07 84 00.pdf

PDF 32 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a Technical Specifications document (Section 07 84 00) for Firestopping work at Tinker Air Force Base, Oklahoma, dated April 2019.

The specification requires furnishing and installing tested and listed firestopping systems to form effective barriers against flame, smoke, and gases while maintaining fire resistance ratings of walls, partitions, floors, and ceiling-floor assemblies. Firestopping must address through-penetrations (around pipes, tubes, conduit, wires, cables, and vents) and construction joints (accommodating expansion, contraction, wind, or seismic movement). Firestopping materials must be asbestos-free, nontoxic, commercially manufactured products from a single domestic manufacturer, either FM APP GUIDE approved or UL listed, with flame spread of 25 or less and smoke development rating of 50 or less per ASTM E84 or UL 723. Fire resistance ratings must be UL listed or FM APP GUIDE approved with "F" ratings equal to the fire-rated assembly being penetrated and "T" ratings meeting ICC IBC requirements where applicable. Through-penetrations must comply with ASTM E814 or UL 1479, while construction joints and gaps must comply with ASTM E119, ASTM E1966, or UL 2079, with cycling requirements per ASTM E1399/E1399M or UL 2079.

The installer must be FM Research approved per FM 4991, operating as a UL Certified Firestop Contractor, or certified by the manufacturer with minimum three years of experience. An independent inspector with minimum two years of firestopping inspection experience is required. Firestopping must be installed in accordance with manufacturer's written instructions in floor penetrations, vertical shafts, curtain wall gaps, perimeter wall gaps, and construction joints, except in floor slabs on grade. All firestopped areas must remain uncovered and unenclosed until inspection is complete and approved by the Contracting Officer, with documentation per ASTM E2393 and ASTM E2174. Government approval is required for submittals including shop drawings, product data, test reports, and inspector/installer qualifications.

View the file

Other files

File Type Posted
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
26 05 73 POWER STUDIES.pdf PDF
26 20 00.pdf PDF
09 90 00.pdf PDF
23 09 13.pdf PDF
23 36 00.00 40.pdf PDF
08 71 00.pdf PDF
05 40 00.pdf PDF
10 14 00.10.pdf PDF
08 33 23.pdf PDF
08 11 13.pdf PDF
07 92 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
image.png PNG image
250063 React VII_Hardware schedule 25MAR26 JL.xlsx XLSX spreadsheet
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
esvEH_singledual_2023_V2.pdf PDF
lk406gn05t4_spec.pdf PDF
2_-_HE05-JINV-S11EE---GNT---L_001.pdf PDF
ERV Schedule_TAFB B9001_O-212477.xlsx XLSX spreadsheet
4500-CIVIL.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 78 23.pdf PDF
esvperf_singledual_2023_V2.pdf PDF
lrad331965pd_spec.pdf PDF
REACT VII SA-01.pdf PDF
TAFB B9001 VAV Schedule.pdf PDF
ARCH-COMBINED.pdf PDF
4500-MUG.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 07 84 00

FIRESTOPPING

04/17

PART 1 GENERAL

1. 1 SUMMARY

Fur ni sh and i nst al l t est ed and l i s t ed f i r est oppi ng syst ems, combi nat i on of mat er i al s, or devi ces t o f or m an ef f ect i ve bar r i er agai nst t he spr ead of f l ame, smoke and gases, and mai nt ai n t he i nt egr i t y of f i r e r esi st ance r at ed wal l s, par t i t i ons, f l oor s, and cei l i ng- f l oor assembl i es, i ncl udi ng t hr ough- penet r at i ons and const r uct i on j oi nt s and gaps.

a. Thr ough- penet r at i ons i ncl ude t he annul ar space ar ound pi pes, t ubes, condui t , wi r es, cabl es and vent s.

b. Const r uct i on j oi nt s i ncl ude t hose used t o accommodat e expansi on, cont r act i on, wi nd, or sei smi c movement ; f i r est oppi ng mat er i al shal l not i nt er f er e wi t h t he r equi r ed movement of t he j oi nt .

