oglala Dam Remediation Design\00_CAD\Design\Sheets\067_SP-S-14_SERVICE SPILLWAY STILLING BASIN DETAILS.dwg - 2/23/2023
Bureau of Indian Affairs Great Plains Region
Safety of Dams Branch
4601 DTC BOULEVARD
SUITE 325
DENVER, CO 80237
(303)662-0100
Consultants
NO DATE ISSUE/REVISION APP
0 3/10/2023 ISSUED FOR BID CMM
1 7/14/2023 AMENDMENT 5: CHANGES
FOR BIDDER QUESTIONS CMM
SHEET NAME SHEET NO.Oglala Dam Remediation Project
Spillway and Outlet Works Rehabilitation
Pine Ridge Indian Reservation, Oglala Lakota County, South Dakota
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
Approved: SHEET NO.
SCALE: 1/2" = 1'-0"
SP-S-13 TRANSVERSE CONTRACTION JOINT
DETAIL
SCALE: 1/2" = 1'-0"
SP-S-13 BAFFLE BLOCK
DETAIL
SCALE: 1/2" = 1'-0"
SP-S-13 END SILL
DETAIL
SCALE: 1/2" = 1'-0"
- RCC DOWELS
DETAIL
T/STILLING BASIN SLAB
EL 2958.0'
SCALE: 3/4" = 1'-0"
- LONGITUDINAL CONTRACTION JOINT
DETAIL
T/STILLING BASIN SLAB
EL 2958.0'
-7
SCALE: 3/4" = 1'-0"
SP-S-13 CVC FACING DOWELS TO RCC
DETAIL
SERVICE SPILLWAY
STILLING BASIN
DETAILS
ISSUED FOR BID
M. PROVENCHE
M. WALKER
J. MORIN
C. MASCHING
15919
SP-S-14
2200324
C
CRJ
L
3' -0
4" C
LR
TY
P
1'-0" 1'-0"
5' -0
EM
BE
D
M
EN
T D
R
IL
LE
D
AN
D
G R
O U
TE
D
6"
CLR
RCC LIFTS
BELOW
CONVENTIONAL
CONCRETE LIFT
FIRST PLACEMENT
9" TYPE 1
WS
#7x24" PLAIN DOWEL @
12" CENTERED ON JOINT
GREASE END OF DOWEL
CONTRACTION
JOINT
CONVENTIONAL
CONCRETE LIFT
RCC LIFTS
BELOW
#8 @ 9"
EW, T&B
#6 ON 5'-0" x 5'-0" GRID
GREASE END
OF DOWEL IN
SECOND PLACEMENT
RCC LIFTS
BELOW
#6 @ 9"
EW, T&B
STILLING BASIN
SLAB
#7x24" PLAIN
DOWEL AT 12"
CNTR ON JOINT
CVC FACING
8' -0
#6 ON 5'-0" x 5'-0" GRID
NOTES:
1. NO DRILLING FOR ANCHOR EMBEDMENT TO OCCUR WITHIN 7 DAYS OF RCC PLACEMENT.
PERCUSSION DRILLING REQUIRED PRIOR TO RCC REACHING DESIGN STRENGTH TO LIMIT
DAMAGE TO RCC MATERIAL.
CONVENTIONAL
CONCRETE LIFT
SECOND PLACEMENT
SCALE: 3/4" = 1'-0"
- BAFFLE BLOCK
SECTION
6" TYPE 1
WS
file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt file:///G:/Blocks/GEI%20General/D_GEI-Section-Mark-FULL_Help.txt
| Sheets and Views |
| SERVICE SPILLWAY STILLING BASIN DETAILS |
File details come from the government source that posted it. Updated .