This document provides guidelines for preparing an Accident Prevention Plan (APP) as required for a federal construction contract. The APP must include: contact information for the plan preparer and approvers; background on the contractor, contract, and project; a safety policy statement; responsibilities and authorities; subcontractor coordination procedures; training requirements; daily inspection procedures; accident reporting requirements; and plans addressing various safety programs and hazards identified in the EM 385-1-1 Safety Manual. For limited-scope service contracts, an abbreviated APP is allowed which must at least include: contact information; project background; safety policy; inspection procedures; accident reporting; emergency response; PPE; and controls for hazards applicable to the work.

View the file

Other files

File Type Posted
Bid Abstract_05-27-2021.pdf PDF
Amendment 0005_Houghtaling Island Topo.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment_0002_Site Visit Sign In Sheet.pdf PDF
Amendment_0002.pdf PDF
Amendment 0001_Pre-bid site vist_directions and instructions.pdf PDF
Amendment 0001.pdf PDF
00 01 15 list of drawings.pdf PDF
00 90 01 AA list of documents.pdf PDF
00 90 01 E- Report of Operations Pipeline Dipper or Bucket Dredges.pdf PDF
AFO - 6 - Index_Notes.pdf PDF
00 90 01 C 33CFR Oil Hazardous Form.pdf PDF
00 90 01 J-Location of Ice Houses.pdf PDF
00 90 01 F-Transportation and Placement Log Mechanical Dredges.pdf PDF
01 50 00 Temp Construction Facilites Controls.pdf PDF
01 58 00 Project ID.pdf PDF
01 57 20.00 10 Environmental protection.pdf PDF
00 90 02 AA WQC PARKS .pdf PDF
01 30 00 Admin Requirments.pdf PDF
W912DS21B0007.pdf PDF
00 90 01 K-Control Points.pdf PDF
01 78 00 clouseout Submittal.pdf PDF
00 90 01 I-Sediment_Physical and Chemistry Data Reports.pdf PDF
35 20 23 dredging.pdf PDF
AFO - 3 - Houghtaling Island Topo and Site.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
01 45 00.00 20 quality control.pdf PDF
01 32 01.00 10 Project Schedule.pdf PDF
00 90 01 L-SUBMITTAL REGISTER_EXAMPLE ONLY.pdf PDF
00 90 01 H-Standard specifications for silt fence.pdf PDF
01 20 00 Tech Spec3.pdf PDF
01 42 00 Sources of Reference.pdf PDF
AFO - 5 - ATB HYDRO.pdf PDF
01 22 00.00 10 measurement and payment.pdf PDF
AFO - 4 - Houghtaling Offshore Hydro.pdf PDF
00 90 02 PARKS Permit Attachement.pdf PDF
00 90 01 A-CQC Report Example.pdf PDF
01 35 26 Gov Safety Requirment.pdf PDF
35 20 29 dredge material transport.pdf PDF
AFO - 2 -location.pdf PDF
01 20 00.00 20 price and payment procedures.pdf PDF
AFO - 1 - Index.pdf PDF
00 90 01 G-Daily Site Safety and Health Inspection Log.pdf PDF
00 90 01 B-Project Sign and Safety Sign.pdf PDF
00 90 02 WQC Attachement.pdf PDF
01 11 00 summary of work2.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

MINIMUM BASIC OUTLINE FOR ACCIDENT

PREVENTION PLANS

An Accident Prevention Plan (APP) is a safety and health policy and program document. The following areas are typically addressed in an APP, but an APP shall be job-specific and shall also address any unusual or unique aspects of the project or activity for which it is written.

The APP shall interface with the employer’s overall safety and health program, and a copy shall be available on the work site. Any portions of the overall safety and health program that are referenced in the APP shall be included as appropriate.

ANSI/ASSE A10.38 should be referenced for Programmatic Issues.

> For LIMITED-SCOPE SERVICE, SUPPLY AND R&D CONTRACTS, for example, mowing (only), park attendant, rest room cleaning, the Contracting Officer and SOHO may allow an ABBREVIATED APP (customized APP requirements and waive the more stringent elements of this section). > See 01.A.11, and Appendix A, paragraph 11.