Gaps r equi r i ng f i r est oppi ng i ncl ude gaps bet ween t he cur t ai n wal l and t he f l oor s l ab and bet ween t he t op of t he f i r e- r at ed wal l s and t he r oof or f l oor deck above and at t he i nt er sect i on of shaf t assembl i es and adj oi ni ng f i r e r esi st ance r at ed assembl i es.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM E119 ( 2016) St andar d Test Met hods f or Fi r e Test s of Bui l di ng Const r uct i on and Materials

ASTM E1399/ E1399M ( 1997; E 2013; R 2013) Cycl i c Movement and Measur i ng t he Mi ni mum and Maxi mum Joi nt Wi dt hs of Ar chi t ect ur al Joi nt Syst ems

ASTM E1966 ( 2015) Fi r e- Resi st i ve Joi nt Syst ems

ASTM E2174 ( 2014b) St andar d Pr act i ce f or On- Si t e I nspect i on of I nst al l ed Fi r e St ops

ASTM E2307 ( 2015a) St andar d Test Met hod f or Det er mi ni ng Fi r e Resi st ance of Per i met er Fi r e Bar r i er Syst ems Usi ng I nt er medi at e- Scal e, Mul t i - st or y Test Apparatus

ASTM E2393 ( 2010a) St andar d Pr act i ce f or On- Si t e I nspect i on of I nst al l ed Fi r e Resi st i ve Joi nt Syst ems and Per i met er Fi r e Bar r i er s

Apr i l 2019 Page 1 SECTI ON 07 84 00

ASTM E699 ( 2009) St andar d Pr act i ce f or Eval uat i on of Agenci es I nvol ved i n Test i ng, Qual i t y Assur ance, and Eval uat i ng of Bui l di ng Components

ASTM E814 ( 2013a) St andar d Test Met hod f or Fi r e Test s of Thr ough- Penet r at i on Fi r e St ops

ASTM E84 ( 2015b) St andar d Test Met hod f or Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Materials

FM GLOBAL ( FM)

FM 4991 ( 2013) Appr oval of Fi r est op Cont r act or s

FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/

I NTERNATI ONAL CODE COUNCI L ( I CC)

I CC I BC ( 2015) I nt er nat i onal Bui l di ng Code

UNDERWRI TERS LABORATORI ES ( UL)

UL 1479 ( 2015) Fi r e Test s of Thr ough- Penet r at i on Firestops

UL 2079 ( 2004; Repr i nt Dec 2014) Test s f or Fi r e Resi st ance of Bui l di ng Joi nt Syst ems

UL 723 ( 2008; Repr i nt Aug 2013) Test f or Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Materials

UL Fi r e Resi st ance ( 2014) Fi r e Resi st ance Di r ect or y

1. 3 SEQUENCING

Coor di nat e t he speci f i ed wor k wi t h ot her t r ades. Appl y f i r est oppi ng mat er i al s, at penet r at i ons of pi pes and duct s, pr i or t o i nsul at i ng, unl ess i nsul at i on meet s r equi r ement s speci f i ed f or f i r est oppi ng. Appl y f i r est oppi ng mat er i al s. at bui l di ng j oi nt s and const r uct i on gaps, pr i or t o compl et i on of encl osi ng wal l s or assembl i es. Cast - i n- pl ace f i r est op devi ces shal l be l ocat ed and i nst al l ed i n pl ace bef or e concr et e pl acement . Pi pe, condui t or cabl e bundl es shal l be i nst al l ed t hr ough cast - i n- pl ace devi ce af t er concr et e pl acement but bef or e ar ea i s conceal ed or made i naccessi bl e. Fi r est op mat er i al shal l be i nspect ed and appr oved pr i or t o f i nal compl et i on and encl osi ng of any assembl i es t hat may conceal i nst al l ed f i r est op.

