00 01 15 list of drawings.pdf
PDF 234 KB Posted
- Attached to
- Maintenance Dredging, Hudson River, NY Federal Navigation Project, Port of Albany Turning Basin Dredge Area
- Solicitation number
- W912DS21B0007
About this file
This document provides contract drawings and specifications for maintenance dredging of the Port of Albany Turning Basin on the Hudson River in New York. The Army Corps of Engineers will contract for dredging of the noted areas according to five drawings detailing hydrographic surveys, placement sites, and project details. Work will remove sediment to authorized depths and discharge at the Houghtaling Island Placement Site. The solicitation seeks dredging services to maintain the federal navigation project in accordance with provided drawings and specifications.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Port of Albany Turning Basin, Hudson River, NY Federal Navigation Project 2021
SECTION 00 01 15 Page 1
PART 1 GENERAL
1.1 SUMMARY
SECTION 00 01 15
LIST OF DRAWINGS
03/21
This section lists the drawings for the project pursuant to contract clause
"DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS
a. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
b. The Contractor shall:
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
c. In general:
(1) Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
d. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
e. The work shall conform to the following contract drawings and maps, all of which form a part of these specifications and are available in the office of the District Engineer, U.S. Army Corps of Engineers, New
York District, 26 Federal Plaza, New York, N.Y. 10278-0090:
Port of Albany Turning Basin, Hudson River, NY Federal Navigation Project 2021
SECTION 00 01 15 Page 2
Contract drawings are as follows:
FY 2021
Maintenance Dredging of Port of Albany Turning Basin, Hudson River, New York
Federal Navigation Project
SHEET NO. DESCRIPTION
Sheet 1 Index
Sheet 2 General Location & Coordinates
Sheet 3 Houghtaling Island Placement Site and Topography Sheet 4 Houghtaling Island Offshore Hydrography Sheet 5 Albany Turning Basin Dredging Area Hydrographic
Survey Sheet 6 Notes and Details
f. The Contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the
Contracting Officer or Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements unless dimensions are specified.
Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have thereby been avoided (DOD FAR Suppl.
52.236-7002).
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
-- End of Section --
File details come from the government source that posted it. Updated .