This section specification outlines requirements for a project identification sign and safety sign for the Port of Albany Turning Basin dredging project. The successful contractor must erect one project identification sign and one safety sign measuring 6 feet by 4 feet within 15 calendar days of receiving the notice to proceed. The signs must display the daily corrected data and the Corps of Engineers castle logo. The contractor must maintain the signs in good condition throughout the project duration and then remove them upon completion.

The related federal contract opportunity is a solicitation by the US Army Corps of Engineers New York District to perform maintenance dredging of the Hudson River in the Port of Albany Turning Basin dredge area. Offerors will dredge the specified area to the required dimensions.

View the file

Other files

File Type Posted
Bid Abstract_05-27-2021.pdf PDF
Amendment 0005_Houghtaling Island Topo.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment_0002_Site Visit Sign In Sheet.pdf PDF
Amendment_0002.pdf PDF
Amendment 0001_Pre-bid site vist_directions and instructions.pdf PDF
Amendment 0001.pdf PDF
00 01 15 list of drawings.pdf PDF
00 90 01 AA list of documents.pdf PDF
00 90 01 E- Report of Operations Pipeline Dipper or Bucket Dredges.pdf PDF
AFO - 6 - Index_Notes.pdf PDF
00 90 01 C 33CFR Oil Hazardous Form.pdf PDF
00 90 01 J-Location of Ice Houses.pdf PDF
00 90 01 F-Transportation and Placement Log Mechanical Dredges.pdf PDF
01 50 00 Temp Construction Facilites Controls.pdf PDF
01 57 20.00 10 Environmental protection.pdf PDF
00 90 02 AA WQC PARKS .pdf PDF
01 30 00 Admin Requirments.pdf PDF
W912DS21B0007.pdf PDF
00 90 01 K-Control Points.pdf PDF
01 78 00 clouseout Submittal.pdf PDF
00 90 01 I-Sediment_Physical and Chemistry Data Reports.pdf PDF
35 20 23 dredging.pdf PDF
AFO - 3 - Houghtaling Island Topo and Site.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
01 45 00.00 20 quality control.pdf PDF
01 32 01.00 10 Project Schedule.pdf PDF
00 90 01 L-SUBMITTAL REGISTER_EXAMPLE ONLY.pdf PDF
00 90 01 H-Standard specifications for silt fence.pdf PDF
01 20 00 Tech Spec3.pdf PDF
01 42 00 Sources of Reference.pdf PDF
AFO - 5 - ATB HYDRO.pdf PDF
01 22 00.00 10 measurement and payment.pdf PDF
AFO - 4 - Houghtaling Offshore Hydro.pdf PDF
00 90 02 PARKS Permit Attachement.pdf PDF
00 90 01 A-CQC Report Example.pdf PDF
00 90 01 D-Guidelines for Preparing Accident Prevention Plan.pdf PDF
01 35 26 Gov Safety Requirment.pdf PDF
35 20 29 dredge material transport.pdf PDF
AFO - 2 -location.pdf PDF
01 20 00.00 20 price and payment procedures.pdf PDF
AFO - 1 - Index.pdf PDF
00 90 01 G-Daily Site Safety and Health Inspection Log.pdf PDF
00 90 01 B-Project Sign and Safety Sign.pdf PDF
00 90 02 WQC Attachement.pdf PDF
01 11 00 summary of work2.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Port of Albany Turning Basin, Hudson River, NY Federal Navigation Project 2021

Section 01 58 00

PROJECT IDENTIFICATION

01/07

PART 1 GENERAL

1.1 SUBMITTALS

Not Used.

1.2 QUALITY ASSURANCE

Not Used.

1.3 PROJECT SIGN AND SAFETY SIGN

Prior to initiating any work on site, provide one project identification sign and one safety sign at the location designated. Construct the sign in accordance with project sign detail shown in Attachment C, Section 00 90 01.

The sign shall be 6 feet by 4 feet. The Corps of Engineers castle logo (an

8.5" x 11" red decal) to be used on the sign will be Government furnished.

The Contractor will be given this logo at the time of the preconstruction conference. The decal shall receive a thin coat of clear spar varnish after application. The sign shall be erected as soon as possible and within 15 calendar days after the date of the receipt of the Notice to

Proceed. The data required by the sign shall be corrected daily. No separate payment will be made for erecting and maintaining the safety sign and all costs in connection therewith will be considered the obligation of the contractor. Upon completion of the project, the Contractor shall remove the sign from the work site. Maintain sign throughout the life of the project.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 58 00 Page 1