This document is a report template for dredging operations on pipeline, dipper or bucket dredges. It requests details on dredge type, size, horsepower, suction pipe, propulsion and crew for scheduled dredging projects. The related federal contract opportunity is a solicitation for maintenance dredging of the Hudson River Navigation Project turning basin at the Port of Albany. Services requested include dredging the designated area to authorized depths and disposing of dredged materials. The solicitation was issued by the Department of the Army Corps of Engineers New York District. No further information is provided on response date, award date, pricing or other contract terms.

View the file

Other files

File Type Posted
Bid Abstract_05-27-2021.pdf PDF
Amendment 0005_Houghtaling Island Topo.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment_0002_Site Visit Sign In Sheet.pdf PDF
Amendment_0002.pdf PDF
Amendment 0001_Pre-bid site vist_directions and instructions.pdf PDF
Amendment 0001.pdf PDF
00 01 15 list of drawings.pdf PDF
00 90 01 AA list of documents.pdf PDF
AFO - 6 - Index_Notes.pdf PDF
00 90 01 C 33CFR Oil Hazardous Form.pdf PDF
00 90 01 J-Location of Ice Houses.pdf PDF
00 90 01 F-Transportation and Placement Log Mechanical Dredges.pdf PDF
01 50 00 Temp Construction Facilites Controls.pdf PDF
01 58 00 Project ID.pdf PDF
01 57 20.00 10 Environmental protection.pdf PDF
00 90 02 AA WQC PARKS .pdf PDF
01 30 00 Admin Requirments.pdf PDF
W912DS21B0007.pdf PDF
00 90 01 K-Control Points.pdf PDF
01 78 00 clouseout Submittal.pdf PDF
00 90 01 I-Sediment_Physical and Chemistry Data Reports.pdf PDF
35 20 23 dredging.pdf PDF
AFO - 3 - Houghtaling Island Topo and Site.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
01 45 00.00 20 quality control.pdf PDF
01 32 01.00 10 Project Schedule.pdf PDF
00 90 01 L-SUBMITTAL REGISTER_EXAMPLE ONLY.pdf PDF
00 90 01 H-Standard specifications for silt fence.pdf PDF
01 20 00 Tech Spec3.pdf PDF
01 42 00 Sources of Reference.pdf PDF
AFO - 5 - ATB HYDRO.pdf PDF
01 22 00.00 10 measurement and payment.pdf PDF
AFO - 4 - Houghtaling Offshore Hydro.pdf PDF
00 90 02 PARKS Permit Attachement.pdf PDF
00 90 01 A-CQC Report Example.pdf PDF
00 90 01 D-Guidelines for Preparing Accident Prevention Plan.pdf PDF
01 35 26 Gov Safety Requirment.pdf PDF
35 20 29 dredge material transport.pdf PDF
AFO - 2 -location.pdf PDF
01 20 00.00 20 price and payment procedures.pdf PDF
AFO - 1 - Index.pdf PDF
00 90 01 G-Daily Site Safety and Health Inspection Log.pdf PDF
00 90 01 B-Project Sign and Safety Sign.pdf PDF
00 90 02 WQC Attachement.pdf PDF
01 11 00 summary of work2.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPORT OF OPERATIONS-PIPELINE, DIPPER OR BUCKET DREDGES l REPORTS CONTROL SYMBOL

ENGCW-0-13

THRU:

I

TO:

I

FROM: -1 REPORT NO.

CHARACTER DA.TE OR PERIOD

MAINTE•

NEW

D OF REPORT NANCI; WORK DAlLV D STA.TU$ D COMPLETION D ANNUAL

NAME AND TYPE: .I PIPELINE DIPPER OR BUCKET SIZI

�- ---·· -··· ···----- - in. dia, dis,h. cu. yds. cap.

DREDGE HORSEPOWER OF DREDGE PUMP SUCTION PIPE JET CUTTER OR BUCKET PROPULSION

NUMBER OF DREDGE I SHORE OTHER I TOTAL WORK SHIFTS PER DAY DAYS PER WEEK

CREW MEMBERS PLANT SCHEDULE

NAM£ AUTH

. I

WIDTH DEPTH OVERDEPTH

PROJECT

DIMEN�

AND BAR 1-LOCATION (indudt station numbers)

A.BSOLUTE DENSITY IN PLA-CE DENSITY VOIDS RATIO

CHARACTER GMS!lir�r GMStlittr

OF

MATERIAL GRAIN SIZE GEOLOGICAL CLASSIFICATION

0�11 MM o.-.. ,. MM o .... MM

CONTRACT NUMBER TOTA.L NO. Of OR DREDGING D CONTRACTOR D Hl,tEO LABOR DAYS ON WHIOt

ORDER WO!i:K WAS DONE CHANNEL AVERAGE I BEFORE DREDGING I A.FTER DREDGING MINIMUM . l BEFORE DREDGING AmR DREDGING

CONDITION DEPTH SOUNDING

RIVER MINIMUM TIME MAKIMUM TIME GAGI: LOCATION

STAGE

WEATHER (clea,-, &lottdy. ,-ain, snow, and fog) I VISIBILITY WIND (ma.,·imu,n ,-,/oclry 6- dir�·lion) CONDITION miles

