01 57 20.00 10 Environmental protection.pdf
PDF 144 KB Posted
- Attached to
- Maintenance Dredging, Hudson River, NY Federal Navigation Project, Port of Albany Turning Basin Dredge Area
- Solicitation number
- W912DS21B0007
About this file
This document package includes a technical specification section and related federal contract opportunity. The technical specification outlines environmental protection requirements for maintenance dredging of the Port of Albany Turning Basin in the Hudson River, New York. Key details include compliance with permits from the New York State Department of Environmental Conservation for water quality and coastal zone management. The contractor must prevent pollution impacts to land, water, air and biological resources from construction activities and waste disposal. Hazardous and non-hazardous waste must be handled according to federal, state and local regulations. The contract opportunity is for maintenance dredging of the designated dredge area in the Port of Albany Turning Basin for the U.S. Army Corps of Engineers, Engineering District New York.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Port of Albany Turning Basin, Hudson River, NY Federal Navigation Project 2021
SECTION 01 57 20.00 10 Page 1
PART 1 GENERAL
1.1 REFERENCES
SECTION 01 57 20.00 10
ENVIRONMENTAL PROTECTION
03/21
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements
Manual
WETLANDS DELINEATION MANUAL (1987) Corps of Engineers Wetlands
Delineation Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
33 CFR 328 Definitions of Waters of the United States
40 CFR 261 Identification and Listing of Hazardous
Waste
40 CFR 262 Standards Applicable to Generators of
Hazardous Waste
40 CFR 279 Standards for the Management of Used Oil
40 CFR 302 Designation, Reportable Quantities, and
Notification
40 CFR 355 Emergency Planning and Notification
40 CFR 68 Chemical Accident Prevention Provisions
49 CFR 171 - 178 Hazardous Materials Regulations
1.2 DEFINITIONS
1.2.1 Environmental Pollution and Damage
Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life;
affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.
1.2.2 Environmental Protection
Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of
SECTION 01 57 20.00 10 Page 2 land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.
1.2.3 Contractor Generated Hazardous Waste
Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the
Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners,excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.
1.2.4 Surface Discharge
The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers,creeks, and/or "waters of the United States" and would require a permit to discharge water from the governing agency.
1.2.5 Waters of the United States
All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328.
1.2.6 Wetlands
Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with
WETLANDS DELINEATION MANUAL.
1.3 GENERAL REQUIREMENTS
Minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract. The Contractor shall comply with all applicable environmental Federal, State, and local laws and regulations. The Contractor shall be responsible for any delays resulting from failure to comply with environmental laws and regulations.
1.4 OIL TRANSFER OPERATIONS
The Contractor shall assure that oil transfer operations to or from his plant comply with all Federal, state, municipal laws, codes and regulations
(see Attachment D of Section 00 90 01 for regulation on "Oil and Hazardous
Material Transfer Operations" - 33 CFR 156). Particular attention is invited to 33 CFR Subchapter O, Pollution. The Contractor shall incorporate in the accident prevention program, submitted in compliance with Section
00700, contract clause "ACCIDENT PREVENTION," sufficient information to demonstrate that all fuel transfers will be made in compliance with 33 CFR
SECTION 01 57 20.00 10 Page 3
156 and any other applicable laws, codes and regulations. (NAP-1/81)
1.5 NOISE LEVEL CRITERIA
Maximum sound pressure levels measured at the booster pumps, engine generators and vehicles including muffler and exhaust components, shall not exceed decibel values prescribed by Federal, State and local codes and regulations. The foregoing applies with the pumps under normal operating conditions at not less than 50% full rated load. Tests will be performed at no additional cost to the Government by the Contractor, or the pump engine and generator manufacturer or by an approved testing agency having proven capability in noise measurements and using approved measurement equipment and acceptable measurement procedures. Test data will be submitted to the
Contracting Officer for approval 5 days after the commencement of dredging operations. Should the sound pressure (noise) level test data indicate a need for sound reduction, the Contractor will provide necessary enclosures, baffles or any other appropriate means around booster pumps and engine generators including muffler and exhaust components, so as to attain noise levels which do not exceed those prescribed by aforementioned regulations.
