9-9. REQUIRED Responsible Vendor Review Form.docx

DOCX document 45 KB Posted

Attached to
Re-Bid Pump Station 182 Redundant Power
Solicitation number
IFB-043-26-RM
Issued by
Leon County, Florida

About this file

This is a Responsible Vendor Review Form required by the City of Tallahassee for the Re-Bid Pump Station 182 Redundant Power project in Florida. The form serves as a qualification assessment tool to ensure only responsible vendors capable of fully performing contract requirements are selected. The project involves the construction of a redundant underground power supply from the City of Tallahassee Electric Department's distribution system to Pump Station 182, including the supply and installation of two 4-inch electrical conduits via horizontal directional drilling, termination cabinets, a pad-mounted transformer, a 2000-amp Main Breaker, and an Automatic Transfer Switch for redundant power. The contractor's scope encompasses coordination with the Electric Utility for primary conductor installation and cable work from transformer secondary connections to the new Main Breaker and Automatic Transfer Switch. The City of Tallahassee will evaluate vendor responsibility based on information provided in the form, solicitation response, and independent research including System for Award Management (SAM) verification.

The form requires vendors to disclose any issues within the past ten years related to business or professional permits, licenses, certifications, government contract suspensions or debarments, formal monitoring agreements, indictments, government contract terminations, convictions related to contracting, governmental investigations, or civil fraud judgments. Vendors must also confirm they possess the necessary organization, experience, accounting and operational controls, and professional and technical skills to meet contract obligations considering all existing commitments. Additionally, vendors must indicate whether they hold active State Term Contracts (STC) or General Administrative Services (GSA) contracts similar to the solicitation scope. Affirmative answers to disqualifying questions require detailed explanations and supporting documentation; however, answering "Yes" does not automatically disqualify a vendor. Vendors must provide immediate written notice to the Procurement Officer if any submitted information becomes erroneous prior to contract execution.

View the file

Other files

File Type Posted
32-APPENDIX G - Pump Station 182 Redundant Power - Survey SS.pdf PDF
31-APPENDIX F - COT Specifications for Installation of Conduits and Electrical Equipment for Power Delivery.pdf PDF
4-4. REQUIRED DEBARMENT CERTIFICATION Attachment H - HMGP GRANT 4399-081-A.pdf PDF
8-8. IFB 043-26-RM GENERAL PROVISIONS Pump Station 182 Redundant Power .pdf PDF
17-APPENDIX B - Pump Station 182 Redundant Power - COT Right of Way Permit.pdf PDF
19-APPENDIX D - Pump Station 182 Redundant Power Electrical Specifications.pdf PDF
18-APPENDIX C - Pump Station182 Redundant Power - FDOT Approved Utility Permit Package.pdf PDF
5-5. IFB 043-26-RM SUPPLEMENTAL SPECIFICATIONS .pdf PDF
14-14. REQUIRED HUMAN TRAFFICKING AFFIDAVIT.pdf PDF
33-APPENDIX H - COT Transformer Specifications.pdf PDF
6-6. IFB 043-26-RM SPECIAL PROVISIONS Pump Station 182 Redundant Power SPECIAL PROVISIONS.docx DOCX document
16-APPENDIX A - COT Environmental Management General Permit (TEM220057).pdf PDF
11-11. REQUIRED Non Collusion Affidavit of Respondent.docx DOCX document
20-APPENDIX E - COT Gas and Electric General Construction Specifications.pdf PDF
21-APPENDIX F - COT Specifications for Installation of Conduits and Electrical Equipment for Power Delivery.pdf PDF
7-7. IFB 043-26-RM PS-12-182 PLANS Redundant Power - Final Plans SS.pdf PDF
23-APPENDIX H - COT Transformer Specifications.pdf PDF
13-13. DRAFT CONTRACT CONSTRUCTION (from IFB) 1.2024.doc DOC document
25-15. IFB 043-26-RM SUPPLEMENTAL INFORMATION.docx DOCX document
34-APPENDIX I - WEG TRANSFORMER DATA SHEETS.pdf PDF
22-APPENDIX G - Pump Station 182 Redundant Power - Survey SS.pdf PDF
15-15. IFB 043-26-RM SUPPLEMENTAL INFORMATION.docx DOCX document
28-APPENDIX C - Pump Station182 Redundant Power - FDOT Approved Utility Permit Package.pdf PDF
10-10. REQUIRED Vendor Conflict of Interest.docx DOCX document
27-APPENDIX B - Pump Station 182 Redundant Power - COT Right of Way Permit.pdf PDF
29-APPENDIX D - Pump Station 182 Redundant Power Electrical Specifications.pdf PDF
24-APPENDIX I - WEG TRANSFORMER DATA SHEETS.pdf PDF
3-3.REQUIRED BID SCHEDULE IFB 043-26-RM Pump Station 182 Redundant Power BID SCHEDULE.xlsx XLSX spreadsheet
1-2. REQUIRED Performance and Bid Bond Trench Safety Act Form.docx DOCX document
26-APPENDIX A - COT Environmental Management General Permit (TEM220057).pdf PDF
12-12. REQUIRED IFB Representations Certifications.docx DOCX document
2-1. REQUIRED IFB 043-26-RM section 123 Pump Station 182 Redundant Power.docx DOCX document
30-APPENDIX E - COT Gas and Electric General Construction Specifications.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A contract can only be awarded to a “responsible vendor”. A responsible vendor has the capability in all respects to fully perform the contract requirements and the integrity and reliability that will assure good faith performance.

