OW-S-01_Outlet_Works_Diversion_Intake_Structure_0004.pdf

PDF 361 KB Posted

Attached to
Oglala Dam Construction Federal contract opportunity
Solicitation number
140A1623R0026
Issued by
Department of the Interior Bureau of Indian Affairs Central Office

About this file

This document package includes engineering drawings and specifications for an outlet works diversion intake structure, along with details of a related federal contract opportunity. The engineering drawings depict plans, elevations, and sections of a precast or cast-in-place concrete intake structure with a trashrack and connection to a 36-inch HDPE diversion pipe. Notes specify the intake structure and trashrack design requirements to resist uplift and equivalent fluid pressures. The related federal contract opportunity is solicitation number 140A1623R0026 for the Oglala Dam Remediation Project issued by the Bureau of Indian Affairs Central Office. The solicitation seeks construction services for rehabilitation of the spillway and outlet works at Oglala Dam on the Pine Ridge Indian Reservation in South Dakota.

View the file

Other files for this federal contract opportunity

Other files attached to Oglala Dam Construction, newest first.
File Type Posted
SECTION_00_41_23_-_Bid_Form_Rev6_0006.docx DOCX document
SECTION_35_20_17_-_Gate_Hydraulic_Operating_Unit_R3_0005.pdf PDF
B08_A6_Solicitation_Questions_and_Answers_Log_Round_3_FINAL_0005.pdf PDF
069_SP-S-15_SERVICE_SPILLWAY_CVC_DETAILS_0005.pdf PDF
Sol_140A1623R0026_Amd_0005.pdf PDF
SECTION_02_41_20_-_Piezometer_Abandonment_R2_0004.pdf PDF
SECTION_31_23_19_-_Dewatering_R1_0004.pdf PDF
SECTION_01_51_38_-_Diversion_and_Care_of_Water_R2_0004.pdf PDF
SECTION_03_37_23_-_Roller-Compacted_Concrete_R1_0004.pdf PDF
SECTION_00_41_23_-_Bid_Form_R4_0004.pdf PDF
E_Revised_Solicitation_SECTION_M_0004.pdf PDF
B08_A6_Solicitation_Questions_and_Answers_Log_Round_2_0004.pdf PDF
Sol_140A1623R0026_Amd_0004.pdf PDF
SECTION_01_20_00_-_Price_and_Payment_Procedures_Rev_2_0004.pdf PDF
SECTION_31_56_23_-_Soil-Cement-Bentonite_Cutoff_Wall_R2_0004.pdf PDF
SECTION_03_30_00_-_Cast_in_Place_Concrete_R3_0004.pdf PDF
G-08_Emergency_Spillway_Site_Plan_0004.pdf PDF
EM-C-11_Embankment_Details_0004.pdf PDF
SECTION_01_50_00_-_Temporary_Facilities_and_Controls_R1_0004.pdf PDF
SECTION_35_20_17_-_Gate_Hydraulic_Operating_Unit_R1_0004.pdf PDF
SECTION_08_90_00_-_Louvers_and_Vents_R1_0004.pdf PDF
G-19_Dam_Mods_Materials_Distribution_Chart_0004.pdf PDF
SECTION_01_45_00_-_Quality_Control_R1_0004.pdf PDF
SECTION_03_40_00_-_Precast_Concrete_R2_0004.pdf PDF
SECTION_03_34_13_-_Controlled_Low_Strength_Material_R1_0004.pdf PDF
SECTION_33_05_24_-_Welded_Steel_Pipe___Fittings_R1_0004.pdf PDF
SECTION_03_40_00_-_Precast_Concrete_R1_0003.pdf PDF
SECTION_02_41_20_-_Piezometer_Abandonment_R1_0003.pdf PDF
SECTION_01_51_38_-_Diversion_and_Care_of_Water_R1_0003.pdf PDF
SECTION_03_30_00_-_Cast_in_Place_Concrete_R2_0003.pdf PDF
SECTION_03_34_13_-_Controlled_Low_Strength_Material_R1_0003.pdf PDF
SECTION_02_41_13_-_Selective_Site_Demolition_R1_0003.pdf PDF
Preliminary_RCC_Mix_Design_Report_0003.pdf PDF
Sol_140A1623R0026_Amd_0003.pdf PDF
SECTION_31_23_13_-_Subgrade_Preparation_R1_0003.pdf PDF
SECTION_13_60_00_-_Manufactured_Home_Installation_R2_0003.pdf PDF
SECTION_03_37_23_-_Roller-Compacted_Concrete_R1_0003.pdf PDF
Sol_140A1623R0026_Amd_0002.pdf PDF
Oglala_Dam_GDR_Final_0002.pdf PDF
Sol_140A1623R0026_Amd_0001.pdf PDF
B08_A8_SF-25_Performance_Bond_Form.pdf PDF
B08_A7_SF-24_Bid_Bond_Form.pdf PDF
B08_A1_Pricing_Schedule.pdf PDF
B08_A3_Plans_and_Drawings.pdf PDF
B08_A6_Solicitation_Questions_and_Answers_Log.xlsx XLSX spreadsheet
Sol_140A1623R0026.pdf PDF
B08_A9_SF-25A_Payment_Bond_Form.pdf PDF
B08_A5_DOL_Wage_Determination.pdf PDF
B08_A4_Investing_in_America_Brand_Guide.pdf PDF
B08_A2_SOW_and_Technical_Specifications.pdf PDF
Show all 50