Details of the proposed enclosure or baffling arrangement shall be submitted to the Contracting Officer for approval. Such details will be accomplished by calculations, which indicate anticipated compliance of sound pressure (noise) levels with codes and regulations noted herein before. All this is especially enforceable where these booster and engine generators locations are in bathing areas.
1.6 SUBCONTRACTORS
The Contractor shall ensure compliance with this section by subcontractors.
1.7 PAYMENT
No separate payment will be made for work covered under this section.
Payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor, and payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations are the Contractor's responsibility. All costs associated with this section must be included in the contract price. The Contractor shall be responsible for all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations.
1.8 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals; G
Environmental Protection Plan; G
1.9 ENVIRONMENTAL PROTECTION PLAN
Prior to commencing construction activities or delivery of materials to the site, the Contractor shall submit an Environmental Protection Plan for
SECTION 01 57 20.00 10 Page 4 review and approval by the Contracting Officer. The purpose of the
Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction. Issues of concern must be defined within the
Environmental Protection Plan as outlined in this section. The Contractor shall address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Topics or issues which are not identified in this section, but which the Contractor considers necessary, shall be identified and discussed after those items formally identified in this section. Prior to submittal of the
Environmental Protection Plan, the Contractor shall meet with the
Contracting Officer for the purpose of discussing the implementation of the initial Environmental Protection Plan; possible subsequent additions and revisions to the plan including any reporting requirements; and methods for administration of the Contractor's Environmental Protection Plan. The
Environmental Protection Plan shall be current and maintained onsite by the
Contractor.
1.9.1 Compliance
No requirement in this Section shall be construed as relieving the
Contractor of any applicable Federal, State, and local environmental protection laws and regulations. During Construction, the Contractor will be responsible for identifying, implementing, and submitting for approval any additional requirements to be included in the Environmental Protection
Plan.
1.9.2 Contents
The environmental protection plan shall include but shall not be limited to, the following:
a. Name(s) of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the Environmental
Protection Plan.
b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.
c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.
d. Description of the Contractor's environmental protection personnel training program.
e. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan must include monitoring and reporting requirements to assure that the control measures are in compliance with the erosion and sediment control plan, Federal, State, and local laws and regulations. A Storm
Water Pollution Prevention Plan (SWPPP) may be substituted for this plan.
f. Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials including methods to control runoff and to contain materials on the site.
SECTION 01 57 20.00 10 Page 5
g. Traffic control plans including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Plan shall include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.
h. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas including methods for protection of features to be preserved within authorized work areas.
i. Drawing showing the location of borrow areas.
j. The Spill Control plan shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations. The Spill Control
Plan supplements the requirements of EM 385-1-1. This plan shall include, as a minimum:
(1) The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual will immediately notify the
Contracting Officer and Facility Response Personnel in addition to the legally required Federal, State, and local reporting channels
(including the National Response Center 1-800-424-8802) if a reportable quantity is released to the environment. Include in the plan a list of the required reporting channels and telephone numbers.
(2) The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.
(3) Training requirements for Contractor's personnel and methods of accomplishing the training.
(4) A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.
(5) The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.
(6) The methods and procedures to be used for expeditious contaminant cleanup.
k. A Non-hazardous solid waste disposal Plan identifying methods and locations for solid waste disposal including clearing debris and schedules for disposal and the following.
(1) The Contractor shall identify any subcontractors responsible for the transportation and disposal of solid waste. Submit licenses or permits for solid waste disposal sites that are not a commercial operating facility.
(2) Evidence of the disposal facility's acceptance of the solid waste must be attached to this plan during the construction. The
SECTION 01 57 20.00 10 Page 6
Contractor shall attach a copy of each of the Non-hazardous Solid
Waste Diversion Reports to the disposal plan. The report shall be submitted on the first working day after the first quarter that non-hazardous solid waste has been disposed and/or diverted and shall be for the previous quarter (e.g. the first working day of
January, April, July, and October).
