G-19_Dam_Mods_Materials_Distribution_Chart_0004.pdf
PDF 413 KB Posted
- Attached to
- Oglala Dam Construction Federal contract opportunity
- Solicitation number
- 140A1623R0026
About this file
This document provides a materials distribution chart for the Oglala Dam Remediation Project being undertaken by the Bureau of Indian Affairs. The chart details excavation and placement quantities for various construction materials including 374,360 cubic yards of excavation, 151,310 cubic yards for embankment fill, and 47,500 cubic yards for common fill. It also specifies furnish quantities for processed filter sand, drain gravel, riprap, bedding stones, and aggregate base course. The related federal contract opportunity is solicitation number 140A1623R0026 for the Oglala Dam Construction project being issued by the Department of the Interior Bureau of Indian Affairs Central Office.
View the file
Other files for this federal contract opportunity
Show all 50
Oglala Dam Construction has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUIRED EXCAVATION MATERIAL SOURCES
BID ITEM 9
374,360 CY
EXCAVATION
10,200 CY
UPSTREAM
COFFERDAM
FILL
ONSITE
DISPOSAL
10,200 CY
BID ITEM 23
EMBANKMENT
FILL
151,310 CY
BID ITEM 24
COMMON FILL
47,500 CY
12,600 CY
FURNISH
PROCESSED
FILTER SAND
1,370 CY
FURNISH
PROCESSED
DRAIN GRAVEL
3,980 CY
FURNISH
COARSE
RIPRAP BEDDING
880 CY
RCC DRAIN
FILTER SAND
6,090 CY
SLOPING DRAIN
FILTER SAND
1,670 CY
BLANKET DRAIN
AND TOE DRAIN
SAND
1,170 CY
BLANKET DRAIN
GRAVEL
200 CY
TOE DRAIN
GRAVEL
8,140 CY
FURNISH
CLASS B
RIPRAP
3,950 CY
UPSTREAM SLOPE
PROTECTION
RIPRAP
1,980 CY
UPSTREAM SLOPE
PROTECTION
BEDDING
3,960 CY
RIPRAP
FILTER SAND
1.0 1.01.0 1.0
EX
C
AV
AT
IO
N
PL
AC
EM
EN
T
1.0
BID ITEM 35
EMERGENCY
SPILLWAY TRAINING
BERMS
29,300 CY
54,820 CY
ONSITE
DISPOSAL
WITHIN WETTED
PERIMTER
91,430 CY
EXCAVATION
DISPOSAL ON-SITE
ONSITE
DISPOSAL
44,620 CY
OFFSITE
DISPOSAL
91,430 CY
BID ITEM 10
BID ITEM 25 BID ITEM 26 BID ITEM 29BID ITEM 27
920 CY
AGGREGATE BASE
COURSE
920 CY
BASE COURSE FOR
EMBANKMENT CREST
AND STILLING BASIN
ACCESS
1.0
BID ITEM 30
60 CY
BANK STONE
PROTECTION
60 CY
BANK STONE
PROTECTION
PLACEMENT
1.0
BID ITEM 31
800 CY
DOWNSTREAM
APRON RIPRAP
3,390 CY
LEFT EMERGENCY
SPILLWAY BERM
RIPRAP
300 CY
DOWNSTREAM
APRON
BEDDING
1,700 CY
LEFT EMERGENCY
SPILLWAY BERM
BEDDING
FU
R
N
IS
H
ED
M
AT
ER
IA
LS
PL
AC
EM
EN
T
1,200 CY
BASE COURSE FOR
ACCESS ROAD
REHABILITATION
\\geiconsulta B:\Working\BUREAU OF INDIAN AFFAIRS\2200324 Oglala Dam Remediation Design\00_CAD\Design\Sheets\019_G-19_DAM MODIFICATIONS MATERIALS DISTRIBUTION CHART 1.dwg - 3/10/2023
Bureau of Indian Affairs Great Plains Region
Safety of Dams Branch
4601 DTC BOULEVARD
SUITE 325
DENVER, CO 80237
(303)662-0100
Consultants
NO DATE ISSUE/REVISION APP
0 3/10/2023 ISSUED FOR BID CMM
1 6/13/2023 AMENDMENT 4: CHANGES
FOR BIDDER QUESTIONS CMM
SHEET NAME SHEET NO.Oglala Dam Remediation Project
Spillway and Outlet Works Rehabilitation
Pine Ridge Indian Reservation, Oglala Lakota County, South Dakota
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
Approved: SHEET NO.
DAM
MODIFICATIONS
MATERIALS
DISTRIBUTION CHART
(SHEET 1 OF 2)
ISSUED FOR BID
P. EGGERS
M. WALKER
C. MAGILL
C. MASCHING
15919
G-19
2200324
NOTES:
1. THE MATERIALS DISTRIBUTION CHART IS INTENDED TO
PROVIDE A GRAPHICAL DEPICTION OF REQUIRED
EXCAVATIONS AND DISPOSITIONS OF EXCAVATED
MATERIALS AND ASSUMED MATERIAL IMPORTS. REFER TO
SECTION 01 20 00 PRICE AND PAYMENT PROCEDURES
| Sheets and Views |
| G-19 DAM MODS MATERIALS DISTRIBUTION CHART 1 OF 2 |
File details come from the government source that posted it. Updated .