Re-Bid Pump Station 182 Redundant Power

Closed State & local contract opportunity Posted

Solicitation number
IFB-043-26-RM
State
Florida
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 23

Opportunity details come from talgov.bonfirehub.com. Updated .

About this opportunity

The City of Tallahassee, Florida, is soliciting sealed bids (IFB 043-26-RM) for the Re-Bid Pump Station 182 Redundant Power Project, a construction initiative to establish a redundant underground electrical power supply from the City of Tallahassee Electric Department's distribution system to Pump Station 182 located in Leon County. The project scope includes supply and installation of two 4-inch HDPE DR11 electrical conduits via horizontal directional drilling from an existing termination cabinet on Engineering Way to Pump Station 182, installation of termination cabinets along the conduit route (supplied by the City), coordination with the Electric Utility for pad-mounted transformer and primary conductor installation, and supply and installation of a 2000-amp Main Breaker and Automatic Transfer Switch (ATS) with associated secondary conduit and cable work. The contractor must be prequalified by the City of Tallahassee in both the Roads and Streets category and the Underground Utilities and Excavation category and must demonstrate technical competency in electrical infrastructure, horizontal directional drilling, and utility coordination. Key deliverables include as-built record drawings prepared by a licensed Florida professional surveyor, ground resistance testing (maximum 10 ohms via fall of potential method), equipment commissioning, startup assistance, and one-year warranty coverage. A mandatory pre-bid meeting is scheduled for March 2, 2026, at 2:00 PM EST via Microsoft Teams with required attendance for all prime bidders; sealed bids must be submitted through the Bonfire platform by March 24, 2026, at 2:30 PM EST, with public virtual bid opening on the same date. Award is anticipated in July 2026 with City Commission approval in August 2026, and the contract term is 180 calendar days from the Notice to Proceed with liquidated damages of $1,685.00 per calendar day for delays beyond contract time.

No local vendor preference applies to this project due to its FEMA Hazard Mitigation Grant Program (HMGP) funding through the Florida Division of Emergency Management; however, small businesses, minority-owned businesses, women's business enterprises, veteran-owned businesses, and labor surplus area firms are encouraged to participate and shall be considered for contract and subcontract awards. Bidders are required to submit a bid bond equal to five percent of the base bid and a performance bond equal to 100 percent of the contract price, along with mandatory certifications including a Non-Collusion Affidavit, Human Trafficking Affidavit, Responsible Vendor Review Form, Conflict of Interest disclosure, Debarment Certification, and IFB Representations and Certifications. Commercial General Liability Insurance of $3,000,000, Business Automobile Liability Insurance of $1,000,000, and Workers' Compensation Insurance as required by Florida Statutes must be maintained. The project is subject to federal procurement standards under 2 C.F.R. Section 200, including Davis-Bacon Act prevailing wage requirements, Contract Work Hours and Safety Standards Act, Clean Air Act compliance, and FEMA debarment certification standards. The project documents do not identify an incumbent contractor or specific award value; however, the 13-line-item bid schedule addresses mobilization, erosion and sedimentation control, permitting fees, conduit and termination cabinet installation, transformer connection work, main breaker installation, ATS installation, wiring connections, and start-up and testing with measurement and payment structures varying by item type.

Opportunity text

The work associated with the construction of the Pump Station 182 Redundant Power Project includes the carrying out of all duties and obligations and the furnishing of all labor, material, tools, equipment, and other incidentals necessary or convenient to the successful completion of the project. This project generally consists of the construction of a redundant underground power supply from the Utility's (City of Tallahassee Electric Department) distribution system to Pump Station 182. Portions of the work will be performed by COT Electric, and portions of the work shall be performed by the Contractor. The Scope of Supply/Division of Responsibility is defined by a document attached to the Electrical Specifications (Appendix D). Pump Station 182 Scope of Work The Contractor's scope of work at Pump Station 182 includes supply and installation of two 4-inch electrical conduits via horizontal directional drilling from an existing termination cabinet on Engineering Way to an existing termination cabinet at the Pump Station 182 site. Additional termination cabinets (supplied by COT Electric) are to be installed by the Contractor along the conduit route. The Contractor's scope also includes coordination with the Electric Utility (City of Tallahassee Electric Department) for the installation of a pad mounted transformer and installation of the primary conductors. The transformer pad and the primary conduits on the Pump Station 182 site shall have been installed by Others. The Contractor's scope of work shall also include the supply and installation of the Main Breaker (2000 amps) and the Automatic Transfer switch (ATS - Redundant Power or Main-to-Main) as coordinated with the overall PS #182 Project. The installation shall include conduit and cable from the secondary of one transformer to the new Main Breaker and from the new Main Breaker to the new ATS (one side of the Main-to-Main ATS - aka Service -to- Service ATS). The work shall also include rework of the existing Main Breaker's outgoing feeder to the new Main-to-Main ATS and the installation of the conduit and cable for the "Load" connection of the new ATS to the Normal Power connection of the existing ATS (Utility-to- Generator ATS - the generator connection will have been made by Others). The Contractor's scope of work includes electrical work that will take place on the PS #182 site, and this work shall be coordinated with the Overhead (O/H) and Underground (U/G) Distribution work performed by the Contractor, the Utility, and Others. The O/H Distribution work shall include the connection/riser to O/H power lines and a connection to a pad mounted transformer. The U/G distribution work shall include the 15KV circuit routed to the PS #182 Site and connected to a pad mounted transformer (see Scope of Supply/Division of Responsibility document). MANDATORY PRE-BID MEETING MARCH 2, 2026@ 2:00PM Microsoft Teams meeting Join: https://teams.microsoft.com/meet/24281848567952?p=bxpbE6QPgKB3TY0Hjv Meeting ID: 242 818 485 679 52 Passcode: GK2kz6fh ________________________________________ Need help? | System reference Dial in by phone +1 850-792-4991,,415546231# United States, Tallahassee Find a local number Phone conference ID: 415 546 231# Join on a video conferencing device Tenant key: talgov@m.webex.com Video ID: 117 283 030 3 More info For organizers: Meeting options | Reset dial-in PIN ________________________________________________________________________________