1. SIGNATURE SHEET. Title, signature, and phone number of the following:

a. Plan preparer (Qualified Person, Competent Person, such as corporate safety staff person, QC);

b. Plan must be approved, by company/corporate officers authorized to obligate the company;

c. Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC).

Provide concurrence of other applicable corporate and project personnel (Contractor).

EM 385-1-1 (2014)

Section 00 90 01 D-1

2. BACKGROUND INFORMATION. List the following:

a. Contractor;

b. Contract number;

c. Project name;

d. Brief project description, description of work to be performed, and location; phases of work anticipated (these will require an

AHA).

3. STATEMENT OF SAFETY AND HEALTH POLICY. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. The Contractor’s written safety program goals, objectives, and accident experience goals for this contract should be provided.

4. RESPONSIBILITIES AND LINES OF AUTHORITIES. Provide the following:

a. A statement of the employer’s ultimate responsibility for the implementation of his SOH program;

b. Identification and accountability of personnel responsible for safety at both corporate and project level. Contracts specifically requiring safety or industrial hygiene personnel shall include a copy of their resumes. Qualifications shall include the OSHA 30-hour course or equivalent course areas as listed here:

(1) OSH Act/General Duty Clause;

(2) 29 CFR 1904, Recordkeeping;

(3) Subpart C: General Safety and Health Provisions, Competent Person;

Section 00 90 01 D-2

(4) Subpart D: Occupational Health and Environmental Controls, Citations and Safety Programs;

(5) Subpart E: PPE, types and requirements for use;

(6) Subpart F: understanding fire protection in the workplace;

(7) Subpart K: Electrical;

(8 Subpart M: Fall Protection;

(9) Rigging, welding and cutting, scaffolding, excavations, concrete and masonry, demolition; health hazards in construction, materials handling, storage and disposal, hand and power tools, motor vehicles, mechanized equipment, marine operations, steel erection, stairways and ladders, confined spaces or any others that are applicable to the work being performed.

c. The names of Competent and/or Qualified Person(s) and proof of competency/qualification to meet specific OSHA Competent/Qualified Person(s) requirements must be attached.

The District SOHO will review the qualifications for acceptance;

d. Requirements that no work shall be performed unless a designated competent person is present on the job site;

e. Requirements for pre-task safety and health analysis;

f. Lines of authority;

g. Policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements) should be identified;

h. Provide written company procedures for holding managers and supervisors accountable for safety.

Section 00 90 01 D-3

5. SUBCONTRACTORS AND SUPPLIERS. If applicable, provide procedures for coordinating SOH activities with other employers on the job site:

a. Identification of subcontractors and suppliers (if known);

b. Safety responsibilities of subcontractors and suppliers.

6. TRAINING.

a. Requirements for new hire SOH orientation training at the time of initial hire of each new employee.

b. Requirements for mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE) and any requirements for periodic retraining/recertification.

c. Procedures for periodic safety and health training for supervisors and employees.

d. Requirements for emergency response training.

> See paragraph 9.b. below for a list of requirements that may require emergency response training.

7. SAFETY AND HEALTH INSPECTIONS.

a. Specific assignment of responsibilities for a minimum daily job site safety and health inspection during periods of work activity: Who will conduct (e.g., SSHO, PM, safety professional, QC, supervisors, employees – depends on level of technical proficiency needed to perform said inspections), proof of inspector’s training/qualifications, when inspections will be conducted, procedures for documentation, deficiency tracking system, and follow-up procedures;

Section 00 90 01 D-4

b. Any external inspections/certifications that may be required (e.g., USCG).

8. ACCIDENT REPORTING. The Contractor shall identify person(s) responsible to provide the following:

a. Exposure data (man-hours worked);

b. Accident investigations, reports, and logs: Report all accidents as soon as possible but not more than 24 hours afterwards to the Contracting Officer/Representative (CO/COR).

The contractor shall thoroughly investigate the accident and submit the findings of the investigation along with appropriate corrective actions to the CO/COR in the prescribed format as soon as possible but no later than five (5) working days following the accident. Implement corrective actions as soon as reasonably possible;

c. The following require immediate accident notification:

(1) A fatal injury;

(2) A permanent total disability;

(3) A permanent partial disability;

(4) The hospitalization of three or more people resulting from a single occurrence;

(5) Property damage of $200,000 or more.