(3) The report shall indicate the total amount of waste generated and total amount of waste diverted in cubic yards (CY)or tons along with the percent that was diverted.
l. A recycling and solid waste minimization plan with a list of measures to reduce consumption of energy and natural resources. The plan shall detail the Contractor's actions to comply with and to participate in Federal, State, Regional and local Government sponsored recycling programs to reduce the volume of solid waste at the source.
m. An air pollution control plan detailing provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
n. A contaminant prevention plan that: identifies potentially hazardous substances to be used on the job site; identifies the intended actions to prevent introduction of such materials into the air, water, or ground; and details provisions for compliance with
Federal, State, and local laws and regulations for storage and handling of these materials. In accordance with EM 385-1-1, a copy of the
Material Safety Data Sheets (MSDS) and the maximum quantity of each hazardous material to be onsite at any given time must be included in the contaminant prevention plan. As new hazardous materials are brought onsite or removed from the site, the plan shall be updated.
o. A waste water management plan that identifies the methods and procedures for management and/or discharge of waste waters which are directly derived from construction activities, such as concrete curing water, clean-up water, dewatering of ground water, disinfecting of water, hydrostatic test water, and water used in flushing of lines. If a settling/retention pond is required, the plan must include the design of the pond including drawings, removal plan, and testing requirements for possible pollutants. If land application will be the method of disposal for the waste water, the plan must include a sketch showing the location for land application along with a description of the pretreatment methods to be implemented. If surface discharge will be the method of disposal, include a copy of the permit and associated documents as an attachment prior to discharging the waste water. If disposal is to a sanitary sewer, the plan must include documentation that the Waste Water Treatment Plant Operator has approved the flow rate, volume, and type of discharge.
p. A historical, archaeological, cultural resources biological resources and wetlands plan that defines procedures for identifying and protecting historical, archaeological, cultural resources, biological resources and wetlands known to be on the project site: and/or identifies procedures to be followed if historical archaeological, cultural resources, biological resources and wetlands not previously known to be onsite or in the area are discovered during construction.
Include in the plan methods to assure the protection of known or discovered resources, identifying lines of communication between
Contractor personnel and the Contracting Officer.
SECTION 01 57 20.00 10 Page 7
1.9.3 Appendix
Attach to the Environmental Protection Plan, as an appendix, copies of all environmental permits, permit application packages, approvals to construct, notifications, certifications, reports, and termination documents.
1.10 PROTECTION FEATURES
This paragraph supplements the Contract Clause PROTECTION OF EXISTING
VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Prior to start of any onsite construction activities, the Contractor and the
Contracting Officer will make a joint condition survey. Immediately following the survey, the Contractor will prepare a brief report including a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. This survey report will be signed by both the the
Contractor and the Contracting Officer upon mutual agreement as to its accuracy and completeness. The Contractor must protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the work under the contract.
1.11 SPECIAL ENVIRONMENTAL REQUIREMENTS
The Contractor shall comply with the special environmental requirements listed here and attached at the end of this section.
1.12 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS
Any deviations from the drawings,plans and specifications, requested by the
Contractor and which may have an environmental impact, will be subject to approval by the Contracting Officer and may require an extended review, processing, and approval time. The Contracting Officer reserves the right to disapprove alternate methods, even if they are more cost effective, if the Contracting Officer determines that the proposed alternate method will have an adverse environmental impact.
1.13 NOTIFICATION
The Contracting Officer will notify the Contractor in writing of any observed noncompliance with Federal, State or local environmental laws or regulations, permits, and other elements of the Contractor's Environmental
Protection plan. After receipt of such notice, the Contractor will inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the contract, or in accordance with the Federal Acquisition Regulation or
Federal Law.
