14-SBE-2 Goal Participation Tutorial.mp4

MP4 file 35 MB Posted

Attached to
Northwest Transfer Station Community Collection Center (NWTS CCC) Floor Upgrades
Solicitation number
IFB-26-00265
Issued by
Hillsborough County, Florida

About this file

This is a tutorial video file related to Small Business Enterprise (SBE) goal participation requirements for a Hillsborough County Board of County Commissioners construction project. The file "14-SBE-2 Goal Participation Tutorial.mp4" serves as instructional material for bidders preparing to submit competitive sealed bids for the Northwest Transfer Station Community Collection Center (NWTS CCC) Floor Upgrades project. The project scope encompasses cast-in-place concrete floor upgrades including demolition of existing concrete and asphalt paving, installation of reinforced concrete meeting ACI 301 standards with specified compressive strength requirements (6,000 psi at 28 days; 4,500 psi at 3 days), steel reinforcement installation, and related facility upgrades across three construction phases. The work includes mobilization, as-built surveys, grading, subgrade stabilization, crushed concrete base installation, steel I-beam and metal canopy placement, and construction quality control testing with documented cylinder testing at three, seven, and 28 days. Bids are due July 31, 2026 at 2:00 p.m. Eastern Time. Substantial Completion is required 150 calendar days from Notice to Proceed, with Final Completion due 180 days from Notice to Proceed. A preconstruction conference will be held prior to work commencement.

The estimated contract value is $2.24 million with an additional $200,000 allowance for Allowance Authorization, governed by Florida law with venue in Hillsborough County. A 5% Small Business Enterprise subcontractor participation goal has been established for this solicitation. Bidders must submit a 5% Earnest Money Deposit or Bid Bond and furnish Performance and Payment Bonds equal to 100% of the contract amount upon award. Progress payments are subject to 5% retainage throughout the contract. Liquidated damages are assessed at $1,000 per day for Substantial Completion delays and $750 per day for Final Completion delays. All bidders must hold a valid Florida Building Contractor (BC) license and comply with E-Verify requirements. Submission requirements include the SBE-1 Form listing all registered SBE subcontractors and material suppliers with scope of work and estimated dollar amounts, Letters of Intent or executed subcontract agreements from subcontractors, Affidavit of Compliance (Foreign Country of Concern), Drug-Free Workplace Certification, and Substitute W-9 Form. Award is made to the lowest responsive and responsible bidder meeting all specifications.

Other files

File Type Posted
Consent of Surety-Change Order.pdf.pdf PDF
23-IFB-26-00265 Payment Bond.pdf PDF
20-Blanket Additional Insured Policy Sample.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
SBE-2 Goal Participation Tutorial.mp4 MP4 file
1. IFB-26-00265 Terms and Conditions.pdf PDF
17-Attachment B - Measurement and Payment.pdf PDF
22-IFB-26-00265 Bid Bond.doc DOC document
7-Change Order Form.pdf.pdf PDF
Drug Free Workplace Form.doc.doc DOC document
IFB-26-00265 Performance Bond.pdf PDF
Attachment C - Technical Specifications.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
Allowance Authorization Release Form.pdf.pdf PDF
Application for Payment.pdf.pdf PDF
SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
4-Consent of Surety-Change Order.pdf.pdf PDF
19-Attachment D - Drawings.pdf PDF
Attachment B - Measurement and Payment.pdf PDF
Change Order Form.pdf.pdf PDF
Subcontractors Statement of Satisfaction.pdf.pdf PDF
Blanket Additional Insured Policy Sample.pdf PDF
24-IFB-26-00265 Performance Bond.pdf PDF
18-Attachment C - Technical Specifications.pdf PDF
26-1. IFB-26-00265 Terms and Conditions.pdf PDF
21-IFB-26-00265 Agreement.docx DOCX document
6-Consent of Surety to Final Payment.pdf.pdf PDF
2-Allowance Authorization Release Form.pdf.pdf PDF
16-Additional Insured Policy Sample.pdf PDF
Consent of Surety to Final Payment.pdf.pdf PDF
Subcontractor Letter of Intent .pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
Attachment D - Drawings.pdf PDF
AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
Substitute W9 Form.pdf.pdf PDF
8-Insurance Certificate.doc.doc DOC document
IFB-26-00265 Payment Bond.pdf PDF
Attachment A - Insurance Requirements.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
IFB-26-00265 Agreement.docx DOCX document
Insurance Certificate.doc.doc DOC document
Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
IFB-26-00265 Bid Bond.doc DOC document
25-Attachment A - Insurance Requirements.pdf PDF
Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
Additional Insured Policy Sample.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
3-Application for Payment.pdf.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .