00 90 01 A-CQC Report Example.pdf

PDF 221 KB Posted

Attached to
Maintenance Dredging, Hudson River, NY Federal Navigation Project, Port of Albany Turning Basin Dredge Area
Solicitation number
W912DS21B0007
Issued by

About this file

This document is a quality control report template for use on federal construction projects. It includes sections for listing equipment and work performed by prime and subcontractors, instructions from government personnel, remarks on project progress and delays, requests for information, environmental and safety controls, and preparatory and initial phase checklists. The related federal contract opportunity is a solicitation from the U.S. Army Corps of Engineers Engineering District New York for maintenance dredging of the Hudson River and Port of Albany Turning Basin dredge area.

View the file

Other files

File Type Posted
Bid Abstract_05-27-2021.pdf PDF
Amendment 0005_Houghtaling Island Topo.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment_0002_Site Visit Sign In Sheet.pdf PDF
Amendment_0002.pdf PDF
Amendment 0001_Pre-bid site vist_directions and instructions.pdf PDF
Amendment 0001.pdf PDF
00 01 15 list of drawings.pdf PDF
00 90 01 AA list of documents.pdf PDF
00 90 01 E- Report of Operations Pipeline Dipper or Bucket Dredges.pdf PDF
AFO - 6 - Index_Notes.pdf PDF
00 90 01 C 33CFR Oil Hazardous Form.pdf PDF
00 90 01 J-Location of Ice Houses.pdf PDF
00 90 01 F-Transportation and Placement Log Mechanical Dredges.pdf PDF
01 50 00 Temp Construction Facilites Controls.pdf PDF
01 58 00 Project ID.pdf PDF
01 57 20.00 10 Environmental protection.pdf PDF
00 90 02 AA WQC PARKS .pdf PDF
01 30 00 Admin Requirments.pdf PDF
W912DS21B0007.pdf PDF
00 90 01 K-Control Points.pdf PDF
01 78 00 clouseout Submittal.pdf PDF
00 90 01 I-Sediment_Physical and Chemistry Data Reports.pdf PDF
35 20 23 dredging.pdf PDF
AFO - 3 - Houghtaling Island Topo and Site.pdf PDF
01 33 00 Submittal Procedures.pdf PDF
01 45 00.00 20 quality control.pdf PDF
01 32 01.00 10 Project Schedule.pdf PDF
00 90 01 L-SUBMITTAL REGISTER_EXAMPLE ONLY.pdf PDF
00 90 01 H-Standard specifications for silt fence.pdf PDF
01 20 00 Tech Spec3.pdf PDF
01 42 00 Sources of Reference.pdf PDF
AFO - 5 - ATB HYDRO.pdf PDF
01 22 00.00 10 measurement and payment.pdf PDF
AFO - 4 - Houghtaling Offshore Hydro.pdf PDF
00 90 02 PARKS Permit Attachement.pdf PDF
00 90 01 D-Guidelines for Preparing Accident Prevention Plan.pdf PDF
01 35 26 Gov Safety Requirment.pdf PDF
35 20 29 dredge material transport.pdf PDF
AFO - 2 -location.pdf PDF
01 20 00.00 20 price and payment procedures.pdf PDF
AFO - 1 - Index.pdf PDF
00 90 01 G-Daily Site Safety and Health Inspection Log.pdf PDF
00 90 01 B-Project Sign and Safety Sign.pdf PDF
00 90 02 WQC Attachement.pdf PDF
01 11 00 summary of work2.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attach list of items of equipment either idle or working as appropriate

Indicate location and description of work performed refer to work by prime and/or subcontractors by letter in table above

Indicate whether: P- Preparatory, I - Initial, or F - Follow-up and include satisfactory work completed or deficiencies with action to be taken.):

A

VERBAL INSTRUCTIONS RECEIVED: List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)

REMARKS: Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials ; offsite surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.

Note if a Preparatory or Initial Phase Meeting was held, and attach a copy of the checklist.

REQUESTS FOR INFORMATION Note that there is an RFI attached to this daily report, assign a control number and attach a sheet to this report which fully describes the RFI , and recommends a solution if applicable

ENVIRONMENTAL QUALITY CONTROL

VISITORS TO THE SITE (List the name of all official visitors to the site and who they represent i.e. State DEP, OSHA)

SAFETY Include all infractions of the accident prevention plan; COE Safety and Health Requirements Manual, EM 385-1-1; or instructions from Government QA personnel. Describe corrective actions taken.

PREPARATORY PHASE CHECKLIST

INITIAL PHASE CHECKLIST

File details come from the government source that posted it. Updated .