9. PLANS (PROGRAMS, PROCEDURES) REQUIRED BY THE

SAFETY MANUAL. Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans may include but not be limited to:

Section 00 90 01 D-5

a. Layout plans (04.A.01);

b. Emergency response plans:

(1) Procedures and tests (01.E.01);

(2) Spill plans (01.E.01, 06.A.02);

(3) Firefighting plan (01.E.01, Section 19);

(4) Posting of emergency telephone numbers (01.E.05);

(5) Man overboard/abandon ship (Section19.A.04);

(6) Medical Support. Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in CPR and first-aid per shift/site (Section 03.A.02; 03.D);

c. Plan for prevention of alcohol and drug abuse (01.C.02);

d. Site sanitation plan (Section 02);

e. Access and haul road plan (4.B);

f. Respiratory protection plan (05.G);

g. Health hazard control program (06.A);

h. Hazard communication program (06.B.01);

i. Process Safety Management Plan (06.B.04);

j. Lead abatement plan (06.B.05 & specifications);

k. Asbestos abatement plan (06.B.05 & specifications);

Section 00 90 01 D-6

l. Radiation Safety Program (06.E.03.a);

m. Abrasive blasting (06.H.01);

n. Heat/Cold Stress Monitoring Plan (06.I.02)

o. Crystalline Silica Monitoring Plan (Assessment) (06.M) ;

p. Night operations lighting plan (07.A.08);

q. Fire Prevention Plan (09.A);

r. Wild Land Fire Management Plan (09.K);

s. Hazardous energy control plan (12.A.01);

t. Critical lift Plan (16.H);

u. Contingency plan for severe weather (19.A.03);

v. Float Plan (19.F.04);

w. Site-Specific Fall Protection & Prevention Plan (21.C);

x. Demolition plan (to include engineering survey) (23.A.01);

y. Excavation/trenching plan (25.A.01);

z. Emergency rescue (tunneling) (26.A.);

aa. Underground construction fire prevention and protection plan (26.D.01);

bb. Compressed air plan (26.I.01);

cc. Formwork and shoring erection and removal plans (27.C);

dd. PreCast Concrete Plan (27.D);

Section 00 90 01 D-7

ee. Lift slab plans (27.E);

ff. Steel erection plan (27.F.01);

gg. Site Safety and Health Plan for HTRW work (28.B);

hh. Blasting Safety Plan (29.A.01);

ii. Diving plan (30.A.13);

jj. Confined space Program (34.A).

10. RISK MANAGEMENT PROCESSES. Detailed project-specific hazards and controls shall be provided by an Activity Hazard Analysis (0I.A.13) for each major phase/activity of work.

11. ABBREVIATED APP for LIMITED-SCOPE SERVICE, SUPPLY AND R&D CONTRACTS. If service, supply and R&D contracts with limited scopes are awarded, the contractor may submit an abbreviated Accident Prevention Plan. This APP shall address the following areas at a minimum. If other areas of the EM 385-1-1 are pertinent to the contract, the contractor must assure these areas are addressed as well.

a. Title, signature, and phone number of the plan preparer.

b. Background Information to include: Contractor; Contract number; Project name; Brief project description, description of work to be performed, and location (map); The project description shall provide a means to evaluate the work being done (see AHA requirements in 01.A.13) and associated hazards involved. Contractor’s APP shall address the identified hazards involved and the control measures to be taken.

c. Statement of Safety and Health Policy detailing their commitment to providing a safe and healthful workplace for all employees.

Section 00 90 01 D-8

d. Responsibilities and Lines of Authorities – to include a statement of the employer’s ultimate responsibility for the implementation of his SOH program; Identification and accountability of personnel responsible for safety at all levels to include designated site safety and health officer (SSHO) and associated qualifications. The District SOHO will review the qualifications for acceptance.

e. Training - new hire SOH orientation training at the time of initial hire of each new employee and any periodic retraining/recertification requirements.

f. Procedures for job site inspections - assignment of responsibilities and frequency.

g. Procedures for reporting man-hours worked and reporting and investigating any accidents as soon as possible but not more than 24 hours afterwards to the Contracting Officer/Representative (CO/COR). An accident that results in a fatal injury, permanent partial or permanent total disability shall be immediately reported to the Contracting Officer.

h. Emergency Planning. Employees working alone shall be provided an effective means of emergency communication.