1.14 PROTECTION OF ENVIRONMENTAL RESOURCES
The Contractor shall at all times perform all work and take such steps
SECTION 01 57 20.00 10 Page 8 required to minimize interference with or disturbance to fish and wildlife. The Contractor will not be permitted to alter water flows or otherwise disturb native habitat adjacent to the work area, which in the opinion of the Contracting Officer, are critical to fish and wildlife. The
Contractor shall anticipate orders to stop work at the discretion of the
Contracting Officer if any fish or wildlife are endangered by construction activities. The environmental resources within the project boundaries and those affected outside the limits of permanent work under this contract shall be protected during the entire period of this contract. The
Contractor shall confine his activities to areas defined by the drawings and specifications.
1.14.1 Protection of Endangered and Threatened Species
Not Used
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS
This paragraph supplements the Contractor's responsibility under the contract clause "PERMITS AND RESPONSIBILITIES" to the extent that the
Government has obtained the NYDEC Water Quality Certificate and Coastal
Zone Management Consistency Statement. The Contractor shall Comply with the terms and conditions of the attached NYDEC Water Quality Certificate and Coastal Zone Management Consistency Statement attached as an appendix on this document.
3.2 LAND RESOURCES
The Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any construction, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated in the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and land forms without approval. No Ropes, cables, or guys will not be fastened to or attached to any trees for anchorage unless specifically authorized. The
Contractor shall provide effective protection for land and vegetation resources at all times, as defined in the following subparagraph. Stone, soil, or other materials displaced into uncleared areas shall be removed by the Contractor.
3.2.1 Work Area Limits
Prior to commencing construction activities the Contractor shall mark the area(s) that need not to be disturbed under this contract. Isolated areas within the general work area, which are not to be disturbed shall be marked or fenced. Monuments and markers shall be protected before construction operations commence. Where construction operations are to be conducted during darkness, any markers must be visible in the dark. The Contractor's personnel must be knowledgeable of the purpose for marking and/or
SECTION 01 57 20.00 10 Page 9 protecting particular objects.
3.2.2 Landscape
Trees, shrubs, vines, grasses, land forms and other landscape features indicated and defined on the drawings to be preserved must be clearly identified by marking, fencing, or wrapping with boards, or any other approved techniques. The Contractor shall restore landscape features damaged or destroyed during construction operations outside the limits of the approved work area.
3.2.3 Erosion and Sediment Controls
The Contractor shall be responsible for providing erosion and sediment control measures in accordance with Federal, State, and local laws and regulations. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. The Contractor shall Construct or install temporary and permanent erosion and sediment control Best Management Practices (BMPs). BMPs may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. Any temporary measures shall be removed after the area has been stabilized.
3.2.4 Contractor Facilities and Work Areas
The Contractor's field offices, staging areas stockpile storage, and temporary buildings shall be placed in areas designated on the drawings or as directed by the Contracting Officer. Temporary movement or relocation of Contractor facilities will be made only when approved. Erosion and sediment controls must be provided for onsite borrow and spoil areas to prevent sediment from entering nearby waters. Temporary excavation and embankments for plant and/or work areas must be controlled to protect adjacent areas.
3.3 WATER RESOURCES
The Contractor shall monitor construction activities to prevent pollution of surface and ground waters. Toxic or hazardous chemicals shall not be applied to soil or vegetation unless otherwise indicated. All water areas affected by construction activities shall be monitored by the Contractor.
For construction activities immediately adjacent to impaired surface waters, the Contractor must be capable of quantifying sediment or pollutant loading to that surface water when required by State or Federally issued
Clean Water Act permits.
3.3.1 Cofferdams, Diversions, and Dewatering Operations
Construction operations for dewatering, removal of cofferdams, tailrace excavation, and tunnel closure will be controlled at all times to maintain compliance with existing State water quality standards and designated uses of the surface water body. The Contractor shall comply with the state of
New York water quality standards and anti-degradation provisions.
