Detail Design and Construction of Class B Vessels (NOAA/OMAO/PIAD)
Solicitation number
1305M222RNMAN00157
Issued by

About this file

This document includes a price schedule and related solicitation for the detail design and construction of Class B vessels for the National Oceanic and Atmospheric Administration. The solicitation seeks proposals for a firm fixed price contract to design and build two vessels with options for two additional vessels. Offerors are required to provide pricing for design and construction of the vessels as well as optional line items including recommended spare parts, additional government requirements support, initial outfitting, crewed survey launches, and special studies. Proposals are due by August 16, 2022. The solicitation will result in a single-award contract to a shipyard located domestically in the continental United States.

View the file

Other files

File Type Posted
Attachment_J.8-004_Project_Peculiar_Documents_Assumed_Bare_Hull_Resistance_Rev1(091522).pdf PDF
Amendment_0006_SF30_1305M222RNMAN00157_Complete.pdf PDF
Attachment_J.9_Class_B_Price_Schedule_REV_2_092222.xlsx XLSX spreadsheet
Amendment_0005_SF30_1305M222RNMAN00157.pdf PDF
RFP_Class_B_1305M222RNMAN00157_REV_1_080322.pdf PDF
Attachment_J.1_Statement_of_Requirements_REV_2_072922.pdf PDF
Attachment_J.2_Contract_Data_Requirements_List_REV_1_072922.pdf PDF
Amendment_0004_SF30_1305M222RNMAN00157_Complete.pdf PDF
Attachment_J.16_Class_B_Payable_Event_Schedule_REV_1_072922.xlsx XLSX spreadsheet
Attachment_J.4_Scientific_Mission_Systems_Specification_REV_1_072922.pdf PDF
Amendment_0003_SF30_1305M222RNMAN00157_Complete.pdf PDF
Amendment_0002_SF30_1305M222RNMAN00157_Complete.pdf PDF
Attachment J.1 Statement of Requirements Revision 1_ 6.9.22.pdf PDF
Amendment_0001_SF30_1305M222RNMAN00157.pdf PDF
Attachment J.8-003 Project Peculiar Documents Tables of Offsets.pdf PDF
Attachment J.17 Subcontracting Plan Outline.pdf PDF
Attachment J.2 Contract Data Requirements List.pdf PDF
Attachment J.16 Class B Payable Event Schedule.xlsx XLSX spreadsheet
Attachment J.15 Initial Outfitting List.pdf PDF
Attachment J.1 Statement of Requirements.pdf PDF
Attachment J.7 Desired Features and Desirable Alternatives.pdf PDF
Attachment J.8-004 Project Peculiar Documents Assumed Bare Hull Resistance.pdf PDF
Attachment J.4 Scientific Mission Systems Specification.pdf PDF
Attachment J.10 DOL Poster.pdf PDF
Attachment J.11 Past Performance Information Form.rtf RTF text file
Attachment J.9 Class B Price Schedule.xlsx XLSX spreadsheet
Attachment J.5 Equipment Salient Characteristics.pdf PDF
Attachment J.14 SF1416 Payment Bond.pdf PDF
Attachment J.8-002 Project Peculiar Documents Hull Lines Plan.pdf PDF
Attachment J.3 Crewed Survey Launch Requirements.pdf PDF
Attachment J.6 Cybersecurity Requirements.pdf PDF
RFP_Class_B_1305M222RNMAN00157_051922.pdf PDF
Attachment J.13 SF1418 Performance Bond.pdf PDF
Attachment J.12 Past Performance Questionnaire.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