This may be cellular phone, two-way radio or other acceptable means. The selected means of communication must be readily available and must be in working condition.

i. Drinking Water provisions, toilet and washing facilities.

j. First Aid and CPR training (at least two employees on each shift shall be qualified/certified to administer first aid and CPR) and provision of first aid kit (types/size).

k. Personal Protective Equipment.

(1) WORK CLOTHING - Minimum Requirements. Employees shall wear clothing suitable for the weather however minimum requirements for work shall be short-sleeve shirt, long pants

Section 00 90 01 D-9

(excessively long or baggy pants are prohibited) and leather work shoes. If analysis determines that safety-toed (or other protective) footwear is necessary (i.e., mowing, weedeating, chain saw use, etc), they shall be worn.

(2) Eye and Face Protection. Eye and face protection shall be worn as determined by an analysis of the operations being performed HOWEVER, all involved in chain saw use, chipping, stump grinding, pruning operations, grass mowing, weedeating and blowing operations shall be provided safety eyewear (Z87.1) as a minimum.

(3) Hearing Protection. Hearing protection must be worn by all those exposed to high noise activities (to include grass mowing and trimming, chainsaw operations, tree chipping, stump grinding and pruning).

(4) Head Protection. Hard hats shall comply with ANSI Z89.1 and shall be worn by all workers when a head hazard exists. At a minimum, hard hats shall be worn when performing activities identified in (2) above.

(5) High Visibility Apparel shall comply with ANSI/ISEA 107, Class 2 requirements at a minimum and shall be worn by all workers exposed to vehicular or equipment traffic.

(6) Protective Leg chaps shall be worn by all chainsaw operators.

(7) Gloves of the proper type shall be worn by persons involved in activities that expose the hands to cuts, abrasions, punctures, burns and chemical irritants.

(8) If work is being performed around water and drowning is a hazard, PFDs must be provided and worn as appropriate.

l. Machine Guards and safety devices. Lawn maintenance equipment must have appropriate guards and safety devices in place and operational.

Section 00 90 01 D-10

m. Hazardous Substances. When any hazardous substances are procured, used, stored or disposed, a hazard communication program must be in effect and MSDSs shall be available at the worksite. Employees shall have received training in hazardous substances being used. When the eyes or body of any person may be exposed to corrosives, irritants or toxic chemicals, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within 10 seconds of the worksite.

n. Traffic control shall be accomplished in accordance with DOT’s MUTCD.

o. Control of Hazardous Energy (Lockout/Tagout). Before an employee performs any servicing or maintenance on any equipment where the unexpected energizing or startup of the equipment could occur, procedures must be in place to ensure adequate control of this energy.

p. Driving, working on (i.e., working with equipment/mowers) while on slopes, working from/in boats/skiffs, etc shall also be considered and dealt with accordingly.

Section 00 90 01 D-11

BLANK

Section 00 90 01 D-12

Section 00 90 01 D-13

Section 00 90 01 D-14

Section 00 90 01 D-15

Section 00 90 01 D-16

Lake_Montauk_FY14_Specs_16_July_2014 32
Lake_Montauk_FY14_Specs_16_July_2014 33
Lake_Montauk_FY14_Specs_16_July_2014 34
Lake_Montauk_FY14_Specs_16_July_2014 35
Lake_Montauk_FY14_Specs_16_July_2014 36
Lake_Montauk_FY14_Specs_16_July_2014 37
Lake_Montauk_FY14_Specs_16_July_2014 38
Lake_Montauk_FY14_Specs_16_July_2014 39
Lake_Montauk_FY14_Specs_16_July_2014 40
Lake_Montauk_FY14_Specs_16_July_2014 41
Lake_Montauk_FY14_Specs_16_July_2014 42
Lake_Montauk_FY14_Specs_16_July_2014 43
Lake_Montauk_FY14_Specs_16_July_2014 44
Lake_Montauk_FY14_Specs_16_July_2014 45
Lake_Montauk_FY14_Specs_16_July_2014 46
Lake_Montauk_FY14_Specs_16_July_2014 47

File details come from the government source that posted it. Updated .