3.3.2 Wetlands
The Contractor shall not enter disturb, destroy, or allow discharge of contaminants into any wetlands, except as authorized herein. The
SECTION 01 57 20.00 10 Page 10
Contractor shall be responsible for the protection of wetlands shown on the drawings in accordance with paragraph 3.1 "Environmental Permits and
Commitments" above. Authorization to enter specific wetlands shall not relieve the Contractor from any obligation to protect other wetlands within, adjacent to, or in the vicinity of the construction site and associated boundaries.
3.4 AIR RESOURCES
Equipment operation, activities, or processes will be performed by the
Contractor in accordance with all Federal and State air emission and performance laws and standards.
3.4.1 Particulates
Dust particles; aerosols and gaseous by-products from construction activities; and processing and preparation of materials, such as from asphaltic batch plants; must be controlled at all times, including weekends, holidays and hours when work is not in progress.The Contractor shall maintain excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and other work areas within or outside the project boundaries free from particulates which would cause the Federal, State, and local air pollution standards to be exceeded or which would cause a hazard or a nuisance. Sprinkling, chemical treatment of an approved type, baghouse, scrubbers, electrostatic precipitators or other methods will be permitted to control particulates in the work area. Sprinkling, to be efficient, must be repeated to keep the disturbed area damp at all times. The Contractor must have sufficient, competent equipment available to accomplish these tasks. Particulate control shall be performed as the work proceeds and whenever a particulate nuisance or hazard occurs. The Contractor shall comply with all State and local visibility regulations.
3.4.2 Odors
Odors from construction activities must be controlled at all times. The odors must be in compliance with State regulations and/or local ordinances and may not constitute a health hazard.
3.4.3 Sound Intrusions
The Contractor shall keep all construction activities under surveillance and control to minimize environment damage by noise and shall comply with the provisions of the State of New York rules.
3.4.4 Burning
Burning will not be allowed on the project site unless specified in other sections of the specifications or authorized in writing by the Contracting
Officer. The specific time, location, and manner of burning will be subject to approval.
3.5 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL
Disposal of wastes will be as directed below, unless otherwise specified in other sections and/or shown on the drawings.
3.5.1 Solid Wastes
Solid wastes (excluding clearing debris) shall be place in containers which are emptied on a regular schedule. Handling, storage, and disposal shall
SECTION 01 57 20.00 10 Page 11 be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste.
3.5.2 Chemicals and Chemical Wastes
Chemicals shall be dispensed ensuring no spillage to the ground or water.
Periodic inspections of dispensing areas to identify leakage and/or potential leakage shall be performed and documented; corrective action shall also be documented. This documentation will be periodically reviewed by the Government. Chemical waste shall be collected in corrosion resistant, compatible containers. Collection drums must be monitored and removed to a staging or storage area when contents are within 6 inches of the top. Wastes will be classified, managed, stored, and disposed of in accordance with Federal, State, and local laws and regulations.
3.5.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
Hazardous wastes are defined in 40 CFR 261, or are as defined by applicable
State and local regulations. Hazardous materials are defined in
49 CFR 171 - 178. The Contractor shall at a minimum, manage and store hazardous waste in compliance with 40 CFR 262 and shall manage and store hazardous waste in accordance with the installation hazardous waste management plan. The Contractor shall take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing. The
Contractor shall segregate hazardous waste from other materials and wastes, and shall take precautionary measures such as berming or other appropriate measures against accidental spillage. The Contractor shall be responsible for storage, describing, packaging, labeling, marking, and placarding of hazardous waste and hazardous material in accordance with 49 CFR 171 - 178, State, and local laws and regulations. The Contractor shall transport
Contractor generated hazardous waste off Government property within 60 days in accordance with the Environmental Protection Agency n(EPA)and the
Department of Transportation laws and regulations. The Contractor shall dispose of hazardous waste in compliance with Federal, State and local laws and regulations. Spills of hazardous or toxic materials shall be immediately reported to the Contracting Officer and the Facility
Environmental Office. Cleanup and cleanup costs due to spills are the
Contractor's responsibility. The disposition of Contractor generated hazardous waste and excess hazardous materials are the Contractor's responsibility.