Files

File Type Posted
16-APPENDIX A - COT Environmental Management General Permit (TEM220057).pdf PDF
10-10. REQUIRED Vendor Conflict of Interest.docx DOCX document
25-15. IFB 043-26-RM SUPPLEMENTAL INFORMATION.docx DOCX document
6-6. IFB 043-26-RM SPECIAL PROVISIONS Pump Station 182 Redundant Power SPECIAL PROVISIONS.docx DOCX document
33-APPENDIX H - COT Transformer Specifications.pdf PDF
28-APPENDIX C - Pump Station182 Redundant Power - FDOT Approved Utility Permit Package.pdf PDF
23-APPENDIX H - COT Transformer Specifications.pdf PDF
9-9. REQUIRED Responsible Vendor Review Form.docx DOCX document
13-13. DRAFT CONTRACT CONSTRUCTION (from IFB) 1.2024.doc DOC document
21-APPENDIX F - COT Specifications for Installation of Conduits and Electrical Equipment for Power Delivery.pdf PDF
31-APPENDIX F - COT Specifications for Installation of Conduits and Electrical Equipment for Power Delivery.pdf PDF
32-APPENDIX G - Pump Station 182 Redundant Power - Survey SS.pdf PDF
7-7. IFB 043-26-RM PS-12-182 PLANS Redundant Power - Final Plans SS.pdf PDF
1-2. REQUIRED Performance and Bid Bond Trench Safety Act Form.docx DOCX document
3-3.REQUIRED BID SCHEDULE IFB 043-26-RM Pump Station 182 Redundant Power BID SCHEDULE.xlsx XLSX spreadsheet
2-1. REQUIRED IFB 043-26-RM section 123 Pump Station 182 Redundant Power.docx DOCX document
30-APPENDIX E - COT Gas and Electric General Construction Specifications.pdf PDF
4-4. REQUIRED DEBARMENT CERTIFICATION Attachment H - HMGP GRANT 4399-081-A.pdf PDF
24-APPENDIX I - WEG TRANSFORMER DATA SHEETS.pdf PDF
26-APPENDIX A - COT Environmental Management General Permit (TEM220057).pdf PDF
12-12. REQUIRED IFB Representations Certifications.docx DOCX document
27-APPENDIX B - Pump Station 182 Redundant Power - COT Right of Way Permit.pdf PDF
29-APPENDIX D - Pump Station 182 Redundant Power Electrical Specifications.pdf PDF
8-8. IFB 043-26-RM GENERAL PROVISIONS Pump Station 182 Redundant Power .pdf PDF
5-5. IFB 043-26-RM SUPPLEMENTAL SPECIFICATIONS .pdf PDF
15-15. IFB 043-26-RM SUPPLEMENTAL INFORMATION.docx DOCX document
22-APPENDIX G - Pump Station 182 Redundant Power - Survey SS.pdf PDF
19-APPENDIX D - Pump Station 182 Redundant Power Electrical Specifications.pdf PDF
14-14. REQUIRED HUMAN TRAFFICKING AFFIDAVIT.pdf PDF
18-APPENDIX C - Pump Station182 Redundant Power - FDOT Approved Utility Permit Package.pdf PDF
17-APPENDIX B - Pump Station 182 Redundant Power - COT Right of Way Permit.pdf PDF
20-APPENDIX E - COT Gas and Electric General Construction Specifications.pdf PDF
34-APPENDIX I - WEG TRANSFORMER DATA SHEETS.pdf PDF
11-11. REQUIRED Non Collusion Affidavit of Respondent.docx DOCX document
Show all 34