Oglala Dam Construction has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10'-0"

NOTE 1

2' -0

N O

TE

7' -6

1' -1

5/

8"

36" DIA HDPE

DIVERSION PIPE

GALV TRASHRACK,

NOTE 2

13'-8", NOTE 1

10'-0"

8' -8

N

O

TE

5' -0

36" DIA HDPE

DIVERSION

PIPE

GALV TRASHRACK,

NOTE 2

PRECAST OR

CAST-IN-PLACE

INTAKE STRUCTURE,

NOTE 1

5'-0"

7' -6

TRASHRACK NOT

SHOWN FOR CLARITY

1' -1

5/

8"

PRECAST OR

CAST-IN-PLACE

INTAKE STRUCTURE,

NOTE 1

36" DIA HDPE

DIVERSION

PIPE

5'-0"

TRASH BARS @ 6" OC

CONNECTION BY

CONTRACTOR

SUPPORT

BAR

1" x7

" P L

SU

PP

O R

T

BA

R S

'-6 " O

C

'-4

/4

5'-10"

1"x2.75: PL TRASH BARS @ 6" OC

\\geiconsulta B:\Working\BUREAU OF INDIAN AFFAIRS\2200324 Oglala Dam Remediation Design\00_CAD\Design\Sheets\073_OW-S-01_OUTLET WORKS DIVERSION INTAKE STRUCTURE .dwg - 11/15/2022

Bureau of Indian Affairs Great Plains Region

Safety of Dams Branch

4601 DTC BOULEVARD

SUITE 325

DENVER, CO 80237

(303)662-0100

Consultants

NO DATE ISSUE/REVISION APP

0 3/10/2023 ISSUED FOR BID CMM

1 6/13/2023 AMENDMENT 4: CHANGES

FOR BIDDER QUESTIONS CMM

SHEET NAME SHEET NO.Oglala Dam Remediation Project

Spillway and Outlet Works Rehabilitation

Pine Ridge Indian Reservation, Oglala Lakota County, South Dakota

If this scale bar does not measure 1" then drawing is not original scale.

Attention:

0 1"

Designed:

Checked:

Drawn:

P.E. No:

GEI Project

Approved: SHEET NO.

OUTLET WORKS

DIVERSION

INTAKE STRUCTURE

ISSUED FOR BID

P. EGGERS

M. WALKER

P. EGGERS

C. MASCHING

OW-S-01

2200324

A

B

C

PLAN

SCALE: 1/2" = 1'-0"INTAKE STRUCTURE

PLAN

SCALE: 3/4" = 1'-0"TRASHRACK

SIDE VIEW

SCALE: 3/4" = 1'-0"TRASHRACK

SCALE: 1/2" = 1'-0"

A

- INTAKE STRUCTURE

SECTION

SCALE: 1/2" = 1'-0"

B

- INTAKE STRUCTURE

SECTION

SCALE: 3/4" = 1'-0"

C

- TRASHRACK

SECTION

NOTES:

1. INTAKE STRUCTURE MAY BE PRECAST OR CAST-IN-PLACE CONCRETE. CONCRETE DIMENSIONS ARE MINIMUM DIMENSIONS. BOX STRUCTURE AND FOOTINGS TO BE DESIGNED TO RESIST UPLIFT DUE TO FULLY CLOGGED TRASHTRACK. INTAKE WALLS AND SLAB TO BE DESIGNED FOR EQUIVALENT FLUID PRESSURE OF 2500 PSF.

2. TRASHRACK TO BE DESIGNED BY CONTRACTOR FOR MAXIMUM LOADING OF 20 FEET OF DIFFERENTIAL HEAD ACROSS THE TRASHRACK. TRASHRACK MAY BE CONSTRUCTED AS A SINGLE PANEL OR MULTIPLE PANELS.

CONTRACTOR TO DESIGN CONNECTION TO INTAKE STRUCTURE. TRASHRACK SHALL BE GALVANIZED STEEL.

Sheets and Views