This document summarizes a solicitation for the detail design and construction of two Class B vessels for the National Oceanic and Atmospheric Administration (NOAA), with options for two additional vessels. Offerors are to provide all resources necessary to deliver the base order of two vessels at their shipyard facilities located within the continental United States. The solicitation includes firm fixed price contract line items for the detail design and construction of each vessel, recommended spare parts, additional government requirements, initial outfitting, and crewed survey launches. Proposals are due by August 16, 2022, with the contract to be awarded under Federal Acquisition Regulation Parts 12 and 15.

View the file

Other files

File Type Posted
Attachment_J.8-004_Project_Peculiar_Documents_Assumed_Bare_Hull_Resistance_Rev1(091522).pdf PDF
Amendment_0006_SF30_1305M222RNMAN00157_Complete.pdf PDF
Attachment_J.9_Class_B_Price_Schedule_REV_2_092222.xlsx XLSX spreadsheet
Amendment_0005_SF30_1305M222RNMAN00157.pdf PDF
RFP_Class_B_1305M222RNMAN00157_REV_1_080322.pdf PDF
Attachment_J.1_Statement_of_Requirements_REV_2_072922.pdf PDF
Attachment_J.2_Contract_Data_Requirements_List_REV_1_072922.pdf PDF
Amendment_0004_SF30_1305M222RNMAN00157_Complete.pdf PDF
Attachment_J.16_Class_B_Payable_Event_Schedule_REV_1_072922.xlsx XLSX spreadsheet
Attachment_J.4_Scientific_Mission_Systems_Specification_REV_1_072922.pdf PDF
Attachment_J.9_Class_B_Price_Schedule_REV_1_080322.xlsx XLSX spreadsheet
Amendment_0003_SF30_1305M222RNMAN00157_Complete.pdf PDF
Attachment J.1 Statement of Requirements Revision 1_ 6.9.22.pdf PDF
Amendment_0001_SF30_1305M222RNMAN00157.pdf PDF
Attachment J.8-003 Project Peculiar Documents Tables of Offsets.pdf PDF
Attachment J.17 Subcontracting Plan Outline.pdf PDF
Attachment J.2 Contract Data Requirements List.pdf PDF
Attachment J.16 Class B Payable Event Schedule.xlsx XLSX spreadsheet
Attachment J.15 Initial Outfitting List.pdf PDF
Attachment J.1 Statement of Requirements.pdf PDF
Attachment J.7 Desired Features and Desirable Alternatives.pdf PDF
Attachment J.8-004 Project Peculiar Documents Assumed Bare Hull Resistance.pdf PDF
Attachment J.4 Scientific Mission Systems Specification.pdf PDF
Attachment J.10 DOL Poster.pdf PDF
Attachment J.11 Past Performance Information Form.rtf RTF text file
Attachment J.9 Class B Price Schedule.xlsx XLSX spreadsheet
Attachment J.5 Equipment Salient Characteristics.pdf PDF
Attachment J.14 SF1416 Payment Bond.pdf PDF
Attachment J.8-002 Project Peculiar Documents Hull Lines Plan.pdf PDF
Attachment J.3 Crewed Survey Launch Requirements.pdf PDF
Attachment J.6 Cybersecurity Requirements.pdf PDF
RFP_Class_B_1305M222RNMAN00157_051922.pdf PDF
Attachment J.13 SF1418 Performance Bond.pdf PDF
Attachment J.12 Past Performance Questionnaire.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

1305M222RNMAN00157

9B. DATED (SEE ITEM 11)

05/19/2022

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

2. AMENDMENT/MODIFICATION NUMBER

A0002

3. EFFECTIVE DATE

06/15/2022

4. REQUISITION/PURCHASE REQUISITION NUMBER

NMAN8600-20-00157

5. PROJECT NUMBER (If applicable)

CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE 6. ISSUED BY

NOAA/ERAD

200 GRANBY STREET, NORFOLK, VA 23510

Andrew Northcutt, andrew.northcutt@noaa.gov, 757-441-6457

See Block 6

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE OF PAGES

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

Andrew Hildebrandt

06/15/2022

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Detail Design and Construction of Class B Vessels

Please see continuation page for details pertaining to this amendment.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

X

Continuation Page – Amendment 0002

DETAIL DESIGN AND CONSTRUCTION OF CLASS B VESSELS

RFP# 1305M222RNMAN00157

The purpose of this Amendment is as follows:

1. To provide Attachment J.1 Statement of Requirements (Revision 1). This revision includes the Appendix A (Piping Material Schedule) that was omitted from the original version.

2. To address questions received from vendors in response to the RFP:

Question 1

Question 1: I have noticed in the RFP NMAN8600-20-00157 package that there are no GA or any other drawings with the exception of the hull lines which is included. Am I missing something? I gather from the RFP that the request is for the Detailed Design and Build of the ships, but who will be responsible for the Class approved drawings package?

Response 1: Please see section 070.c of Attachment J.1 Statement of Requirements and Section

C, Part 3 Statement of Work Detail Design and Construction paragraph C-3.1.070c.

Question 2

Question 2: On the NOAA Class B RFP you talk about (in single System Vendors) the need to build two Crewed Survey Launch Aluminum Boats per ship. If we have them built at our ACE

Aluminum Boat Building Facility in Green Bay would that be acceptable or do you want them build by a separate Vendor?

Response 2: The Government will accept a subsidiary of the prime contractor as the CSL SSV.

Question 3

Question 3: Although I am not a potential prime contractor for the NOAA Class B Vessels program, as a potential supplier I am very interested in the role of the required Propulsion Single

Source Vendor (SSV). The description in the RFP package does not indicate that the Propulsion

SSV is responsible for the thrusters required as a major part of the propulsion system. Who has the responsibility on this platform with regard to the selection and integration of the thrusters if not the Propulsion SSV.

Response 3: Please see the following sections of the RFP.

Section C-3.1.202 PROPULSION SINGLE SYSTEMS VENDOR (SSV) FOR SHIP

PROPULSION SYSTEM

The Propulsion SSV shall be responsible for the overall engineering, design, procurement, integration, including prime mover vendor equipment integration, regulatory body approval and testing of the main propulsion machinery plant including, but not limited to the following:

2. Thruster motors, drives, motor controllers and interconnecting cabling and thruster drives.

Section 235.a Azimuthing Propulsors of Attachment J.1 Statement of Requirements

Two azimuthing propulsors shall be provided in a “L-Drive” configuration with vertically mounted AC propulsion motors located inside the extents of the hull plating.

6 ISSUED BY CODE:
AJ930073:
5 PROJECT NUMBER If applicableRow1:
8 NAME AND ADDRESS OF CONTRACTOR Number street county State and ZIP Code:
undefined:
10A MODIFICATION OF CONTRACTORDER NUMBER:
undefined_2:
10A MODIFICATION OF CONTRACTORDER NUMBER_2:
10B DATED SEE ITEM 13:
11 THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS:
The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off
13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS:
undefined_3:
B THE ABOVE NUMBERED CONTRACTORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES such as changes in paying office:
undefined_4:
undefined_5:
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
undefined_6:
1:
is not: Off
is required to sign this document and return: Off
14 DESCRIPTION OF AMENDMENTMODIFICATION Organized by UCF section headings including solicitationcontract subject matter where feasible:
15B CONTRACTOROFFEROR:
15C DATE SIGNED: