11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf
PDF 99 KB Posted
- Solicitation number
- IFB-26-00265
- Issued by
- Hillsborough County, Florida
About this file
This is a Small Business Enterprise (SBE) Subcontractors/Material Suppliers List form (SBE-1 Form) issued by Hillsborough County for the Northwest Transfer Station Community Collection Center (NWTS CCC) Floor Upgrades project. The form requires bidders to list all registered SBE subcontractors and material suppliers that will be utilized on the project, including the business name, scope of work or work item number, and estimated dollar amount for each item. The project involves cast-in-place concrete floor upgrades at a Hillsborough County facility, with bids due July 31, 2026 at 2:00 p.m. Eastern Time. The scope of work encompasses demolition of existing concrete and asphalt paving, installation of cast-in-place concrete meeting ACI 301 standards with specified compressive strength requirements, steel reinforcement installation, quality control testing, and related facility upgrades across three construction phases. Substantial Completion is required 150 calendar days from Notice to Proceed with liquidated damages of $1,000 per day, and Final Completion is due 180 days from Notice to Proceed with liquidated damages of $750 per day.
The estimated contract value is $2.24 million with an additional $200,000 allowance for Allowance Authorization. A 5% Small Business Enterprise subcontractor participation goal has been established for this solicitation. Material suppliers registered as SBEs that furnish supplies but do not manufacture them will receive partial credit of 50% toward the project's SBE participation goal. All SBEs listed must be registered with Hillsborough County or demonstrate reciprocal eligibility with supporting documentation. Bidders must submit a 5% Earnest Money Deposit or Bid Bond upon submission and furnish Performance and Payment Bonds equal to 100% of the contract amount upon award. Progress payments are subject to 5% retainage throughout the contract. Failure to complete the SBE-1 Form requirements may result in the entire bid being rejected. Bidders must hold a valid Florida Building Contractor (BC) license and comply with all E-Verify requirements, insurance requirements naming Hillsborough County as Additional Insured, and other compliance certifications including Drug-Free Workplace Certification and the Affidavit of Compliance (Foreign Country of Concern).
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBE – 1 FORM
(Revised 12/2025)
HILLSBOROUGH COUNTY
SMALL BUSINESS ENCOURAGEMENT PROGRAM
SUBCONTRACTORS/MATERIAL SUPPLIERS LIST (SBE-1 FORM)
BID NO.: BIDDER NAME:
List all registered Small Business Enterprise (SBE) subcontractors/material suppliers1 to be utilized on this project.
Include business name, scope of work/work item number to be performed, and estimated dollar amount of each item.
If the solicitation is a “Work Order/Term Contract”, the “Estimated Dollar Amount” may be left blank. All SBEs that are listed as “registered” must either be registered with Hillsborough County or have reciprocal eligibility
(provide supporting documentation) as specifically set forth in the County’s solicitation document.
A Bidders failure to complete the requirements of this page may result in their entire Bid being rejected.
Registered SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated
Dollar Amount
1Material Suppliers: Registered SBE firms that furnish supplies for projects, but do not manufacture the supplies, will be partially credited at fifty percent (50%) towards the project’s SBE participation goal.
List all other subcontracted scopes of work or work item numbers to be performed by non-registered SBE subcontractors/material suppliers on this project and estimated dollar amount of each item:
Non-SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated
Dollar Amount
File details come from the government source that posted it. Updated .