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

Apr i l 2019 Page 2 SECTI ON 07 84 00

PROCEDURES:

SD- 02 Shop Dr awi ngs

Fi r est oppi ng Syst em; G

SD- 03 Pr oduct Dat a

Fi r est oppi ng Mat er i al s; G

SD- 06 Test Repor t s

I nspect i on; G

SD- 07 Cer t i f i cat es

I nspect or Qual i f i cat i ons Fi r est oppi ng Mat er i al s I nst al l er Qual i f i cat i ons; G

1. 5 QUALI TY ASSURANCE

1. 5. 1 Installer

Engage an exper i enced I nst al l er who i s:

a. FM Resear ch appr oved i n accor dance wi t h FM 4991, oper at i ng as a UL Cer t i f i ed Fi r est op Cont r act or , or

b. Cer t i f i ed, l i censed, or ot her wi se qual i f i ed by t he f i r est oppi ng manuf act ur er as havi ng t he necessar y st af f , t r ai ni ng, and a mi ni mum of 3 year s exper i ence i n t he i nst al l at i on of manuf act ur er ' s pr oduct s i n accor dance wi t h speci f i ed r equi r ement s. Submi t document at i on of t hi s exper i ence. A manuf act ur er ' s wi l l i ngness t o sel l i t s f i r est oppi ng pr oduct s t o t he Cont r act or or t o an i nst al l er engaged by t he Cont r act or does not i n i t sel f conf er i nst al l er qual i f i cat i ons on t he buyer . The I nst al l er shal l have been t r ai ned by a di r ect r epr esent at i ve of t he manuf act ur er ( not di st r i but or or agent ) i n t he pr oper sel ect i on and i nst al l at i on pr ocedur es. The i nst al l er shal l obt ai n f r om t he manuf act ur er and submi t wr i t t en cer t i f i cat i on of t r ai ni ng, and r et ai n pr oof of cer t i f i cat i on f or dur at i on of f i r est op installation.

1. 5. 2 I nspect or Qual i f i cat i ons

The i nspect or shal l have a mi ni mum of t wo year s exper i ence i n const r uct i on f i el d i nspect i ons of f i r est oppi ng syst ems, pr oduct s, and assembl i es. The i nspect or shal l be compl et el y i ndependent of , and di vest ed f r om, t he i nst al l er , t he manuf act ur er , and t he suppl i er of any mat er i al or i t em bei ng i nspect ed. The i nspect or shal l not be a compet i t or of t he i nst al l er , t he cont r act or , t he manuf act ur er , or suppl i er of any mat er i al or i t em bei ng i nspect ed. I ncl ude i n t he qual i f i cat i ons submi t t al a not ar i zed st at ement assur i ng compl i ance wi t h t he r equi r ement s st at ed herein.

1. 6 DELI VERY, STORAGE, AND HANDLI NG

Del i ver mat er i al s i n t he or i gi nal unopened packages or cont ai ner s showi ng name of t he manuf act ur er and t he br and name. St or e mat er i al s of f t he

Apr i l 2019 Page 3 SECTI ON 07 84 00 gr ound, pr ot ect ed f r om damage and exposur e t o el ement s and t emper at ur es i n accor dance wi t h manuf act ur er r equi r ement s. Remove damaged or det er i or at ed mat er i al s f r om t he si t e. Use mat er i al s wi t hi n t hei r i ndi cat ed shel f l i f e.

PART 2 PRODUCTS

2. 1 FI RESTOPPI NG SYSTEM

Submi t det ai l dr awi ngs i ncl udi ng manuf act ur er ' s descr i pt i ve dat a, t ypi cal det ai l s conf or mi ng t o UL Fi r e Resi st ance or ot her det ai l s cer t i f i ed by anot her nat i onal l y r ecogni zed t est i ng l abor at or y, i nst al l at i on i nst r uct i ons or UL l i s t i ng det ai l s f or a f i r est oppi ng assembl y i n l i eu of f i r e- t est dat a or r epor t . For t hose f i r est op appl i cat i ons f or whi ch no UL t est ed syst em i s avai l abl e t hr ough a manuf act ur er , a manuf act ur er ' s engi neer i ng j udgment , der i ved f r om si mi l ar UL syst em desi gns or ot her t est s, shal l be submi t t ed f or r evi ew and appr oval pr i or t o i nst al l at i on.

Submi t t al must i ndi cat e t he f i r est oppi ng mat er i al t o be pr ovi ded f or each t ype of appl i cat i on. When mor e t han a t ot al of 5 penet r at i ons and/ or const r uct i on j oi nt s ar e t o r ecei ve f i r est oppi ng, pr ovi de dr awi ngs t hat i ndi cat e l ocat i on, " F" " T" and " L" r at i ngs, and t ype of appl i cat i on.

