00 90 01 A-CQC Report Example.pdf
PDF 221 KB Posted
- Attached to
- Maintenance Dredging, Hudson River, NY Federal Navigation Project, Port of Albany Turning Basin Dredge Area
- Solicitation number
- W912DS21B0007
About this file
This document is a quality control report template for use on federal construction projects. It includes sections for listing equipment and work performed by prime and subcontractors, instructions from government personnel, remarks on project progress and delays, requests for information, environmental and safety controls, and preparatory and initial phase checklists. The related federal contract opportunity is a solicitation from the U.S. Army Corps of Engineers Engineering District New York for maintenance dredging of the Hudson River and Port of Albany Turning Basin dredge area.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attach list of items of equipment either idle or working as appropriate
Indicate location and description of work performed refer to work by prime and/or subcontractors by letter in table above
Indicate whether: P- Preparatory, I - Initial, or F - Follow-up and include satisfactory work completed or deficiencies with action to be taken.):
A
VERBAL INSTRUCTIONS RECEIVED: List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)
REMARKS: Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials ; offsite surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.
Note if a Preparatory or Initial Phase Meeting was held, and attach a copy of the checklist.
REQUESTS FOR INFORMATION Note that there is an RFI attached to this daily report, assign a control number and attach a sheet to this report which fully describes the RFI , and recommends a solution if applicable
ENVIRONMENTAL QUALITY CONTROL
VISITORS TO THE SITE (List the name of all official visitors to the site and who they represent i.e. State DEP, OSHA)
SAFETY Include all infractions of the accident prevention plan; COE Safety and Health Requirements Manual, EM 385-1-1; or instructions from Government QA personnel. Describe corrective actions taken.
PREPARATORY PHASE CHECKLIST
INITIAL PHASE CHECKLIST
File details come from the government source that posted it. Updated .