To assist in making this determination, Vendors responding to this Solicitation are required to fully and accurately answer each of the questions below. For each “Yes” answer to questions 1.1 through 1.8, Vendor must provide a detailed explanation and attach copies of any relevant document cited in the explanation. Answering “Yes” to questions 1.1 through 1.8 will not necessarily disqualify a Vendor from participating in this Solicitation. However, failure to provide additional information as requested by the City of Tallahassee may disqualify a Vendor.

The City of Tallahassee (COT) will base its determination of a Vendor’s responsibility on: (a) information provided by Vendor in response to this form; (b) information provided elsewhere in a Vendor’s response to the Solicitation (including financial information) and (c) information obtained from independent research (including information COT obtains from the internet or third parties, including System for Award Management (SAM)).

Vendors shall provide immediate written notice to COT if any time prior to contract execution, a Vendor learns that the information provided in connection with this form was erroneous when submitted or has become erroneous for reason of changed circumstances. Vendor must contact the Procurement Officer with any questions regarding this form.

1.0 Within the last ten (10) years, in the State of Florida or any State or Federal jurisdiction has the Vendor or any of its officers, directors or owner:

1.1
Been, subject to a revocation, suspension, disbarment, administrative complaint, sanction, fine, adverse action, or disciplinary action relating to any business or professional permit, certification, and/or license?
· Yes

· No

1.2
Been suspended, debarred, or disqualified from any government contracting process or agreed to voluntary exclusion from any government procurement process?
· Yes

· No

1.3
Been subject to formal monitoring agreement or corrective action plan as part of a contract with a government entity?
· Yes

· No

1.4
Been subject to an indictment, administrative proceeding, civil action or judgment in connection with any government contract?
· Yes

· No

1.5
Had a government contract terminated for cause?
· Yes

· No

Responsible Vendor Review Form

1.6
Been convicted of a crime related to governmental or nongovernmental contracting?
· Yes

· No

1.7
Been subject to governmental investigation relating to alleged violation of any statutory regulatory violation?
· Yes

· No

1.8
Had a judgement entered in a civil lawsuit based on an allegation of fraud?
· Yes

· No

2.0
Does the vendor have the necessary organization, experience, accounting and operational controls, and professional and technical skills to meet its obligations under the proposed contract with COT, taking into consideration all existing commercial and governmental business commitments?
· Yes

· No

3.0
General Information

Do you have an active State Term Contract (STC) or General Administrative Services (GSA) Contract similar to the scope of services for this solicitation. If yes, provide an attachment with links to the contract(s)

· STC

· GSA

· Not Applicable

By my signature below, I certify that I am an authorized representative of the Vendor named below and that all of the information provided above is true and complete to the best of my knowledge.

Name and Title Vendor Name

Signature Date

File details come from the government source that posted it. Updated .