Al so, submi t a wr i t t en r epor t i ndi cat i ng l ocat i ons of and t ypes of penet r at i ons and t ypes of f i r st oppi ng used at each l ocat i on; r ecor d t ype by UL l i s t pr i nt ed number s.

2. 2 FI RESTOPPI NG MATERI ALS

Pr ovi de f i r est oppi ng mat er i al s, suppl i ed f r om a si ngl e domest i c manuf act ur er , consi st i ng of commer ci al l y manuf act ur ed, asbest os- f r ee, nont oxi c pr oduct s FM APP GUI DE appr oved, or UL l i s t ed, f or use wi t h appl i cabl e const r uct i on and penet r at i ng i t ems, compl yi ng wi t h t he f ol l owi ng mi ni mum r equi r ement s:

2. 2. 1 Fi r e Hazar d Cl assi f i cat i on

Mat er i al shal l have a f l ame spr ead of 25 or l ess, and a smoke devel oped r at i ng of 50 or l ess, when t est ed i n accor dance wi t h ASTM E84 or UL 723.

Mat er i al shal l be an appr oved f i r est oppi ng mat er i al as l i s t ed i n UL Fi r e Resi st ance or by a nat i onal l y r ecogni zed t est i ng l abor at or y.

2. 2. 2 Toxicity

Mat er i al shal l be nont oxi c and car ci nogen f r ee t o humans at al l s t ages of appl i cat i on or dur i ng f i r e condi t i ons and shal l not cont ai n hazar dous chemi cal s or r equi r e har mf ul chemi cal s t o c l ean mat er i al or equi pment .

2. 2. 3 Fi r e Resi st ance Rat i ng

Fi r est op syst ems shal l be UL Fi r e Resi st ance l i s t ed or FM APP GUI DE appr oved wi t h " F" r at i ng at l east equal t o f i r e- r at i ng of f i r e wal l or f l oor i n whi ch penet r at ed openi ngs ar e t o be pr ot ect ed. Wher e r equi r ed, f i r est op syst ems shal l al so have " T" r at i ng at l east equal t o t he f i r e- r at ed f l oor i n whi ch t he openi ngs ar e t o be pr ot ect ed.

2. 2. 3. 1 Through-Penetrations

Fi r est oppi ng mat er i al s f or t hr ough- penet r at i ons, as descr i bed i n par agr aph SYSTEM DESCRI PTI ON, shal l pr ovi de " F" , " T" and " L" f i r e r esi st ance r at i ngs i n accor dance wi t h ASTM E814 or UL 1479. Fi r e r esi st ance r at i ngs shal l be

Apr i l 2019 Page 4 SECTI ON 07 84 00 as f ol l ows:

2. 2. 3. 1. 1 Penet r at i ons of Fi r e Resi st ance Rat ed Wal l s and Par t i t i ons

F Rat i ng = Rat i ng of wal l or par t i t i on bei ng penet r at ed.

2. 2. 3. 1. 2 Penet r at i ons of Fi r e Resi st ance Rat ed Fl oor s, Fl oor - Cei l i ng Assembl i es and t he Cei l i ng Membr ane of Roof - Cei l i ng Assembl i es

Wher e t he penet r at i ng i t em i s out si de of a wal l cavi t y t he F r at i ng must be equal t o t he f i r e r esi st ance r at i ng of t he f l oor penet r at ed, and t he T r at i ng shal l be i n accor dance wi t h t he r equi r ement s of I CC I BC.

2. 2. 3. 1. 3 Penet r at i ons of Fi r e and Smoke Resi st ance Rat ed Wal l s, Fl oor s, Fl oor - Cei l i ng Assembl i es, and t he cei l i ng membr ane of Roof - Cei l i ng Assembl i es

Wher e t he penet r at i ng i t em i s out si de of a wal l cavi t y t he F r at i ng must be equal t o t he f i r e r esi st ance r at i ng of t he f l oor penet r at ed, and t he T r at i ng shal l be i n accor dance wi t h t he r equi r ement s of I CC I BC. L Rat i ng = <10 cf m/ sf Wher e L r at i ng i s r equi r ed.

