This solicitation requests proposals for the detail design and construction of two Class B vessels with options for two additional vessels for the National Oceanic and Atmospheric Administration. The contractor shall provide all resources necessary to deliver the vessels in accordance with specifications. Base contract line items include detail design and construction of the first two vessels, with optional line items for vendor-recommended spare parts, additional government requirements, initial outfitting, and detail design and construction of the third and fourth vessels. Proposals are due by August 16, 2022. Award is anticipated as a firm fixed-price single-award contract. The North American Industry Classification System code is 336611 and the small business size standard is 1,250 employees.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
1305M222RNMAN00157
9B. DATED (SEE ITEM 11)
05/19/2022
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
2. AMENDMENT/MODIFICATION NUMBER
A0004
3. EFFECTIVE DATE
08/04/2022
4. REQUISITION/PURCHASE REQUISITION NUMBER
NMAN8600-20-00157
5. PROJECT NUMBER (If applicable)
CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE 6. ISSUED BY
NOAA/ERAD
200 GRANBY STREET, NORFOLK, VA 23510
Andrew Northcutt, andrew.northcutt@noaa.gov, 757-441-6457
See Block 6
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE OF PAGES
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
Andrew Hildebrandt
08/04/2022
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Detail Design and Construction of Class B Vessels
Please see continuation page for details pertaining to this amendment.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
X
Continuation Page – Amendment 0004
DETAIL DESIGN AND CONSTRUCTION OF CLASS B VESSELS
RFP# 1305M222RNMAN00157
The purpose of this Amendment is as follows:
1. To provide the following revised solicitation documents:
• RFP_Class_B_1305M222RNMAN00157_REV_1_080322.pdf o Changes made are identified in the responses to the questions received below.
• Attachment_J.1_Statement_of_Requirements_REV_2_072922.pdf o Changes made are identified in the responses to the questions received below.
o An additional change includes the addition of Appendix A to the document.
• Attachment_J.2_Contract_Data_Requirements_List_REV_1_072922.pdf o Changes made are identified in the responses to the questions received below.
o Additional changes include the following:
• DI-034 Block 6 on page 53 of J.2 has been changed to "3-D Product Model data 21 DPT DR 3; Monthly thereafter."
• DI-044-44. Block 6 on page 78 of J.2 has been changed to "90 DPT BT.
The final hard copy deliverables shall be provided for the Ship via, one for each DC Locker and one for Damage Control Central located on the bridge."
• DI-055-03 Block 4 on page 100 of J.2 has been changed to “The Underway Sonar Self-Noise Survey Report shall document the results of the survey. The report shall document the ship’s trim and ballast condition and water depths at the time of the survey. Noise data shall be provided in tabular and graphical form.”
• Attachment_J.4_Scientific_Mission_Systems_Specification_REV_1_072922.pdf o Changes made are identified in the responses to the questions received below.
• Attachment_J.9_Class_B_Price_Schedule_REV_1_080322.xlsx o Changes made are identified in the responses to the questions received below.
• Attachment_J.16_Class_B_Payable_Event_Schedule_REV_1_072922.xlsx o Changes made are identified in the responses to the questions received below.
2. To address the following questions received from vendors in response to the RFP:
Question 32
Question 32: The flow down of ‘Buy American’ clauses is minimal, and appears to say – ‘list the components you intend to source from OCONUS, and the USG will then assess acceptability.’ Is that correct? Also, does that apply to overseas engineering design services
(hours) given only ‘Distribution A?’
Response 32: Yes, this is correct. Foreign made supplies must be identified per FAR 52.225-1 and 52.212-3 (f). Overseas engineering design services are not applicable. All Buy American requirements are identified in the contract.
Question 33
Question 33: (J4, 4.1j) Regarding Acoustic Sensor Calibration System - can more detail be provided on expected functionality and end use so that this can be fully integrated by KUTL during HAT?
