Attachment_J.9_Class_B_Price_Schedule_REV_2_092222.xlsx
XLSX spreadsheet 41 KB Posted
- Solicitation number
- 1305M222RNMAN00157
About this file
This document outlines a solicitation for the detail design and construction of four Class B vessels for the National Oceanic and Atmospheric Administration (NOAA). The base requirement is for the detail design and construction of two vessels, with options to procure up to two additional vessels. Offerors must have shipyards located within the continental United States. The solicitation will result in a firm fixed price, single award contract. Pricing must be submitted using the price schedule included as an attachment, and proposals are due no later than August 16, 2022. In addition to the detail design and construction of each vessel, offerors must provide options for vendor-recommended spare parts, initial outfitting, additional crewed survey launches, and special studies and documentation to support changes to requirements. Production, engineering, and material handling rates must also be included to cover additional government requirements ordered on an as-needed basis.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
| SECTION B- PRICE SCHEDULE - REV 2 | ||||||
| Detail Design and Construction of Class B Vessels | ||||||
| RFP 1305M222RNMAN00157 | ||||||
| CLIN | DESCRIPTION | QTY | UNIT | Estimated Base Amount | Labor Rate/Markup | EXTENDED PRICE |
| BASE ITEMS | ||||||
| 0001 | NOAA CLASS B DETAIL DESIGN AND CONSTRUCTION, VESSEL #1. INCLUDES ONE CREWED SURVEY LAUNCH. | 1 | EA | NA | ||
| 0002 | OPTION - VENDOR RECOMMENDED SPARES, VESSEL #1. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.) | 1 | NTE | $ 3,000,000.00 | ||
| 0003a | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #1 - Production. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Production Rates.) | 1 | NTE | 500 Hours | ||
| 0003b | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #1 - Engineering. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.) | 1 | NTE | 500 hours | ||
| 0003c | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR, VESSEL #1 - Material. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.) | 1 | NTE | $ 100,000.00 | ||
| * See second tab for Production and Engineering hourly rates and Material Handling and Markup percentage. | ||||||
| 0004 | OPTION - INITIAL OUTFITTING, VESSEL #1. | 1 | LO | |||
| 0005 | NOT TO EXCEED (NTE) - SPECIAL STUDIES AND DOCUMENTATION, VESSEL #1. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.) | 1 | NTE | 1,000 hours | ||
| 0006 | NOAA CLASS B DETAIL DESIGN AND CONSTRUCTION, VESSEL #2. INCLUDES ONE CREWED SURVEY LAUNCH. | 1 | EA | NA | ||
| 0007 | OPTION - VENDOR RECOMMENDED SPARES, VESSEL #2. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.) | 1 | NTE | $ 3,000,000.00 | ||
| 0008a | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #2 - Production. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Production Rates.) | 1 | NTE | 500 Hours | ||
| 0008b | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #2 - Engineering. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.) | 1 | NTE | 500 hours | ||
| 0008c | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #2 - Material. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.) | 1 | NTE | $ 100,000.00 | ||
| * See second tab for Production and Engineering hourly rates and Material Handling and Markup percentage. | ||||||
| 0009 | OPTION - INITIAL OUTFITTING, VESSEL #2. | 1 | LO | |||
| 0010 | NOT TO EXCEED (NTE) - SPECIAL STUDIES AND DOCUMENTATION, VESSEL #2. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.) | 1 | NTE | 1,000 hours | ||
| BASE ITEMS TOTAL | $ - 0 | |||||