3.5.4 Fuel and Lubricants
Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spill and evaporation. Fuel, lubricants and oil shall be managed and stored in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded shall be stored in marked corrosion-resistant containers and recycled or disposed in accordance with 40 CFR 279, State, and local laws and regulations. Storage of fuel on the project site is not allowed. Storage of fuel on the project site shall be in accordance with all Federal, State, and local laws and regulations.
3.5.5 Waste Water
Disposal of waste water will be as specified below.
a. Waste water from construction activities, such as onsite material
SECTION 01 57 20.00 10 Page 12 processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc. will not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants. The Contractor shall dispose of the construction related waste water off-Government property in accordance with all Federal, State, Regional and Local laws and
b. For discharge of ground water and run-off surface water, the
Contractor shall discharge in accordance with all Federal, State, Regional, and/or Local laws and regulations.
c. Water generated from the flushing of lines after hydrostatic testing shall be land applied in accordance with all Federal, State, and local laws and regulations for land application.
3.6 RECYCLING AND WASTE MINIMIZATION
The Contractor shall participate in State and local government sponsored recycling programs. The Contractor is further encouraged to minimize solid waste generation throughout the duration of the project.
3.7 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
The contractor shall maintain an inventory of non-hazardous solid waste diversion and disposal of construction and demolition debris. The
Contractor shall submit a report to the Facility through the Contracting
Officer on the first working day after each fiscal year quarter, starting the first quarter that non-hazardous solid waste has been generated.
Include the following in the report:
a. Construction and Demolition (C&D) Debris Disposed in Cubic Yards (CY) or Tons (TN), as appropriate.
b. Construction and Demolition (C&D) Debris Recycled in Cubic Yards (CY) or Tons (TN), as appropriate.
c. Total (C&D) Debris Generated in Cubic Yards (CY) or Tons (TN), as appropriate.
d. Waste sent to Waste-To-Energy Incineration Plant (This amount should not be included in the recycled amount) in Cubic Yards (CY) or Tons (TN), as appropriate.
3.8 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
Known existing historical, archaeological, and cultural resources within the Contractor's work area are shown on the drawings. The Contractor shall protect these resources and be responsible for their preservation during the life of the Contract. If during excavation or other construction activities any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, all activities that may damage or alter such resources will be temporarily suspended. Resources covered by this paragraph include but are not limited to: any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, paving's, wall, or other constructed features; and any indication of agricultural or other human activities. Upon such discovery or find, immediately notify the
SECTION 01 57 20.00 10 Page 13
Contracting Officer so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. The Contractor shall cease all activities that may result in impact to or the destruction of these resources and shall secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources.
3.9 BIOLOGICAL RESOURCES
The Contractor shall minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat. The protection of threatened and endangered animal and plant species, including their habitat, in accordance with Federal, State, Regional, and local laws and
3.10 TRAINING OF CONTRACTOR PERSONNEL
Contractor's personnel shall be trained in all phases of environmental protection and pollution control by means of conducting environmental protection/pollution control meetings prior to commencing construction activities. Additional meetings shall be conducted for new personnel and when site conditions change. The training and meeting agenda shall include:
methods of detecting and avoiding pollution; familiarization with statutory and contractual pollution standards, familiarization and care of monitoring devices, vegetative covers in order to ensure adequate and continuous environmental/pollution control. Additionally, the meeting topics shall include information on anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants, recognition and protection of archeological sites, artifacts, wetlands and endangered species and their habitat that are known to be in the area.
3.11 POST CONSTRUCTION CLEANUP
The Contractor shall clean up all areas used for construction in accordance with Contract Clause: "Cleaning Up". The Contractor shall unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work. The disturbed area must be graded, filled and the entire area seeded unless otherwise indicated.
-- End of Section --