17-APPENDIX B - Pump Station 182 Redundant Power - COT Right of Way Permit.pdf
PDF 111 KB Posted
- Attached to
- Re-Bid Pump Station 182 Redundant Power
- Solicitation number
- IFB-043-26-RM
- Issued by
- Leon County, Florida
About this file
Pump Station 182 Redundant Power - City of Tallahassee Right of Way Permit
This is a Right of Way Permit issued by the City of Tallahassee, Florida for construction work associated with the Pump Station 182 Redundant Power Project. Permit number ROW2022-155 was issued on October 26, 2022, with a construction start date of November 2, 2022, and an expiration date of twelve months from the issue date. The project involves directional drilling under Pottsdamer Street to install electrical conduit that will provide redundant power to Pump Station 182, located south of Orange Avenue. The applicant is Matthew Cashin, with contact information provided for coordination with City staff including Inspector Tyler Harrison and Traffic Mobility Management contact Ed Gomez. The contractor's primary responsibilities include supply and installation of two 4-inch electrical conduits via horizontal directional drilling from an existing termination cabinet on Engineering Way to Pump Station 182, installation of termination cabinets, coordination with the City of Tallahassee Electric Department for transformer pad and primary conductor installation, and supply and installation of a 2000-amp Main Breaker and Automatic Transfer Switch system.
The permit establishes specific requirements for construction execution, including restoration of all damaged right of way within 48 hours of disturbance, implementation of erosion controls prior to and during construction, and maintenance of two-way traffic 24 hours daily unless otherwise approved by Traffic Engineering. The contractor must comply with current FDOT Design Standards and specifications, call 1-800-432-4770 before digging for underground utility locations, and request final inspection within 72 hours of project completion. All backfill of excavated areas must be compacted to 100 percent maximum density per AASHTO T-99 standards with test reports submitted to the City inspector. The contractor assumes full liability for any construction work and any damages to private property or public utilities, with all work warranted against defects for two years from the date of final acceptance. A Stormwater Pollution Prevention Plan is required if not included in the approved plans, with the contractor assuming full responsibility for on-site containment of potentially illicit and sedimentation discharges.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Permit to Work in the Right of Way
Permit Number: ROW2022-155
This permit expires within 12 months of the "Issue Date"
Inspector:
Project Name:
Application Date
Issue Date
Construction Start Date
Final Inspection Date
01/02/2023
10/26/2022
11/02/2022 Pump Station 182 Redundant Power
Tyler Harrison
Matthew CashinApplicant
2619 Centennial BoulevardAddress Address
Contact Name
Contact Number
Location and Project Description
Inspection Categories
General
Restore all damaged ROW within 48 hours of disturbance.
Erosion controls shall be in place prior and during all construction.
Maintenance of Traffic Plan shall be in place prior and during all construction.
File MOT Plan with Traffic Mobility Management, Ed Gomez (850)891.8265
The contractor shall be responsible for the location and depth verification of utility service laterals.
Telephone/Cable Specific
Place all conduit and/or cable in the appropriate corridor.
Bore under all tree protection zone/dip lines.
Bore all streets, driveways and sidewalks.
Project Specific
All construction shall be in accordance with the most current FDOT Design Standards.
891.8476 for an inspection prior to pouring sidewalk, curb and gutter and driveway also within 48 hours of completeion. All driveways shall be 6" thick to the right of way line or 20' from the roadway, whichever is greater. Remove curb completely and install driveway per FDOT standard plan 522-003.
Any cuts in the asphalt shall be patched in accordance with the FDOT and City standards.
All work shall be completed in accordance with the latest FDOT, Standard Plans and Specifications
Cable:
Electric:
Telephone:
Cut: Bore: Overhead:
Gas:
Sewer:
Water:
¨¨ þ
¨ þ ¨
Curb:
Sidewalk:
Asphalt:
Drainage:
Driveway:
Cut: Construction: Connection:
Contact Name
Contact Number 8507594425
Contractor Name
This project includes directional drilling under Pottsdamer Street for electrical conduit that will provide redundant power to
Pump Station 182 located just south of Orange Avenue.
GENERAL TERMS AND CONDITIONS
For Construction within the City of Tallahassee Public Right-of-Way
It is the responsibility of the applicant to repair any and all damages to private property and public utilities, including roadway and drainage facilities. Should damage occur, it shall be reported immediately and repaired by the permittee within
48 hours of incident. If the damage is threatening to the facility, adjacent property, or the public, the City will require immediate repair. The City will approve all repair methods and inspect the completed repairs. Should applicant fail to comply with these terms and conditions, the permit will be revoked and all work shall cease. The permit will not be reinstated until such time as repairs are completed. The general terms and conditions contained herein and individual
Terms and Conditions may be adjusted to site specific items at time of approval by the City of Tallahassee Public Works
Operation Division, Required Notifications:
" CALL BEFORE DIGGING FOR UNDERGROUND UTILITY LOCATIONS, CALL 1-800-432-4770
General Requirements
1. Do not damage any tree roots or remove any trees.
2. Replace all damaged landscape items and re-sod all disturbed areas (with like sod).
3. Do not alter, block or disturb any drainage facilities, that are not on the approved plans.
4. Do not cut any sidewalks, driveways or roadway that is not on the approved plans.
5. Should roadway cut be approved, roadbed replacement must meet COT Standards.
6. All backfill of excavated areas behind the curb but within the R /W shall be compacted to 100% of maximum density as determined by AASHTO T-99. Copies of all test reports are required to be submitted to the City inspector.
7. Two-way traffic must be maintained 24 hours a day, unless approved by Traffic Engineering. A "Maintenance of Traffic" plan must be approved by the Traffic Engineering Department if construction projects have a duration of eight hours or more .
The MOT plan must be attached to the application and becomes a part of the permit.
8. Liability for any construction work done in anticipation of a City of Tallahassee construction project performed previous to or during a City of Tallahassee construction project is the sole responsibility of permittee. The City of Tallahassee will be held harmless for any damage incurred before, during or after the completion of the project.
9. Do not interrupt any utility service without coordinating the proposed interruption, with the affected utility.
10. Applicant shall request appointment for Final Inspection within 72 hours of project completion.”
11. All Work shall be warranted by the Contractor against defects resulting from the use of inferior materials, equipment, or workmanship for two (2) years from the date of Final Acceptance.
12. Permittee agree agrees work with in the City's easements or r /w shall be guaranteed for two years from date of acceptance from the City.
13. SWPPP plan approval an requirements? If the plans have no erosion control plans, then contractor shall submit one for approval. This plan is for a recommendation only! Contractor shall be fully responsible for providing containment on site of all potentially illicit and sedimentation discharges.