2. 2. 3. 2 Const r uct i on Joi nt s and Gaps

Fi r e r esi st ance r at i ngs of const r uct i on j oi nt s, as descr i bed i n par agr aph SYSTEM DESCRI PTI ON, and gaps such as t hose bet ween f l oor s l abs and cur t ai n wal l s shal l be t he same as t he const r uct i on i n whi ch t hey occur .

Const r uct i on j oi nt s and gaps shal l be pr ovi ded wi t h f i r est oppi ng mat er i al s and syst ems t hat have been t est ed i n accor dance wi t h ASTM E119, ASTM E1966 or UL 2079 t o meet t he r equi r ed f i r e r esi st ance r at i ng. Cur t ai n wal l j oi nt s shal l be pr ovi ded wi t h f i r est oppi ng mat er i al s and syst ems t hat have been t est ed i n accor dance wi t h ASTM E2307 t o meet t he r equi r ed f i r e r esi st ance r at i ng. Syst ems i nst al l ed at const r uct i on j oi nt s shal l meet t he cycl i ng r equi r ement s of ASTM E1399/ E1399M or UL 2079. Al l j oi nt s at t he i nt er sect i on of t he t op of a f i r e r esi st ance r at ed wal l and t he under si de of a f i r e- r at ed f l oor , f l oor cei l i ng, or r oof cei l i ng assembl y shal l pr ovi de a mi ni mum cl ass I I movement capabi l i t y .

2. 2. 4 Mat er i al Cer t i f i cat i on

Submi t cer t i f i cat es at t est i ng t hat f i r est oppi ng mat er i al compl i es wi t h t he speci f i ed r equi r ement s. For al l i nt umescent f i r est op mat er i al s used i n t hr ough penet r at i on syst ems, manuf act ur er shal l pr ovi de cer t i f i cat i on of compl i ance wi t h UL 1479.

PART 3 EXECUTI ON

3. 1 PREPARATION

Ar eas t o r ecei ve f i r est oppi ng must be f r ee of di r t , gr ease, oi l , or l oose mat er i al s whi ch may af f ect t he f i t t i ng or f i r e r esi st ance of t he f i r est oppi ng syst em. For cast - i n- pl ace f i r est op devi ces, f or mwor k or met al deck t o r ecei ve devi ce pr i or t o concr et e pl acement must be sound and capabl e of suppor t i ng devi ce. Pr epar e sur f aces as r ecommended by t he manufacturer.

3. 2 INSTALLATION

Compl et el y f i l l voi d spaces wi t h f i r est oppi ng mat er i al r egar dl ess of geomet r i c conf i gur at i on, subj ect t o t ol er ance est abl i shed by t he

Apr i l 2019 Page 5 SECTI ON 07 84 00 manuf act ur er . Fi r est oppi ng syst ems f or f i l l i ng f l oor voi ds 4 i nches or mor e i n any di r ect i on must be capabl e of suppor t i ng t he same l oad as t he f l oor i s desi gned t o suppor t or be pr ot ect ed by a per manent bar r i er t o pr event l oadi ng or t r af f i c i n t he f i r est opped ar ea. I nst al l f i r est oppi ng i n accor dance wi t h manuf act ur er ' s wr i t t en i nst r uct i ons. Pr ovi de t est ed and l i s t ed f i r est op syst ems i n t he f ol l owi ng l ocat i ons, except i n f l oor s l abs on gr ade:

a. Penet r at i ons of duct , condui t , t ubi ng, cabl e and pi pe t hr ough f l oor s and t hr ough f i r e- r esi st ance r at ed wal l s, par t i t i ons, and cei l i ng- f l oor assemblies.

b. Penet r at i ons of ver t i cal shaf t s such as pi pe chases, el evat or shaf t s, and ut i l i t y chut es.

c. Gaps at t he i nt er sect i on of f l oor s l abs and cur t ai n wal l s, i ncl udi ng i nsi de of hol l ow cur t ai n wal l s at t he f l oor s l ab.

d. Gaps at per i met er of f i r e- r esi st ance r at ed wal l s and par t i t i ons, such as bet ween t he t op of t he wal l s and t he bot t om of r oof decks.

e. Const r uct i on j oi nt s i n f l oor s and f i r e r at ed wal l s and par t i t i ons.

f . Ot her l ocat i ons wher e r equi r ed t o mai nt ai n f i r e r esi st ance r at i ng of t he const r uct i on.