Response 33: The government uses acoustic systems for quantitative echo measurements, these systems require regular calibration with a target sphere. This is a regular practice with split beam systems and multibeam systems and is regularly conducted with the SES SSV and their equipment. The general idea is to suspend a target sphere within the acoustic beam and then move the target throughout the beam to map out both the beam pattern and sensitivity of the system. The target strength (in effect, the acoustic reflectivity) of the sphere can be calculated analytically and confirmed in a lab. The split-beam sonar systems can locate the target within the beam, so control of the sphere is required, but not precise line-out measurements. The work is done in calm water with the ship at anchor or drifting.
For all systems, the target suspension needs to be kept clear of the hull. The target is suspended between 13 and 25 meters below the transducers. This requires some sort of outriggers. A minimum of three outrigger/ downriggers are required for three-dimensional control of the targets; four outriggers make control simpler.
The government has modified J.4 section 4.1j from “Two shielded cables shall be installed in parallel from the Scientific Server Room to each watertight junction box and terminated with connectors at each end. The shielded cables shall be constructed of 6 pairs of AWG bare copper, with all pairs enclosed in a polyester/aluminum shield. Cables shall be able to accommodate 30A at 12V. Three independent cables of the same type, 30.5 m (100 feet) in length each, with mating watertight connectors at each end shall be provided.” to “Two cables installed in parallel from the Scientific Server Room to each watertight junction box shall be provided. Each of these cables shall be of the same type, constructed of 2-conductor #10 AWG uncoated copper enclosed in a polyester/aluminum shield, 100 feet (30.5 m) in length each, with mating watertight connectors at each end.”
Question 34
Question 34: RFP_Class_B_1305M222RNMAN00157_051922; Section C-3.1.095f page 51 and Section C-3.1.095i page 52; "Equipment access and removal routes shall be verified by inspection of the actual installation and location of all equipment identified on the Shipbuilder's equipment removal routing plan and by actual removal and reinstallation of any two shipboard equipment items selected by the Government." and "The Contractor shall demonstrate equipment removal in accordance with the Equipment Removal Drawing. The Government may request the actual removal and reinstallation of up to five (5) shipboard equipment items to be demonstrated." Question: It appears that 3.1.095f and 3.1.095i are duplicate requirements. Will the Government remove 3.1.095i to remove the duplication?
Response 34: The Government agrees that there is a duplication of requirements between C-
3.1.095f and C-3.1.095i and will therefore delete clause C-3.1.095i. However please note that clause C-3.1.095f has been modified from:
“Equipment access and removal routes shall be verified by inspection of the actual installation and location of all equipment identified on the Shipbuilder's equipment removal routing plan and by actual removal and reinstallation of any two shipboard equipment items selected by the
Government. Where the selected equipment must pass through a WERP to be removed from the ship, the equipment will be moved to the WERP location without the WERP being removed.
Verification shall ensure the installations of identified equipment are in accordance with the plan and the equipment can be removed from the ship and removal routes are clear of non-removable interferences not identified on the plan.”
to:
“Equipment access and removal routes shall be verified by inspection of the actual installation and location of all equipment identified on the Shipbuilder's equipment removal routing plan and by actual removal and reinstallation of any five shipboard equipment items selected by the
Government. Where the selected equipment must pass through a WERP to be removed from the ship, the equipment will be moved to the WERP location without the WERP being removed.
Verification shall ensure the installations of identified equipment are in accordance with the plan and the equipment can be removed from the ship and removal routes are clear of non-removable interferences not identified on the plan.”
Question 35
Question 35: Attachment J.1 Statement of Requirements; Section 583.2 page 149 and
Attachment J.9 Class B Price Schedule; "Two (2) Crewed Survey launches shall be provided in accordance with Attachment J.3 Crewed Survey Launch Requirements." and CLINS 0001,0006, 0012, 0017 state "INCLUDES ONE CREWED SURVEY LAUNCH." Question: How many
Crewed Survey Launch Vessel are to be priced with each NOAA Class B Vessel?