| OPTION ITEM 1 (Not included in Total Price for evaluation purposes) | ||||||
| 0011 | OPTION- CREWED SURVEY LAUNCH REQUIREMENTS, VESSEL #1, #2, #3, #4. UP TO TWELVE (12) ADDITIONAL CREWED SURVEY LAUNCHES (UP TO 3 PER VESSEL). | 12 | EA | NA | ||
| OPTION ITEM 1 TOTAL | $ - 0 | |||||
| OPTION ITEM 2 | ||||||
| 0012 | NOAA CLASS B DETAIL DESIGN AND CONSTRUCTION, VESSEL #3. INCLUDES ONE CREWED SURVEY LAUNCH. | 1 | EA | NA | ||
| 0013 | OPTION - VENDOR RECOMMENDED SPARES, VESSEL #3. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.) | 1 | NTE | $ 3,000,000.00 | ||
| 0014a | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #3 - Production. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Production Rates.) | 1 | NTE | 500 Hours | ||
| 0014b | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #3 - Engineering. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.) | 1 | NTE | 500 hours | ||
| 0014c | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #3 - Material. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.) | 1 | NTE | $ 100,000.00 | ||
| * See second tab for Production and Engineering hourly rates and Material Handling and Markup percentage. | ||||||
| 0015 | OPTION - INITIAL OUTFITTING, VESSEL #3. | 1 | LO | |||
| 0016 | NOT TO EXCEED (NTE) - SPECIAL STUDIES AND DOCUMENTATION, VESSEL #3. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.) | 1 | NTE | 5,000 hours | ||
| OPTION ITEM 2 TOTAL | $ - 0 | |||||
| OPTION ITEM 3 | ||||||
| 0017 | NOAA CLASS B DETAIL DESIGN AND CONSTRUCTION, VESSEL #4. INCLUDES ONE CREWED SURVEY LAUNCH. | 1 | EA | NA | ||
| 0018 | OPTION - VENDOR RECOMMENDED SPARES, VESSEL #4. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.) | 1 | NTE | $ 3,000,000.00 | ||
| 0019a | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #4 - Production. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Production Rates.) | 1 | NTE | 500 Hours | ||
| 0019b | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #4 - Engineering. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.) | 1 | NTE | 500 hours | ||
| 0019c | NOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #4 - Material. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.) | 1 | NTE | $ 100,000.00 | ||
| * See second tab for Production and Engineering hourly rates and Material Handling and Markup percentage. | ||||||
| 0020 | OPTION - INITIAL OUTFITTING, VESSEL #4. | 1 | LO | |||
| 0021 | NOT TO EXCEED (NTE) - SPECIAL STUDIES AND DOCUMENTATION, VESSEL #4. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.) | 1 | NTE | 5,000 hours | ||
| OPTION ITEM 3 TOTAL | $ - 0 |
| BASE ITEMS TOTAL | $ - 0 |
| OPTION ITEM 2 TOTAL | $ - 0 |
| OPTION ITEM 3 TOTAL | $ - 0 |
| TOTAL | $ - 0 |
&G
Labor Rates and Markup
| SECTION B- PRICE SCHEDULE | |||
| Detail Design and Construction of Class B Vessels | |||
| RFP 1305M222RNMAN00157 | |||
| Additional Government Requirements, Vendor Recommended Spares, Initial Outfitting, and Special Studies and Documentation | |||
| Government Fiscal Year | Fully Burdened Production Rate (Per Hour) | Fully Burdened Engineering Rate (Per Hour) | Material Handling/Markup Rate (Percentage) |
| FY 2023 | |||
| FY 2024 | |||
| FY 2025 | |||
| FY 2026 | |||
| FY 2027 | |||
| FY 2028 | |||
| FY 2029 | |||
| FY 2030 | |||
| FY 2031 |
CLIN 0011 Crewed Survey Launch
| SECTION B- PRICE SCHEDULE | |
| Detail Design and Construction of Class B Vessels | |
| RFP 1305M222RNMAN00157 | |
| Crewed Survey Launches | |
| Government Fiscal Year | Price per Crewed Survey Launch |
| FY 2023 | |
| FY 2024 | |
| FY 2025 | |
| FY 2026 | |
| FY 2027 | |
| FY 2028 | |
| FY 2029 | |
| FY 2030 | |
| FY 2031 |
image1.png
File details come from the government source that posted it. Updated .