3. 2. 1 I nsul at ed Pi pes and Duct s

Ther mal i nsul at i on shal l be cut and r emoved wher e pi pes or duct s pass t hr ough f i r est oppi ng, unl ess i nsul at i on meet s r equi r ement s speci f i ed f or f i r est oppi ng. Repl ace t her mal i nsul at i on wi t h a mat er i al havi ng equal t her mal i nsul at i ng and f i r est oppi ng char act er i st i cs.

3. 2. 2 Fi r e Damper s

I nst al l and f i r est op f i r e damper s i n accor dance wi t h Sect i on 23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEM. Fi r est op i nst al l ed wi t h f i r e damper must be t est ed and appr oved f or use i n f i r e damper syst em. Fi r est op i nst al l ed wi t h f i r e damper must be t est ed and appr oved f or use i n f i r e damper syst em.

3. 2. 3 Dat a and Communi cat i on Cabl i ng

Cabl i ng f or dat a and communi cat i on appl i cat i ons shal l be seal ed wi t h r e- ent er abl e f i r est oppi ng pr oduct s and devi ces as i ndi cat ed.

3. 2. 3. 1 Re- Ent er abl e Devi ces

Fi r est oppi ng devi ces shal l be pr e- manuf act ur ed modul ar devi ces, cont ai ni ng bui l t - i n sel f - seal i ng i nt umescent i nser t s. Fi r est oppi ng devi ces shal l al l ow f or cabl e moves, addi t i ons or changes wi t hout t he need t o r emove or r epl ace any f i r est op mat er i al s. Devi ces must be capabl e of mai nt ai ni ng t he f i r e r esi st ance r at i ng of t he penet r at ed membr ane at 0 per cent t o 100 per cent v i sual f i l l of penet r ant s; whi l e mai nt ai ni ng " L" r at i ng of <10 cf m/ sf measur ed at ambi ent t emper at ur e and 400 degr ees F at 0 per cent t o 100 per cent v i sual f i l l .

Apr i l 2019 Page 6 SECTI ON 07 84 00

3. 2. 3. 2 Re- Seal abl e Pr oduct s

Pr ovi de f i r est oppi ng pr e- manuf act ur ed modul ar pr oduct s, cont ai ni ng sel f - seal i ng i nt umescent i nser t s. Fi r est oppi ng pr oduct s shal l al l ow f or cabl e moves, addi t i ons or changes. Devi ces shal l be capabl e of mai nt ai ni ng t he f i r e r esi st ance r at i ng of t he penet r at ed membr ane at 0 per cent t o 100 per cent v i sual f i l l of penet r ant s.

3. 3 INSPECTION

For al l pr oj ect s, t he f i r est opped ar eas shal l not be cover ed or encl osed unt i l i nspect i on i s compl et e and appr oved by t he Cont r act i ng Of f i cer .

I nspect t he appl i cat i ons i ni t i al l y t o ensur e adequat e pr epar at i ons ( c l ean sur f aces sui t abl e f or appl i cat i on, et c. ) and per i odi cal l y dur i ng t he wor k t o assur e t hat t he compl et ed wor k has been accompl i shed accor di ng t o t he manuf act ur er ' s wr i t t en i nst r uct i ons and t he speci f i ed r equi r ement s.

Submi t wr i t t en r epor t s i ndi cat i ng l ocat i ons of and t ypes of penet r at i ons and t ypes of f i r est oppi ng used at each l ocat i on; t ype shal l be r ecor ded by UL l i s t ed pr i nt ed number s.

3. 3. 1 I nspect i on St andar ds

I nspect al l f i r est oppi ng i n accor dance t o ASTM E2393 and ASTM E2174 f or f i r est op i nspect i on, and document i nspect i on r esul t s t o be submi t t ed.

3. 3. 2 I nspect i on Repor t s

Submi t i nspect i on r epor t st at i ng t hat f i r est oppi ng wor k has been i nspect ed and f ound t o be appl i ed accor di ng t o t he manuf act ur er ' s r ecommendat i ons and t he speci f i ed r equi r ement s.

- - End of Sect i on - -

Apr i l 2019 Page 7 SECTI ON 07 84 00

File details come from the government source that posted it. Updated .