SECTION B- PRICE SCHEDULE - REV 1
Detail Design and Construction of Class B Vessels
RFP 1305M222RNMAN00157
CLINDESCRIPTIONQTYUNITEstimated Base AmountLabor Rate/MarkupEXTENDED PRICE
BASE ITEMS
0001NOAA CLASS B DETAIL DESIGN AND CONSTRUCTION, VESSEL #1. INCLUDES ONE CREWED SURVEY LAUNCH.1EANA
0002OPTION - VENDOR RECOMMENDED SPARES, VESSEL #1. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.)1NTE$ 3,000,000.00
0003aNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #1 - Production. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Production Rates.)1NTE500 Hours
0003bNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #1 - Engineering. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.)1NTE500 hours
0003cNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR, VESSEL #1 - Material. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.)1NTE$ 100,000.00
* See second tab for Production and Engineering hourly rates and Material Handling and Markup percentage.
0004OPTION - INITIAL OUTFITTING, VESSEL #1.1LO
0005NOT TO EXCEED (NTE) - SPECIAL STUDIES AND DOCUMENTATION, VESSEL #1. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.)1NTE$ 210,000.00
0006NOAA CLASS B DETAIL DESIGN AND CONSTRUCTION, VESSEL #2. INCLUDES ONE CREWED SURVEY LAUNCH.1EANA
0007OPTION - VENDOR RECOMMENDED SPARES, VESSEL #2. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.)1NTE$ 3,000,000.00
0008aNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #2 - Production. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Production Rates.)1NTE500 Hours
0008bNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #2 - Engineering. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.)1NTE500 hours
0008cNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #2 - Material. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.)1NTE$ 100,000.00
* See second tab for Production and Engineering hourly rates and Material Handling and Markup percentage.
0009OPTION - INITIAL OUTFITTING, VESSEL #2.1LO
0010NOT TO EXCEED (NTE) - SPECIAL STUDIES AND DOCUMENTATION, VESSEL #2. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.)1NTE$ 210,000.00
BASE ITEMS TOTALERROR:#REF!
OPTION ITEM 1 (Not included in Total Price for evaluation purposes)
0011OPTION- CREWED SURVEY LAUNCH REQUIREMENTS, VESSEL #1, #2, #3, #4. UP TO TWELVE (12) ADDITIONAL CREWED SURVEY LAUNCHES (UP TO 3 PER VESSEL).12EANA
OPTION ITEM 1 TOTAL
OPTION ITEM 2
0012NOAA CLASS B DETAIL DESIGN AND CONSTRUCTION, VESSEL #3. INCLUDES ONE CREWED SURVEY LAUNCH.1EANA
0013OPTION - VENDOR RECOMMENDED SPARES, VESSEL #3. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.)1NTE$ 3,000,000.00
0014aNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #3 - Production. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Production Rates.)1NTE500 Hours
0014bNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #3 - Engineering. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.)1NTE500 hours
0014cNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #3 - Material. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.)1NTE$ 100,000.00
* See second tab for Production and Engineering hourly rates and Material Handling and Markup percentage.
0015OPTION - INITIAL OUTFITTING, VESSEL #3.1LO
0016NOT TO EXCEED (NTE) - SPECIAL STUDIES AND DOCUMENTATION, VESSEL #3. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.)1NTE$ 1,000,000.00
OPTION ITEM 2 TOTALERROR:#REF!
OPTION ITEM 3
0017NOAA CLASS B DETAIL DESIGN AND CONSTRUCTION, VESSEL #4. INCLUDES ONE CREWED SURVEY LAUNCH.1EANA
0018OPTION - VENDOR RECOMMENDED SPARES, VESSEL #4. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.)1NTE$ 3,000,000.00
0019aNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #4 - Production. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Production Rates.)1NTE500 Hours
0019bNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #4 - Engineering. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.)1NTE500 hours
0019cNOT TO EXCEED (NTE) - ADDITIONAL GOVERNMENT REQUIREMENTS (AGR), VESSEL #4 - Material. (Estimated Base Amount to be multiplied by average of FY23-FY31 Material Handling/Markup Rates.)1NTE$ 100,000.00
* See second tab for Production and Engineering hourly rates and Material Handling and Markup percentage.
0020OPTION - INITIAL OUTFITTING, VESSEL #4.1LO
0021NOT TO EXCEED (NTE) - SPECIAL STUDIES AND DOCUMENTATION, VESSEL #4. (Estimated Base Amount to be multiplied by average of FY23-FY31 Fully Burdened Engineering Rates.)1NTE$ 1,000,000.00
OPTION ITEM 3 TOTALERROR:#REF!
BASE ITEMS TOTALERROR:#REF!
OPTION ITEM 2 TOTALERROR:#REF!
OPTION ITEM 3 TOTALERROR:#REF!
TOTALERROR:#REF!

&G

Labor Rates and Markup

SECTION B- PRICE SCHEDULE
Detail Design and Construction of Class B Vessels
RFP 1305M222RNMAN00157
Additional Government Requirements, Vendor Recommended Spares, Initial Outfitting, and Special Studies and Documentation
Government Fiscal YearFully Burdened Production Rate (Per Hour)Fully Burdened Engineering Rate (Per Hour)Material Handling/Markup Rate (Percentage)
FY 2023
FY 2024
FY 2025
FY 2026
FY 2027
FY 2028
FY 2029
FY 2030
FY 2031

CLIN 0011 Crewed Survey Launch

SECTION B- PRICE SCHEDULE
Detail Design and Construction of Class B Vessels
RFP 1305M222RNMAN00157
Crewed Survey Launches
Government Fiscal YearPrice per Crewed Survey Launch
FY 2023
FY 2024
FY 2025
FY 2026
FY 2027
FY 2028
FY 2029
FY 2030
FY 2031