Response 35: Attachment J.1 section 583.b has been updated from “Two (2) Crewed Survey launches shall be provided in accordance with Attachment J.3 Crewed Survey Launch
Requirements.” to “Crewed Survey Launches shall meet the requirements of Attachment J.3
Crewed Survey Launch Requirements and the contract.” The CLIN description for the base vessels and option vessels remain the same to require a single crewed survey launch per CLIN.
Question 36
Question 36: RFP_Class_B_1305M222RNMAN00157_051922; Section B; (6) For OPTION
CLINS 0002, 0007, 0013, 0018 – VENDOR RECOMMENDED SPARES, VESSEL #’S 1, 2, 3
AND 4. The Offeror shall provide additional repair parts, spares, special tools, and support and test equipment as required by the Government. Orders for this effort shall be executed via bilateral contract modification. No action shall be taken by the Offeror without prior approval of the Contracting Officer (CO) or formally delegated representative. The stated material handling percentage proposed shall be applied to the proposed materials costs. The material handling percentage stated in the price schedule under CLINS 0002, 0007, 0013 and 0018 includes any applicable handling charges, storage, overhead, or other costs. Question: The Government has not identified a minimum level of vendor spares. This creates inconsistent responses between vendors potentially creating an unfair evaluation. Will the Government clarify that Section B is requiring only the identification of the material handling percentage associated with Vendor
Recommended Spares not a lot price for delivered spares?
Response 36: For the purposes of this proposal, the Government will use $3,000,000 per CLIN as the estimated base amount of the Vendor Recommended Spares. This amount is to be multiplied by the offeror’s material handling/markup rates for the evaluated price for these
CLINs. The Price Schedule and Section B of the RFP have been updated to reflect this.
Question 37
Question 37: RFP_Class_B_1305M222RNMAN00157_051922; Section I.1(P) and L.2(J);
L.2(J) page 140: "Proprietary Products/Information/Data As part of the Offeror’s Business
Proposals, Offerors shall disclose the use of proprietary products, information and/or processes.
Other than items allowed in the aforementioned disclosure, it is the Government’s desire that all noncommercial technical data (TD) and computer software (CS) and computer software documentation (CSD) be delivered with Unlimited Rights. If such noncommercial TD/CS/CSD contains elements generated previously with offeror’s own capital, with a minimum of
Government Purpose Rights (as defined in FAR 52.227-13 and 14). If the Offeror proposes to deliver commercial TD/CS/CSD, it is the Government’s desire to obtain a license to the commercial TD/CS/CSD that would grant the Government the rights to use and modify such data solely to maintain, repair, overhaul, modernize, and replace components, equipment, and parts of the vessel without the written permission or authorization of the Contractor. Offeror’s price proposal shall include all applicable licenses that are included in the Offerors’ technical proposal." Question: The only data rights clauses included in the solicitation are FAR 52.227-
14 and Alt II. These clauses do not provide a mechanism for the contractor to deliver technical data to the Government with rights other than Unlimited Rights or Limited Rights.
Notwithstanding this, the solicitation on p. 140 (Section L, Volume 1 – Business Proposal) appears to contemplate delivery of technical data subject to other licenses (for example, Government Purpose Rights) that are neither defined in nor contemplated by the included and cited data rights clauses. Page 140 references requirements from the DFARS that are not applicable to a FAR acquisition. Please remove the quoted content from the solicitation.
Response 37: Vendors are responsible for the software/equipment recommendations as part of their design and any required licenses. Any proprietary information needs to be marked and identified as so. Any restrictions on licenses or data use needs to be identified in the proposal.
DFARS is not references in the RFP.
Question 38
Question 38: Referring to Attachment J.1, Section 330.a, please confirm if refrigerated spaces may be illuminated with LED fixtures.
Response 38: The Government confirms that refrigerated spaces may be illuminated with LED fixtures.
Question 39
Question 39: Can a gondola or faired appendage design be added to the hull form to help achieve optimum sonar mission system performance?
Response 39: The Government will not entertain a gondola or faired appendage design due to the draft limitations of the expected harbors of operation.
Question 40
Question 40: (RFP C-3.1.426) Item 12 is DPINS, item 16 is Inertial Navigation System. The question is, is the DPINS considered the same unit as the survey dept INS - is intent the system is shared between the DP and scientific sonars or are redundant (separate) systems required?
Response 40: Yes, the dynamic positioning system and the scientific electronic system can use the same inertial navigation system.
Question 41
Question 41: Source Document: RFP_Class_B_1305M222RNMAN00157_051922 &
Attachment J.16 Class B Payable Event Schedule. Reference: FAR 52.232-16 PROGRESS
PAYMENTS (NOV 2021). Content Excerpt: The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, per Attachment J.16 Payable
Event Schedule and under the following conditions: (a) Computation of amounts. (1) Unless the
Contractor requests a smaller amount, the Government will compute each progress payment as
80 percent of the Contractor’s total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The Contracting
Officer will consider cost of money that would be allowable under Federal Acquisition
Regulation (FAR) 31.205-10 as an incurred cost for progress payment purposes. Question: The
Attachment J.16 progress payment schedule explicitly shows a % payment for Payable Events throughout the contract, however FAR 52.232-16 PROGRESS PAYMENTS (NOV 2021) part
(a) states "the Government will compute each progress payment as 80 percent of the Contractor’s total costs incurred". These two (2) requirements appear to contradict each other regarding payment. Is the government requiring progress payments in accordance with J-16 payable events schedule or monthly payments at 80% of cost incurred?
Response 41: The Government will be following Attachment J.16 Payable Events schedule.
The Government may elect to amend the document during Final Negotiations. FAR 52.232-16
Progress Payments, has been removed from the RFP and replaced by new language in Section H
(Commercial Item Financing) and FAR 52.232-29 (added in 52.212-5) and 52.232-32 (added in
Section I).
Question 42
Question 42: Source Document: RFP_Class_B_1305M222RNMAN00157_051922 &
PAYMENTS (NOV 2021). Content Excerpt: The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, per Attachment J.16 Payable
Event Schedule and under the following conditions: (a) Computation of amounts. (1) Unless the
Contractor requests a smaller amount, the Government will compute each progress payment as
80 percent of the Contractor’s total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The Contracting
Officer will consider cost of money that would be allowable under Federal Acquisition
Regulation (FAR) 31.205-10 as an incurred cost for progress payment purposes. Question:
FAR 52.232-16 PROGRESS PAYMENTS (NOV 2021) part (a) states "the Government will compute each progress payment as 80 percent of the Contractor’s total costs incurred". When is the remaining 20% paid?
Response 42: FAR 52.232-16 Progress Payments, has been removed from the RFP and replaced by new language in Section H (Commercial Item Financing) and FAR 52.232-29 (added in
52.212-5) and 52.232-32 (added in Section I).
Question 43
Question 43: Source Document: RFP_Class_B_1305M222RNMAN00157_051922 &
PAYMENTS (NOV 2021). Content Excerpt: The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, per Attachment J.16 Payable
Event Schedule and under the following conditions: (a) Computation of amounts. (1) Unless the
Contractor requests a smaller amount, the Government will compute each progress payment as
80 percent of the Contractor’s total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The Contracting
Officer will consider cost of money that would be allowable under Federal Acquisition
Regulation (FAR) 31.205-10 as an incurred cost for progress payment purposes. Question: The current payable event schedule (J.16) and/or 80% cost incurrred monthly progress payments may lead to negative cash flow for offerors. Can offeror's submit alternate progress payment schedules?
Response 43: The Government will be following Attachment J.16 Payable Events schedule.