WORK PERFORMED DISTRIBUTION OF TIME

ITEM UNIT QU ... NTITY EFFECTIVE WORKING TIME HOURS I MIN. ( ch11rg1able Jo ,011 of U'Ork) AVERAGE WIOTH Of CUT FEET PUMPING OR DREOGING

TOTAL ADVANCE THIS PERIOD FEET PCT. OF EFFECTIVE RENT AL TIME 1

•• TOT AL ADV. PREVIOUS TO THIS PERIOD FEET BOOSTER (in lin•J Hrs.

_",f;,,_.

TOTAL ADVANCE TO DATE FEET NON-EFFECTIVE WORKING TIME

FLOATING PIPE, SHORE PIPE, lf::h��i-:r"�::@\:As:: :t�? (chargeable to cart of war-k)

TOT AL LENGTH OF DISCHARGE PIPE FEET HANDLING PIPE LINES

AVERAGE LIFT FEET I HANDLING ANCHOR LINES

AVERAGE PUMP SPEED R.P.M. CLEARING PUMP AND PIPE LINE

AVG. DREDGED PER PUMP. HR, GROSS CU.YDS. CLEARING CUTTER OR SUCTION HEAD

SCOWS LOADED NUMBER WAITING FOR SCOWS

AVERAGE LOAD PER SCOW CU.VOS. TO AND FROM WHARF OR ANCHORAGE

CUBIC YARDS REMOVED CHANGING LOCATION OF PLANT ON JOB

AMOUNT DREDGED THIS PERIOD: "LOSS DUE TO OPPOSING NATURAL ELEMENTS I

(1) GROSS r,ompuled dllJONnl) LOSS DUE TO PASSING VESSELS I

(2) CREDITED IP"Y p/,,,,J SHORE LINE ANO SHORE WORK

AMOUNT PREVIOUSLY REPORTED, WAITING FOR BOOSTER

(1) GROSS (comput.ed amount) MINOR OPER. REPAIRS ( �.,-pldi11 in r,markr)

(2) CREDIT ED fp«y plauJ WAITING FOR ATTENDANT PLANT

TOTAL AMOUNT DREDGED TO DATE, PREPARATION ANO MAKING UP TOW

(1) GROSS r,0111puted1amountJ TRANSFERRING PLANT BETWEEN WORKS

(2) CREDifED I p;iy .pia«J LAY TIME OFF SHIFT ANO SATURDAYS

ATTENDANT PLANT SUNDAYS AND HOLIDAYS

ITEM N"ME OR NUMBER HOURS FIRE DRILL -·

MISCELLANEOUS (e.,pl,1in in remarks)

TOT AL NON-EFFECTIVE WORKING TIME

PCT. OF NON-EFFECTIVE RENTAL TIME j %

TOT AL EFFECTIVE AND NON-EFFECTIVE

(chargtab/e ,;!�! of' wa,/eJ

PCT. OF _TOT AL TIME IN PERIOD 7 % ., }./:� ··i A¥-\:·❖��✓:��· l-- ""··

(not ,har$eahfe ta earl of wo�)

MAJOR REPAIRS AND ALTERATIONS

CESSATION

COLLISIONS

MISCELLANEOUS (e.,-pl"in i11 r-,markr)

NUM■IHI OF

BY DISTRICT PERSONNEL I av 01v .• oce PERSONNEL TOT AL LOST TIME

IN5PECTIONS PERCENTAGE OF TOTAL TIME 1 % J}lttfi.�::\ �\i�r:;\.�:�:-:

CONTRACT HA.S A.NYTHIN<, �• ,oL<>rED WH1C" Ml'-'"' L•,w TO A.

CHA.NG£ ORDER OR CLA.IM? D NO D YES TOTAL TIME IN PERIOD

USE ONLY (If" YES ... e.,"J)l11irt u#der nu,aris on ba,lt)

ENG FORM

JA.N 70 4267

REPLACES ENG FORM 28 (Costs), 1 MAR 53, AND ENG FORM 29 {CarhJ.

I JA.N 02, WHICH ARE OBSOLETE. (1:Rlln-,l-J.04)

{S,gnatur, 11114 Remarlu rtqttirrd on rl''IN� sid,.)

Section 00 90 01 E-1 e3opardb Typewritten Text e3opardb Typewritten Text e3opardb Typewritten Text e3opardb Typewritten Text e3opardb Typewritten Text

Section 00 90 01 E-2 e3opardb Typewritten Text e3opardb Typewritten Text

00 90 01 ATT. F-2

duckk Rectangle

File details come from the government source that posted it. Updated .