The Government may elect to amend the document during Final Negotiations. FAR 52.232-16
Progress Payments, has been removed from the RFP and replaced by new language in Section H
(Commercial Item Financing) and FAR 52.232-29 (added in 52.212-5) and 52.232-32 (added in
Section I).
Question 44
Question 44: Source Document: Attachment J.16 Class B Payable Event Schedule. Reference:
Attachment J.16 Class B Payable Event Schedule. Content Excerpt: Worksheet Notes - "1 For customary progress payments based on cost incurred, submit a progress payment request" and "2
For performance based payments, b". Question: Attachment J.16 Notes 1 and 2 appear to hint at two (2) different payment requirements and note 2 appears incomplete. Please provide clarification.
Response 44: Attachment J.16 Class B Payable Event Schedule has been revised. The “notes” tab has been deleted.
Question 45
Question 45: Source Document: Amendment_0003_SF30_1305M222RNMAN00157 &
Attachment J.9 Class B Price Schedule. Reference: Amendment 0003 Question and Answer
#26. Content Excerpt: Response #26 in Amendment 0003 states "Response 26: The
Government is requiring lot pricing for CLINS 0004, 0009, 0015, and 0020 based on Attachment
J.15 Initial Outfitting List. This list is not all inclusive and subject to change. Any additions or deletions will be handled with a contract modification and incorporate material handling mark up rates provided in Attachment J.9 Class B Price Schedule. For bidding purposes the Offerors should provide a lot price for all items identified in J.15 Initial Outfitting List." Question:
Response #26 in Amendment 0003 states "Response 26: The Government is requiring lot pricing for CLINS 0004, 0009, 0015, and 0020 based on Attachment J.15 Initial Outfitting List. This list is not all inclusive and subject to change. Any additions or deletions will be handled with a contract modification and incorporate material handling mark up rates provided in Attachment
J.9 Class B Price Schedule. For bidding purposes the Offerors should provide a lot price for all items identified in J.15 Initial Outfitting List.", however Attachment J.9 includes Material
Handling/Markup Rate (Percentage) for "Additional Government Requirements" CLINs; not
Initial Outfitting CLINs (0003, 0008, 0014, 0019). Please clarify.
Response 45: Attachment J-9 Price Schedule has been revised to include a table for the mark up of rates for the material handling for the Initial Outfitting CLINs (0003, 0008, 0014, 0019).
Question 46
Question 46: Is it possible to receive the names of the shipyards bidding on this project?
Response 46: Below is a list of shipyards that has at one point or another expressed interest in this requirement. This list is not all inclusive. There could be other shipyards that are interested and have not yet contacted us. Alternatively, there could be shipyards on this list that are no longer interested.
Nichols Brothers Boat Builders
Fincantieri Marine Group
Bollinger Shipyards Lockport, LLC
Thoma-Sea Marine Constructors, LLC
VT Halter Marine, Inc.
Austal USA
JT Marine Inc.
Conrad Shipyards, LLC
Frasier Shipyards
Philly Shipyard
| 6 ISSUED BY CODE: |
| AJ930073: |
| 5 PROJECT NUMBER If applicableRow1: |
| 8 NAME AND ADDRESS OF CONTRACTOR Number street county State and ZIP Code: |
| undefined: |
| 10A MODIFICATION OF CONTRACTORDER NUMBER: |
| undefined_2: |
| 10A MODIFICATION OF CONTRACTORDER NUMBER_2: |
| 10B DATED SEE ITEM 13: |
| 11 THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS: |
| The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off |
| 13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS: |
| undefined_3: |
| B THE ABOVE NUMBERED CONTRACTORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES such as changes in paying office: |
| undefined_4: |
| undefined_5: |
| C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| undefined_6: |
| 1: |
| is not: Off |
| is required to sign this document and return: Off |
| 14 DESCRIPTION OF AMENDMENTMODIFICATION Organized by UCF section headings including solicitationcontract subject matter where feasible: |
| 15B CONTRACTOROFFEROR: |
| 15C DATE SIGNED: |